VM120 Field Install - Alt 3-19-21
VM120 Field Install - Alt 3-19-21
(THIS INFORMATION IS STANDARD DATA FROM VENDOR'S CATALOGS) CHEMICAL ADHESIVE ANCHOR SCOPE OF WORK
MANUFACTURER LIST
CHEMICAL ADHESIVE BOLT - GENERIC SCHEDULE
INSTALLATION NOTES
NOTES: THE CHEMICAL ADHESIVE ANCHOR THIS "GENERIC ANCHOR SCHEDULE" IS FOR REFERENCE ONLY. ALL INFORMATION PROVIDED HEREIN
SYSTEM CONSISTS OF:
SHALL BE REVIEWED, APPROVED AND UPDATED AS NEEDED BY THE PROJECT EXECUTION TEAM
TO SUIT THE PROJECT SPECIFIC REQUIREMENTS FOR CONSTRUCTION.
MECHANICAL CONTRACTOR SHALL REFER TO THE "PROJECT SPECIFIC ANCHOR SCHEDULE"
ANCHOR BOLT INSTALLATION DETAIL
CAST-IN-PLACE ANCHOR BOLT - GENERIC SCHEDULE
THIS "GENERIC" ANCHOR SCHEDULE IS FOR REFERENCE ONLY. ALL INFORMATION PROVIDED HEREIN SHALL BE
REVIEWED, APPROVED AND UPDATED AS NEEDED BY THE PROJECT EXECUTION TEAM
TO SUIT THE PROJECT SPECIFIC REQUIREMENTS FOR CONSTRUCTION.
MECHANICAL CONTRACTOR SHALL REFER TO THE "PROJECT SPECIFIC" CAST-IN-PLACE ANCHOR BOLT SCHEDULE