TO POWER SOURCE(BY OTHERS)

STP MCP = 150AT 3POLE 400VAC 250AF

1 2 3 4 5 6 7 8 9 10 11 12 13

75AT 75AT 30AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 60AT
3P 3P 3P 3P 3P 3P 3P 3P 3P 30 3P 2P 3P

Y/D Y/D M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13

AC-1 AC-2 AC-3 AC-4 AC-5 AC-6 AC-7 AC-8 AC-9 AC-10 AC-11 AC-12 AC-13
N. BUS

G. BUS

X1 X1 X3 X3 X3 X3 X3 X3 X3 X3 X3 X4 X2

M M M M M M M M M M M M M
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
SBR BLOWER 1 SBR BLOWER 2 DIGESTER WAS PUMP 1 WAS PUMP 2 INF. PUMP 1 INF. PUMP2 EFF. PUMP1 EFF. PUMP2 SPARE 1 (FUTURE) SPARE 2 (FUTURE) MET.PUMP LPP
15KW, 28A 15KW, 28A 5.5KW, 13.5A 0.4KW, 1.2A 0.4KW, 1.2A 3.7KW, 8.2A 3.7KW, 8.2A 3.7KW, 8.2A 3.7KW, 8.2A 3.7KW, 8.2A 3.7KW, 13.5A 0.045KW, 0.36A

SINGLE LINE DIAGRAM

A9 A10 A11 A14

STP - MCP SCHEDULE OF LOADS MAIN CIRCUIT BREAKER: 150AT 3POLE 400VAC 250AF 29200

28400
FLC CIRCUIT BREAKER AD
START WIRE 17800 2500 7500
CKT. SIZE
DESCRIPTION HP kW V IA IB IC IA-N I B-N I C-N UP PHASE AT AF NOP
NO.
1 SBR BLOWER 1 20 15 400 28 28 28 Y/D 3 75 100 3 X1
2 SBR BLOWER 2 20 15 400 28 28 28 Y/D 3 75 100 3 X1

2400
3 DIGESTER 7.5 5.5 400 13.5 13.5 13.5 DOL 3 30 32 3 X3 ASD
WP-1 INF-1
4 WAS. PUMP 1 0.5 0.4 400 1.2 1.2 1.2 DOL 3 20 32 3 X3 LS-1 INF-2

5200
5 WAS. PUMP 2 0.5 0.4 400 1.2 1.2 1.2 DOL 3 20 32 3 X3 SBR 1 3000
LS-3
6 INFLUENT PUMP 1 5 3.7 400 8.2 8.2 8.2 DOL 3 20 32 3 X3
MCP
7 INFLUENT PUMP 2 5 3.7 400 8.2 8.2 8.2 DOL 3 20 32 3 X3

2750
8 EFFLUENT PUMP 1 5 3.7 400 8.2 8.2 8.2 DOL 3 20 32 3 X3 DRIVEWAY

11500

10700
UP TO
BLW-3 CTRL. RM.
9 EFFLUENT PUMP 2 5 3.7 400 8.2 8.2 8.2 DOL 3 20 32 3 X3
BLW-1
10 SPARE 1 (FUTURE) 5 3.7 400 8.2 8.2 8.2 DOL 3 20 32 3 X3 BLW-2

8000
1300

1200
UP TO
11 SPARE 2 (FUTURE) 5 3.7 400 8.2 8.2 8.2 DOL 3 20 32 3 X3 STP
WP-2
12

5200
METERING 0.045 230 0.36 DOL 1 20 32 2 X4 SBR 2 LS-2 1600
13 LPP 9 9 9 3 60 63 3 X2

2800

2800
LS-4

1800
O/G
TOTAL 58.545 121.1 121.1 121.1 9.36 9 9 EFF-1
EFF-2

COMPUTATION OF LOADS : 2000

I MCB = 0.25(28)+121+1.732(9.36)
I MCB = 144.3A
MAIN CIRCUIT BREAKER AE

1 STP POWER PLAN


E-1 SCALE 1:200 M.
WIRE & CONDUIT SCHEDULE
COLOR (CONDUIT in Ø)
C12 C13
CODE DESCRIPTION
O/G
EFF-1

BLW-1 EFF-2

BLW-2 WP-1

BLW-3 WP-2
MCP
INF-1 SBR

INF-2 LS
ASD

AS-BUILT
PROJECT: OWNER: REV. No. DATE REMARKS DESIGN : MCB SHEET CONTENT : SHEET No.

ECO-SYSTEM - - - GENERAL NOTES

TECHNOLOGIES, INC.
ALFREDO A. RIVERA
PROF. ELECTRICAL ENGINEER SM RETAIL CORPORATE OFFICE
CAD :

CHECK BY :
DBC

GTT/TLV
SINGLE LINE DIAGRAM
STP-MCP SCHEDULE OF LOADS E
PROPOSED SEWAGE-SBR TREATMENT PLANT SM PRIME HOLDINGS, INC. COMPUTATION OF LOADS
SKH Mansion Bldg. #3 V.Victorio St., Brgy. Pleasant Hills,
P.T.R. No. : 1375802 REG. No. : 3049 APPROVED BY : RYS WIRE & CONDUIT SCHEDULE
Mandaluyong City
Tel. no.: 650-001 to 06 ISSUED AT:
ISSUED ON:
SAN PEDRO, LAGUNA
01-11-2021
T.I.N. : 107-715-667
LOCATION: Jose Diokno Boulevard, Pasay City 1308 Metro Manila DATE DRAWN : 04-27-2020
STP POWER PLAN
LEGEND & ABBREVIATION