EW 1145 Loading Arm Heaving Rope UTF Ongoing study Coordinate with MTCE-Planning for documentation. - N N
Provision of Mono Rail with Chain Pulley Block of SWL 5 Ton Load at Rear Side of
EW 2039 ISBL Ongoing study For documentation. Sketch available. Coordinate with MTCE-CWS / Ops-ISBL. Saved in Handover Files N N
E-0412/A/B/C/D
EW 2099 Provision of Shelter for Anti Surge Valves (FV6590, FV6596, FV6598, FV5096, FV5098) ISBL For implementation For implementation Saved in Handover Files / Turnover to Execution Y N
Study Report on hold with Tech Comm. See comments from Ms. Mina. Wind speed meter has
EW 2303 Wind Speed Meter UTF Study done for approval Saved in Handover Files / Turnover to Execution Y N
PO. Other materials and services need budget.
EW 3170 Modification of KM-1106 Mounting Polymer Wide Ongoing study Coordinate with MTCE-Execution for documentation. - N N
EW 3195 Provision of Temporary Hazardous Waste Staging Area for ISBL and OSBL NCP Wide Study done for approval For Tech Comm approval. Confirm if EW 3800 will be absorbed in the scope. Saved in Handover Files Y Y
EW 3324 Installation and Modification of Backwash Line Support of Y-311K/LM OSBL Study done for approval For Tech Comm approval. Pending latest vibration data. Coordinate with Ms. Regine Cueto. Saved in Handover Files Y Y
EW 3432 Provision of PP PCS 2 Blower Suction Covers/Head PPx Study done for approval Study for approval Saved in Handover Files Y N
MF for Sir Paul's approval. Justification has been provided. Sir Jayson Perez requested to use
EW 3436 Supply and Installation of Roller and Lifeline in Aromatics Gantry Magellan Modform done for approval same lifeline as FG warehouses instead. Check with MF controller on the way forward if this Saved in Handover Files Y Y
option will proceed.
EW 3493 PP PCS VSD Panel Canopy PPx For implementation For implementation Saved in Handover Files / Turnover to Execution Y N
EW 3550 Rehabilitation of New and Old Packaging Workshop Maintenance Ongoing implementation Implemented by MTCE-PLP. For documentation. Saved in Handover Files / Turnover to Execution N N
EW 3567 Permanent Platform and Guardrail for New Fire Monitor and Hydrant UTF Ongoing study For revision of platform design. Coordinate with Area Custodian. Saved in Handover Files Y N
EW 3594 Permanent Access Platform for PP-Y-7016 and PP-Y-7017 Filters PP For implementation For implementation Saved in Handover Files / Turnover to Execution Y N
EW 3595 Permanent Access Platform for 8801F2 and 8839F2 Filters PP Ongoing study Assigned to J. Baldrias - N N
EW 3616 Roll Rack for PE3 Packaging Packaging Modform done for approval MF for approval. Coordinate with Area Custodian for budget to schedule the implementation. Saved in Handover Files N N
EW 3800 Convert Drums & Totes staging area from gravel surface to concrete pavement AEU Study done for approval Assigned to J. Baldrias - N N
EW 3958 PE-V-5814 Coupling Guard Stand Modification PE-2 Modform done for approval MF ongoing Saved in Handover Files Y N
EW 3223 Construction of Permanent Laboratory in ETS OSBL Study done for approval Check with Lead (I. Gayeta / R. Cabrera) Saved in Handover Files Y
REW NO.
EM 0499
EM 0500
EW 1145
EW 1302
EW 2039
EW 2099
EW 2303
EW 3125
EW 3170
EW 3177
EW 3195
EW 3201
EW 3233
EW 3324
EW 3340
EW 3385
EW 3393
EW 3432
EW 3436
EW 3459
EW 3488 - 3
EW 3488 - 4
EW 3488 - 5
EW 3493
EW 3538
EW 3550
EW 3557
EW 3567
EW 3568
EW 3572
EW 3594
EW 3595
EW 3616
EW 3617 - 1
EW 3637
EW 3740
EW 3800
EW 3839
EW 3849
EW 3860
EW 3920
EW 3958
REW TITLE
Provision of Mono Rail with Chain Pulley Block of SWL 5 Ton Load at Rear Side of
E-0412/A/B/C/D
Provision of Shelter for Anti Surge Valves (FV6590, FV6596, FV6598, FV5096, FV5098)
Provision of Temporary Hazardous Waste Staging Area for ISBL and OSBL
Rehabilitation of Public Road (Magellan Bridge to JGSPG Main Gate) and Installation of Solar
Street Lighting
Renovation of PMC and Admin Building (Provision of Sewage Treatment Plant (STP) for PMC
Building)
Renovation of PMC and Admin Building (Provision of Sewage Treatment Plant (STP) for OSBL
Building)
Permanent Platform and Guardrail for New Fire Monitor and Hydrant
Addendum: Additive Basket for Additive Hoist Station, PP Ext2 7th Floor
Convert Drums & Totes staging area from gravel surface to concrete pavement
PP For implementation
PP For implementation
PP Ongoing study
REMARKS
For implementation
For documentation
For implementation
Study Report on hold with Tech Comm. See comments from Ms. Mina. Wind speed meter has
PO. Other materials and services need budget.
Implemented
For Tech Comm approval. Confirm if EW 3800 will be absorbed in the scope.
For Tech Comm approval. Pending latest vibration data. Coordinate with Ms. Regine Cueto.
Implemented
Confirm with Admin if this will proceed. Initial cost estimate done by M. Enriquez.
HAZOP pending
MF for approval
For implementation
DR ongoing. Final recommendations are available. Update package then initiate DR.
For implementation
For implementation
Assigned to J. Baldrias
MF for approval. Coordinate with Area Custodian for budget to schedule the implementation.
MF on hold with Sir Paul. Check with Area Custodian for justification.
For implementation
Assigned to J. Baldrias
For implementation
MF ongoing
MF ongoing
FILES Visit? Email?
- N N
- N N
- Y Y
- N N
- N N
- N N
- N N
- N N
EM 0324
EM 0515
EM 0521
EM 0522
EW 1852
EW 2035
EW 2095
EW 2281
EW 2502
EW 2769
EW 2919
EW 2947
EW 2989
EW 3038
EW 3077
EW 3082
EW 3093
EW 3109
EW 3152
EW 3171
EW 3178
EW 3204
EW 3213
EW 3214
EW 3215
EW 3223
EW 3224
EW 3255
EW 3278
EW 3311
EW 3359
EW 3391
EW 3394
EW 3400
EW 3411
EW 3413
EW 3435
EW 3497
EW 3499
EW 3500
EW 3517
EW 3525
EW 3558
EW 3571
EW 3588
EW 3593
EW 3614
EW 3661
EW 3663
EW 3674
EW 3685 - 1
EW 3774
EW 3808
EW 3936
HAN
REW TITLE
Provision of Platform
Conversion of starting method from direct online (BLD) to soft-starter for the follow motors;
PE-KM-4003, PE-KM-4303, PE-YM-7001, PE-YM-7301 and PP-YM-7001
Installation of pipe support at Pellet Conveying System going to line E due to high vibration
PP Cancelled
Packaging No Budget
PP Ongoing implementation
Chemical
Modform done for approval
Warehouse
PP Ongoing study
Chemical
Study done for approval
Warehouse
Chemical
Study done for approval
Warehouse
REMARKS
Implemented
Handed over to Execution. Initial plan was to implement platforms in ISBL but no budget.
OSBL platforms to be budgeted by Ops.
Cancelled
For implementation
Implemented
Implemented
Implemented
Implemented
Implemented
Implemented
Implemented
MF for approval. Check status with Sir Pagsi. Followed up by Sir Alex Macaya.
Implemented
Implemented
EW 3129
EW 3075
REW TITLE
PE-1 No progress
OTES - DE
REMARKS
Implemented
-
FILES Visit? Email?
- N N
REW NO.
EM 0394
EW 1695
EW 2522
EW 2595
EW 2801
EW 2914
EW 3071
EW 3166
EW 3173
EW 3429
HA
REW TITLE
Provision of Switching Station downstream of PDS Pair B to allow the transport of resin to
either PP1A or PP1B
Packaging Ongoing DE
ISBL I-Implemented
PP Ongoing DE
ISBL No progress
REMARKS
Ongoing implementation
Implemented