SCHEDULE MAINTENANCE

HOTEL SANTIKA
2016
Pe Bulan Action Supervise
No Deskripsi rio Jan Feb Mar April Mei Juni July August Sept October Nov Des by by
de I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
I HVAC SYSTEMS
C AC DUCT 2M
- Cleaning Coil /Evaporator
- Check Ampere Motor
- Cleaning Filter/Replace
D AC Split 2M
Outdoor Unit/Condenser
- Cleaning Outdoor
- Check Ampere Motor
- Check Ampere Fan
- Check Pressure Suction
- Check Pressure Discharge
Indoor Unit/Evaporator
- Cleaning Indoor
- Check Fan/Blower
- Check Ampere

Pe Bulan Action Supervise


No Deskripsi rio Jan Feb Mar April Mei Juni July August Sept October Nov Des by by
de I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
G Heat Pump/Water Heater
- Cleaning Evap M
- Hot Water Pump M
- Hot Water Circulation Pump M

II VERTICAL TRANSPORTATION
1 Lift Passenger 1 M
2 Lift Passenger 2 M
3 Lift Passenger 3 M
4 Lift Passenger 4 M

III ELECTRONIC EQUIPMENT


1 PABX
- Battery W
- Rectifier W
- Line Phone W
- Operate Consule W
2 MATV M
3 Sound System M
4 CCTV M

IV FIRE SERVICE & ALARM


1 Fire Diesel Pump M
2 Fire Electric Pump M
3 Jockey Hydrant Pump M
4 Fire Accessories M
5 MCFA M
- Battery M
- Heat Detector 3M
- Smoke Detector 3M
6 Emergency Light 3M
7 Authorize Motor Valve 6M
8 Fire Extinguisher 6M
9 Hydrant System 6M
10 Sprinkler System 6M
11 Pressuration Fan (Stair Case) 6M

Pe Bulan Action Supervise


No Deskripsi rio Jan Feb Mar April Mei Juni July August Sept October Nov Des by by
de I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV

VI FB EQUIPMENT
B Storage
- Refrigerator M
- Ice Maker M
- Freezer M
- Chiller M
- Cold Room M
C Cooking
- Kualiring M
- Stove M
- Bain Merie M
- Rice Cooker M
- Heated Grill M
D Sanitation
- Kitchen Hood Duct M
- Dish Washing M
M
FBeverage
- Coffee Urn 3M
- Juice Dispancher 3M
- Carbonate Drink 3M
G Other Equipment
- Pipa LPG & Ansul 3M

Pe Bulan Action Supervise


No Deskripsi rio Jan Feb Mar April Mei Juni July August Sept October Nov Des by by
de I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
X VEHICLE
1 Car 1 W
2 Car 2 W
3 Motorcycle W

Pe Bulan Action Supervise


No Deskripsi rio Jan Feb Mar April Mei Juni July August Sept October Nov Des by by
de I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
XI INTERIOR SURFACE
1 Ceiling A
2 Wall 6M
XII PEST CONTROL M

XIII POWER PLAN / GENSET


1 Storage tank W
2 Daily tank D
3 Fuel pump D
4 Battery D
5 Deep Stick Oil D
6 Radiator D
8 Air Filter / Oil Filter / Fuel filter W

XIV PLUMBING and SEWAGE


1 Water and Reservoir
Deep Well 3M
PDAM 3M
Reservoir Volume
- Intermediate Tank 3M
- Ground Water Tank 1 3M
- Ground Water Tank 2 3M
- Roof Water Tank 1 3M
- Roof Water Tank 2 3M
2 Filtration / Back Wash
- Sand Filter D
- Carbon Filter D

Pe Bulan Action Supervise


No Deskripsi rio Jan Feb Mar April Mei Juni July August Sept October Nov Des by by
de I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
4 STP / IPAL
- Grease Trap D
- Drainase Kitchen W
- Rotor Dish M
- Sumpit Pump M
- Effluent Pump M
- Clorination M
5 Test Water to Laborate
- Row Water 3M
- Waste Water STP 3M

XV OTHER EQUIPMENT
M
- Room General Maintenace D