Professional Documents
Culture Documents
19 Elcb
19 Elcb
Project: DCS & HV Package For BPCL LPG Terminal, Haldia Checking Date: _____________________
Name of Contractor: ABB India Limited Due on:___________________________
Sl. ELCB No Machine Location ELCB Specification Neutral Body Inspection Condition Sig. Of Sig. of Remarks
No Sl. No Earthing Earthing No Ok / Not Electrician Safety
Rating Leakage Ok Officer
(Amp) Current
(mA)
Electrical Engineer (ABB) Engineer/Supervisor(ABB) Safety Officer(ABB) RCM /Site Head (ABB)