5TO MOLINO
172-X01780-144-46-DS-005 1
Revisión
COMPANIA MINERA DONA INES DE
GERENCIA DE PROYECTOS
COLLAHUASI
15
20 Nº of Pumps - 2 2
33 Seismic Conditions - See Site Conditions Document See Site Conditions Document
34 Power Supply:
35 Power/speed kW/rpm VTS / VTS 200 HP / 1382 RPM
36 Voltage
37 - Rated Terminal V 380 380
38 - Nominal System V 400 400
39 Frequency Hz 50 50
40 Phase - 3 3
41 Special Requirements:
Siemmens Siemmens
42 Motor Brand Approved US Motors US Motors
Baldor-Reliance Baldor-Reliance
Notes (1): In the case of Exceptions, they must be indicated and detailed in a separate document.
(2) m.s.c.: meters of slurry column.
(3) m.w.c.: meters of water column.
(4) 1 cSt = 1 x 10-6 m2/s
(5) Clockwise / Counterclockwise
(6) Water required only during starts and detentions.
COMPANIA MINERA DONA INES DE
GERENCIA DE PROYECTOS
COLLAHUASI
Notes (1): In the case of Exceptions, they must be indicated and detailed in a separate document.
(2) m.s.c.: meters of slurry column.
(3) m.w.c.: meters of water column.
(4) 1 cSt = 1 x 10-6 m2/s
(5) Clockwise / Counterclockwise
(6) Water required only during starts and detentions.
COMPANIA MINERA DONA INES DE
GERENCIA DE PROYECTOS
COLLAHUASI
I. ATTACHMENTS
* These sketches are only for reference and they don't reflect a specific model or design.
* Discharge Pump according to Bottom Angular up 45°.
* Case Rotation (direction of rotation is determined from the motor side of the pump)
COMPANIA MINERA DONA INES DE
GERENCIA DE PROYECTOS
COLLAHUASI