DETAILED ESTIMATE
PLATFORM CONSTRUCTION ( MAHARANA PRATAP STATUE)
AND BEAUTIFICATION WORK AT ROAD JUNCTION (TIRAHA) JIRAPUR DISTRICT RAJGARH.
UADD SOR
SN PARTICULARS NO LENGTH WIDTH DEPTH QTY RATES UNIT AMOUNT
STATUE BEAUTIFICATION
PORTION
612 SQM
PAVER BLOCK AREA AROUND
STATUE 71.01 43458.12
FOOTING
PCC 10x4 1 0.15 6
STEP 1 10x4 0.8 0.2 6.4
STEP 2 10x4 0.5 0.15 3
COLUMN 10x4 1.5 0.3 18
Platform footings
PCC 1X4 1 0.15 0.6
FOOTING STEP 1 4X4 0.8 0.2 2.56
FOOTING STEP 2 4X4 0.5 0.15 1.2
COLUMN 4X4 1.5 0.3 7.2
366 EACH
TOTAL 10 3660
SANITARY FITTINGS
(INCLUDING DI PIPES, VALVES,
SPRINKLER NOZZELS,WATER SEALS,
ETC.) LUMP SUM 2 50000 100000
FOUNTAIN STRUCTURES
ORNAMENTS, INSTALLATION
CHARGES, INCLUDING LABOUR
AND INSTRUMENTS, ETC. ( LUMP
SUM) 2 200000 400000
TOTAL 2040045.808
18% GST 367208.2454
GRAND TOTAL 2407254.053