You are on page 1of 10

PINTU Rencana Pagar PINTU

5 METER PINTU
5 METER
5 METER
Rencana Jembatan

36.8 m 19,2 m 24,6 m 23,9 m 9,20 m


61 m 53.5 m KETERANGAN

3
506.5,3 m - All unit in mm
- Concrete K-175 (Pondasi &Sloof)
- Concrete K-225 (Jembatan)
- Concrete K-275 (Retaining Wall)
- Lean Concrete K-125
- D6 (Pondasi & Sloof)
- D10 (Jembatan & Retaining Wall)

47 m
Rencana Pagar BRC

Rencana Pagar BRC


PINTU PINTU PINTU
1 METER 3 METER 1 METER
PINTU
1 METER
4m

PINTU
2,4 m
27,9 m 19,3 m 17,4 24,1 m
5+

5 METER 53.6 m 42.5

Owner

UPT. PEMATANG SIANTAR

Main Contractor

GAPEKSINDO JAYA BERSAMA

AS BUILT DRAWING

Lay Out Pagar Brastagi


PROJECT :

PEMBUATAN PENGAMAN SWITCHYARD GI

Skala : NTS
TERSEBAR UPT PEMATANG SIANTAR

JUDUL GAMBAR

Lay Out Pagar GI Berastagi

SKALA NTS

UK. KERTAS A3

NO. REVISI

NO. LEMBAR
1/10
1.2 m
KETERANGAN

- All unit in mm
MT : +0.00

- Concrete K-175 (Pondasi &Sloof)


- Concrete K-225 (Jembatan)
- Concrete K-275 (Retaining Wall)
- Lean Concrete K-125
- D6 (Pondasi & Sloof)
- D10 (Jembatan & Retaining Wall)
DETAIL 1

2.4 m 2.4 m

Tampak Depan Pagar


Skala : NTS
5 cm

Pagar BRC 6 mm
Owner
1.2 m

UPT. PEMATANG SIANTAR


1.5 m

Main Contractor

GAPEKSINDO JAYA BERSAMA

Tiang Pagar 2" AS BUILT DRAWING


25 cm

PROJECT :

2.4 m PEMBUATAN PENGAMAN SWITCHYARD GI


TERSEBAR UPT PEMATANG SIANTAR

Detail Pagar BRC JUDUL GAMBAR

- Tampak Depan Pagar


- Detail Pagar BRC
Skala : NTS
SKALA NTS

UK. KERTAS A3

NO. REVISI

NO. LEMBAR 2/10


1m
Tiang Pagar 2"
Tinggi 175 cm

1.2 m
Bingkai Pintu 2"

Sloof K-175
KETERANGAN

2.2 m
20*30 cm
- All unit in mm
- Concrete K-175 (Pondasi &Sloof)
- Concrete K-225 (Jembatan)

30 cm
Pondasi K-175 - Concrete K-275 (Retaining Wall)
70*70*45 cm - Lean Concrete K-125
45 cm - D6 (Pondasi & Sloof)
- D10 (Jembatan & Retaining Wall)

Pintu Pagar BRC 1 m


70 cm

80 cm
Skala : NTS
90cm

3m
Tiang Pagar 2"
Tinggi 175 cm
1.2 m

Bingkai Pintu 2"

Sloof K-175
2.2 m

20*30 cm
Owner

UPT. PEMATANG SIANTAR

Main Contractor
30 cm

GAPEKSINDO JAYA BERSAMA

Pondasi K-175
45 cm

AS BUILT DRAWING
70*70*45 cm
PROJECT :

PEMBUATAN PENGAMAN SWITCHYARD GI


TERSEBAR UPT PEMATANG SIANTAR
70 cm

80 cm
90cm
JUDUL GAMBAR

- Pintu Pagar BRC 1 m


Pintu Pagar BRC 3 m - Pintu Pagar BRC 3 m
NTS

Skala : NTS
SKALA

UK. KERTAS A3

NO. REVISI

NO. LEMBAR
3/10
KETERANGAN

- All unit in mm
5m
- Concrete K-175 (Pondasi &Sloof)
- Concrete K-225 (Jembatan)
2.5 m - Concrete K-275 (Retaining Wall)
Tiang Pagar 2" - Lean Concrete K-125
Tinggi 175 cm - D6 (Pondasi & Sloof)
- D10 (Jembatan & Retaining Wall)
1.2 m

Bingkai Pintu 2"

Sloof K-175
2.2 m

20*30 cm
30 cm

Pondasi K-175
45 cm

70*70*45 cm

Owner

70 cm
UPT. PEMATANG SIANTAR

Pintu Pagar BRC 5 m


80 cm
90cm
Main Contractor

Skala : NTS GAPEKSINDO JAYA BERSAMA

AS BUILT DRAWING

PROJECT :

PEMBUATAN PENGAMAN SWITCHYARD GI


TERSEBAR UPT PEMATANG SIANTAR

JUDUL GAMBAR

- Pintu Pagar BRC 5 m

SKALA NTS

UK. KERTAS A3

NO. REVISI

NO. LEMBAR 4/10


Tiang BRC 2"

Pagar BRC 6 mm

KETERANGAN
Sloof 20*30 cm - All unit in mm
- Concrete K-175 (Pondasi &Sloof)
- Concrete K-225 (Jembatan)
- Concrete K-275 (Retaining Wall)
- Lean Concrete K-125
- D6 (Pondasi & Sloof)
- D10 (Jembatan & Retaining Wall)
5 cm

MT : 0+00
15 cm
15 cm

Timbunan
Pondasi K-175
45 cm

70*70*45 cm
Lantai Kerja 5 cm

Pasir Urug 10 cm Owner

UPT. PEMATANG SIANTAR


70 cm
Main Contractor

80cm
GAPEKSINDO JAYA BERSAMA
90 cm
AS BUILT DRAWING

Pondasi : K-175 PROJECT :

Dimensi : 70*70*45 cm PEMBUATAN PENGAMAN SWITCHYARD GI


TERSEBAR UPT PEMATANG SIANTAR

JUDUL GAMBAR

Detail 1 Detail 1

Skala : NTS SKALA NTS

UK. KERTAS A3

NO. REVISI

NO. LEMBAR 5/10


Tiang BRC 2"

Sloof K-175 KETERANGAN

A 20*30 cm - All unit in mm


Tiang BRC Tertanam 20 cm - Concrete K-175 (Pondasi &Sloof)
- Concrete K-225 (Jembatan)
30 cm

- Concrete K-275 (Retaining Wall)


- Lean Concrete K-125
- D6 (Pondasi & Sloof)
4D6-15 cm, tinggi 65 cm
45 cm

- D10 (Jembatan & Retaining Wall)


5D6-15cm
A 20 cm
D6-15cm
Pondasi K-175
70 cm 70x70x45cm

Detail Penulangan Pondasi & Sloof


Skala : NTS

2D6-15cm

Sloof K-175
20*30 cm Owner

UPT. PEMATANG SIANTAR


30 cm

Main Contractor

D6-15cm GAPEKSINDO JAYA BERSAMA

AS BUILT DRAWING

PROJECT :

PEMBUATAN PENGAMAN SWITCHYARD GI


20 cm TERSEBAR UPT PEMATANG SIANTAR

Potongan A-A JUDUL GAMBAR

- Detail Penulangan Pondasi & Sloof


- Tampak Atas Penulangan Sloof

Skala : NTS
SKALA NTS

UK. KERTAS A3

NO. REVISI

NO. LEMBAR 6/10


5m
2.5 m

KETERANGAN

- All unit in mm
- Concrete K-175 (Pondasi &Sloof)
- Concrete K-225 (Jembatan)
- Concrete K-275 (Retaining Wall)
- Lean Concrete K-125
- D6 (Pondasi & Sloof)
20 cm

- D10 (Jembatan & Retaining Wall)

5m

Potongan Jembatan
Skala : NTS

Pagar BRC
Pintu BRC 5 m Pagar BRC

Owner

Jembatan K-275 UPT. PEMATANG SIANTAR


Dimensi P: 2 m
L: 5 m
Main Contractor
2m

Saluran Air T: 0.20 m


GAPEKSINDO JAYA BERSAMA

AS BUILT DRAWING

PROJECT :

PEMBUATAN PENGAMAN SWITCHYARD GI


TERSEBAR UPT PEMATANG SIANTAR
5m

Tampak Atas Jembatan


JUDUL GAMBAR

- Potongan Jembatan
- Tampak Atas Jembatan

Skala : NTS SKALA NTS

UK. KERTAS A3

NO. REVISI

NO. LEMBAR 7/10


KETERANGAN

- All unit in mm
4.9 m - Concrete K-175 (Pondasi &Sloof)
- Concrete K-225 (Jembatan)
- Concrete K-275 (Retaining Wall)
- Lean Concrete K-125
- D6 (Pondasi & Sloof)
D10-200 mm - D10 (Jembatan & Retaining Wall)

D10-150 mm
1.9 m

D10-100 mm
10 cm

D10-150 mm
Owner

UPT. PEMATANG SIANTAR

Main Contractor

GAPEKSINDO JAYA BERSAMA

AS BUILT DRAWING
Detail Penulangan Jembatan
Skala : NTS
PROJECT :

PEMBUATAN PENGAMAN SWITCHYARD GI


TERSEBAR UPT PEMATANG SIANTAR

JUDUL GAMBAR

Detail Penulangan Pondasi

SKALA NTS

UK. KERTAS A3

NO. REVISI

NO. LEMBAR 8/10


0.3 m 2,7 m 0.3 m
A Balok K-225
20*30 cm

0,3 m
Kolom K-225
30*30 cm

KETERANGAN

3m
Pasangan Batu - All unit in mm
Tebal 30 cm
- Concrete K-175 (Pondasi &Sloof)
- Concrete K-225 (Jembatan)
- Concrete K-275 (Retaining Wall)
- Lean Concrete K-125
- D6 (Pondasi & Sloof)
MT 0+00
0.3 m - D10 (Jembatan & Retaining Wall)
Pondasi Sloof K-225
50*30 cm
A

Tampak Depan Retaining Wall


Skala : NTS

Balok K-225
0.3 m 20*30 cm
0.3 m

Kolom K-225
30*30 cm
Owner

UPT. PEMATANG SIANTAR


3m

Main Contractor

GAPEKSINDO JAYA BERSAMA

AS BUILT DRAWING

MT 0+00 PROJECT :
0.3 m

Pondasi Sloof K-225 PEMBUATAN PENGAMAN SWITCHYARD GI


TERSEBAR UPT PEMATANG SIANTAR

50*30 cm
0.5 m
JUDUL GAMBAR

- Tampak Depan Retaining Wall

Potongan A-A - Potongan A-A

SKALA NTS

Skala : NTS UK. KERTAS A3

NO. REVISI

NO. LEMBAR 9/10


C

Penulangan Balok C

KETERANGAN
Penulangan Kolom Penulangan Kolom
- All unit in mm
- Concrete K-175 (Pondasi &Sloof)
- Concrete K-225 (Jembatan)
A A - Concrete K-275 (Retaining Wall)
- Lean Concrete K-125
- D6 (Pondasi & Sloof)
- D10 (Jembatan & Retaining Wall)

Penulangan Pondasi
B

30 cm 50 cm

2D10-20cm 3D10-20cm
40 cm
20 cm

30 cm

2D6-20cm
D6-20cm D6-20cm 20 cm
30 cm

30 cm

20 cm
20 cm

Owner

D6-20cm
2D10-20cm

20 cm

10 cm
UPT. PEMATANG SIANTAR
3D10-20cm 2D6-20cm
Main Contractor

Selimut Beton 5 cm Selimut Beton 5 cm GAPEKSINDO JAYA BERSAMA


Selimut Beton 5 cm

AS BUILT DRAWING
POTONGAN A-A POTONGAN B-B POTONGAN C-C
PROJECT :

PEMBUATAN PENGAMAN SWITCHYARD GI


TERSEBAR UPT PEMATANG SIANTAR

DETAIL POTONGAN TULANGAN RETAINING WALL


JUDUL GAMBAR

Detail Penulangan Retaining Wall


Skala : NTS SKALA NTS

UK. KERTAS A3

NO. REVISI

NO. LEMBAR 10/10

You might also like