QUOTATION
Dear Sir,
1. We offer our quotation according to your designed project for your consideration.
PAYMENT SCHEDULE
T0 At the time of contact 70%
T1 Material / equipment on position on site 20%
T2 Completion job 10%
Best Regards
MUHAMMAD NAEEM
0300-4205588
0321-4205588
NOTE: Our quotation is based on standard specification and configuration. If any parameter
and configuration were change, the quotation would definitely change accordingly. It may
also be noted that offered elevator will be used as a passenger elevator only.
1
10-07-2023
Specification
Parameters & planning
Main Parameters
1. Elevator Type Automatic Elevator
2. Machine Type VVVF Machine
3. Rated Load (kg) 1000kg
4. Persons Cargo
5. Speed (m/s) L1: 1 M/S
6. Drive System VVVF
7. Control System Step integrated controller system
8. Stops/Floors/Doors 3/3/3
9. Floor Mark B+G+2
10. Home Floor G Floor
11. Car Entrances 1
12. Travel Height 54ft
13. Door Operator Yes
14. Door-Opening Type 800mm swing door
15. Main Power 380V / AC, 3Phase, 50Hz
16. Light Power 220V / AC, 1Phase, 50Hz
2
10-07-2023
COP / LOP
1. COP 1. COP face plate China
2. Position indicator Dot Matrix
3. Hairline stainless steel Yes
3
10-07-2023
Car System
1. Car Stainless Steel
Safety Parts
1. Over travel switch China
2. Buffer spring Buffer + Hydraulic
3. ARD Imported
4
10-07-2023
Standard Features:
5
10-07-2023
BUILDERS/OWNER WORK
Preparatory work and facilities in connection with Lift installation detailed below shall be
provided by the client or his Contractor in accordance with the Manufacturer's drawings
and specifications and in accordance with all relevant local ordinances and regulations.
a. Prepare a hoist way properly framed, enclosed and ventilated with lighting facility.
b. Provide suitable pit of proper depth drains and waterproofing, if required. Lift shaft
shall have adequate artificial lightning to be operated from a switch accessible from
the place from which access to lift pit is obtained.
d. Provide and / or cut all necessary holes, chases and openings and make it good.
e. Supply and fix all supports, separator beams, reinforced concrete slabs, etc.
necessary for the Installation of the machinery, guide brackets, doors, buffers, etc.
f. Furnish all necessary cement and / or concrete for "grouting-in" brackets, bolts, etc.
h. Provide mains for three phase power (415V-3 (+/- 5%) Phase – 50 Hz.) with isolator
of proper rating and single-phase lighting supply with switch to controller at top
floor. Position of outlets and size of wires as indicated by Lift Contractor.
i. Furnish required electric power for necessary lighting (temporary - 240V – 1 Phase
– 50 Hz.)of working place, using tools for installation, testing of lift and spray
painting.
j. Furnish required electric power for necessary lighting (temporary - 240V – 1 Phase
– 50 Hz.)of working place, using tools for installation, testing of lift and spray
painting.
k. Provide & Fix heat insulation materials on shaft top floor slab and proper ventilation
for maintaining the temperature inside shaft within 40C°.
l. Furnish required electric power for necessary lighting (temporary - 240V – 1 Phase
– 50 Hz.)of working place, using tools for installation, testing of lift and spray
painting.
m. Provide & Fix heat insulation materials on shaft top floor slab and proper ventilation
for maintaining the temperature inside shaft within 40C°.
n. Provide permanent light at each floor level in the shaft with a 3-pin socket in the pit.
6