You are on page 1of 2

CONTRACT REF.

PARTICULAR SPECIFICATION
APPENDIX D

Clause Description Page Soft Copy

1 Public Sector Standard Conditions Of Contract (PSSCOC) for 86 Pages PDF


Construction Works 2020 (8th Edition Jul 2020) and List of Amendments +
14 Pages

2 The Particular Conditions of Contract 8 pages PDF

3 The Appendix to Public Sector Standard Conditions of Contract for 2 pages PDF
Construction Works

4 Standard Specifications for Civil Engineering Works (2022 Edition) 181 pages PDF

5 Supplementary Specifications 7 167 pages PDF

6 Supplementary Specifications 8 7 pages PDF

7 Performance Guarantee Template 6 pages PDF

8 Statement of Construction Plant, Equipment and Workmen 2 pages PDF

9 Soil Investigation Report


9.1 Trial Trench and Offshore Soil Investigation Works for Infrastructure 201 pages PDF
Works at Hougang Town (By Fosta Pte Ltd)
9.2 [D/250/14] Term Contract No. 35 for Site Investigation Works for a 463 pages PDF
Period of 30 Months (by TÜV SÜD AL Technologies Pte Ltd)
9.3 Trial Contract No.39, Soil Investigation Works for a Period of 30 619 pages PDF
Months - Soil Investigation Works at BuangKok Drive (WI015) (by
Geomotion Singapore)

Page 1 of 2
CONTRACT REF.:

PARTICULAR SPECIFICATION
APPENDIX D

Clause Description Page Soft Copy

10 Services Plan
10.1 Coordinated Services Plan 1 page PDF
10.2 Existing Utilities Plan 1 page PDF
10.3 Mugliston Park Pumping Station Manholes Lowering Plan 3 pages PDF
10.4 Mugliston Park Pumping Station and Grouting of Disused Pipeslines 1 page PDF
10.5 Sewerage Information Plans (SIP) - for information only 21 pages PDF
10.6 Water Service Plan (WSP) - for information only 21 pages PDF

Note :
a) Main Contractor shall make available a copy of the Main Contract
upon request by the Sub-Contractor and the Sub-Contractor shall be
deemed to have full knowledge of the Main Contract save for the
detailed rates and/or prices of the Main Contractor.

b) In the context of the above Specifications, the term ‘Contractor’ shall


mean the ‘Sub-Contractor’ of this Sub-contract and all obligations stated
therein shall be the responsibilities of the Sub-Contractor, unless
otherwise specified in other document forming part of this Sub-Contract.

c) Notwithstanding the above the Sub-Contractor is deemed to have


familiarised himself with the requirements of the Main-Contract General
Specifications and Particular Specifications.

Page 2 of 2

You might also like