WATER TANK PLATFORM INSPECTION

Batch per
listing
HOUSE UNIT ACTUAL PICTURE/ LOCATION REMARKS

Use angle bar for platform ky


naka tiles. Ni suggest ang
1 B4L7 tag-iya iyang mga piping is sa 1st-10
ibabaw ipaagi for inlet &
outlet.

2 B5L7 Ready for concrete platform 1st


at front area. Okay for piping

3 B3L4
Use angle bar for platform
4 B1L1 kay naka tiles. Ok ang piping 1st
is exposed.

5 B10L3

6 B9L4

7 B8L9
It's better to put the tank at
8 B3L1 the front for concrete 1st
platform. If sa likod maglisud
ta inag piping. Pls inform HO

9 B1L10

10 B5L11
Use angle bar for platform
because the HO plans to
B2L9 2nd
extend/ renovate their rear
area.

Ready for concrete platform.


B4L1 Let HO remove their plants 2nd
for preparation
The HO wants to
renovate/extension their
rear area. Pero ang piping sa
B2L3 likod is dili kasudlan ug inlet 4th
pipe. Mag need pa nga
mulibot sa atubangan
padung sa tanke.

Ready for concrete platform.


B8L1 Let HO remove their plants 4th
for preparation

Ready for concrete platform.


B8L5 Let HO remove their plants 3rd
for preparation

For clarification sa HO kay


B9L9 plan nila mag extension sa 5th
rear area. Waiting sa
feedback sa HO.
Ready for concrete platform. no option
B9L19
Okay for exposed pipe.

Ready for Installation.


B8L9 Already have a concrete 1st
platform

Ready for concrete platform


B8L11 at front area. No problem for 5th
piping

Use angle bar for platform ky


naka tiles. Ang piping sa kilid
is ma exposed. Mo tuyok tas
B1L3 atubangan for inlet pipe to 5th
water tank. Mag chipping tas
rampa sa car garage para ma
lubong ang pipe patuyok sa
likod
Ready for concrete platform.
B7L5 Okay for piping. Need no option
ipakuha ni HO ang mga
plants for clearing sa area.

B7L12 Ready for concrete platform 5th


at rear area. Okay for piping

Ready for concrete platform.


B7L9 Okay for piping. Need 5th
ipakuha ni HO ang mga
plants for clearing sa area.
B5L9 Ready for concrete platform 2nd
at rear area. Okay for piping.

Okay for concrete platform


at rear area. Mo tuyok tas
atubangan for inlet pipe to
B5L6 water tank. Mag chipping tas 4th
rampa sa car garage para ma
lubong ang pipe patuyok sa
likod.
B1L9 Ready for concrete platform no option
at rear area. Okay for piping

Ready for concrete platform


at rear area. Okay for piping.
B6L1 2nd
Need ipakuha sa HO ang mga
plants and lights
Ready for concrete platform no option
B6L3 at rear area. Okay for piping.

Ready for concrete platform


B1L15 at rear area. For awareness 5th
pls inform HO nga ari mag
piping gawas sa firewall.
PED Schedule of
Status PMD Feedback Concrete Pouring

CONFIRMED

ok
HO Change her mind
she choose option B
(FOR TOP
MANAGEMENT
APPROVAL)
Need removal of
plants
Need removal of
plants

Need removal of
plants
ok
ok

Need removal of
plants
ok

ok
ok

ok

Need removal of
plants
Need approval for the
location of piping