A. RENCANA KERJA
1 Piping fire line main deck 06/08/23 – 16/08/23
2 Piping SWC 06/08/23 – 20/08/23
B. PELAKSANAAN
ITEM BELUM START (item belum mulai kerja sesuai Plan Start)
6 Fit up plate form 1 p/s and rope tank Fit up stiffener rope tank
centre centre
NO ITEM PICTURE
PT. Multi Ocean Shipyard
1 Main Cable Tank Comment inspection
C. INSPECTION
ITEM INSPECTION (item pemeriksaan oleh QC, OS / Class) di tgl daily report di buat