You are on page 1of 98

0 1 2 3 4 5 6 7 8 9

-WC1 -WC1 -WC1 -WC1 -WC1 -WC1

-WC2 -WC2 -WC2 -WC2 -WC2 -WC2

-WC3 -WC3 -WC3 -WC3 -WC3 -WC3

1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
2 4 6
-QB0 -QB1 -QB2 -QB3 -QB4 -QB5 -QB6
63 A 1 3 5 25A 25A 25A 25A 25A 25A
Main switch 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6

View Main contactor

Data sheet
/ 1L1

/ 1L2

/ 1L3

/ 2L1

/ 2L2

/ 2L3

/ 3L1

/ 3L2

/ 3L3

/ 5L1

/ 5L2

/ 5L3

/ 6L1

/ 6L2

/ 6L3
Create a new project with the "CARWASH_V23_TEMPLATE.ZW9"
basic project as a template.
-WE2 -WE2 -WE2 -WE2 -WE2 -WE2 -WE2

-WE1 -WE1 -WE1 -WE1 -WE1 -WE1

PE

-XD1 L1 L2 L3 N PE
/ N.2

/ PE.2

/ PE.3

/ PE.4

/ N.5

/ PE.5

/ N.6

/ PE.6
Feed car wash fuse Control Supply drag Supply side brushes Roof brush supply Supply wheel brush Supply rotary
by customers 80A voltage chain plate/dehumidifier
generation

Date 22.05.2014 Training Center EPLAN Software & Service Supply EXERCISE_03.1 = EVG
Ed. DEB + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Device tag list


/ 3L1

/ 3L2 Device Artikel 1 Artikel 2


Number designation 1 Number designation 1
/ 3L3
F7 SIE.3RV2011-1AA40

1 3 5 1 3 5 F8 SIE.3RV2011-1BA40
-F7 -F8
1,1-1,6 A 1,4-2 A
(1,1 A) (1,65 A) SIE.1LA7073-4AB10-ZA11 Squirrel-cage motor
I> I> I> I> I> I> M7
2 4 6 2 4 6

M8 SIE.1LA7080-4AA10-ZA11 Squirrel-cage motor

Please create this schematic.


+WAH

U1 V1 W1 PE U1 V1 W1 PE

-M7
M -M8
M
0,37 kW 3 0,55 kW 3

Date 20.05.2014 Training Center EPLAN Software & Service Side brushes EXERCISE_07.1 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 3L1

/ 3L2

/ 3L3

1 3 5 1 3 5
-F7 -F8
1,1-1,6 A 1,4-2 A
(1,1 A) (1,65 A)
I> I> I> I> I> I>
2 4 6 2 4 6

Please extend this schematic to include path funct


texts.
+WAH

U1 V1 W1 PE U1 V1 W1 PE

-M7
M -M8
M
0,37 kW 3 0,55 kW 3

Positioning motor, Rotation, side brush


side brush left left

Date 22.05.2014 Training Center EPLAN Software & Service Side brushes EXERCISE_09.1 = SEB
Ed. DEB + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Insert the page macro "EXERCISE_10.1" with the pages =SPS+ASK 6,


10 and 13 into your project

6.9 / PLC+.2 PLC+.2 / 6.0


-XD2 7 -XD2 13

U2+ /

U3- /
U3+
U2-
/

/
-W7 1
-W6 1

Infeed, side brush right,


Infeed, side brush left, forwards Infeed, side brush left, back Rotation, side brush left forwards Infeed, side brush right, back Rotation, side brush right Spray arch, side brush left Spray arch, side brush right
=SEB+ESK

=DAB+ESK

=SEB+ESK-XD1:5 =SEB+ESK-XD1:6 =SEB+ESK-XD1:7 =SEB+ESK-?Q1:A1 =SEB+ESK-?Q2:A1 =SEB+ESK-?Q3:A1 =SEB+WAH-MB5:x1 =SEB+WAH-MB6:x1


-XD1 1+ 2+ 3+ 4+
-XD1 1+
O25.04 O25.05 O25.06 O25.07 O25.08 O25.09 O25.10 O25.11

13
-K105 -K105 -K105 -K105 -K105 -K105 -K105 -K105
-QA4
14 OUT17 OUT18 OUT19 OUT20 OUT21 OUT22 OUT23 OUT24
3 5.1 3 6.1 3 5.2 3 6.2 3 5.3 3 6.3 3 5.4 3 6.4
-XD4 9 10 11 12 13 14 15 16
-XD1 1 2 3 4 -XD1 1

-W6 -W7
ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110
12G1 2x1
300 V 2 3 4 5 300/500 V 2
-XD3 23 25 26 27 28 29 31 33

-W10 -W14 -W15


ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110
12G1 4G1,0 4G1,0
300 V 1 2 3 4 5 6 300 V 1 300 V 1

-XD2 8 9 10 11 14
=SEB+ESK

=SEB+WAH

=SEB+WAH
Data sheet
-XD1 5+ 5 6+ 6 7+ 7 8+ 8 9+ 9 10+ 10
1.1 1.2 1.3 1.4 2.1 2.2 2.3 2.4
+U3 +I3 -U3/-I3 SH +U4 +I4 -U4/-I4 SH

A1 A1 A1 A1 A1 A1 x1 x1
-K109 / 2 -K109 / 2
-Q1 -Q2 -Q3 -Q4 -Q5 -Q6 -MB5 -MB6
24 V A2 24 V A2 24 V A2 24 V A2 24 V A2 24 V A2 x2 x2

-XD4:9 -XD4:13
-XD1 5-
Motorstrom Rotation Motorstrom Rotation
3 5.1 3 6.1 3 5.2 3 6.2 3 5.3 3 6.3 3 5.4 3 6.4 -W10 7 -W14 2 -W15 2
IN17 IN18 IN19 IN20 IN21 IN22 IN23 IN24 Seitenbürste rechts Seitenbürste rechts
-K101 -K101 -K101 -K101 -K101 -K101 -K101 -K101

I24.12 I24.16 I24.13 I24.17 I24.14 I24.18 I24.15 I24.19 10.9 / PLC-.2 PLC-.2 / 10.1
-XD3 24 32 34
=SEB+ESK-XD1:1 =SEB+ESK-XD1:2 =SEB+ESK-XD1:3 =SEB+ESK-XD1:4 =DAB+ESK-QA4:14
Servo-motor overload switch, Rotation motor overload switch, Servo-motor overload switch, Rotation motor overload switch, Motor overload switch Rotation Spare Spare Spare
Infeed, side Infeed, side Rotation, Infeed, side Infeed, side Rotation, Spray arch, Spray arch,
left side brush left side brush right side brush right side brush Roof brush brush left, brush left, back side brush left brush right, brush right, back side brush right side brush left side brush right
forwards forwards Motor current, Motor current,
rotation, side rotation, side
Servo-motor Rotation motor Servo-motor Rotation motor Motor overload Spare Spare Spare
overload overload overload overload switch brush right brush right
switch, left side switch, left side switch, right side switch, right side Rotation Roof
brush brush brush brush brush

Date 14.05.2014 Training Center EPLAN Software & Service PLC EXERCISE_10.1 = SPS
Ed. EPL + ASK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 6
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 3L1

/ 3L2

/ 3L3

1 3 5 1 3 5
-F7 -F8
1,1-1,6 A 1,4-2 A
(1,1 A) (1,65 A)
I> I> I> I> I> I>
2 4 6 2 4 6

1 3 5 1 3 5 1 3 5
-Q1 -Q2 -Q3
2 4 6 2 4 6 2 4 6
+WAH

U1 V1 W1 PE U1 V1 W1 PE

-M7
M -M8
M
0,37 kW 3 0,55 kW 3

Positioning motor, Rotation, side brush


side brush left left

Please complete your schematic.


Date 20.05.2014 Training Center EPLAN Software & Service Side brushes EXERCISE_11.1 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 3L1

/ 3L2

/ 3L3

1 3 5 1 3 5
1 3 5 1 3 5 -F9 -F10
-F7 -F8 1,1-1,6 A 1,4-2 A
(1,1 A) (1,65 A)
1,1-1,6 A 1,4-2 A I> I> I> I> I> I>
(1,1 A) (1,65 A)
I> I> I> I> I> I> 2 4 6 2 4 6
2 4 6 2 4 6

1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
-Q1 -Q2 -Q3 -Q4 -Q5 -Q6
2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6
+WAH

+WAH

U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE

-M7
M -M8
M -M9
M -M10
M
0,37 kW 3 0,55 kW 3 0,37 kW 3 0,55 kW 3

Positioning motor, Rotation, side brush Positioning motor, Rotation, side brush
side brush left left side brush right right

Please complete your schematic.


Date 20.05.2014 Training Center EPLAN Software & Service Side brushes EXERCISE_12.1 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 2
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 1L1

1
-FB7
16 A 2
View
Data sheet

-TB1 L N PE +PLT-KA2
13 23 33 43 51
5A S33 S34

14 24 34 44 52

Data sheet

.5
DCOK

+ +' - -' 13 14
I<IN A1 A2 S11 S12
Data sheet

13 11
+PLT-KA2
Data sheet

1 .3 14 +PLT-SF1 12
-FB8 Emergency stop
View

Data sheet
6A 2 +PLT-XD1 1 2 3
View
Emergency stop

a a

-XD2 -XD2
PE.2 /

1 2 6 7
N.2 /

b c d b c d
A1 A1
-QA3 -QA4
24 V A2 24 V A2

-WE2

-WE1

Insert the page macro "EXERCISE_13.1" page =EVG+ESK/2 into the SIE.3RT2015-1BB42-0CC0 SIE.3RT2015-1BB42-0CC0
1 2 1 2

project.
3 4 3 4
5 6 5 6
21 22 21 22

Control voltage
24 VDC

Date 20.05.2014 Training Center EPLAN Software & Service Control voltage generation EXERCISE_13.1 = EVG
Ed. EPL + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 2
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

-WC1 -WC1 -WC1 -WC1 -WC1 -WC1

-WC2 -WC2 -WC2 -WC2 -WC2 -WC2

-WC3 -WC3 -WC3 -WC3 -WC3 -WC3

2 4 6
-QA3
1 3 5

2 4 6
-QA4
1 3 5

1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
2 4 6
-QB0 -QB1 -QB2 -QB3 -QB4 -QB5 -QB6
63 A 1 3 5 25A 25A 25A 25A 25A 25A
Main switch 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6

View Main contactor

Data sheet
/ 1L1

/ 1L2

/ 1L3

/ 2L1

/ 2L2

/ 2L3

/ 3L1

/ 3L2

/ 3L3

/ 5L1

/ 5L2

/ 5L3

/ 6L1

/ 6L2

/ 6L3
Place the power contacts "-QA3" and "-QA4" in the schematic.

-WE2 -WE2 -WE2 -WE2 -WE2 -WE2

-WE1 WE1 WE1 WE1 WE1 WE1

PE

-XD1 L1 L2 L3 N PE
/ N.2

/ PE.2

/ PE.3

/ N.5

/ PE.5

/ N.6

/ PE.6
Feed car wash fuse Control Supply drag Supply side brushes Roof brush supply Supply wheel brush Supply rotary
by customers 80A voltage chain plate/dehumidifier
generation

Date 22.05.2014 Training Center EPLAN Software & Service Supply EXERCISE_13.2 = EVG
Ed. DEB + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

SE_028.1/3.0 / 1L2 Device tag list


/ 1L3
Device Artikel 1 Artikel 2
Number designation 1 Number designation 1
FB9 SIE.5SJ6106-6

FB10 SIE.5SJ6106-6

FB11 SIE.5SJ6106-6
1 1
-FB9 -FB11
6A 2 6A 2 TB2 PXC.2866750 Power supply

XD2:3 PXC.3209578 Feed-through terminal

-TB2 L N PE
5A PXC.3209578 Feed-through terminal
XD2:4

Data sheet XD3:1 PXC.3044225 Feed-through terminal

DCOK PXC.3044225 Feed-through terminal


I<IN XD3:2
+ +' +'' - -' -'' 13 14

1
-FB10
6A 2

a a
-XD3 1 2
-XD2 b c d
3
b c d
4

-WE2
/ PLC+.1
/ PLC+.2
/ PLC+.3

PLC-.1
PLC-.2
PLC-.3
/
/
/

-WE1

Please create this schematic.


Supply PLC Power supply
24 VDC 230
VAC

Date 20.05.2014 Training Center EPLAN Software & Service Control voltage generation EXERCISE_14.1 = EVG
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 3
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Infeed, side brush right,


Infeed, side brush left, forwards Infeed, side brush left, back Rotation, side brush left forwards Infeed, side brush right, back Rotation, side brush right Spray arch, side brush left Spray arch, side brush right

O25.04 O25.05 O25.06 O25.07 O25.08 O25.09 O25.10 O25.11

-K105 -K105 -K105 -K105 -K105 -K105 -K105 -K105


OUT17 OUT18 OUT19 OUT20 OUT21 OUT22 OUT23 OUT24
3 5.1 3 6.1 3 5.2 3 6.2 3 5.3 3 6.3 3 5.4 3 6.4

-XD3 23 25 26 27 28 29 31 33

-W10 -W14 -W15


ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110
12G1 4G1,0 4G1,0
300 V 1 2 3 4 5 6 300 V 1 300 V 1
=SEB+ESK

=SEB+WAH

=SEB+WAH
Data sheet
-XD1 5+ 5 6+ 6 7+ 7 8+ 8 9+ 9 10+ 10
21 21 21 21
-Q2 -Q1 -Q5 -Q4
.2 22 .1 22 .5 22 .4 22
A1 A1 A1 A1 A1 A1 x1 x1
-Q1 -Q2 -Q3 -Q4 -Q5 -Q6 -MB5 -MB6
24 V A2 24 V A2 24 V A2 24 V A2 24 V A2 24 V A2 x2 x2

-XD1 5-

-W10 7 -W14 2 -W15 2

10.9 / PLC-.2 PLC-.2 / 10.1


-XD3 24 32 34
Infeed, side Infeed, side Rotation, Infeed, side Infeed, side Rotation, Spray arch, Spray arch,
brush left, brush left, back side brush left brush right, brush right, back side brush right side brush left side brush right
forwards forwards

3RT2015-1BB42-0CC0 SIE.3RT2015-1BB42-0CC0 SIE.3RT2015-1BB42-0CC0 SIE.3RT2015-1BB42-0CC0 SIE.3RT2015-1BB42-0CC0 SIE.3RT2015-1BB42-0CC0


1 2 1 2 1 2 1 2 1 2 1 2
3 4 3 4 3 4 3 4 3 4 3 4
5 6 5 6 5 6 5 6 5 6 5 6

Please draw the interlockings for the contactors -Q1, -Q2 and -Q4,
21 22 .2 21 22 .1 21 22 21 22 .5 21 22 .4 21 22

-Q5.
Date 20.05.2014 Training Center EPLAN Software & Service Outputs roof/side brush EXERCISE_17.1 = SPS
Ed. EPL + ASK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 10
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

6.9 / PLC+.2 PLC+.2 / 6.0


-XD2 7 -XD2 13

-W7 1
-W6 1
=SEB+ESK

=DAB+ESK
-XD1 1+ 2+ 3+ 4+
-XD1 1+
13 13 13 13 13
-F7 -F8 -F9 -F10 -FC1
=SEB+ESK/1.1 14 =SEB+ESK/1.3 14 =SEB+ESK/1.5 14 =SEB+ESK/1.7 14 14

-XD1 1 2 3 4 -XD1 1

-W6 -W7
ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110
12G1 2x1
300 V 2 3 4 5 300/500 V 2

-XD2 8 9 10 11 14

At the motor overload switch elements "=SEB+ESK-F7 to F10", select


via a device selection an appropriate part with auxiliary contacts and
then place on this schematic page the "trip-indicating" contacts.
3 5.1 3 6.1 3 5.2 3 6.2 3 5.3 3 6.3 3 5.4 3 6.4
IN17 IN18 IN19 IN20 IN21 IN22 IN23 IN24
-K101 -K101 -K101 -K101 -K101 -K101 -K101 -K101

I24.12 I24.16 I24.13 I24.17 I24.14 I24.18 I24.15 I24.19

Servo-motor overload switch, Rotation motor overload switch, Servo-motor overload switch, Rotation motor overload switch, Motor overload switch Rotation Spare Spare Spare
left side brush left side brush right side brush right side brush Roof brush

Servo-motor Rotation motor Servo-motor Rotation motor Motor overload Spare Spare Spare
overload overload overload overload switch
switch, left side switch, left side switch, right side switch, right side Rotation Roof
brush brush brush brush brush

Date 22.05.2014 Training Center EPLAN Software & Service Messages motor protecting devices EXERCISE_18.1 = SPS
Ed. DEB + ASK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 6
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 3L1

/ 3L2

/ 3L3

1 3 5 13 21 1 3 5 13 21
1 3 5 13 21 1 3 5 13 21 -F9 -F10
-F7 -F8 1,1-1,6 A 14 22 1,4-2 A 14 22
(1,1 A) (1,65 A)
1,1-1,6 A 14 22 1,4-2 A 14 22 I> I> I> I> I> I>

=SPS+ASK/6.3

=SPS+ASK/6.4
(1,1 A) (1,65 A)
I> I> I> I> I> I> 2 4 6 2 4 6

=SPS+ASK/6.1

=SPS+ASK/6.2
2 4 6 2 4 6

1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
-Q1 -Q2 -Q3 -Q4 -Q5 -Q6
2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6
+WAH

+WAH

U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE

-M7
M -M8
M -M9
M -M10
M
0,37 kW 3 0,55 kW 3 0,37 kW 3 0,55 kW 3

Positioning motor, Rotation, side brush Positioning motor, Rotation, side brush
side brush left left side brush right right

Date 20.05.2014 Training Center EPLAN Software & Service Side brushes EXERCISE_18.1 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

IU-Converter
Allpolig
..\SE\IU-Wandler.ems
IU-Wandler
Variante A

-BE1 -X2
1 2
-X1
1
2
U=
I~

Create this transducer and save it as a symbol macro

Date 14.05.2014 Training Center EPLAN Software & Service Black box / symbol macro EXERCISE_19.1 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 201
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 3L1

/ 3L2

/ 3L3

1 3 5 13 21 1 3 5 13 21
1 3 5 13 21 1 3 5 13 21 -F9 -F10

U2+ /

U3+ /
U2- /

U3- /
-F7 -F8 1,1-1,6 A 14 22 1,4-2 A 14 22
(1,1 A) (1,65 A)
1,1-1,6 A 14 22 1,4-2 A 14 22 I> I> I> I> I> I>
(1,1 A) (1,65 A)
I> I> I> I> I> I> 2 4 6 2 4 6
2 4 6 2 4 6

-B1 -X2 -B2 -X2


1 2 1 2
-X1 -X1
1 1
2
U= 2
U=
I~ I~

1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
-Q1 -Q2 -Q3 -Q4 -Q5 -Q6
2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6
+WAH

+WAH

U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE

-M7
M -M8
M -M9
M -M10
M
0,37 kW 3 0,55 kW 3 0,37 kW 3 0,55 kW 3

Positioning motor, Rotation, side brush Positioning motor, Rotation, side brush
side brush left left side brush right right

Please complete your schematic.


Date 20.05.2014 Training Center EPLAN Software & Service Side brushes EXERCISE_20.1 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 3L1

/ 3L2

/ 3L3

1 3 5 13 21 1 3 5 13 21
1 3 5 13 21 1 3 5 13 21 -F9 -F10

U2+ /

U3+ /
U2- /

U3- /
-F7 -F8 1,1-1,6 A 14 22 1,4-2 A 14 22
(1,1 A) (1,65 A)
1,1-1,6 A 14 22 1,4-2 A 14 22 I> I> I> I> I> I>
(1,1 A) (1,65 A)
I> I> I> I> I> I> 2 4 6 2 4 6
2 4 6 2 4 6

-B1 -X2 -B2 -X2


1 2 1 2
-X1 -X1
1 1
2
U= 2
U=
I~ I~

1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
-Q1 -Q2 -Q3 -Q4 -Q5 -Q6
2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6

-WE1 -WE1 -WE1 -WE1


+WAH

+WAH

U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE

-M7
M -M8
M -M9
M -M10
M
0,37 kW 3 0,55 kW 3 0,37 kW 3 0,55 kW 3

Positioning motor, Rotation, side brush Positioning motor, Rotation, side brush
side brush left left side brush right right

Please complete your schematic.


Date 20.05.2014 Training Center EPLAN Software & Service Side brushes EXERCISE_21.1 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

1.6 / L1 L1 / 1.2
x1
-P1
x2
1.) Create a new project (as shown in the example).
2.) Consider which sort code is needed to obtain a useful
cross-reference result.

Date 20.05.2014 Training Center EPLAN Software & Service Interruption point EXERCISE_21.2 = EVG
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

1 2

-T1
3 4

L1 / 3.2

Date 20.05.2014 Training Center EPLAN Software & Service Interruption point Source EXERCISE_21.2 = EVG
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 2
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

2.7 / L1

x1
-P2
x2

Date 20.05.2014 Training Center EPLAN Software & Service Interruption point EXERCISE_21.2 = EVG
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 3
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 1L2

/ 1L3

1 1
-FB9 -FB11
6A 2 6A 2

-TB2 L N PE
5A

Data sheet

DCOK
I<IN
+ +' +'' - -' -'' 13 14

PLC+ PLC-

1
-FB10
6A 2

a a
-XD3 1 2
-XD2 b c d
3
b c d
4

-WE2
/ PLC+.1
/ PLC+.2
/ PLC+.3

PLC-.1
PLC-.2
PLC-.3
/
/
/

-WE1

Insert the potential definition points PLC+ und PLC- and format the
connecting lines PLC+ light blue, PLC- dark blue.
Supply PLC Power supply
24 VDC 230
VAC

Date 20.05.2014 Training Center EPLAN Software & Service Control voltage generation EXERCISE_21.3 = EVG
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 2
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

45[1,77'']

R 11 1/4

9
R

52
52
250

45

70

52
64,5

5
1,2
52

52
39,5

R1

200

Please create the drawing of the control panel.

Date 24.04.2014 Training Center EPLAN Software & Service Drawing Operating Panel EXERCISE_23.1 = CAD
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 3
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

R 30

R 10
0
20
R

256 80

Please create a drawing for the belt drive.

Date 24.04.2014 Training Center EPLAN Software & Service Drawing for belt drive EXERCISE_23.1 = CAD
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 4
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 6L1

/ 6L2

/ 6L3

1 3 5

-FB1
25 A 2 4 6

Fan 2
Fan 1 on
on

O1.00 O1.01

1 3 5 13 21 1 3 5 13 21
=SPS+ASK-KF10
-FC1 -FC2
10-16 A 14 22 10-16 A 14 22
-X1 1 -X1 2
I> I> I> I> I> I>
2 4 6 2 4 6

1 3 5 1 3 5
-QA1 -QA2
.1 2 4 6 .2 2 4 6

-WE1 -WE1

=SPS+ASK-XD3 83 85 -XD1 1 2 3 4 5 6 7 8

A1 A1

+WAH
-QA1 -QA2
24 V A2 24 V A2 U1 V1 W1 PE U1 V1 W1 PE

-MA1
M -MA2
M
5,5 kW 3 5,5 kW 3

PLC-.2
=SPS+ASK-XD3 84 86
SIE.3RT1015-1BB42 SIE.3RT1015-1BB42
1 2 .5 1 2 .8
3 4 .5 3 4 .8
5 6 .6 5 6 .8 Fan 1 Fan 2
21 22 21 22

Please create this schematic.


Date 20.05.2014 Training Center EPLAN Software & Service Fan EXERCISE_24.1 = TRO
Ed. EPL + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Device tag list


Device Artikel 1 Artikel 2
Number designation 1 Number designation 1
FB1 SIE.5SG5700 NEOZED built-in fuse base SIE.5SE2325

FC1 3RV1121-0KA10

FC2 3RV1121-0KA10

QA1 SIE.3RT1015-1BB42 Contactor

QA2 SIE.3RT1015-1BB42 Contactor

MA1 LENZE.112-31 Three-phase motor

MA2 LENZE.112-31 Three-phase motor

Date 22.05.2014 Training Center EPLAN Software & Service Fan parts list EXERCISE_24.1 = TRO
Ed. DEB + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 2
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 3L1

/ 3L2

/ 3L3

1 3 5 13 21 1 3 5 13 21
1 3 5 13 21 1 3 5 13 21 -F9 -F10

U2+ /

U3+ /
U2- /

U3- /
-F7 -F8 1,1-1,6 A 14 22 1,4-2 A 14 22
(1,1 A) (1,65 A)
1,1-1,6 A 14 22 1,4-2 A 14 22 I> I> I> I> I> I>
(1,1 A) (1,65 A)
I> I> I> I> I> I> 2 4 6 2 4 6
2 4 6 2 4 6

-B1 -X2 -B2 -X2


1 2 1 2
-X1 -X1
1 1
2
U= 2
U=
I~ I~

1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
-Q1 -Q2 -Q3 -Q4 -Q5 -Q6
2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6

-X2 1 2 3 4 5 6 -X2 7 8 9 10 11 12

-WE1 -WE1 -WE1 -WE1


+WAH

+WAH

Terminal box for left-hand side brush Terminal box for right-hand side brush
set
-X3 1 2 3 4 5 6 7 8 -X4 1 2 3 4 5 6 7 8

U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE

-M7
M -M8
M -M9
M -M10
M
0,37 kW 3 0,55 kW 3 0,37 kW 3 0,55 kW 3

Positioning motor, Rotation, side brush Positioning motor, Rotation, side brush
side brush left left side brush right right

Complete the schematic as shown in the example.


Date 20.05.2014 Training Center EPLAN Software & Service Side brushes EXERCISE_25.1 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Terminal line-up diagram Terminal line-up diagram


Terminal strip X2 =SEB+ESK-X2 Terminal strip X3 =SEB+WAH-X3

Terminal Part number Jumper Cross-section Terminal Part number Jumper Cross-section

PXC.3030417 PXC.3030417

1 PXC.3031212 2,5 1 PXC.3031212 2,5

2 PXC.3031212 2,5 2 PXC.3031212 2,5

3 PXC.3031212 2,5 3 PXC.3031212 2,5

4 PXC.3031212 2,5 4 PXC.3031238

5 PXC.3031212 2,5 5 PXC.3031212 2,5

6 PXC.3031212 2,5 6 PXC.3031212 2,5

7 PXC.3031212 2,5 7 PXC.3031212 2,5

8 PXC.3031212 2,5 8 PXC.3031238

9 PXC.3031212 2,5 PXC.3022276

10 PXC.3031212 2,5

11 PXC.3031212 2,5

12 PXC.3031212 2,5 Terminal line-up diagram


PXC.3022276 =SEB+WAH-X4
Terminal strip X4

Terminal Part number Jumper Cross-section

PXC.3030417

1 PXC.3031212 2,5

2 PXC.3031212 2,5

3 PXC.3031212 2,5

4 PXC.3031238

5 PXC.3031212 2,5

6 PXC.3031212 2,5

7 PXC.3031212 2,5

8 PXC.3031238

PXC.3022276

Date 06.05.2014 Training Center EPLAN Software & Service Terminal line-up diagram EXERCISE_25.1 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 201
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 3L1

/ 3L2

/ 3L3

1 3 5 13 21 1 3 5 13 21
1 3 5 13 21 1 3 5 13 21 -F9 -F10

U2+ /

U3+ /
U2- /

U3- /
-F7 -F8 1,1-1,6 A 14 22 1,4-2 A 14 22
(1,1 A) (1,65 A)
1,1-1,6 A 14 22 1,4-2 A 14 22 I> I> I> I> I> I>
(1,1 A) (1,65 A)
I> I> I> I> I> I> 2 4 6 2 4 6
2 4 6 2 4 6

-B1 -X2 -B2 -X2


1 2 1 2
-X1 -X1
1 1
2
U= 2
U=
I~ I~

1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
-Q1 -Q2 -Q3 -Q4 -Q5 -Q6
2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6

-X2 1 2 3 4 5 6 -X2 7 8 9 10 11 12

-WE1 -WE1 -WE1 -WE1


+WAH

+WAH

Terminal box for left-hand side brush Terminal box for right-hand side brush
set
-X3 1 2 3 PE 4 5 6 PE -X4 1 2 3 PE 4 5 6 PE

U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE U1 V1 W1 PE

-M7
M -M8
M -M9
M -M10
M
0,37 kW 3 0,55 kW 3 0,37 kW 3 0,55 kW 3

Designate all PE terminals as "PE", and re-number the terminal strips;


pay attention to the terminal sorting and identical designations.
Date 22.05.2014 Training Center EPLAN Software & Service Side brushes EXERCISE_25.2 = SEB
Ed. DEB + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Terminal line-up diagram Terminal line-up diagram


Terminal strip X2 =SEB+ESK-X2 Terminal strip X3 =SEB+WAH-X3

Terminal Part number Jumper Cross-section Terminal Part number Jumper Cross-section

PXC.3030417 PXC.3030417

1 PXC.3031212 2,5 1 PXC.3031212 2,5

2 PXC.3031212 2,5 2 PXC.3031212 2,5

3 PXC.3031212 2,5 3 PXC.3031212 2,5

4 PXC.3031212 2,5 PE PXC.3031238

5 PXC.3031212 2,5 4 PXC.3031212 2,5

6 PXC.3031212 2,5 5 PXC.3031212 2,5

7 PXC.3031212 2,5 6 PXC.3031212 2,5

8 PXC.3031212 2,5 PE PXC.3031238

9 PXC.3031212 2,5 PXC.3022276

10 PXC.3031212 2,5

11 PXC.3031212 2,5

12 PXC.3031212 2,5 Terminal line-up diagram


PXC.3022276 =SEB+WAH-X4
Terminal strip X4

Terminal Part number Jumper Cross-section

PXC.3030417

1 PXC.3031212 2,5

2 PXC.3031212 2,5

3 PXC.3031212 2,5

PE PXC.3031238

4 PXC.3031212 2,5

5 PXC.3031212 2,5

6 PXC.3031212 2,5

PE PXC.3031238

PXC.3022276

Date 06.05.2014 Training Center EPLAN Software & Service Terminal line-up diagram EXERCISE_25.2 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 201
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 3L1

/ 3L2

/ 3L3

1 3 5 13 21 1 3 5 13 21

U2+ /

U3+ /
U2- /

U3- /
1 3 5 13 21 1 3 5 13 21 -F9 -F10
-F7 -F8 1,1-1,6 A 14 22 1,4-2 A 14 22
(1,1 A) (1,65 A)
1,1-1,6 A 14 22 1,4-2 A 14 22 I> I> I> I> I> I>
(1,1 A) (1,65 A)
I> I> I> I> I> I> 2 4 6 2 4 6
2 4 6 2 4 6

-B1 -X2 -B2 -X2


1 2 1 2
-X1 -X1
1 1
2
U= 2
U=
I~ I~

1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
-Q1 -Q2 -Q3 -Q4 -Q5 -Q6
2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6

-X2 1 2 3 4 5 6 -X2 7 8 9 10 11 12

-W18 -WE1 -W20 -WE1 -W22 -WE1 -W24 -WE1


ÖLFLEX SERVO 730 ÖLFLEX SERVO 730 ÖLFLEX SERVO 730 ÖLFLEX SERVO 730
4G1,5 4G1,5 4G1,5 4G1,5
600 V 1 2 3 GNYE 600 V 1 2 3 GNYE 600 V 1 2 3 GNYE 600 V 2 1 3 GNYE
+WAH

+WAH

Terminal box for left-hand side brush Terminal box for right-hand side brush
set
-X3 1 2 3 4 5 6 7 8 -X4 1 2 3 4 5 6 7 8

-W19 1 2 3 GNYE -W21 1 2 3 GNYE -W23 1 2 3 GNYE -W25 1 2 3 GNYE

ÖLFLEX SERVO 730 U1 V1 W1 PE ÖLFLEX SERVO 730 U1 V1 W1 PE ÖLFLEX SERVO 730 U1 V1 W1 PE ÖLFLEX SERVO 730 U1 V1 W1 PE
4G1,5 4G1,5 4G1,5 4G1,5
600 V
-M7
M 600 V
-M8
M 600 V
-M9
M 600 V
-M10
M
0,37 kW 3 0,55 kW 3 0,37 kW 3 0,55 kW 3

Positioning motor, Rotation, side brush Positioning motor, Rotation, side brush
side brush left left side brush right right

Complete the schematic as shown in the example


Date 20.05.2014 Training Center EPLAN Software & Service Side brushes EXERCISE_26.1 = SEB
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 5L1

/ 5L2

/ 5L3

1 3 5 13 21 1
Insert the page macro
-FC1 -FB1
"DAY_3_EXERCISE_26.2" and complete

U1+ /
U1- /
1-1,65 A 14 22 10 A 2
(1,1 A)
I> I> I>

cables and shields


TRIPPING CHARACTERISTICS
2 4 6

1 3 5

PE.6
N.6
-QA1
2 4 6

-BE1 -X2
Dimensionings 1 2
-X1
1
2
U=
I~
+ASK-TA1 L N PE +5V RS485+ RS485- AGND V024 DI01 DI02 DI03 DI04 DI05 V0TF AI11 AI12 GND SC11 SC12 GND SC21 SC22 GND

L N PE +5V RS485- 1 2 3 4 5 6 7 13 14 15 16 17 18 19 20 21
-X1 -X11 RS485+ AGND -X10

+ -
Parameter
1 3 5 1 3 5 V ON
-QA2 -QA3
2 4 6 2 4 6 MOVITRAC mA OFF
07

S11

S12
-X2 -X3 -X11
U V W PE PE R+ R- 8 9 10 11 12
DO01-C DO01-NODO01-NC DO02 GND
-XD2 1 2 3

-W26 -XD3 1 2 3 4
ÖLFLEX SERVO 730
-WE1 View Control panel
4G1,5 -W29
600 V 1 2 3 GNYE ÖLFLEX CLASSIC 400 CP 1 2 3 GNYE
5G1,5
400 V
Operating manual
+WAH

Roof brush
terminal box
-XD3 1 2 3 4 5 6 7 8 9

-W27 1 2 3 GNYE -W28 1 2 3 GNYE SH

ÖLFLEX SERVO 730 ÖLFLEX CLASSIC 400 CP


4G1,5 5G1,5
600 V U1 V1 W1 PE 400 V U1 V1 W1 PE

-MA2
M -MA3
M
0,55 kW 3 0,37 kW 3

Roof brush rotation Roof brush lifting motor


left-right-rotating

Date 20.05.2014 Training Center EPLAN Software & Service Roof brushes EXERCISE_26.2 = DAB
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Insert the page macro "EXERCISE_27.1" (16 pages) into the project.

Date 13.05.2014 Training Center EPLAN Software & Service Insert page macro EXERCISE_27.1 = SPS
Ed. EPL + ASK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 4
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

15.9 / PLC+.2 PLC+.2 / 15.0


-XD2 15 -XD2 19

User-defined property arrangement


-W16 1 -W17 1

1.) Create a new property arrangement,


=SCH+SST

=HYD+HST
-XD1 1
-XD1 1

13 13 13 13 and modify the page according to this


-BP1 P -BP2 P -BP3 P -BP1 P
14 14 14 14 template
-XD1 2 3 4 -XD1 2

-W16 -W17
ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110
5G1,0 mm² 4G1,0 mm²
300 V 2 3 4 300 V 2

-XD2 16 17 18 20 21 22 23 24

1 1.1 1 2.1 1 1.2 1 2.2 1 1.3 1 2.3 1 1.4 1 2.4


IN1 IN2 IN3 IN4 IN5 IN6 IN7 IN8
-K103 -K103 -K103 -K103 -K103 -K103 -K103 -K103

I25.28 I26.00 I25.29 I26.01 I25.30 I26.02 I25.31 I26.03

Pressure switch lubricating unit 1 bar pressure decreased 20Bar pressure reached Pressure switch hydraulic unit Spare Spare Spare Spare

Pressure switch 1 bar 20Bar pressure Pressure switch Spare Spare Spare Spare
lubricating unit pressure decreased reached hydraulic unit

Date 22.05.2014 Training Center EPLAN Software & Service Task: User-defined property EXERCISE_28.1 = SPS
Ed. DEB + ASK
GmbH & Co KG arrangement
Appr CARWASH 01-01-14-TC Page 15
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

User-defined property arrangement

2.) Change the display for all cables in the project with the new property arrangement
3.) Then change the text size for all cables in the project to 1.3mm
4.) Export the property arrangement saved for 1.) and use it in the EPLAN-DEMO project

Date 24.04.2014 Training Center EPLAN Software & Service Task: User-defined property EXERCISE_28.1 = SPS
Ed. EPL + ASK
GmbH & Co KG arrangement
Appr CARWASH 01-01-14-TC Page 16
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 6L1

/ 6L2

/ 6L3

1 3 5

-FB1
25 A 2 4 6

Fan 1 on Fan 2 on

O72.30 O72.31

1 3 5 13 21 1 3 5 13 21
=SPS+ASK-KF10 =SPS+ASK-KF10
-FC1 -FC2
10-16 A 14 22 10-16 A 14 22
-X4 7 -X4 8
I> I> I> I> I> I>
2 4 6 2 4 6

1 3 5 1 3 5
-QA1 -QA2
.1 2 4 6 .2 2 4 6

-WE1 -WE1

=SPS+ASK-XD3 49 50 -XD1 1 2 3 PE 4 5 6 PE

-W31
.1 -W32 -W33
ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 100 H ÖLFLEX CLASSIC 100 H
4G1,0 mm² 5G2,5 mm² 5G2,5 mm²
300 V 2 3 450 V BK GY BN GNYE 450 V BK GY BN GNYE

A1 A1

+WAH
-QA1 -QA2
24 V A2 24 V A2 U1 V1 W1 PE U1 V1 W1 PE

-W31 1
-MA1
M -MA2
M
5,5 kW 3 5,5 kW 3

PLC-.4
=SPS+ASK-XD3 49-
SIE.3RT1015-1BB42 SIE.3RT1015-1BB42
1 2 .5 1 2 .8
3 4 .5 3 4 .8
5 6 .6 5 6 .8 Fan 1 Fan 2
21 22 21 22

Date 20.05.2014 Training Center EPLAN Software & Service Task: User-defined property EXERCISE_28.1 = TRO
Ed. EPL + ESK
GmbH & Co KG arrangement
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

-XD1 PLC-.3 / 4.0


1- 2- 3- 4- 5- 6- 7- 8- 9-

PLC-.3
4.9 /
-XD1 PLC+.3 / 4.0
1+ 2+ 3+ 4+ 5+ 6+ 7+ 8+ 9+
4.9 / PLC+.3

5
-XD200
-W1 1 -W2 5 -W3 1

5
=SKT+WAH

+PLT

=DAB+WAH
-XD100
View Pushbutton Data sheet Pushbutton
-XD1 1+
13 x1 13 x1 13 x1 11 x1 -XD1 1+ 2+
11 11 11
-SF1 -SF2 -SF3 -SF4
-BG1 grün 14 x2 grün 14 x2 grün 14 x2 rot 12 x2 -BG1 -BG2
Data sheet
Data sheet 12 12 View 12

-XD1 1 -XD100 1 2 3 4 -XD1 1 2

-W1 -W2 -W3


ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110
4G1,0 12G1 4G1,0
300 V 2 300 V 1 2 3 4 300 V 2 3

-XD200 1 2 3 4

-XD1 2 3 4 5 6 7 8 9

Insert the page macro "EXERCISE_29.1". In the navigator create the


plugs =SPS+ASK-XD200 and =SPS+PLT-XD100 and then place the
pins in accordance with the template in the schematic
-X1 1 2 -X1 3 -X1 4 -X1 5 -X1 6 -X1 7 -X1 8

-KF7

I20.00 I20.01 I20.02 I20.03 I20.04 I20.05 I20.06 I20.07

Pulse counter Program 1 Program 2 Program 3 Program Spare Roof brush, position Roof brush, position
chain start start start stop switch, bottom switch, top

Date 20.05.2014 Training Center EPLAN Software & Service Inputs panel and roof brush EXERCISE_29.1 = SPS
Ed. EPL + ASK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 4
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Terminals with bridge connection points Left wheel washing brush tilts Left wheel washing brush tilts Right wheel washing brush tilts Right wheel washing brush tilts
Front left wheel washing brush Back left wheel washing brush forward back Front right wheel washing brush Back right wheel washing brush forward back

O26.20 O26.21 O26.22 O26.23 O26.24 O26.25 O26.26 O26.27

-K107 -K107 -K107 -K107 -K107 -K107 -K107 -K107


OUT1 OUT2 OUT3 OUT4 OUT5 OUT6 OUT7 OUT8
1 1.1 1 2.1 1 1.2 1 2.2 1 1.3 1 2.3 1 1.4 1 2.4

-XD3 51 53 55 57 59 61 63 65
=RWB+WAH

=RWB+WAH
-XD1 1 2 3 4 -XD2 1 2 3 4

A1 A1 A1 A1 A1 A1 A1 A1
-MB1 -MB2 -MB3 -MB4 -MB5 -MB6 -MB7 -MB8
A2 A2 A2 A2 A2 A2 A2 A2

-XD1 1- 2- 3- 4- -XD2 1- 2- 3- 4-

16.8 / PLC-.2 PLC-.2 / 16.1


-XD3 52 54 56 58 60 62 64 66

Front left wheel Back left wheel Left wheel washing Left wheel washing Front right wheel Back right wheel Right wheel washing Right wheel washing
washing brush washing brush brush tilts forward brush tilts back washing brush washing brush brush tilts forward brush tilts back

1.) Draw the terminal strips as shown.

Date 20.05.2014 Training Center EPLAN Software & Service Inputs, fluid power engineering, wheel EXERCISE_30.1 = SPS
Ed. EPL + ASK
GmbH & Co KG washing brushes
Appr CARWASH 01-01-14-TC Page 16
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Rotary table rotation assistance Rotary table rotation assistance


Rotary table rotation left Rotary table rotation right left right Spare Spare Spare Spare

O26.28 O26.29 O26.30 O26.31 O27.00 O27.01 O27.02 O27.03

-K107 -K107 -K107 -K107 -K107 -K107 -K107 -K107


OUT9 OUT10 OUT11 OUT12 OUT13 OUT14 OUT15 OUT16
2 3.1 2 4.1 2 3.2 2 4.2 2 3.3 2 4.3 2 3.4 2 4.4

-XD3 67 69 71 73 75 77 79 81
=DRT+WAH

-XD1 1 2 3 4

A1 A1 A1 A1
-MB1 -MB2 -MB3 -MB4
A2 A2 A2 A2

-XD1 1- 2- 3- 4-

17.8 / PLC-.2 PLC-.2 / 17.1


-XD3 68 70 72 74 76 78 80 82

Rotary table Rotary table Rotary table Rotary table Spare Spare Spare Spare
rotation left rotation right rotation assistance rotation assistance
left right

Date 20.05.2014 Training Center EPLAN Software & Service Outputs fluid power rotary table EXERCISE_30.1 = SPS
Ed. EPL + ASK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 17
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Value sets / Placeholder objects


/ 6L1

/ 6L2

/ 6L3

1 3 5

-FB1
25 A 2 4 6

1.) Highlight the devices "-MA1, -MA2, - FC1" and "-FC2"


2.) Use "Insert > Placeholder object" to place the placeholder
object in the schematic.
3.) Open the property dialog of the placeholder object.
3.) Create the following variables in the "Value" tab: 1 3 5 13 21 1 3 5 13 21

- part_no_MA -FC1
10-16 A 14 22
-FC2
10-16 A 14 22
- part_no_FC I> I> I> I> I> I>
2 4 6 2 4 6
3.) Then create the following value sets:
- 0,37 kW
- 0,55 kW
1 3 5 1 3 5
-QA1 -QA2
4.) Assign the variables to the appropriate properties. .1 2 4 6 .2 2 4 6

Then, make a part selection at the variables "part_no...".


Open the popup menu at the placeholder object and select the
-WE1 -WE1

"Assign value set" function.


-XD1 1 2 3 4 5 6 7 8
-W32 -W33
ÖLFLEX CLASSIC 100 H ÖLFLEX CLASSIC 100 H
5G2,5 5G2,5
450 V BK GY BN GNYE 450 V BK GY BN GNYE

A1 A1

+WAH
-QA1 -QA2
.5 A2 .8 A2 U1 V1 W1 PE U1 V1 W1 PE
24 V 24 V
-W31 1
-MA1
M -MA2
M
5,5 kW 3 5,5 kW 3

PLC-.2
=SPS+ASK-XD3 84

Fan 1 Fan 2

Date 22.05.2014 Training Center EPLAN Software & Service Fan EXERCISE_31.1 =
Ed. DEB +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Data Portal
Exercise: Data Portal Navigator
Page: =DAB+ESK/1 Roof brushes
The frequency converter MOVITRAC 07 must be replaced by a frequency converter from the Data
Portal.
1.) Delete frequency converter "=DAB+ASK-TA1" on schematic page "=DAB+ESK/1 roof
brushes".
2.) Select menu items "Utilities > Data portal navigator".
3.) Search for all parts with the following criteria:
Designation: 0,37
Manufacturer: SEW +ASK-TA1 X1 X10
0,37kW
X12 1 2 1 2 3 4 1 2 3 4 5 8 9

Product group: Electrical engineering >


L N PE PE REF1 AI11 AI12 GND DI00 DI01 DI02 DI03 DI04 24VIO GND

Net Nominal value Binary inputs


3x 200VAC -10% ...

Converters
3x 240VAC +10%
0,37kW V
MOVITRAC S11

Product group: MOVITRAC


MC07B0004-2B1-4-00 mA

TF/TH

Feature: Complex representation


Motor Input Braking resistor Binary outputs
DO01-NO
U V W PE DI05TF VOTF +R -R PE GND DO02 DO03 GND DO01-C DO01-NC
X2 X12 X2 X13 U V W
Shielding
screen bottom 6 7 +R -R
Shielding
screen bottom 1 2 3 4 5 6 7

4.) Select the frequency converter with type


1x230V "SEW.MC07B0004-2B1-​4-​00" and
add it as a device in the graphical editor.

Date 24.04.2014 Training Center EPLAN Software & Service Exercise: Device concept EXERCISE_32.1 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 3
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 2L1

/ 2L2

/ 2L3

PE.5 /
1 1 1
-FB1 -FB2 -FB3
10 A 2 10 A 2 10 A 2

1 3 5
-QA1
2 4 6

+ASK-TA1 X1 1 2 3 X10 1 2 3 4 X12 1 2 3 4 5 8 9


3,7kW L1 L2 L3 PE PE REF1 AI11 AI12 GND DI00 DI01 DI02 DI03 DI04 24VIO GND

Net Nominal value Binary inputs


3x 380VAC -10% ...
3x 500VAC +10%
V
MOVITRAC S11
MC07B0030-5A3-4-00 mA
3,7kW
TF/TH
Motor Input Braking resistor Binary outputs
DO01-NO
U V W PE DI05TF VOTF +R -R PE GND DO02 DO03 GND DO01-C DO01-NC
X2 U V W
Shielding
screen bottom X12 6 7 X2 +R -R
Shielding
screen bottom X13 1 2 3 4 5 6 7

-XD2 1 2 3 4

-W30
ÖLFLEX CLASSIC 100 H
5G2,5
450 V BK GY BN GNYE
+WAH

U1 V1 W1 PE

-MA1
M
3 kW 3 -BS1 +
Inkremental-
geber
-

Assembly instructions
Scale drawing

Chain motor with pulse generator and

Please create this schematic.


power supply, frequency converter

Date 05.06.2014 Training Center EPLAN Software & Service Drag chain EXERCISE_33.1 = SKT
Ed. EPL + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Create a scheme for labeling:

1.) Start the "Labeling" function.


2.) Import the "LB.device.xml" labeling scheme.
3.) Use the new scheme to create a labeling and check it.
4.) Copy the scheme and convert it to an Excel file output.
5.) Use the new scheme to create a labeling and check it.

Date 22.05.2014 Training Center EPLAN Software & Service EXERCISE EXERCISE_36.1 =
Ed. DEB +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Edit a plot frame:


1.) Copy the plot frame "FN1_001.FN1" and rename it "SEM_FN1_001.FN1".
2.) Edit this new plot frame according to the example.
3.) Enter the new plot frame in a desired project
(Settings/Project/Management/Pages
in the combobox "Standard plot frame").

118

Date 20.05.2014 Training Center EPLAN Software & Service EXERCISE EXERCISE_39.1 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

F26_002

D-40789 Monheim
An der alten Ziegelei 2
EPLAN Software & Service GmbH & Co KG Phone. +49 (0)2173 - 39 64 - 0
Fax
E-mail

Customer EPLAN Software & Service End customer EPLAN Software & Service
Street An der alten Ziegelei 2 Street An der alten Ziegelei 2
ZIP code / City 40789 Monheim am Rhein ZIP code / City 40789 Monheim am Rhein
Phone +49 (0)2173 - 39 64 - 0 Phone +49 (0)2173 - 39 64 - 0
Fax +49 (0)2173 - 39 64 - 25 Fax +49 (0)2173 - 39 64 - 25
E-mail info@eplan.de E-mail info@eplan.de

Project name TRAINING_V23_PROJECT_EXERCISE_PART1_NEW


Place of installation Monheim
Manufacturer (company) EPLAN Software & Service GmbH & Co KG
Job number 01-01-2013-TC
Make CARWASH
Project description CARWASH Part feature Korrosionsschutzlackierung
Commission Training Center Input lead NYY 4x25mm²
Responsible for project power supply 400 V AC
Created on 2012 / 2013 Control voltage 24VDC
Project end Type TC-P8
Edit date 20.05.2014 Environmental consideration None
by (short name) Regulation Werksnorm 07-3B
Degree of protection IP 4x
Number of pages 20 Enclosures RITTAL TS-8 series

2
Date 25.04.2014 Training Center EPLAN Software & Service Title page / cover sheet =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 1
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Table of contents Column X: An automatically generated page was edited F06_001

Page Page description supplementary page field Date Edited by X


/1 Title page / cover sheet 25.04.2014 EPL
/2 Table of contents : /1 - =REPORT+VER/1.1 25.04.2014 EPL
=HA1+ES1/1 Power supply 25.04.2014 EPL
=HA1+ES1/2 PLC 25.04.2014 EPL
=HA1+ES1/3 SPS Übersicht 25.04.2014 EPL
=HA1+ES1/4 Power circuit 25.04.2014 EPL
=HA1+ES1/5 Emergency stop 25.04.2014 EPL
=HA1+ES1/6 Control 25.04.2014 EPL
=REPORT+KLP/1 Terminal-strip overview : =HA1+ES1-XD1 - =HA1+ES1-XD6 25.04.2014 EPL
=REPORT+KLP/2 Terminal diagram =HA1+ES1-XD1 25.04.2014 EPL
=REPORT+KLP/3 Terminal diagram =HA1+ES1-XD2 25.04.2014 EPL
=REPORT+KLP/4 Terminal diagram =HA1+ES1-XD3 25.04.2014 EPL
=REPORT+KLP/5 Terminal diagram =HA1+ES1-XD4 25.04.2014 EPL
=REPORT+KLP/6 Terminal diagram =HA1+ES1-XD5 25.04.2014 EPL
=REPORT+KLP/7 Terminal diagram =HA1+ES1-XD6 25.04.2014 EPL
=REPORT+KBP/1 Cable overview : W1 - W3 25.04.2014 EPL
=REPORT+KBP/2 Cable diagram W1 W2 W3 25.04.2014 EPL
=REPORT+BME/1 Device tag list : =HA1+ES1-FB1 - =HA1+PS1-MA2 25.04.2014 EPL
=REPORT+VER/1 Connection list : - 25.04.2014 EPL
=REPORT+VER/1.1 Connection list : - 25.04.2014 EPL

1 =HA1+ES1/1
Date 25.04.2014 Training Center EPLAN Software & Service Table of contents : /1 - =
Ed. EPL +
GmbH & Co KG =REPORT+VER/1.1
Appr CARWASH 01-01-2013-TC Page 2
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

-1L1 / 4.1
-1L2 / 4.1
-1L3 / 4.1

1 1
PE
-FB1 -FB2
6A 26A 2

-TB1
1 2 PE
T1 T2 T3
-QB1
80 A L1 L2 L3

Data sheet

31 32
+ -
24V DC

1
-FB3
6A 2

L+ L-

PE - conductor rail
PE

a a

-XD2 b c d
1
b c d
2

L1 L2 L3 N PE

-XD1 1 2 3 4 5
2.6 / -1L+
5.0 / -2L+

-1L-
-2L-
2.6 /
5.0 /

Power supply Control voltage

=+/2 2
Date 25.04.2014 Training Center EPLAN Software & Service Power supply = HA1
Ed. EPL + ES1
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 1
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

1L+ / 1.3

1L- / 1.4
+ES1-XD3 1PE

+ES1-XD3 1- 2- 3-

+ES1-XD3 1+ 2+ 3+

RJ45 RJ45 1 2 3 4 5 6 7 8 9 SH 1 2 3 4 5 6 7 8 9 SH 1.1 1.2 1.3 1.4 2.1 2.2 2.3 2.4
ETH ETH DO1 DI1 GND res +5 V DO1_ DI1_ res n.c. SH DO1 DI1 GND res +5 V DO1_ DI1_ res n.c. SH US UILC LGND FE UM UM SGND FE

ETH1 ETH2 RB IN RB OUT 5


INLINE -KF1

1 3
Date 25.04.2014 Training Center EPLAN Software & Service PLC = HA1
Ed. EPL + ES1
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 2
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

1 1.1
Emergency Stop signal -SF3:22 /6.1
1.2
1.3
2.1
Start 1 pump -SF5:14 /6.3
2.2
2.3

-KF1
1.4
Stop -SF4:22 /6.2
1.5
1.6
2.4
Start 2 pump -SF6:14 /6.4
2.5
2.6
ETH PLC
MRESET 1 2 3 4 5 2 1.1
Pump 1 malfunction -QA2:14 /6.5
LNK RUN 1.2

ACT
STP FAIL 1.3
2.1
100 RUN / PROG 2.2
10/100 2.3
1.4
Pump 2 malfunction -QA3:14 /6.6
LNK 1.5
ACT INLINE CONTROL 1.6
2.4
100
2.5
2.6
IB
REMOTE RESET REMOTE
3 1.1
IN OUT 1.2
xxxxxxx
(Seriennr.) 1.3
2.1
RC IL 2.2
PRG
BA RDY / RUN
2.3
1.4
RD BSA 1.5
TR FAIL 1.6
2.4
RF
2.5
2.6

4 1.1
Activate 1 pump -QA5:A1 /6.7
1.2
1.3
2.1
2.2
2.3
1.4
Activate 2 pump -QA6:A1 /6.8
1.5
1.6
2.4
2.5
2.6

5 US
1.1
Voltage US /2.6
1.2
UILC Voltage UM /2.7
1.3
LGND GND /2.7
1.4
FE PE /2.7
2.1
UM Voltage US /2.7
2.2
UM Voltage UM /2.7
2.3
SGND GND /2.8
2.4
FE PE /2.8

2 4
Date 20.05.2014 Training Center EPLAN Software & Service SPS Übersicht = HA1
Ed. EPL + ES1
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 3
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

1.8 / -1L1
1.8 / -1L2
1.8 / -1L3

1 3 5

-FB4
D02/63 A 2 4 6

1 3 5
-QA4
/5.1 2 4 6
Emergency stop

1 3 5 13 21 1 3 5 13 21
-QA2 -QA3
1,6-2,5 A 14 22 1,6-2,5 A 14 22
I> I> I> I> I> I>

/6.5

/6.6
2 4 6 2 4 6

1 3 5 1 3 5
-QA5 -QA6
/6.7 2 4 6 /6.8 2 4 6

PE PE

-XD4 1 2 3 4 5 6 7 8
PE PE

-W1 BK BN GY GNYE -W2 BK BN GY GNYE


ÖLFLEX CLASSIC 100 H ÖLFLEX CLASSIC 100 H
4G2,5 4G2,5
450 V 450 V
+PS1

U1 V1 W1 PE U1 V1 W1 PE

-MA1
M -MA2
M
0,55 kW 3 0,55 kW 3

Pump 1 Pump 2

3 5
Date 25.04.2014 Training Center EPLAN Software & Service Power circuit = HA1
Ed. EPL + ES1
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 4
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

1.4 / -2L+
-2L+ / 6.0
-XD5 1

-W3 1
/6.1

-XD6 1

11
-SF1
Emergency stop 12

21
-SF2
Stop system 22

13
-SF3
/6.1 14
Startup system
4
-XD6 3

-W3 3 4
/6.1

-XD5 3 4
13
-QA4
.1 14

A1
-QA4
24 V A2

-2L- / 6.7
-XD5 13

1.4 / -2L-
Emergency stop

ABB.GJL1211001R0101
1 2 /4.2
3 4 /4.2
5 6 /4.3
13 14 .2

4 6
Date 25.04.2014 Training Center EPLAN Software & Service Emergency stop = HA1
Ed. EPL + ES1
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 5
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

5.9 / -2L+
-XD5 2

-W3 2
.1

-XD6 2
Activate 1 pump Activate 2 pump
-QA5:A1 -QA6:A1
O2.00 O2.01

-KF1

4 1.1 4 1.4

21 21 13 13 13 13
-SF3 -SF4 -SF5 -SF6 -QA2 -QA3
/5.1 22 22 14 14 /4.2 14 /4.6 14
Startup system

-XD6 5 6 7 8

-W3
/5.1
/5.1 5 6 7 8
.1
SUPERFLEX-N-PUR
12G1,5
500 V

-XD5 5 6 7 8 9 10 -XD5 11 12

1 1.1 1 1.4 1 2.1 1 2.4 2 1.1 2 1.4

-KF1

A1 A1
I1.00 I1.01 I1.02 I1.03 I1.04 I1.05
-SF3:22 -SF4:22 -SF5:14 -SF6:14 -QA2:14 -QA3:14 -QA5 -QA6
24 V A2 24 V A2
Emergency Stop signal Stop Start 1 pump Start 2 pump Pump 1 malfunction Pump 2 malfunction

5.9 / -2L-
-XD5 14 15

Activate 1 pump Activate 2 pump

Emergency Stop Stop Start 1 pump Start 2 pump Pump 1 Pump 2


signal malfunction malfunction
MOE.052217 MOE.052217
1 2 /4.2 1 2 /4.6
3 4 /4.2 3 4 /4.6
5 6 /4.3 5 6 /4.6

5 =REPORT+KLP/1
Date 25.04.2014 Training Center EPLAN Software & Service Control = HA1
Ed. EPL + ES1
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 6
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Terminal-strip overview TC_F14_002

Terminals
Terminal strip Function text Terminal diagram page
first last Total PE Total N Total number
=HA1+ES1-XD1 Power supply 1 5 1 1 5 =REPORT+KLP/2

=HA1+ES1-XD2 Control voltage 1 2 0 0 2 =REPORT+KLP/3

=HA1+ES1-XD3 PLC controllers 1+ 1PE 1 0 4 =REPORT+KLP/4

=HA1+ES1-XD4 Drive terminal strip 1 8 2 0 8 =REPORT+KLP/5

=HA1+ES1-XD5 Enclosure 1 15 0 0 15 =REPORT+KLP/6

=HA1+ES1-XD6 console 1 8 0 0 8 =REPORT+KLP/7

=HA1+ES1/6 2
Date 25.04.2014 Training Center EPLAN Software & Service Terminal-strip overview : = REPORT
Ed. EPL + KLP
GmbH & Co KG =HA1+ES1-XD1 - =HA1+ES1-XD6
Appr CARWASH 01-01-2013-TC Page 1
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Terminal diagram F13_003

Strip
External targets
=HA1+ES1-XD1 Internal targets

Target designation Wiring Jumper Function text Jumper Wiring Target designation Placement
1 Power supply =HA1+ES1-QB1:L1 =HA1+ES1/1.1

2 = =HA1+ES1-QB1:L2 =HA1+ES1/1.1

3 = =HA1+ES1-QB1:L3 =HA1+ES1/1.1

4 = =HA1+ES1-FB2:1 =HA1+ES1/1.4

5 = PE =HA1+ES1/1.2

1 3
Date 25.04.2014 Training Center EPLAN Software & Service Terminal diagram =HA1+ES1-XD1 = REPORT
Ed. EPL + KLP
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 2
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Terminal diagram F13_003

Strip
External targets
=HA1+ES1-XD2 Internal targets

Target designation Wiring Jumper Function text Jumper Wiring Target designation Placement
=HA1+ES1-XD3:1+ 1 Control voltage =HA1+ES1-FB3:2 =HA1+ES1/1.3

=HA1+ES1-XD5:1

=HA1+ES1-XD3:1- 2 Control voltage =HA1+ES1-TB1:32 =HA1+ES1/1.4

=HA1+ES1-XD5:13

2 4
Date 25.04.2014 Training Center EPLAN Software & Service Terminal diagram =HA1+ES1-XD2 = REPORT
Ed. EPL + KLP
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 3
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Terminal diagram F13_003

Strip
External targets
=HA1+ES1-XD3 Internal targets

Target designation Wiring Jumper Function text Jumper Wiring Target designation Placement
1+ =HA1+ES1-XD2:1:b =HA1+ES1/1.3

1- =HA1+ES1-XD2:2:b =HA1+ES1/1.4

=HA1+ES1-KF1:5:1.2 2+ =HA1+ES1-KF1:5:1.1 =HA1+ES1/2.6

=HA1+ES1-KF1:5:1.3 2-

=HA1+ES1-KF1:5:2.2 3+ =HA1+ES1-KF1:5:2.1 =HA1+ES1/2.7

=HA1+ES1-KF1:5:2.3 3-

=HA1+ES1-KF1:5:2.4 1PE

3 5
Date 25.04.2014 Training Center EPLAN Software & Service Terminal diagram =HA1+ES1-XD3 = REPORT
Ed. EPL + KLP
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 4
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Terminal diagram F13_003

Strip
External targets
=HA1+ES1-XD4 Internal targets

Target designation Wiring Jumper Function text Jumper Wiring Target designation Placement
=HA1+PS1-MA1:U1 1 Pump 1 =HA1+ES1-QA5:2 =HA1+ES1/4.2

=HA1+PS1-MA1:V1 2 = =HA1+ES1-QA5:4 =HA1+ES1/4.2

=HA1+PS1-MA1:W1 3 = =HA1+ES1-QA5:6 =HA1+ES1/4.3

=HA1+PS1-MA1:PE 4 = PE =HA1+ES1/4.3

=HA1+PS1-MA2:U1 5 Pump 2 =HA1+ES1-QA6:2 =HA1+ES1/4.6

=HA1+PS1-MA2:V1 6 = =HA1+ES1-QA6:4 =HA1+ES1/4.6

=HA1+PS1-MA2:W1 7 = =HA1+ES1-QA6:6 =HA1+ES1/4.6

=HA1+PS1-MA2:PE 8 = PE =HA1+ES1/4.6

4 6
Date 25.04.2014 Training Center EPLAN Software & Service Terminal diagram =HA1+ES1-XD4 = REPORT
Ed. EPL + KLP
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 5
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Terminal diagram F13_003

Strip
External targets
=HA1+ES1-XD5 Internal targets

Target designation Wiring Jumper Function text Jumper Wiring Target designation Placement
=HA1+ES1-XD6:1 1 Emergency stop =HA1+ES1-XD2:1:c =HA1+ES1/1.3

=HA1+ES1-XD6:2 2 Emergency Stop signal =HA1+ES1-QA2:13 =HA1+ES1/6.5

=HA1+ES1-XD6:3 3 Emergency stop =HA1+ES1-QA4:A1 =HA1+ES1/5.1

=HA1+ES1-QA4:14 =HA1+ES1/5.2

=HA1+ES1-XD6:4 4 Emergency stop =HA1+ES1-QA4:13 =HA1+ES1/5.2

=HA1+ES1-XD6:5 5 Emergency Stop signal =HA1+ES1-KF1:1:1.1 =HA1+ES1/6.1

=HA1+ES1-XD6:6 6 Stop =HA1+ES1-KF1:1:1.4 =HA1+ES1/6.2

=HA1+ES1-XD6:7 7 Start 1 pump =HA1+ES1-KF1:1:2.1 =HA1+ES1/6.3

=HA1+ES1-XD6:8 8 Start 2 pump =HA1+ES1-KF1:1:2.4 =HA1+ES1/6.4

=HA1+ES1-QA2:14 9 Pump 1 malfunction =HA1+ES1-KF1:2:1.1 =HA1+ES1/6.5

=HA1+ES1-QA3:14 10 Pump 2 malfunction =HA1+ES1-KF1:2:1.4 =HA1+ES1/6.6

=HA1+ES1-KF1:4:1.1 11 Activate 1 pump =HA1+ES1-QA5:A1 =HA1+ES1/6.7

=HA1+ES1-KF1:4:1.4 12 Activate 2 pump =HA1+ES1-QA6:A1 =HA1+ES1/6.8

=HA1+ES1-QA4:A2 13 Emergency stop =HA1+ES1-XD2:2:c =HA1+ES1/1.4

=HA1+ES1-QA5:A2 14 Activate 1 pump

=HA1+ES1-QA6:A2 15 Activate 2 pump

5 7
Date 25.04.2014 Training Center EPLAN Software & Service Terminal diagram =HA1+ES1-XD5 = REPORT
Ed. EPL + KLP
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 6
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Terminal diagram F13_003

Strip
External targets
=HA1+ES1-XD6 Internal targets

Target designation Wiring Jumper Function text Jumper Wiring Target designation Placement
=HA1+ES1-XD5:1 1 Emergency stop =HA1+ES1-SF1:11 =HA1+ES1/5.1

=HA1+ES1-XD5:2 2 Emergency Stop signal =HA1+ES1-SF3:21 =HA1+ES1/6.1

=HA1+ES1-XD5:3 3 Emergency stop =HA1+ES1-SF3:14 =HA1+ES1/5.1

=HA1+ES1-XD5:4 4 = =HA1+ES1-SF3:13 =HA1+ES1/5.1

=HA1+ES1-XD5:5 5 Emergency Stop signal =HA1+ES1-SF3:22 =HA1+ES1/6.1

=HA1+ES1-XD5:6 6 Stop =HA1+ES1-SF4:22 =HA1+ES1/6.2

=HA1+ES1-XD5:7 7 Start 1 pump =HA1+ES1-SF5:14 =HA1+ES1/6.3

=HA1+ES1-XD5:8 8 Start 2 pump =HA1+ES1-SF6:14 =HA1+ES1/6.4

6 +KBP/1
Date 25.04.2014 Training Center EPLAN Software & Service Terminal diagram =HA1+ES1-XD6 = REPORT
Ed. EPL + KLP
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 7
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Cable overview TC_F10_003

Cable designation Source Target Cable type Condctrs ø Length Function text
W1 =HA1+ES1-XD4 =HA1+PS1-MA1 ÖLFLEX CLASSIC 100 H 4G 2,5 Pump 1

W2 =HA1+ES1-XD4 =HA1+PS1-MA2 ÖLFLEX CLASSIC 100 H 4G 2,5 Pump 2

W3 =HA1+ES1-XD5 =HA1+ES1-XD6 SUPERFLEX-N-PUR 12G 1,5 Emergency Stop signal

+KLP/7 2
Date 25.04.2014 Training Center EPLAN Software & Service Cable overview : W1 - W3 = REPORT
Ed. EPL + KBP
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 1
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Cable diagram TC_F09_002

Cable name W1 Cable type ÖLFLEX CLASSIC 100 H


Function text Pump 1 No. of conductors 4G Cross-section 2,5 Cable length
Connection Connection
Function text Page / column Target designation Conductor Target designation Page / column Function text
point point

Pump 1 =HA1+ES1/4.2 =HA1+ES1-XD4 1 BK =HA1+PS1-MA1 U1 =HA1+ES1/4.2 Pump 1

= =HA1+ES1/4.2 =HA1+ES1-XD4 2 BN =HA1+PS1-MA1 V1 =HA1+ES1/4.2 =

= =HA1+ES1/4.3 =HA1+ES1-XD4 3 GY =HA1+PS1-MA1 W1 =HA1+ES1/4.2 =

= =HA1+ES1/4.3 =HA1+ES1-XD4 4 GNYE =HA1+PS1-MA1 PE =HA1+ES1/4.2 =

Cable name W2 Cable type ÖLFLEX CLASSIC 100 H


Function text Pump 2 No. of conductors 4G Cross-section 2,5 Cable length
Connection Connection
Function text Page / column Target designation Conductor Target designation Page / column Function text
point point

Pump 2 =HA1+ES1/4.6 =HA1+ES1-XD4 5 BK =HA1+PS1-MA2 U1 =HA1+ES1/4.6 Pump 2

= =HA1+ES1/4.6 =HA1+ES1-XD4 6 BN =HA1+PS1-MA2 V1 =HA1+ES1/4.6 =

= =HA1+ES1/4.6 =HA1+ES1-XD4 7 GY =HA1+PS1-MA2 W1 =HA1+ES1/4.6 =

= =HA1+ES1/4.6 =HA1+ES1-XD4 8 GNYE =HA1+PS1-MA2 PE =HA1+ES1/4.6 =

Cable name W3 Cable type SUPERFLEX-N-PUR


Function text Emergency Stop signal No. of conductors 12G Cross-section 1,5 Cable length
Connection Connection
Function text Page / column Target designation Conductor Target designation Page / column Function text
point point

Emergency stop =HA1+ES1/5.1 =HA1+ES1-XD5 1 1 =HA1+ES1-XD6 1 =HA1+ES1/5.1 Emergency stop

Emergency Stop signal =HA1+ES1/6.1 =HA1+ES1-XD5 2 2 =HA1+ES1-XD6 2 =HA1+ES1/6.1 Emergency Stop signal

Emergency stop =HA1+ES1/5.1 =HA1+ES1-XD5 3 3 =HA1+ES1-XD6 3 =HA1+ES1/5.1 Emergency stop

= =HA1+ES1/5.2 =HA1+ES1-XD5 4 4 =HA1+ES1-XD6 4 =HA1+ES1/5.2 =

Emergency Stop signal =HA1+ES1/6.1 =HA1+ES1-XD5 5 5 =HA1+ES1-XD6 5 =HA1+ES1/6.1 Emergency Stop signal

Stop =HA1+ES1/6.2 =HA1+ES1-XD5 6 6 =HA1+ES1-XD6 6 =HA1+ES1/6.2 Stop

Start 1 pump =HA1+ES1/6.3 =HA1+ES1-XD5 7 7 =HA1+ES1-XD6 7 =HA1+ES1/6.3 Start 1 pump

Start 2 pump =HA1+ES1/6.4 =HA1+ES1-XD5 8 8 =HA1+ES1-XD6 8 =HA1+ES1/6.4 Start 2 pump

10

11

GNYE

1 +BME/1
Date 25.04.2014 Training Center EPLAN Software & Service Cable diagram W1 W2 W3 = REPORT
Ed. EPL + KBP
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 2
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Device tag list F03_002

Device tag Quantity Designation Type number Manufacturer Part number

=HA1+ES1-FB1 1 Circuit breaker 6 A FAZ6-B6 MOE MOE.FAZ6-B6

=HA1+ES1-FB2 1 Circuit breaker 6 A FAZ6-B6 MOE MOE.FAZ6-B6

=HA1+ES1-FB3 1 Circuit breaker 6 A FAZ6-B6 MOE MOE.FAZ6-B6

=HA1+ES1-FB4 1 NEOZED built-in fuse base 5SG5700 SIE SIE.5SG5700

=HA1+ES1-KF1 1 Controller ILC 370 PN 2TX-IB PXC PXC.2876915

=HA1+ES1-QA2 1 3RV2011-0KA15 SIE SIE.3RV2011-0KA15


CIRCUIT-BREAKER SZ S00, FOR MOTOR PROTECTION, CLASS 10

=HA1+ES1-QA3 1 3RV2011-0KA15 SIE SIE.3RV2011-0KA15


CIRCUIT-BREAKER SZ S00, FOR MOTOR PROTECTION, CLASS 10

=HA1+ES1-QA4 1 Motor contactor GJL1211001R0101 ABB ABB.GJL1211001R0101

=HA1+ES1-QA5 1 Power circuit breaker DIL0AM MOE MOE.052217

=HA1+ES1-QA6 1 Power circuit breaker DIL0AM MOE MOE.052217

=HA1+ES1-QB1 1 Main / Emergency stop switch 690V KG80T213/04 E FEC KGS KGS.KG80T213/04 E FEC

=HA1+ES1-SF1 1 M22-PV/KC02/IY MOE MOE.M22-PV/KC02/IY

=HA1+ES1-SF2 1 M22-D-R-X0/KC11/I MOE MOE.M22-D-R-X0/KC11/I

=HA1+ES1-SF3 1 M22-D-G-X1/KC11/I MOE MOE.M22-D-G-X1/KC11/I

=HA1+ES1-SF4 1 M22-D-R-X0/KC11/I MOE MOE.M22-D-R-X0/KC11/I

=HA1+ES1-SF5 1 M22-D-G-X1/KC11/I MOE MOE.M22-D-G-X1/KC11/I

=HA1+ES1-SF6 1 M22-D-G-X1/KC11/I MOE MOE.M22-D-G-X1/KC11/I

=HA1+ES1-TB1 1 Power supply unit, primary switched-mode, narrow model Mini-PS-100-240VAC/24DC/4 PXC PHO.Mini-PS-100-240VAC/24DC/4

=HA1+PS1-MA1 1 Squirrel-cage motor 1LA7080-4AA10-ZA11 SIE SIE.1LA7080-4AA10-ZA11

=HA1+PS1-MA2 1 Squirrel-cage motor 1LA7080-4AA10-ZA11 SIE SIE.1LA7080-4AA10-ZA11

+KBP/2 +VER/1
Date 25.04.2014 Training Center EPLAN Software & Service Device tag list : =HA1+ES1-FB1 - = REPORT
Ed. EPL + BME
GmbH & Co KG =HA1+PS1-MA2
Appr CARWASH 01-01-2013-TC Page 1
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Connection list F27_002

Connection Target 1 Target 2 Color Cross-section =HA1+ES1-FB3:2 =HA1+ES1-XD2:1:a BU 2,5

=HA1+ES1-SF3:21 =HA1+ES1-XD6:2 BU 2,5 =HA1+ES1-TB1:32 =HA1+ES1-XD2:2:a DBU 2,5

=HA1+ES1-SF3:22 =HA1+ES1-XD6:5 BU 2,5 PE =HA1+ES1-TB1:PE GNYE 1,5

=HA1+ES1-SF3:21 =HA1+ES1-SF4:21 BU 2,5 =HA1+ES1-QA5:4 =HA1+ES1-XD4:2 BK 1,5

=HA1+ES1-SF4:21 =HA1+ES1-SF5:13 BU 2,5 =HA1+ES1-QA2:4 =HA1+ES1-QA5:3 BK 1,5

=HA1+ES1-SF4:22 =HA1+ES1-XD6:6 BU 2,5 =HA1+ES1-QA2:6 =HA1+ES1-QA5:5 BK 1,5

=HA1+ES1-SF5:14 =HA1+ES1-XD6:7 BU 2,5 =HA1+ES1-QA2:2 =HA1+ES1-QA5:1 BK 1,5

=HA1+ES1-KF1:1:1.1 =HA1+ES1-XD5:5 BU 2,5 =HA1+ES1-QA5:2 =HA1+ES1-XD4:1 BK 1,5

=HA1+ES1-KF1:1:1.4 =HA1+ES1-XD5:6 BU 2,5 =HA1+ES1-QA5:6 =HA1+ES1-XD4:3 BK 1,5

=HA1+ES1-KF1:1:2.1 =HA1+ES1-XD5:7 BU 2,5 PE =HA1+ES1-XD4:4 GNYE 1,5

=HA1+ES1-KF1:1:2.4 =HA1+ES1-XD5:8 BU 2,5 =HA1+ES1-QA6:4 =HA1+ES1-XD4:6 BK 1,5

=HA1+ES1-QA2:13 =HA1+ES1-XD5:2 BU 2,5 =HA1+ES1-QA2:1 =HA1+ES1-QA3:1 BK 1,5

=HA1+ES1-QA2:13 =HA1+ES1-QA3:13 BU 2,5 =HA1+ES1-QA2:3 =HA1+ES1-QA3:3 BK 1,5

=HA1+ES1-KF1:2:1.1 =HA1+ES1-XD5:9 BU 2,5 =HA1+ES1-QA3:4 =HA1+ES1-QA6:3 BK 1,5

=HA1+ES1-QA2:14 =HA1+ES1-XD5:9 BU 2,5 =HA1+ES1-QA2:5 =HA1+ES1-QA3:5 BK 1,5

=HA1+ES1-KF1:2:1.4 =HA1+ES1-XD5:10 BU 2,5 =HA1+ES1-QA3:6 =HA1+ES1-QA6:5 BK 1,5

=HA1+ES1-QA3:14 =HA1+ES1-XD5:10 BU 2,5 =HA1+ES1-QA3:2 =HA1+ES1-QA6:1 BK 1,5

=HA1+ES1-KF1:4:1.4 =HA1+ES1-XD5:12 BK 1,5 =HA1+ES1-QA6:2 =HA1+ES1-XD4:5 BK 1,5

=HA1+ES1-KF1:4:1.1 =HA1+ES1-XD5:11 BK 1,5 =HA1+ES1-QA6:6 =HA1+ES1-XD4:7 BK 1,5

=HA1+ES1-QA6:A1 =HA1+ES1-XD5:12 BK 1,5 PE =HA1+ES1-XD4:8 GNYE 1,5

=HA1+ES1-QA5:A1 =HA1+ES1-XD5:11 BK 1,5 =HA1+ES1-FB4:2 =HA1+ES1-QA4:1 BK 1,5

=HA1+ES1-QA5:A2 =HA1+ES1-XD5:14 DBU 2,5 =HA1+ES1-QA2:1 =HA1+ES1-QA4:2 BK 1,5

=HA1+ES1-QA6:A2 =HA1+ES1-XD5:15 DBU 2,5 =HA1+ES1-FB4:6 =HA1+ES1-QA4:5 BK 1,5

=HA1+ES1-SF5:13 =HA1+ES1-SF6:13 BU 2,5 =HA1+ES1-QA2:5 =HA1+ES1-QA4:6 BK 1,5

=HA1+ES1-SF6:14 =HA1+ES1-XD6:8 BU 2,5 =HA1+ES1-FB4:4 =HA1+ES1-QA4:3 BK 1,5

=HA1+ES1-QB1:L1 =HA1+ES1-XD1:1 BK 1,5 =HA1+ES1-QA2:3 =HA1+ES1-QA4:4 BK 1,5

=HA1+ES1-QB1:L2 =HA1+ES1-XD1:2 BK 1,5 =HA1+ES1-QA4:A1 =HA1+ES1-XD5:3 BU 2,5

=HA1+ES1-QB1:L3 =HA1+ES1-XD1:3 BK 1,5 =HA1+ES1-QA4:A2 =HA1+ES1-XD5:13 DBU 2,5

PE =HA1+ES1-XD1:5 GNYE 1,5 =HA1+ES1-QA4:14 =HA1+ES1-XD5:3 BU 2,5

=HA1+ES1-FB3:1 =HA1+ES1-TB1:31 BU 2,5 =HA1+ES1-SF1:12 =HA1+ES1-SF2:21 BU 2,5

+BME/1 1.1
Date 25.04.2014 Training Center EPLAN Software & Service Connection list : - = REPORT
Ed. EPL + VER
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 1
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Connection list F27_002

Connection Target 1 Target 2 Color Cross-section

=HA1+ES1-SF2:22 =HA1+ES1-SF3:13 BU 2,5

=HA1+ES1-SF1:11 =HA1+ES1-XD6:1 BU 2,5

=HA1+ES1-SF3:14 =HA1+ES1-XD6:3 BU 2,5

=HA1+ES1-SF3:13 =HA1+ES1-XD6:4 BU 2,5

=HA1+ES1-QA4:13 =HA1+ES1-XD5:4 BU 2,5

=HA1+ES1-FB4:3 =HA1+ES1-QB1:T2 BK 1,5

=HA1+ES1-FB4:5 =HA1+ES1-QB1:T3 BK 1,5

=HA1+ES1-XD2:1:c =HA1+ES1-XD5:1 BU 2,5

=HA1+ES1-XD2:2:c =HA1+ES1-XD5:13 DBU 2,5

=HA1+ES1-KF1:5:2.4 =HA1+ES1-XD3:1PE BK 1,5

=HA1+ES1-KF1:5:2.3 =HA1+ES1-XD3:3- DBU 2,5

=HA1+ES1-KF1:5:2.2 =HA1+ES1-XD3:3+ BU 2,5

=HA1+ES1-KF1:5:2.1 =HA1+ES1-XD3:3+ BU 2,5

=HA1+ES1-KF1:5:1.3 =HA1+ES1-XD3:2- DBU 2,5

=HA1+ES1-KF1:5:1.2 =HA1+ES1-XD3:2+ BU 2,5

=HA1+ES1-KF1:5:1.1 =HA1+ES1-XD3:2+ BU 2,5

=HA1+ES1-XD2:2:b =HA1+ES1-XD3:1- DBU 2,5

=HA1+ES1-XD2:1:b =HA1+ES1-XD3:1+ BU 2,5

=HA1+ES1-FB1:1 =HA1+ES1-QB1:T1 BK 1,5

=HA1+ES1-FB1:2 =HA1+ES1-TB1:1 BK 1,5

=HA1+ES1-FB2:1 =HA1+ES1-XD1:4 BK 1,5

=HA1+ES1-FB2:2 =HA1+ES1-TB1:2 BK 1,5

=HA1+ES1-FB1:1 =HA1+ES1-FB4:1 BK 1,5

1
Date 25.04.2014 Training Center EPLAN Software & Service Connection list : - = REPORT
Ed. EPL + VER
GmbH & Co KG
Appr CARWASH 01-01-2013-TC Page 1.1
Modification Date Name Original Replacement of Replaced by Page 20
0 1 2 3 4 5 6 7 8 9

Macro project:
1.) Create a new project named "MASTERDATA". Use the project template "IEC_BAS001.zw9", the project
property "Type of project" and please set up as a "Macro project"
2.) Delete all pages of this project, and switch to the structure properties of the project.
3.) Set for the "page" as many structure elements as possible as "identifying" in order to integrate the macro
project optimally.
4.) Create a schematic page using the following scheme: == Macro
type.Trade ++
Function.Subfunction & Representation
type # Macro
name =
Higher-level
function +
Mounting location /A Variant
Page name: ==PART.ELECTRIC++DRIVES.DIRECT&MULTI_LINE#CURRENT_TRANSFORMER=SEB+ESK/A
Page description: IU transducer.
5.) Create on this page the "IU Transducer" macro.

Date 22.05.2014 Training Center EPLAN Software & Service Macro EXERCISE_51.1 = MAKRO
Ed. DEB + EXERCISE
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

IU-Converter
Allpolig
PART\ELECTRIC\DRIVES\DIRECT\MULTI_LINE\CURRENT_TRANSFORMER.ema
CURRENT_TRANSFORMER
Variante A

-BE1 -X2
1 2
-X1
1
2
U=
I~

Please create this exchanger.

Date 22.05.2014 Training Center EPLAN Software & Service Symbol macro EXERCISE_51.1 = MAKRO
Ed. DEB + EXERCISE
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 2
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Macro boxes:
1.) Copy a window section of a partial circuit to the macro project via the clipboard.
2.) Manually insert a macro box via the newly placed objects.
3.) Add the "2866747.ema" window macro.
4.) What are the disadvantages when generating macros, as described in item 3.

Date 22.05.2014 Training Center EPLAN Software & Service Macro EXERCISE_51.1 = MAKRO
Ed. DEB + EXERCISE
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 3
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Generate macros:
1.) Generate all macros of your macro project via the "Generate macros > Automatically from
macro project" function.
2.) Check the macros generated.

Date 22.05.2014 Training Center EPLAN Software & Service Macro EXERCISE_51.1 = MAKRO
Ed. DEB + EXERCISE
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 4
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Accessory management
1.) Create the following accessories for the IU transducer:
# Fixing material -BE1 -X2

# Mounting instructions -X1


1
1 2

U=
# Connecting cable 2m
2
I~

# Connecting cable 5m
2.) Create an accessories list and assign it to part "CINV".
3.) At the IU transducer, carry out device selection, and also select the fixing material and the
mounting instructions.

Date 13.05.2014 Training Center EPLAN Software & Service IU EXERCISE_52.1 =


Ed. EPL +
GmbH & Co KG TRANSDUCER task
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

PLC overviews
1.) Insert the "EXERCISE_53.1.emp" page macro, and complete your projects via the overview
pages.
2.) Then, harmonize the multi-line functions with the newly inserted overview functions.

Date 22.05.2014 Training Center EPLAN Software & Service PLC overviews EXERCISE_53.1 =
Ed. DEB +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

1 1.1
1.2
1.3
2.1
2.2
2.3

-K100
1.4
1.5
1.6
2.4
2.5
2.6
ETH PLC
MRESET 1 2 3 4 5 2 1.1
LNK RUN 1.2

ACT
STP FAIL 1.3
2.1
100 RUN / PROG 2.2
10/100 2.3
1.4
LNK 1.5
ACT INLINE CONTROL 1.6
2.4
100
2.5
2.6
IB
REMOTE RESET REMOTE
3 1.1
IN OUT 1.2
xxxxxxx
(Seriennr.) 1.3
2.1
RC IL 2.2
PRG
BA RDY / RUN
2.3
1.4
RD BSA 1.5
TR FAIL 1.6
2.4
RF
2.5
2.6

4 1.1
1.2
1.3
2.1
2.2
2.3

Place PLC overviews


1.4
1.5
1.6
2.4
2.5

1.) Create the overview page =SPS+ASK/51 with


2.6

5 1.1
Voltage US

the page description "PLC overview controller with


US
1.2
UILC Voltage UM
LGND
1.3
1.4

digital connection points".


FE PE
2.1
UM Voltage US
2.2
UM Voltage UM

2.) On the overview page, place the


SGND
2.3
2.4
FE PE

=SPS+ASK-K100 device.
Date 22.05.2014 Training Center EPLAN Software & Service PLC overviews EXERCISE_53.2 = SPS
Ed. DEB + ASK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

/ 6L1

/ 6L2

/ 6L3

1 3 5

-FB1
25 A 2 4 6

Fan 2
Fan 1 on
on

O1.00 O1.01

1 3 5 13 21 1 3 5 13 21
=SPS+ASK-KF10
-FC1 -FC2
10-16 A 14 22 10-16 A 14 22
-X1 1 -X1 2
I> I> I> I> I> I>
2 4 6 2 4 6

1 3 5 1 3 5
-QA1 -QA2
.1 2 4 6 .2 2 4 6

-WE1 -WE1

=SPS+ASK-XD3 83 85 -XD1 1 2 3 4 5 6 7 8

A1 A1

+WAH
-QA1 -QA2
24 V A2 24 V A2 U1 V1 W1 PE U1 V1 W1 PE

-MA1
M -MA2
M
5,5 kW 3 5,5 kW 3

PLC-.2
=SPS+ASK-XD3 84 86
SIE.3RT1015-1BB42 SIE.3RT1015-1BB42
1 2 .5 1 2 .8
3 4 .5 3 4 .8
5 6 .6 5 6 .8 Fan 1 Fan 2
21 22 21 22

3.) Select two PLC outputs in the navigator and place them on the schematic page
=TRO+ESK/1 (fan).
Date 20.05.2014 Training Center EPLAN Software & Service Fan EXERCISE_53.2 = TRO
Ed. EPL + ESK
GmbH & Co KG
Appr EPL CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Cross-references / Cross-reference display


Contact image display Pair cross-reference Device cross-references between multi-line and
single-line representations
1 3 5 13 21
-F1
14 22
13 x1
I> I> I>
.2

.2
3+PE
13 21
-S5
2 4 6
14 x2 x1 U1 V1 W1 PE
-F1 -F1
-S5 -M1
M

.5
.0 14 .0 22
.4 x2 -M1
M .7 3~
^.9 3

Contact image: On cpmponent Cross-reference (main / aux. function) Settings: Cross-references / contact image > General
Device cross-references PLC cross-references
-K2
.7 1
I0.00 /1.7 Spare
1 3 5 21
A1 -Q1 -S1
1
-Q1 .0 2 4 6 .5 22 13 23
A2 .5 -S1 -S1 -K2
.4 14 .4 24

1 2 .1 I0.00
3 4 .2
5 6 .2 Spare

Contact image: In path Cross-reference (main / aux. function)

21
13 -K1
A1 B1 -K1 .1 22 Settings: Cross-references / contact image > Display
-K1
A2 B2
.1 14
Cross-references to device tag lists Interruption point cross-references
1.7
S* / 1.8 Star cross-reference
1.8
13 14 .2 21 22 .2

21 1.6 / S*
-S4
1.6 / S*
Contact image: In path .5
.5
22
-S4
13
-S4
23

Contact / coil index .4 14 .4 24 1.6 / S*


Contact image display
"Symbole image" Interruption point cross-references
13 x1
C / 1.7
Chain cross-reference
-S6
14 x2 x1 Cross-reference (main / aux. function)
-S6 1.6 / C C / 1.9
Settings: Cross-references / contact image >
.1

.1 x2
Display 1.8 / C

Date 22.05.2014 Training Center EPLAN Software & Service Cross-references / Cross-reference EXERCISE_54.1 =
Ed. DEB +
GmbH & Co KG display
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Error in connection point logic


Connection point type: Connection point type:
-WC1

-WC2
A1
-WC3

2
2 4 6
1 3 5 V1
-QB0 -QA1
63 A 1 3 5
Main switch 2 4 6
1

Message: Targets have differing connection point types


Message: Connection and connecting point have differing connection point types Message: Targets have differing connection point types
Cause: Conductor / wire <-> Direct connection point Message: Connection and connecting point have differing connection point types
Cause: Internal <-> Direct connection point
Connection point type: Number of targets:
1 1 1

A1 U
A1 U
A1 U
-Q1 -Q2 -Q3
-X1 1 -X1 1 A2
2
A2
2
A2
2

/N

Message: Targets have differing connection point types


Message: Differing terminal connections (internal/external) connected Message: Too many connections at a connection point
Cause: Conductor / wire <-> Saddle jumper Message: A connection point has too many targets: 3. Maximum number of targets allowed: 2

Connection point type: Number of targets:


1.2 / K3

13 13 13
K8 2 3 -S1 -S2 -S3
A1 14 14 14
-K3
A2
1

K3 / 1.2
-X1 3

Message: A terminal connection point has too many targets: 3. Maximum number of targets allowed: 2
Message: Targets have differing connection point types Cause: You connected at least one of the two terminal function connections with more components than the
Cause: Fluid power <-> Conductor / wire specified number

Date 23.05.2014 Training Center EPLAN Software & Service Error in connection point logic EXERCISE_55.1 = EVG
Ed. DEB + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Numbering devices
Please number all electrical engineering devices according to "Page/Identifier/Column".
Terminals and cables must be excluded from the numbering.

Date 22.05.2014 Training Center EPLAN Software & Service Numbering devices EXERCISE_61.1 =
Ed. DEB +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Number cables
Please number all cables according to source and target.

-X1 1

-W(-X1/-X2)

-X2 1

Date 22.05.2014 Training Center EPLAN Software & Service Number cables EXERCISE_61.2 =
Ed. DEB +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Analog PLC inputs and channel oriented editing.


On the "=SPS+ASK/14" schematic page, also place the channels "7" and "8" of the
"=SEB+ESK-K109" analog card. Also complete the "=SEB+ESK-XD4" terminal strip.

-XD4 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

1.1 1.2 1.3 1.4 2.1 2.2 2.3 2.4 1.1 1.2 1.3 1.4 2.1 2.2 2.3 2.4
+U5 +I5 -U5/-I5 SH +U6 +I6 -U6/-I6 SH +U7 +I7 -U7/-I7 SH +U8 -I8 -U8/I8 SH

-K109 / 3 -K109 / 3 / 4 / 4

I19 I21

Spare Spare

Spare Spare Spare Spare

Date 22.05.2014 Training Center EPLAN Software & Service PLC connection points EXERCISE_62.1 = SEB
Ed. DEB + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Sorting terminal strips


1.) Insert the "TERMINAR_SORT.ema" macro in the "=SEB+ESK/1" page. Device tags are to
be imported with the "Do not change" insertion mode..
2.) Check the "=SEB+ESK-X2" terminal strip's terminal sorting and modify it as needed
3.) Discuss the possibilities of a default terminal sorting.

Date 22.05.2014 Training Center EPLAN Software & Service Sorting terminal strips EXERCISE_63.1 =
Ed. DEB +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Reserve terminals
1.) The terminal strip "=SEB+WAH-XD1" is to consist of at least 10 terminals. Create the
missing terminals as "non-placed" terminals.
2.) The terminal strip "=SKT+WAH-XD1" is to be built with at least "10" multi-level terminals.
3.) At the terminal strip "=SKT+WAH-XD1", add the end bracket "3022276" as alignable
accessories, and then create a terminal line-up diagram.

Date 22.05.2014 Training Center EPLAN Software & Service Reserve terminals EXERCISE_63.2 =
Ed. DEB +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Terminals with bridge connection points Left wheel washing brush tilts Left wheel washing brush tilts Right wheel washing brush tilts Right wheel washing brush tilts
Front left wheel washing brush Back left wheel washing brush forward back Front right wheel washing brush Back right wheel washing brush forward back

O26.20 O26.21 O26.22 O26.23 O26.24 O26.25 O26.26 O26.27

-K107 -K107 -K107 -K107 -K107 -K107 -K107 -K107


OUT1 OUT2 OUT3 OUT4 OUT5 OUT6 OUT7 OUT8
1 1.1 1 2.1 1 1.2 1 2.2 1 1.3 1 2.3 1 1.4 1 2.4

1.) Draw the terminal strips as shown.

-XD3 51 53 55 57 59 61 63 65
=RWB+WAH

=RWB+WAH
-XD1 1 2 3 4 -XD2 1 2 3 4

A1 A1 A1 A1 A1 A1 A1 A1
-MB1 -MB2 -MB3 -MB4 -MB5 -MB6 -MB7 -MB8
A2 A2 A2 A2 A2 A2 A2 A2

-XD1 1- 2- 3- 4- -XD2 1- 2- 3- 4-

16.8 / PLC-.2 PLC-.2 / 16.1


-XD3 52 54 56 58 60 62 64 66

Front left wheel Back left wheel Left wheel washing Left wheel washing Front right wheel Back right wheel Right wheel washing Right wheel washing
washing brush washing brush brush tilts forward brush tilts back washing brush washing brush brush tilts forward brush tilts back

Date 20.05.2014 Training Center EPLAN Software & Service Inputs, fluid power engineering, wheel EXERCISE_63.3 = SPS
Ed. EPL + ASK
GmbH & Co KG washing brushes
Appr CARWASH 01-01-14-TC Page 16
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Rotary table rotation assistance Rotary table rotation assistance


Rotary table rotation left Rotary table rotation right left right Spare Spare Spare Spare

O26.28 O26.29 O26.30 O26.31 O27.00 O27.01 O27.02 O27.03

-K107 -K107 -K107 -K107 -K107 -K107 -K107 -K107


OUT9 OUT10 OUT11 OUT12 OUT13 OUT14 OUT15 OUT16
2 3.1 2 4.1 2 3.2 2 4.2 2 3.3 2 4.3 2 3.4 2 4.4

-XD3 67 69 71 73 75 77 79 81
=DRT+WAH

-XD1 1 2 3 4

A1 A1 A1 A1
-QM1-MB1 -QM1-MB2 -QM2-MB1 -QM2-MB2
A2 A2 A2 A2

-XD1 1- 2- 3- 4-

17.8 / PLC-.2 PLC-.2 / 17.1


-XD3 68 70 72 74 76 78 80 82

Rotary table Rotary table Rotary table Rotary table Spare Spare Spare Spare
rotation left rotation right rotation assistance rotation assistance
left right

Date 20.05.2014 Training Center EPLAN Software & Service Outputs fluid power rotary table EXERCISE_63.3 = SPS
Ed. EPL + ASK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 17
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

13 13 13
-S1 -S2 -S3
14 14 14

-X1 1

Date 22.05.2014 Training Center EPLAN Software & Service Understanding connectors EXERCISE_64.1 =
Ed. DEB +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

13 13 13
-S4 -S5 -S6
14 14 14

-X2 1

Date 22.05.2014 Training Center EPLAN Software & Service Understanding connectors EXERCISE_64.1 =
Ed. DEB +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 2
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

13 13 13
-S7 -S8 -S9
14 14 14

-X3 1

Date 22.05.2014 Training Center EPLAN Software & Service Understanding connectors EXERCISE_64.1 =
Ed. DEB +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 3
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Display of the connection properties


1.) Add a cable as shown on page =EVG+ESK/1.
2.) Enter a connection definition point on page =SKT+ESK/1 and change the property
arranagement as follows:
- Connection: "Connection cross-section/diameter with unit (31007)"
- Connection: "Connection color/number (31004)"
- Connection: "Device tag (superior, without project structures) (20003)"
3.) Create a macro from the connection definition point you just created and place it on the
selected connection.

Date 14.05.2014 Training Center EPLAN Software & Service Display of connection properties EXERCISE_64.2 = EVG
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 0
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

-WC1 -WC1 -WC1 -WC1 -WC1 -WC1

-WC2 -WC2 -WC2 -WC2 -WC2 -WC2

-WC3 -WC3 -WC3 -WC3 -WC3 -WC3

2 4 6
-QA3
1 3 5

2 4 6
-QA4
1 3 5

1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
2 4 6
-QB0 -QB1 -QB2 -QB3 -QB4 -QB5 -QB6
63 A 1 3 5 25A 25A 25A 25A 25A 25A
Main switch 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6

View Main contactor

Data sheet
-W100
ÖLFLEX CLASSIC 100 CY
5G4
750 V BK BN GY
/ 1L1

/ 1L2

/ 1L3

2.1 / 2L1

2.1 / 2L2

2.1 / 2L3

/ 3L1

/ 3L2

/ 3L3

/ 5L1

/ 5L2

/ 5L3

/ 6L1

/ 6L2

/ 6L3
-WE2 -WE2 -WE2 -WE2 -WE2 -WE2 -WE2

-WE1 -WE1 -WE1 -WE1 -WE1 -WE1

PE

-XD1 L1 L2 L3 N PE
/ N.2

/ PE.2

/ PE.3

2.4 / N.5

2.4 / PE.5

/ N.6

/ PE.6
Feed car wash fuse Control Supply drag Supply side brushes Roof brush supply Supply wheel brush Supply rotary
by customers 80A voltage chain plate/dehumidifier
generation

Date 20.05.2014 Training Center EPLAN Software & Service Display of connection properties EXERCISE_64.2 = EVG
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

1.3 / 2L1

1.3 / 2L2

1.3 / 2L3

PE.5 / 1.7

N.5 / 1.6
1 1 1
-FB1 -FB2 -FB3
10 A 2 10 A 2 10 A 2

1 3 5
-QA1
2 4 6

+ASK-TA1 X1 1 2 3 X10 1 2 3 4 X12 1 2 3 4 5 8 9


3,7kW L1 L2 L3 PE PE REF1 AI11 AI12 GND DI00 DI01 DI02 DI03 DI04 24VIO GND

Net Nominal value Binary inputs

S11
mA

TF/TH
Motor Input Braking resistor Binary outputs
DO01-NO
U V W PE DI05TF VOTF +R -R PE GND DO02 DO03 GND DO01-C DO01-NC
X2 U V W
Shielding
screen bottom X12 6 7 X2 +R -R
Shielding
screen bottom X13 1 2 3 4 5 6 7

-XD2 1 2 3 4 PE

-W30
ÖLFLEX CLASSIC 100 H
5G2,5
450 V BK BU BN GNYE
+WAH

U1 V1 W1 PE

-MA1
M
3 kW 3 -BS1 +
Inkremental-
geber
-

Assembly instructions
Scale drawing

Chain motor with pulse generator and


power supply, frequency converter

Date 20.05.2014 Training Center EPLAN Software & Service Display of connection properties EXERCISE_64.2 = EVG
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 2
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Saddle jumpers
Set the connection definition points as follows: in the terminal strip, connect
terminal 1 with 3 and 2 with 4 via a saddle jumper in each case..

-X1 1 2 3 4
Terminal, general, with saddle jumper, 2 connection points

Date 22.05.2014 Training Center EPLAN Software & Service Saddle jumper formation via connection EXERCISE_64.3 =
Ed. DEB +
GmbH & Co KG definition points
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Connection numbering
1.) Run a connection numbering in the "CARWASH" project. Use the "Project data >
Connections > Numbering > Place" functionality for this purpose.
2.) Update all the connections in the "CARWASH" project.
3.) Follow the menu items "Project data > Connections > Numbering > Place" and choose the
"Potential oriented" scheme in the "Settings: Connection numbering" dialog.
4.) Check the result.

Date 13.05.2014 Training Center EPLAN Software & Service Connection numbering EXERCISE_65.1 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

2D panel layout in EPLAN Electric P8


1.) Create in your CARWASH project a new page of the "Panel layout" page
type with the scale 1:5.
2.) On the page, place the "MP AE 1090.500" mounting panel.
3.) Insert the KK40x40 macro and adjust the size of the individual cable ducts
according to the exercise.
4.) Place the items from the "2D panel layout navigator" using the "Place on
mounting rail" auxiliary function.
5.) Also place the individual terminal parts from the 2D panel layout navigator
using the "Place on mounting rail" option
6.) Generate an enclosure legend with the "Manual placement" output format.
What do you notice in this context?

Date 22.05.2014 Training Center EPLAN Software & Service Mounting panel EXERCISE_66.1 = EVG
Ed. DEB + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Enclosure legend
-UR1
Item number Device tag Type number
-UR1
1;2 -TB1;-TB2 QUINT-PS/ 1AC/24DC/ 5

530 3;4 -FB7;-FB8 5SJ6116-6

50
5-7 -FB9;-FB11;-FB12 5SJ6106-6

1 2 =EVG+ESK 8;9;26 - 28;31 - 33;55;56 -QA3;-QA4;=DAB-QA2;=DAB-QA3; 3RT2015-1BB42-0CC0

128
3 4 5 19 6 7 10 18
=SEB-Q1 - =SEB-Q6
8 9
19 -FB10 UT 6-TMC M 6A
SIEMENS SIEMENS
SIEMENS SIEMENS SIEMENS SIEMENS SIEMENS
5SJ61 5SJ61 5SJ61 5SJ61 5SJ61

3RT2 3RT2

20 - 23;34 =DAB-FC1;=SEB-F7 - =SEB-F10 3RV2901-1E

72
24;30 =SEB-F8;=SEB-F10 3RV2011-1BA40

25;29;53 =DAB-FC1;=SEB-F7;=SEB-F9 3RV2011-1AA40

128
25 20 24 21 29 22 30 23 =SEB+ESK
54 =DAB-FB1 5SJ6110-6
26 27 28 31 32 33
SIEMENS SIEMENS SIEMENS
SIEMENS SIEMENS SIEMENS
SIEMENS SIEMENS SIEMENS SIEMENS

3RT2 3RT2 3RT2


3RT2 3RT2 3RT2
3RV2 3RV2 3RV2 3RV2

72
128
53 34 =DAB+ESK
54 35 52
55 56
SIEMENS SIEMENS
SIEMENS SIEMENS
5SJ61

3RT2 3RT2
3RV2
59

450
153

64 77
57 63
75

Date 14.05.2014 Training Center EPLAN Software & Service Mounting panel EXERCISE_66.1 = EVG
Ed. EPL + ESK
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 4
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Combining report overviews

1.) Copy form F18_002.F18 and save it under SEM_002.F18.


2.) Open the form properties.
3.) Choose the value "Part number [1] <20100 1>" for the "Summarize in
one line after <13111>" property.
4.) Close the form and create a new schematics legend for
"=EVG+ESK-UR1".

Date 20.05.2014 Training Center EPLAN Software & Service EXERCISE EXERCISE_66.2 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Number of pages per structure


1.) Copy a plot frame and save it under another name.
2.) Add special text, page properties "Number of pages per structure (11004)" and "Highest
page number per structure (11043)".
3.) Enter the plot frame you just created for the CARWASH project.

Date 13.05.2014 Training Center EPLAN Software & Service Number of pages per structure EXERCISE_67.1 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Page filters
All pages with the mounting location "WAH" should be put out.
Set up the appropriate page filter to achieve this result.

Date 13.05.2014 Training Center EPLAN Software & Service Page filters EXERCISE_68.1 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Page filters
You wish to output all pages containing devices with "WAH" mounting locations.
Set up the appropriate page filter to achieve this result.

Date 13.05.2014 Training Center EPLAN Software & Service Page filters EXERCISE_68.1 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 2
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

6.9 / PLC+.2 PLC+.2 / 6.0


-XD2 7 -XD2 13

-W7 1
-W6 1
=SEB+ESK

=DAB+ESK
-XD1 1+ 2+ 3+ 4+
-XD1 1+
13 13 13 13 13
-F7 -F8 -F9 -F10 -FC1
14 14 14 14 14

-XD1 1 2 3 4 -XD1 1

-W6 -W7
ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110
12G1 2x1
300 V 2 3 4 5 300/500 V 2

-XD2 8 9 10 11 14

Please create a missing-word list with the languages RU and CN for this page.

3 5.1 3 6.1 3 5.2 3 6.2 3 5.3 3 6.3 3 5.4 3 6.4


IN17 IN18 IN19 IN20 IN21 IN22 IN23 IN24
-K101 -K101 -K101 -K101 -K101 -K101 -K101 -K101

I24.12 I24.16 I24.13 I24.17 I24.14 I24.18 I24.15 I24.19

Servo-motor overload switch, Rotation motor overload switch, Servo-motor overload switch, Rotation motor overload switch, Motor overload switch Rotation Spare Spare Spare
left side brush left side brush right side brush right side brush Roof brush

Servo-motor Rotation motor Servo-motor Rotation motor Motor overload Spare Spare Spare
overload overload overload overload switch
switch, left side switch, left side switch, right side switch, right side Rotation Roof
brush brush brush brush brush

Date 20.05.2014 Training Center EPLAN Software & Service Messages motor protecting devices EXERCISE_71.1 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 6
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

6.9 / PLC+.2 PLC+.2 / 6.0


-XD2 7 -XD2 13

-W7 1
-W6 1
=SEB+ESK

=DAB+ESK
-XD1 1+ 2+ 3+ 4+
-XD1 1+
13 13 13 13 13
-F7 -F8 -F9 -F10 -FC1
14 14 14 14 14

-XD1 1 2 3 4 -XD1 1

-W6 -W7
ÖLFLEX CLASSIC 110 ÖLFLEX CLASSIC 110
12G1 2x1
300 V 2 3 4 5 300/500 V 2

-XD2 8 9 10 11 14

Import the translated missing-word list "RU_CN.TXT" into the current dictionary.
Then translate the page into the languages RU and CN.

3 5.1 3 6.1 3 5.2 3 6.2 3 5.3 3 6.3 3 5.4 3 6.4


IN17 IN18 IN19 IN20 IN21 IN22 IN23 IN24
-K101 -K101 -K101 -K101 -K101 -K101 -K101 -K101

I24.12 I24.16 I24.13 I24.17 I24.14 I24.18 I24.15 I24.19

Servo-motor overload switch, Rotation motor overload switch, Servo-motor overload switch, Rotation motor overload switch, Motor overload switch Rotation Spare Spare Spare
left side brush left side brush right side brush right side brush Roof brush

Servo-motor Rotation motor Servo-motor Rotation motor Motor overload Spare Spare Spare
overload overload overload overload switch
switch, left side switch, left side switch, right side switch, right side Rotation Roof
brush brush brush brush brush

Date 20.05.2014 Training Center EPLAN Software & Service Messages motor protecting devices EXERCISE_71.2 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 6
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Read in customer and manufacturer data


1.) Use copy to create two new customer records in parts management and modify the
relevant entries.
2.) Create a new manufacturer record.
3.) In project management, select new records for customers, end customers, and
manufacturers

Date 16.05.2014 Training Center EPLAN Software & Service Read in customer and manufacturer data EXERCISE_73.1 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Revision control "Properties comparison"


1.) Create a reference project from the "CARWASH" project.
2.) Under "Options > Settings > Company > Properties comparison of projects", create a
new scheme using the name "TC_Revision".
3.) Define in different categories meaningful comparison settings for your purposes (e.g., in
the category Device, Potentials, etc.).
4.) Edit different pages in the "CARWASH" project in such a way that you move one item,
delete one item, add one item, and adjust the "Technical characteristic", etc..
5.) Compare the "CARWASH" project with the reference project.
6.) Assess the result of the comparison.

08.05.2014 EPL Date 22.05.2014 Training Center EPLAN Software & Service REVISION CONTROL EXERCISE_74.1 = CA1
Ed. DEB + ET1
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Revision control "Change tracking"


1.) Complete the "CARWASH" project.
2.) Generate a revision from the CARWASH project.
3.) Modifications in the project are tracked from now on; modified pages are marked as
"Draft".
4.) Complete modified pages and comment the modifications.
5.) Update the reports and create a revision overview. Finally, update the table of contents.
6.) When project editing is done, close the project again.

08.05.2014 EPL Date 22.05.2014 Training Center EPLAN Software & Service REVISION CONTROL EXERCISE_74.2 = CA1
Ed. DEB + ET1
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214
0 1 2 3 4 5 6 7 8 9

Redlining

1.) Export the CARWASH project to a PDF file.


2.) Enter a meaningful comment in the PDF file. (See the menu Tools > Comment & Markup).
3.) After you have entered the comments in the PDF file, save the changes.
4.) Import the PDF comments into EPLAN.
5.) Find and check all imported comments using the Comment Navigator.

Date 16.05.2014 Training Center EPLAN Software & Service Redlining EXERCISE_75.1 =
Ed. EPL +
GmbH & Co KG
Appr CARWASH 01-01-14-TC Page 1
Modification Date Name Original Replaced by Replaced by Page 214

You might also like