You are on page 1of 14

Insights from the ABA

CCCM Pilot Training in


Afghanistan
Global CCCM Cluster

1
Area-based Approach Working Group
ABA CCCM Resources

Giovanna Federici Elena Valentini


Global Site Management, NRC ABA CCCM, IOM

2
The Area Based
Working Group
Timeline

3
The Area Based CCCM Training
• Outline developed and reviewed in 2022
• Interlinked with the Global CCCM Training
package and the CCT
• Pilot Training conducted in Afghanistan from 15
to 17 May
• Target Group: CCCM Working Group Members
• 16 participants in persons and 8 online
• ABA CCCM Resource Matrix

4
A Pilot based on…

5
Challenges and Lesson Learned

Hybrid online and in person modalities

Integrate in the outline a training Module on Exit


Strategies and Closure

6
The Training Outline

Module 1 Module 2
Module 3
Introduction to Introduction to the
The ABA CCCM
Area Based Training Case
Framework
approaches Study

7
The Training Outline

Module 4 Module 5 B
Module 5 A Working in
Defining the
Working in urban scattered small
Catchement
neighbourhood sites
Area
(To be developed)

8
The Training Outline

Module 7
Module 6 Module 8
Participation and
Community Provide
Representation in
Centers and information and
Area Based
Mobile Teams listening back
CCCM

9
The Training Outline

Module 9 Module 10 Monitoring and


Area Based Exit and Closure Evaluation
Coordination (To be developed)

10
Groups
Group 1: Introduction to ABA, Introduction to the Case Study and The
ABA CCCM Framework (Module 1, 2 and 3)
Group 2: Defining the Catchment Area and ABA CCCM Modalities
(Module 4 and 6)
Group 3: Specificities of working in Urban Area and Specificities of
working in Rural areas (Module 5A and 5B)
Group 4: Participation and Representation, Providing information and
listening back (Module 7 and 8)
Group 5: Area Based Coordination and Exit Strategies (Module 9 and 10)

11
Validate the Training outline
• Review the content of the Training modules assigned to your group
• Discuss what is essential to cover in the modules
• Based on your discussion, move the sticky notes with the training
content:
MUST: the topic must be included in the module
SHOULD: the topic should be included in the module
COULD: the topic could be included in the module

• Use the extra sticky notes to add any additional topics that must-
should-could be included in the modules

12
Build an ABA CCCM Toolkit
• Reflect and discuss:
What operational tools should be shared?
Are there operational tools you/your agency can share to
contribute to the training package development?
• Add your ideas in the flipchart
• Leave us your contact details if you want to contribute to
building the the ABA CCCM toolkit!

13
ABA CCCM Training Package: Way Forward
• Review of the training package by a ”Steering
Committee”
• Address the comments and update the package
• Second Pilot
• Publication

QUESTIONS?
14

You might also like