Contract No:MMDE/MWSIP/ADB/UECP/ICB-2B/P47381-005-SRI/ICB/2016/026

RECORD OF SURVEY
Description: Tunnel No.02 After Excavation Bed Level Survey (6+318~6+380)
Date: 2023.06.16 RFI. No:
P.NO N E Z Chainage Offset Tolerence Remarks
1 566106.134 501848.538 182.023 K6+379.992 3.655 -0.839
2 566105.401 501847.743 182.275 K6+380.020 2.574 -0.587
3 566104.332 501846.673 182.368 K6+379.998 1.062 -0.494
4 566103.103 501845.531 182.355 K6+379.912 -0.614 -0.507
5 566101.726 501844.087 182.26 K6+379.930 -2.609 -0.602

6 566104.711 501841.060 182.465 K6+384.181 -2.701 -0.395


7 566106.525 501842.448 182.407 K6+384.515 -0.441 -0.453
8 566107.951 501843.571 182.249 K6+384.756 1.358 -0.610
9 566109.5 501844.635 182.222 K6+385.126 3.2 -0.637
10 566110.653 501845.807 182.44 K6+385.136 4.844 -0.419
11 566111.391 501846.902 182.51 K6+384.903 6.144 -0.349

12 566115.652 501844.12 182.257 K6+389.898 7.117 -0.600


13 566114.281 501842.487 182.261 K6+390.052 4.99 -0.596
14 566112.939 501841.317 182.25 K6+389.904 3.216 -0.607
15 566111.833 501839.96 182.22 K6+390.056 1.472 -0.637
16 566110.608 501838.716 182.276 K6+390.044 -0.274 -0.581
17 566108.819 501837.032 182.142 K6+389.934 -2.728 -0.715

18 566112.487 501833.490 182.537 K6+395.033 -2.714 -0.318


19 566113.808 501834.951 182.421 K6+394.963 -0.745 -0.434
20 566114.738 501836.006 182.059 K6+394.895 0.659 -0.796
21 566115.542 501836.688 182.234 K6+394.997 1.709 -0.621
22 566116.525 501837.876 182.332 K6+394.874 3.246 -0.523
23 566117.768 501839.124 182.306 K6+394.896 5.007 -0.549
24 566118.904 501840.276 182.291 K6+394.909 6.625 -0.564
25 566119.749 501841.246 182.298 K6+394.839 7.91 -0.557

26 566120.898 501834.647 182.309 K6+400.261 3.976 -0.543


27 566119.644 501833.568 182.315 K6+400.113 2.328 -0.537
28 566118.421 501832.312 182.452 K6+400.110 0.575 -0.400
29 566117.471 501831.336 182.389 K6+400.109 -0.787 -0.463
30 566116.128 501830.039 182.461 K6+400.049 -2.653 -0.391

31 566119.652 501826.698 182.319 K6+404.905 -2.594 -0.531


32 566121.002 501828.072 182.506 K6+404.916 -0.668 -0.344
33 566122.113 501828.945 182.418 K6+405.105 0.732 -0.432
34 566123.364 501830.242 182.395 K6+405.099 2.534 -0.455

Surveyed By: 1/5 Checked By:


Contract No:MMDE/MWSIP/ADB/UECP/ICB-2B/P47381-005-SRI/ICB/2016/026
RECORD OF SURVEY
Description: Tunnel No.02 After Excavation Bed Level Survey (6+318~6+380)
Date: 2023.06.16 RFI. No:
P.NO N E Z Chainage Offset Tolerence Remarks
35 566124.282 501831.024 182.379 K6+405.212 3.735 -0.471

36 566127.558 501827.603 182.519 K6+409.946 3.563 -0.329


37 566126.779 501826.842 182.391 K6+409.917 2.474 -0.457
38 566125.479 501825.674 182.377 K6+409.798 0.731 -0.471
39 566124.462 501824.587 182.325 K6+409.826 -0.758 -0.523
40 566123.017 501823.244 182.453 K6+409.725 -2.728 -0.395

41 566126.817 501819.655 182.543 K6+414.952 -2.655 -0.302


42 566128.01 501820.994 182.438 K6+414.874 -0.863 -0.407
43 566129.15 501821.947 182.436 K6+415.028 0.614 -0.409
44 566130.159 501823.085 182.45 K6+414.959 2.134 -0.395
45 566131.038 501824.048 182.45 K6+414.919 3.437 -0.395

Geological Overbreak
1 566115.15 501836.024 182.172 K6+395.178 0.959 -0.683
2 566115.332 501836.523 182.18 K6+394.961 1.444 -0.675
3 566113.256 501836.609 182.159 K6+393.412 0.059 -0.696
4 566113.243 501836.704 181.968 K6+393.336 0.119 -0.887
5 566113.024 501837.165 182.147 K6+392.858 0.297 -0.709
6 566111.945 501837.273 182.092 K6+392.008 -0.378 -0.764
7 566111.749 501837.865 182.011 K6+391.456 -0.089 -0.845
8 566111.694 501838.388 182.14 K6+391.052 0.247 -0.717
9 566110.087 501837.16 182.155 K6+390.754 -1.753 -0.702
10 566109.576 501837.66 182.136 K6+390.039 -1.75 -0.721
11 566111.606 501839.553 182.121 K6+390.177 1.022 -0.736
12 566111.191 501841.314 182.037 K6+388.652 1.996 -0.821
13 566109.964 501839.775 182.126 K6+388.844 0.037 -0.732
14 566108.299 501838.955 182.001 K6+388.221 -1.711 -0.857
15 566107.336 501841.009 182.027 K6+386.099 -0.908 -0.832
16 566108.504 501841.302 181.877 K6+386.733 0.115 -0.982
17 566109.338 501841.873 181.867 K6+386.934 1.106 -0.991
18 566106.422 501840.723 182.126 K6+385.643 -1.75 -0.733
19 566105.917 501841.874 182.184 K6+384.479 -1.277 -0.676
20 566105.688 501844.248 181.943 K6+382.660 0.267 -0.917
21 566104.657 501844.092 181.982 K6+382.030 -0.563 -0.879
22 566105.628 501844.449 181.988 K6+382.477 0.369 -0.873
23 566106.169 501845.509 181.935 K6+382.127 1.507 -0.926
24 566106.374 501847.079 181.976 K6+381.180 2.776 -0.885

Surveyed By: 2/5 Checked By:


Contract No:MMDE/MWSIP/ADB/UECP/ICB-2B/P47381-005-SRI/ICB/2016/026
RECORD OF SURVEY
Description: Tunnel No.02 After Excavation Bed Level Survey (6+318~6+380)
Date: 2023.06.16 RFI. No:
P.NO N E Z Chainage Offset Tolerence Remarks
25 566103.669 501843.961 182.06 K6+381.412 -1.346 -0.801
26 566102.976 501844.123 182.121 K6+380.802 -1.712 -0.740

27 566121.076 501839.152 185.972 K6+397.250 7.332 -3.118


28 566120.607 501840.211 186.11 K6+396.176 7.765 -3.256
29 566120.211 501840.908 185.557 K6+395.406 7.989 -2.703
30 566121.052 501839.864 185.48 K6+396.736 7.826 -2.626
31 566121.416 501838.843 185.238 K6+397.709 7.347 -2.385
32 566121.342 501839.869 184.402 K6+396.941 8.032 -1.548
33 566120.815 501840.775 184.425 K6+395.932 8.314 -1.571
34 566120.015 501841.538 184.438 K6+394.826 8.304 1.583
35 566119.242 501842.32 184.462 K6+393.727 8.327 -1.607
36 566118.032 501843.073 184.484 K6+392.334 8.0240 -1.628
37 566116.316 501844.204 184.064 K6+390.315 7.64 -1.207
38 566117.174 501843.691 184.272 K6+391.288 7.87 -1.416
39 566117.580 501843.244 184.891 K6+391.891 7.832 -2.035
40 566118.244 501842.521 185.648 K6+392.871 7.776 -2.792
41 566118.940 501841.448 186.053 K6+394.118 7.491 -3.198
42 566119.115 501840.448 186.379 K6+394.940 6.895 -3.524
43 566119.785 501840.375 186.174 K6+395.472 7.31 -3.320
44 566120.395 501839.584 186.544 K6+396.460 7.167 -3.690
45 566120.844 501838.64 186.626 K6+397.440 6.803 -3.772
46 566121.119 501838.128 186.106 K6+397.994 6.627 -3.253
47 566121.278 501837.814 185.334 K6+398.327 6.513 -2.481
48 566121.358 501837.531 184.093 K6+398.581 6.365 -1.240
49 566121.09 501836.794 183.534 K6+398.903 5.65 -0.681
50 566115.666 501836.282 182.162 K6+395.368 1.504 -0.693
51 566111.77 501840.323 182.168 K6+389.758 1.689 -0.689
52 566111.889 501840.741 182.133 K6+389.552 2.071 -0.724
53 566111.804 501841.7 182.153 K6+388.823 2.7 -0.705
54 566110.991 501844.284 182.09 K6+386.440 3.987 -0.769
55 566112.440 501844.422 182.244 K6+387.383 5.096 -0.614
56 566113.956 501844.702 182.236 K6+388.275 6.353 -0.622
57 566114.752 501843.114 181.986 K6+389.953 5.768 -0.871
58 566113.54 501842.36 181.793 K6+389.609 4.383 -1.064
59 566113.817 501841.078 181.411 K6+390.700 3.656 -1.446
60 566113.799 501840.028 181.364 K6+391.419 2.89 -1.492
61 566114.529 501840.356 181.446 K6+391.714 3.634 -1.410
62 566115.830 501841.188 181.601 K6+392.068 5.138 -1.255

Surveyed By: 3/5 Checked By:


Contract No:MMDE/MWSIP/ADB/UECP/ICB-2B/P47381-005-SRI/ICB/2016/026
RECORD OF SURVEY
Description: Tunnel No.02 After Excavation Bed Level Survey (6+318~6+380)
Date: 2023.06.16 RFI. No:
P.NO N E Z Chainage Offset Tolerence Remarks
63 566116.779 501842.535 181.872 K6+391.810 6.765 -0.984
64 566118.015 501839.776 182.275 K6+394.619 5.647 -0.580
65 566118.096 501839.106 182.263 K6+395.144 5.223 -0.592
66 566117.399 501839.448 182.233 K6+394.406 4.982 -0.622
67 566117.488 501838.774 182.156 K6+394.939 4.561 -0.699
68 566118.109 501838.376 182.229 K6+395.662 4.708 -0.625
69 566118.723 501840.499 182.064 K6+394.623 6.659 -0.791
70 566118.144 501841.467 181.927 K6+393.534 6.95 -0.928
71 566117.579 501841.366 181.729 K6+393.199 6.484 -1.127
72 566116.905 501840.307 181.61 K6+393.453 5.255 -1.245
73 566116.685 501839.025 181.514 K6+394.188 4.182 -1.341
74 566117.223 501837.815 181.67 K6+395.417 3.688 -1.184
75 566118.369 501837.752 181.843 K6+396.283 4.442 -1.011
76 566119.420 501838.538 181.943 K6+396.490 5.738 -0.911
77 566120.044 501837.78 181.946 K6+397.465 5.629 -0.908
78 566119.645 501836.402 182.211 K6+398.139 4.362 -0.642
79 566119.174 501837.145 181.829 K6+397.284 4.567 -1.025
80 566118.717 501836.44 181.774 K6+397.447 3.743 -1.080
81 566120.257 501835.208 182.055 K6+399.410 3.932 -0.798
82 566119.858 501836.07 182.265 K6+398.523 4.272 -0.588
83 566118.703 501836.316 181.73 K6+397.523 3.644 -1.124
84 566118.975 501835.328 181.587 K6+398.407 3.125 -1.266
85 566120.189 501833.936 181.824 K6+400.247 2.972 -1.028
86 566121.306 501832.665 181.757 K6+401.934 2.838 -1.094
87 566123.168 501831.184 181.281 K6+404.302 3.073 -1.569
88 566122.607 501830.497 181.193 K6+404.378 2.19 -1.657
89 566123.320 501829.797 181.268 K6+405.377 2.184 -1.582
90 566124.348 501830.143 181.402 K6+405.873 3.149 -1.448
91 566125.278 501828.949 181.255 K6+407.373 2.94 -1.594
92 566124.988 501828.202 181.304 K6+407.685 2.202 -1.545
93 566124.636 501827.903 181.753 K6+407.641 1.742 -1.096
94 566123.794 501826.996 181.583 K6+407.668 0.505 -1.266
95 566125.967 501826.877 181.773 K6+409.310 1.934 -1.075
96 566125.481 501826.136 181.75 K6+409.478 1.063 -1.098
97 566127.844 501826.255 181.85 K6+411.090 2.795 -0.997
98 566127.707 501825.709 181.966 K6+411.372 2.308 -0.881
99 566129.079 501824.428 182.276 K6+413.249 2.345 -0.57
100 566129.569 501824.91 182.095 K6+413.265 3.032 -0.751
101 566120.121 501832.52 181.758 K6+401.185 1.909 -1.094

Surveyed By: 4/5 Checked By:


Contract No:MMDE/MWSIP/ADB/UECP/ICB-2B/P47381-005-SRI/ICB/2016/026
RECORD OF SURVEY
Description: Tunnel No.02 After Excavation Bed Level Survey (6+318~6+380)
Date: 2023.06.16 RFI. No:
P.NO N E Z Chainage Offset Tolerence Remarks
102 566121.433 501831.658 182.003 K6+402.727 2.205 -0.848
103 566122.183 501830.454 181.259 K6+404.104 1.863 -1.591
104 566122.680 501829.316 181.301 K6+405.253 1.393 -1.549
105 566122.776 501828.36 181.812 K6+405.988 0.774 -1.038
106 566123.487 501826.586 181.766 K6+407.734 -0.003 -1.083
107 566125.264 501825.589 181.956 K6+409.703 0.52 -0.892
108 566126.38 501825.73 181.894 K6+410.406 1.398 -0.953
109 566125.52 501828.041 181.452 K6+408.179 2.457 -1.397
110 566125.938 501828.515 181.509 K6+408.148 3.088 -1.340
111 566125.429 501829.248 181.46 K6+407.273 3.26 -1.389
112 566124.378 501830.878 181.514 K6+405.383 3.697 -1.336
113 566122.969 501831.967 181.852 K6+403.614 3.496 -0.999
114 566121.856 501833.118 181.902 K6+402.013 3.547 -0.949
115 566120.463 501834.937 181.845 K6+399.747 3.881 -1.007
116 566118.825 501836.579 181.856 K6+397.427 3.918 -0.998
117 566120.717 501837.153 181.985 K6+398.385 5.648 -0.868
118 566120.369 501838.975 181.853 K6+396.866 6.712 -1.001
119 566119.728 501841.016 182.047 K6+394.984 7.73 -0.808
120 566118.721 501841.704 182.117 K6+393.782 7.522 -0.738
121 566117.485 501842.925 182.02 K6+392.045 7.537 -0.836
122 566115.879 501843.613 182.081 K6+390.414 6.911 -0.776
123 566114.906 501845.211 182.304 K6+388.602 7.38 -0.554
124 566110.382 501843.342 181.928 K6+386.659 2.887 -0.931
125 566111.330 501842.263 181.766 K6+388.091 2.774 -1.092
126 566112.739 501841.418 181.487 K6+389.690 3.149 -1.370
127 566112.192 501840.631 181.488 K6+389.846 2.203 -1.369
128 566113.158 501839.735 181.437 K6+391.163 2.234 -1.419
129 566114.534 501838.758 181.385 K6+392.831 2.491 -1.471
130 566116.062 501837.657 181.508 K6+394.694 2.766 -1.347
131 566116.146 501836.524 181.648 K6+395.544 2.012 -1.206
132 566117.058 501835.843 181.532 K6+396.673 2.159 -1.322
133 566118.518 501834.743 181.628 K6+398.486 2.387 -1.225
134 566119.606 501833.888 181.883 K6+399.863 2.531 -0.969
135 566120.819 501834.435 181.975 K6+400.352 3.769 -0.877

Surveyed By: 5/5 Checked By: