0% found this document useful (0 votes)
64 views1 page

Inspection Report for TTRO Project

The inspection report summarizes the testing of a 148H4 micron cartridge filter. It lists the project details including the customer, main supplier, sub-supplier, purchase order number, and quality assurance plan number. The equipment tag number and quantity of one filter are also provided.

Uploaded by

virendra katke
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

Inspection Report for TTRO Project

The inspection report summarizes the testing of a 148H4 micron cartridge filter. It lists the project details including the customer, main supplier, sub-supplier, purchase order number, and quality assurance plan number. The equipment tag number and quantity of one filter are also provided.

Uploaded by

virendra katke
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Report No: QC/COM-01

INSPECTION REPORT Date


Page 01 OF 01
QULITY ASSURANCE & CONTROL
PROJECT DBO OF 45 MLD CAPACITY TERITARY CUSTOMER CHENNAI METROPOLIAN WATER SUPPLY
TREATMENT REVERSE OSMOSIS (TTRO) & SEWEARGE BOARD
PMC TAMILNADU WATER INVESTMENT CO. MAIN SUPPLIER BGR ENERGY SYSTEMS LTD.
SUB SUPPLIER GEOFLIUD PROCESSORS PVT. LTD. VENDOR MECHMANN ENGINEERING PVT. LTD.
PO NO. 7500006263 QAP NO H0669-2017-R4

EQUIPMENT 148H4 (MICRON CARTRIDGE FILTER) CLIENT DRG. NO. CMWSSB-KOD-45MLD-ME-GCF-DS-10067


R.3
BGR DRG. NO. GID-2377-ME-GCF-DS-10067 TAG NO./ QTY. 01GCF01AT200- 01 NO.

COMPLIANCE REPORT

FOR SS FILTERS PVT. LTD. FOR CLINET/TPI