FIRE ALARM SYSTEM FIRE FIGHTING SYSTEM CORNER

PARCEL CORNER COORDINATES

NORTH EAST
1 2900521.99 403679.53
2 2900538.29 403674.84
3 2900543.55 403693.73
2900527.24
Fire Fighting Legend 4
5
403698.42

UPRIGHT SPRINKLER 6
PENDENT SPRINKLER

SIAMESE FIRE DEPARTMENT CONNECTION


DRY CHEMICAL PORTABLE FIRE EXTINGUISHER

‫جار‬ ‫جار‬ ‫جار‬ ‫جار‬ ALARM CHECK VALVE


0070000123
CO PORTABLE FIRE EXTINGUISHER

FOAM PORTABLE FIRE EXTINGUISHER 25 KG


19.61 19.61
HOSE STATION , FOAM FIRE HOSE CABINET . KEY PLAN
NOT TO SCALE

UNDER GROUND FIRE FIGHTING TANK


HOSE STATION , WATER WET FIRE HOSE CABINET . PLOT No. : 0070000123
16.00 16.00 113M^3 ENOUGH FOR 60 MINUTES

1.75
LOCATION : First Industrial City

JP
15.50
PUMPS SET TOTAL AREA : 333 M²

EP
DP
EP
EL
‫حمام‬ ‫حمام‬
DP ELECTRICAL PUMP EP 200 G.P.M @ 7 BAR SCHEDULE OF SET BACK
JP

DIESEL PUMP DP 200 G.P.M @ 8 BAR NORTH EAST WEST SOUTH


JOCKEY PUMP JP 20 G.P.M @ 8.5 BAR LENGTH 19.61 M 16.97 M 16.96 M 19.61 M
‫حمام‬
H SB
‫حمام‬
SETBACK 2.00 M 2.00 M 1.50 M 1.96 M
‫بوفي ه‬ ‫بوفي ه‬ OS & Y VALVE
13.58 m²
‫ص الة رياض ة‬
13.58 m²
‫ص الة رياض ة‬ PERCENTAGE 11.79% 10.20% 7.65% 11.56%
‫حمام‬ 24.25 m² ‫حمام‬ 24.25 m²
‫غرف ة‬
24.60 m²
‫غرف ة‬
24.60 m²
Fire Alarm Legend LAND UTILITY SCHEDULE

CFACP DESCRIPTION BLDG.


TOTAL AREA PERCENTAGE
AREA HEIGHTS

Ground Floor
‫جار‬ ‫جار‬
208.00 M2
‫جار‬ EL EL
UP
‫جار‬ UP
SMOKE DETECTOR CEILING MOUNTED COVER 49 SQM @ 9.1 HEIGHT First Floor 208.00 M2
ZONE#01 Second Floor 208.00 M2 14.80
62.46 % 62.46 %

16.97

16.97
16.96

16.96
SMOKE DETECTOR CEILING MOUNTED WITH SOUND BASE Third Floor 208.00 M2

0.60 B CFACP 0.60


SB SIDE WALK AREA: 125.00 M2 -- 37.54 % 37.54 %
TOTAL LOT 333.00 M² 100.00 %
UP M UP
H HEAT DETECTOR CEILING MOUNRED
BUILT AREA:
--
208.00 M² -- 62.46 %

M MULTI SUBJECT DETECTOR CEILING MOUNRED


UP UP

‫غرف ة‬ ‫غرف ة‬
‫ص الة طع ام‬ 24.60 m² ‫ص الة طع ام‬ 24.60 m² M FIRE ALARM MANUAL CALL STATION.
SB
42.20 m² 42.20 m² _
3
B AUDIBLE APPLIANCE ( BELL )
17
0.00 0.00 _
AUDIBLE APPLIANCE WITH STROP LIGHT
1
EXIT
1 _
EOL END OF LINE DEVICE 1 _
0.00 0.00 Grand total: 23
EXIT EMERGENCY EXIT SIGN WITHE BACKUP BATTERY 1.5 HOUR LEGEND:
SYMBOL DESCRIPTION:
EL EMERGENCY LIGHT FEED FROM EMERGENCY POWER SYSTEM
AND WITHE BACKUP BATTERY 1.5 HOUR.
19.61 19.61
‫ش ارع‬ ‫ش ارع‬ DIRECTIONAL EMERGENCY SIGN WITHE BACKUP BATTERY 1.5
HOUR

STAMP HERE:

Ground Floor Plan Ground Floor Plan


P103

P93 P102
P101
P72 P92 MODON IS NOT LIABLE FOR ANY
MISINTERPRETATION REFLECTED HEREIN.
P10 DISCLAIMER :
EL P63 P71 P91 P104
‫حمام‬ ‫حمام‬ CONSULTANT WILL TAKE FULL RESPONSIBILITIES FOR EVERY ACTIONS
P9 INTERPRETED IN THE DRAWING.
‫بوفي ه‬ ‫بوفي ه‬ P62 P8
‫حمام‬
H
‫واس عافات اولي ه‬ ‫حمام‬
‫واس عافات اولي ه‬ CONSULTANT :
‫ غرف ة‬SB SB ‫غرف ة‬ P61 P7
‫غرف ة‬ ‫غرف ة‬
13.58 m² 24.25 m² 13.58 m² 24.25 m²
‫حمام‬ 19.40 m² ‫حمام‬ 19.40 m²
P6
P51

UP
DN
UP
DN P5
P4
EL EL

ZONE#02
B BASMAAT AL IMAR ENGINEERING CONSULTANTS
M
B

EXIT M Design -Planning -Surveying -Supervision -Studies


UP UP Qassim -Buraidah -Omar bin al-Khattab Road
DN DN Karim Saber Marei
Architectural
Structural Elsaeed Ahmed Abo elfotouh

Electrical Walid Elnadi


SB SB SB Sanitary
‫غرف ة‬ ‫غرف ة‬ ‫غرف ة‬ ‫غرف ة‬ ‫غرف ة‬ ‫غرف ة‬
21.83 m² 19.40 m² 19.40 m² 21.83 m² 19.40 m² 19.40 m² P221 Mechanical

Date: Revision:
P22 MO-DAY-YR Rev.01 DESCRIPTION CHECKED BY APRVD.
MO-DAY-YR Rev.01 XXX XXX

EL P1 MO-DAY-YR Rev.01 XX MO-DAY-YR MO-DAY-YR


MO-DAY-YR Rev.01 XXX Checked Approved
P211 PROJECT LOCATION:
P21

P2 First Industrial City


P3

Typical Floor Plan(1F-3F) Typical Floor Plan(1F-3F) MODON CONTRACT


NUMBER:
CLIENT :

804269 BLOCK : 00
LOT NO. 0070000123 LOT AREA 333
LEASE AGREEMENT NO:

1/ 100

MODON/ TECHNICAL SUPPORT ENGINEERING DEPARTMENT ESD 301