Redi-Check prior to each deliverable.

VC Mandatory

13. The Only Minimum in Plumbing Engineering


PM, Your Discipline Director, Outside Architect, Client(s)

Teams files, 01 Administration/ 1.03 Scope of Work

Prevention is the responsibility of all VC stakeholders.

It is imperative that you talk to the AHJ, Most jurisdictions although accepting a particular
Code have their own distinct amendments. Many areas may have State Plumbing Codes
Lead Engineer /Designer from each discipline involved
30, 60, 90, IFB, IFP, IFC

Redi-check is Mandatory at VC, if you do not have dates built into the schedule from
the PM, it is your responsibility to work with your Dept. Director and the PM to get
these incorporated. The QC process is NOT Optional
/ Process Vendor requirements
Observe Analyze React
Static press, residual
press, flow volume
Final and First are not the same thing! Do Not
wait until this phase of the project to coordinate
with the other disciplines, coordinate and talk
throughout the project from start to finish.

From the Projects inception until ready for IFC issue, Coordination is in addition to
Redi-check. they are both separate and mandatory tasks of your design.