Job Names Execution Time on Sep-6th start date

Sharepoint Load 4:00 PM EST 9/4/2021


Workday Active Employees Load 4:05 PM EST 9/4/2021
Sales_Load 4:20 PM EST 9/4/2021
GL_Load 8:30 PM EST 9/4/2021
BI Commission Load 8:30 PM EST 9/4/2021
MKT Pre Load No need to run NA
MKT Load 9:30 PM EST 9/4/2021
End date Average Time (mins)
9/6/2021 1
9/6/2021 10
9/6/2021 180+ 60(Sales_tab_Load)
9/6/2021 110
9/6/2021 120
NA NA
9/6/2021 30+ 20(MKTTab Load)
Job Status
Once job Completed successfully set the dates as 1/1/1900
Once job Completed successfully set the dates as 1/1/1900
Once job Completed successfully set the dates as 1/1/1900
Once job Completed successfully set the dates as 1/1/1900
Once job Completed successfully set the dates as 1/1/1900
NA
Once job Completed successfully set the dates as 1/1/1900
Comment
Before running job place file in prod

Perform Next jobs if and only if Sales_ETL_Load completed


GL Load will be having the 3 rd step as GL_full_Load , so removing GL_Tab_Load job
BI Commission load and GL Load can run at once as there is no depency and common packages in each.
Take the Files for both the dates and place that on shared paths on both sun and Monday
MKT Load includes MKT ETL Load and MKT Tab Load
Monday Tuesday
Workday all hours load
Workday active employees load Y
WMS Load Y (Skip ControlM and Run Manually)
TPDealerEquity Load
TireBuyer TAB Load
Telematics Export
Sharepoint Load Y
SDWheelPrice Export
Sales TAB Load
Sales Load Y
Sales CA TAB Load
ReportParams Load
PEG Load Y (Skip and Run Manually)
PBICanada GMROI Export
PBICanada Export
OnBaseStmt Import
MKT TAB Load
MKT Pre Load ?
MKT Load Y
LPPRACT2ATDW Load
LPPR ATDW2ACT Load
Jira Load
InventoryProfit Load
GPMVCMFile Export
GPMVCM Load
GL Load Y
GL Cube Full Process Y
Equity Load
DTPrice Export
DelticomPrice Export
Delivery TAB Load
Delivery Load Y (Skip and Run Manualy using the dates )
CRM Marketing Load Disabled
CRM Load Disabled
CRM Import Disabled
CRM Commission Load Disabled
CRM Churn Load Disabled
ContiGen Export
Competitor Load Night Manualy using the dates
BI Commission TAB Load
BI Commission Load Y
Augeo Export Y (Run Manually)
Anaplan Upload ?/Y
Anaplan Export ?/Y