You are on page 1of 7

2500 3000

500 500
2500

500 500
2500
200

SHEET TITLE: PROJECT NAME: DATE:


Activity Tower Dual Cable Zipline April 12, 2014
BACK
(Sheet 1) LOCATION: PREPARED BY:
Alominos, Pangasinan CSR Builders & Consultancy
3000

TO LANDING
2500
7500

2500
2500
200

SHEET TITLE: PROJECT NAME: DATE:


Activity Tower Dual Cable Zipline April 12, 2014
SIDE
(Sheet 2) LOCATION: PREPARED BY:
Alominos, Pangasinan CSR Builders & Consultancy
3000
2500
7500

2500
2500
200

SHEET TITLE: PROJECT NAME: DATE:


Activity Tower Dual Cable Zipline April 12, 2014
TAKE OFF PLATFORM (120m)
(Sheet 3) LOCATION: PREPARED BY:
Alominos, Pangasinan CSR Builders & Consultancy
1500
3000 3000
50 50 50 50

50
H H H H
DOWN DOWN

500
500

SHEET TITLE:

(Sheet 4)
LEVEL FLOORING
2600
1600
2600
1600

2600
3000

500
500
UP UP

H H H H

LOCATION:
50
2ND. FLOOR TAKE OFF PAD FLOOR PLAN
SCALE 1:100 SCALE 1:100

PROJECT NAME:
5” CONC. SLAB WITH 12MM o
BARS SPA.40M.C.

Alominos, Pangasinan
3000

H H

Activity Tower Dual Cable Zipline


DATE:
3000

April 12, 2014

PREPARED BY:
UP

H H
GROUND FLOOR PLAN

CSR Builders & Consultancy


SCALE 1:100
3000
TO LANDING
2500

200
1500

SHEET TITLE: PROJECT NAME: DATE:


Activity Tower Dual Cable Zipline April 12, 2014
PLATFORM
(Sheet 4) LOCATION: PREPARED BY:
Alominos, Pangasinan CSR Builders & Consultancy
CABLE ANCHOR
00
25
2500

1500

200

00
30

25
00

SHEET TITLE: PROJECT NAME: DATE:


Activity Tower Dual Cable Zipline April 12, 2014
PLATFORM
(Sheet 4) LOCATION: PREPARED BY:
Alominos, Pangasinan CSR Builders & Consultancy