Increment Plan

Incr. Start Days End Size Status Release Date


1 13.6.2006 42 24.7.2006 19
2 25.7.2006 42 4.9.2006 0

Template note: Increment plan is intended to collect individual sprints into larger releases. In smaller projects, this is not ne

Sprint Plan
Sprint Start Days End Size Status Release Date
1 6/13/2006 14 6/26/2006 8 Planned
2 6/27/2006 14 7/10/2006 3 Planned
3 7/11/2006 14 7/24/2006 8 Planned
4 7/25/2006 14 8/7/2006 0 Planned
5 8/8/2006 14 8/21/2006 0 Planned
6 8/22/2006 14 9/4/2006 0 Planned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unallocated stories 13
Goal

ger releases. In smaller projects, this is not needed.

Goal Increment
Planning 1
Specification and prototype development 1
Specification and prototype development 1
Specification and prototype development 2
Specification and prototype development, documentation 2
Usability test, documentation, prototype corrections 2
Product Backlog

Story ID Story name Status Size Sprint Priority Comments


1 This is a sample story Done 3 1
2 This is another sample story Ongoing 5 1 You can add comments here to add key detail
or explanation to the story. For larger
definitions, use external tools and materials.
3 This is a third sample story Planned 3 2
4 This is a fourth sample story Planned 8 3
5 This is an unallocated sample story Planned 13
6 This is a removed story Removed 5
Product Backlog Burndown Chart
Original planned size 137
Count trend from last 3 sprints 12
Velocity and Remain

Velocity (points per sprint)


10
Original estimate 30
Last 3 sprints 25.0
Realized total average 25.0 8
Average last 8 25.0
Avg. worst 3 in last 8 25.0
Trend 25.0 6

Predictions - Completion at the end of sprint…


4
Original estimate - Min 3
Original estimate - Avg 5
Original estimate - Max 8 2
Last 3 sprints 6
Realized average 6
Average last 8 6 0
Avg. worst 3 in last 8 6
Trend 6
Realized + St. Dev 6 Development Velo
12
Realized - St. Dev 6

10

Remain. Planned Realized Current Total


Sprint Work Work Work Size
8
1 137 23 23 137
2 114 29 27 137
3 87 31 137 6
4 56 28 137
5 28 28 137
4
6
7
8 2
9
10
0
11 Planned Speed
Average Realized
12 Avg. Worst 3 in Last 8
13
14
15
16
17
18
19
20
21
22
23
24
Velocity and Remaining Work
Note:
In this chart, the tops of the bars show the amount of actual
(or planned) implemented functionality at the beginning of each spr
The bottoms of the bars show the changes in project scope
(i.e. if the amount of story points
in the project increases, the bottoms move lower). The length
of the bars indicate the estimated size of the project at the
beginning of each sprint.
The red line indicates the current planned scope.

Development Velocity

Planned Speed Realized Speed


Average Realized Avg. Last 8
Avg. Worst 3 in Last 8
s show the amount of actual
ionality at the beginning of each sprint.
he changes in project scope

toms move lower). The length


ed size of the project at the

nt planned scope.
W o r k R e m a in in g ( h )
Sprint 1 Backlog

35

Daily Pro g ress 30


Id eal Pro gress 25
Current Tre nd
20

15

10

Sprint implementation days 5 Effort Remaining on im


Trend calculated based on last 5 Days Totals 33 33
Task name Story ID Responsible Status Est. 1
Example task 1 Danny Dev Done 5 5
Example task 2 1 Tina Tester Ongoing 7 7
Example task 3 2 Danny Dev Ongoing 12 12
<Delete these example lines> 2 Planned 9 9
W o r k R e m a in in g ( h )

35

30

25

20

15

10

Remaining on implementation day…


30 23 21
2 3 4 5
2 0
7 2 2
12 12 10
9 9 9
W o r k R e m a in in g ( h )
Sprint 1 Backlog

Da ily Pro gress 0.9


0.8
Idea l Prog ress
0.7
Cu rren t Tre nd 0.6
0.5
0.4
0.3
0.2
0.1
0

Sprint implementation days 5 Effort Remaining on impleme


Trend calculated based on last 5 Days Totals 0 0
Task name Story ID Responsible Status Est. 1 2
Remaining on implementation day…

3 4 5
Story ID: 1 Story: This is a sample story
Task: Example task

Responsible Person: Danny Dev


Initial Work Work
Estimate 5 Done Left

Story ID: 1 Story: This is a sample story


Task: Example task 2

Responsible Person: Tina Tester


Initial Work Work
Estimate 7 Done Left

Story ID: 2 Story: This is another sample story


Task: Example task 3

Responsible Person: Danny Dev


Initial Work Work
Estimate 12 Done Left

Story ID: 2 Story: This is another sample story


Task: <Delete these example lines>

Responsible Person:
Initial Work Work
Estimate 9 Done Left