Providing and supplying labour for casting of Cast-In-Situ RCC Box Drain
as per drawing and design including leveling, dressing, PCC, R/F steel
1 cutting bending and binding as per BBS, Suttering providing and fixing, RMT 850 220.90 187765.00 0.00 0 220.90 187765.00
concreting and curing (Shuttering supporting, Binding Wire, All Tools &
Tackels, Concrete Vibrator etc by Contractor)
Providing and supplying labour for casting of Cast-In-Situ RCC Box Drain
(Heavy Duty Drain) as per drawing and design including leveling,
dressing, PCC, R/F steel cutting bending and binding as per BBS,
2 Suttering providing and fixing, concreting and curing (Shuttering RMT 1200 32.50 39000.00 0.00 0 32.50 39000.00
supporting, Binding Wire, All Tools & Tackels, Concrete Vibrator etc by
Contractor)
3 Supply Labour - Skilled for 8 Hours Per Day 450 0.00 0.00 0.00 0 0.00 0.00
4 Supply Labour - Unskilled for 8 Hours Per Day 350 0.00 0.00 0.00 0 0.00 0.00
Total 226765.00 0.00 226765.00
Deductions:
TDS 1% 2268 0 2268
SECURITY @5% 11338 0 11338
Debit for Fooding & Advance
Total Deduction 13606 0 13606
Less Adv:-
Chainage
S.No. Side Description Unit Length Quantity Bill No. Remarks
From To
1 68+484 68+506 LHS Construction of drain RMT 22.400 22.400 1
2 68+560 68+601 LHS Construction of drain RMT 41.300 41.300 1
3 68+653 68+680 LHS Construction of drain RMT 27.700 27.700 1
4 68+832 68+889 LHS Construction of drain RMT 57.500 57.500 1
5 69+037 69+059 LHS Construction of drain RMT 22.000 22.000 1
6 68+433 68+437 LHS Construction of drain RMT 4.000 4.000 1
7 69+004 69+024 RHS Construction of drain RMT 20.000 20.000 1
8 69+034 69+060 RHS Construction of drain RMT 26.000 26.000 1
Chainage
S.No. Side Description Unit Length Quantity Bill No. Remarks
From To
Construction of Heavy Duty
1 68+630 68+653 LHS RMT 22.500 22.500 1
drain
Construction of Heavy Duty
2 69+024 69+034 RHS RMT 10.000 10.000 1