E
S
THIS SITE
STA 0+000
STA 0+352
SAN SEBASTIAN
PARISH CHURCH
SAN NARCISO
NATION
MUNICIPAL HALL
AL HIG
HWAY
LOCATION MAP
SCALE: NTS
VICINITY MAP
SCALE: NTS
PROJECT TITLE: PREPARED AND SUBMITTED BY: SHEET CONTENTS: SHEET NO:
A-BLOCK CONSTRUCTION
#0451 Purok 3B, National Highway,
Brgy. Calapacuan, Subic, Zambales FABRICATION/INSTALLATION OF CANAL COVER
AS-BUILT PLAN AS SHOWN 1 OF 3
POL VINCENT L. ANGELES
LOCATION: BRGY. SAN RAFAEL,SAN NARCISO, ZAMBALES PROJECT ENGINEER/OWNER
12ØMM HOR. BARS 12ØMM HOR. BARS
750 950 750
12ØMM BARS
SPACED @0.40M 12ØMM BARS
SPACED @ 0.40M
PROJECT TITLE: PREPARED AND SUBMITTED BY: SHEET CONTENTS: SHEET NO:
A-BLOCK CONSTRUCTION
#0451 Purok 3B, National Highway,
Brgy. Calapacuan, Subic, Zambales FABRICATION/INSTALLATION OF CANAL COVER
AS-BUILT PLAN AS SHOWN 2 OF 3
POL VINCENT L. ANGELES
LOCATION: BRGY. SAN RAFAEL,SAN NARCISO, ZAMBALES PROJECT ENGINEER/OWNER
A
500
6-12MMØ TOP BAR
750 100
500
TYPICAL ROAD SECTION W/ DRAINAGE
CANAL @ STA 0+210 TO STA 0+243 C 500
500
8-12MMØ TOP BAR
SCALE: 1:50
1150 750
100
1150
750
1150
PROJECT TITLE: PREPARED AND SUBMITTED BY: SHEET CONTENTS: SHEET NO:
A-BLOCK CONSTRUCTION
#0451 Purok 3B, National Highway,
Brgy. Calapacuan, Subic, Zambales FABRICATION/INSTALLATION OF CANAL COVER
AS-BUILT PLAN AS SHOWN 3 OF 3
POL VINCENT L. ANGELES
LOCATION: BRGY. SAN RAFAEL,SAN NARCISO, ZAMBALES PROJECT ENGINEER/OWNER