Project Name :
LINE Project
Site Location :
Cilegon, Indonesia
Document Title :
Document No. :
LINE-905-CI-4-1101
0 28-Dec-2022 Issued for Construction S.J. HWANG S.K. PARK C.M. BAE
A 25-Nov-2022 Issued for Approval S.J. HWANG S.K. PARK C.M. BAE
Rev.
Rev. Date. Revised Page Description Remarks
No.
TABLE OF CONTENTS
7. MODELING ‥‥‥‥‥‥‥‥‥‥‥‥‥‥.‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥…..‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥20
7.1 3D-VIEW ‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥
20
7.2 STAAD INPUT LOADIND DATA ‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥‥
21
1. DESIGN CRITERIA
1.1 GENERAL
Code Description
ASCE 7-10 Minimum Design Loads for Buildings and Other Structures
ACI 318M - 14 Building Code Requirements for Structural Concrete and Commentary
2) Reinforced Concrete
2) Sliding Stability
Design Condition Stability Ratio
All Conditions 1.5
Accidental Condition 1.2
3) Buoyancy
- Empty Condition / Operating Condition SF = 1.20
1) Legend
2) Combination for Allowable Stress Design (for Foundation Stability and Serviceability Check)
Increase
Condition Load combinations
Factor
Empty + Wind 1.0 Ds + 1.0 De + 0.6 W 1.00
Empty + Earthquake 1.0 Ds + 1.0 De + 0.7 Ehe - 0.7 Eve 1.00
Operating 1.0 Ds + 1.0 Do 1.00
Operating + Thermal 1.0 Ds + 1.0 Do + 1.0 T 1.00
Operating + Wind 1.0 Ds + 1.0 Do + 0.6 W 1.00
Operating + Wind(Uplift) 0.6 Ds + 0.6 Do + 0.6 W 1.00
Operating + Earthquake 1.0 Ds + 1.0 Do + 0.7 Eho + 0.7 Evo 1.00
Operating + Earthquake(Uplift) 0.6 Ds + 0.6 Do + 0.7 Eho - 0.7 Evo 1.00
Test + Partial Wind 1.0 Ds + 1.0 Dt + 0.6 Wp 1.00
Bundle Pull(For Exchangers) 1.0 Ds + 1.0 De + 1.0 Bp 1.00
3) Combination for Ultimate Strength Design (for Reinforced Concrete Member Design)
2. DESIGN DATA
PLAN
SECTION
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 9 of 58
[unit : mm]
5.00
Anchor Bolts
8ea - M30
PLAN
4.04 [unit : m]
(O.D)
0.69
Equipment
0.00
(hes)
(TOG) 0.50
y 0.60 1.10
0.60 (hs) (ht)
(BOF)
x
SECTION
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 11 of 58
4. DESIGN LOAD
1) Empty Weight
- Vertical Load : De = 4941 kg = 49.41 kN
2) Operating Weight
- Vertical Load : Do = 102909 kg = 1029.09 kN
3) Test Weight
- Vertical Load : Dt = 86807 kg = 868.07 kN
1) By Vendor
1) By Vendor
- In Empty Condition, Ee
Lateral Force : Hse = 1002 kg = 10.02 kN
Moment at Top of Pedestal : Mse = 2674 kg.m = 26.74 kN.m
- In Operating Condition, Eo
Lateral Force : Hso = 20876 kg = 208.76 kN
Moment at Top of Pedestal : Mso = 55698 kg.m = 556.98 kN.m
- In Empty Condition, Ee
Vertical Force : 0.2 x SDS x Weight_E = 0.2 x 0.608 x 49.41 = 6.01 kN
- In Operating Condition, Eo
Vertical Force : 0.2 x SDS x Weight_O = 0.2 x 0.608 x 1,029.09 = 125.14 kN
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 15 of 58
5. LOAD COMBINATION
5.1 LEGEND
Ds Dead Load Ehe Lateral Earthquake Load(Empty)
De Empty Load of Equipment Eve Vertical Earthquake Load(Empty)
Do Operating Load of Equipment Eho Lateral Earthquake Load(Operating)
Dt Test Load of Equipment Evo Vertical Earthquake Load(Operating)
T Thermal Load
W Wind Load
Wp Partial Wind Load * E = Eh + Ev (ASCE 7-10 12.4-1)
5.2 ALLOWABLE STRESS DESIGN ( for Foundation Stability and Serviceability Check )
Comb. Increased
Load Combination Description
No. Factor
L/C A101 1.0 Ds + 1.0 De + 0.6 Wx Empty + Wind 1.00
L/C A102 1.0 Ds + 1.0 De + 0.6 Wz Empty + Wind 1.00
L/C A103 1.0 Ds + 1.0 De + 0.7 Ehex - 0.7 Eve Empty + Earthquake 1.00
L/C A104 1.0 Ds + 1.0 De + 0.7 Ehez - 0.7 Eve Empty + Earthquake 1.00
L/C A105 1.0 Ds + 1.0 Do Operating 1.00
L/C A106 1.0 Ds + 1.0 Do + 1.0 T Operating + Thermal 1.00
L/C A107 1.0 Ds + 1.0 Do + 0.6 Wx Operating + Wind 1.00
L/C A108 1.0 Ds + 1.0 Do + 0.6 Wz Operating + Wind 1.00
L/C A109 0.6 Ds + 0.6 Do + 0.6 Wx Operating + Wind(Uplift) 1.00
L/C A110 0.6 Ds + 0.6 Do + 0.6 Wz Operating + Wind(Uplift) 1.00
L/C A111 1.0 Ds + 1.0 Do + 0.7 Ehox + 0.7 Evo Operating + Earthquake 1.00
L/C A112 1.0 Ds + 1.0 Do + 0.7 Ehoz + 0.7 Evo Operating + Earthquake 1.00
L/C A113 0.6 Ds + 0.6 Do + 0.7 Ehox - 0.7 Evo Operating + Earthquake(Uplift) 1.00
L/C A114 0.6 Ds + 0.6 Do + 0.7 Ehoz - 0.7 Evo Operating + Earthquake(Uplift) 1.00
L/C A115 1.0 Ds + 1.0 Dt + 0.6 Wpx Test + Partial Wind 1.00
L/C A116 1.0 Ds + 1.0 Dt + 0.6 Wpz Test + Partial Wind 1.00
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 18 of 58
- PC PILE
Ap x Ep
kver = a x
Lp
K1 = 4 Ep I β³ = 9670.0 kN/m
2
K2,3 = 2 Ep I β = 12496.6 kN
K4 = 2 Ep I β = 563.7 kN·m/deg
where, α = 1
N = 10 <= Assumed
h = 0
Eo = 7000 kN/m2
I = 0.001065 m4
7. MODELING
7.1 3D-VIEW
FOOTING
(T=1.1m)
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 21 of 58
1) Dead Load _ Ds
• Self weight
2) Empty Load _ De
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 22 of 58
3) Operating Load _ Do
4) Test Load _ Dt
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 23 of 58
5) Wind Load_X-Drection _ Wx
6) Wind Load_Z-Drection _ Wz
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 24 of 58
8. STABILITY CHECK
1) Vertical Direction
- Pvmax = 525.595 kN ≤ Pva = 700.00 kN (LC 111) O.K !
2) Horizontal Direction
- Phmax = 36.82 kN ≤ Pha = 60.00 kN (LC 111) O.K !
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 29 of 58
3) Uplift Check
- Pumax = 0.00 kN ≤ Pua = 100.00 kN (LC 113) O.K !
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 30 of 58
9. MEMBER DESIGN
5) Member Design
Mu f'c fy h b cover d
Φb
(kN.m) (MPa) (MPa) (mm) (mm) (mm) (mm)
105.86 24 420 1100 1,000 50 1040.5 0.90
Mu 105.86 10 6
x
Required Rn = = 2
= 0.1086 N/mm²
φbbd² 0.90 x 1,000 x 1041
0.85 f'c 2 x Rn
ρ = 1- 1-
fy 0.85 f'c
0.85 x 24 2 x 0.109
= 1 - 1- = 0.00026
420 0.85 x 24
As(min.2) = 0.25 x √f'c x b x d / fy = 0.25 x √24 x 1000 x 1040.5 / 420 = 3034 mm2
As(min) = Max ( As(min.1) , As(min.2) ) = 3468 mm2
n = Es / Ec = 8.69
ρ = As / ( b x d) = 0.0014
k = -n x ρ + (nxρ)2+2xnxρ = 0.1432
j = 1-k/3 = 0.9523
fs = Ms / ( As x j x d) = 59.19 N/mm²
280 280
s1 = 380 - 2.5Cc = 380 - 2.5 x 50 = 1672.6 mm
fs 59.19
280 280
s2 = 380 = 380 = 1797.6 mm
fs 59.19
Mu f'c fy h b cover d
Φb
(kN.m) (MPa) (MPa) (mm) (mm) (mm) (mm)
104.69 24 420 1100 1,000 150 940.5 0.90
Mu 104.69 10 6
x
Required Rn = = 2
= 0.1315 N/mm²
φbbd² 0.90 x 1,000 x 941
0.85 f'c 2 x Rn
ρ = 1- 1-
fy 0.85 f'c
0.85 x 24 2 x 0.132
= 1 - 1- = 0.00031
420 0.85 x 24
As(min.2) = 0.25 x √f'c x b x d / fy = 0.25 x √24 x 1000 x 940.5 / 420 = 2743 mm2
As(min) = Max ( As(min.1) , As(min.2) ) = 3135 mm2
Crack control
- Maximum spacing for cracking consideration
n = Es / Ec = 8.69
ρ = As / ( b x d) = 0.0015
k = -n x ρ + (nxρ)2+2xnxρ = 0.1500
j = 1-k/3 = 0.9500
fs = Ms / ( As x j x d) = 64.63 N/mm²
280 280
s1 = 380 - 2.5Cc = 380 - 2.5 x 150 = 1271.4 mm
fs 64.63
280 280
s2 = 380 = 380 = 1646.4 mm
fs 64.63
Mu f'c fy h b cover d
Φb
(kN.m) (MPa) (MPa) (mm) (mm) (mm) (mm)
95.10 24 420 1100 1,000 50 1040.5 0.90
Mu 95.10 10 6
x
Required Rn = = 2
= 0.0976 N/mm²
φbbd² 0.90 x 1,000 x 1041
0.85 f'c 2 x Rn
ρ = 1- 1-
fy 0.85 f'c
0.85 x 24 2 x 0.098
= 1 - 1- = 0.00023
420 0.85 x 24
As(min.2) = 0.25 x √f'c x b x d / fy = 0.25 x √24 x 1000 x 1040.5 / 420 = 3034 mm2
As(min) = Max ( As(min.1) , As(min.2) ) = 3468 mm2
Crack control
- Maximum spacing for cracking consideration
fs = Ms / ( As x j x d) = 53.91 N/mm²
280 280
s1 = 380 - 2.5Cc = 380 - 2.5 x 50 = 1848.6 mm
fs 53.91
280 280
s2 = 380 = 380 = 1973.6 mm
fs 53.91
Mu f'c fy h b cover d
Φb
(kN.m) (MPa) (MPa) (mm) (mm) (mm) (mm)
76.76 24 420 1100 1,000 150 940.5 0.90
Mu 76.76 10 6
x
Required Rn = = 2
= 0.0964 N/mm²
φbbd² 0.90 x 1,000 x 941
0.85 f'c 2 x Rn
ρ = 1- 1-
fy 0.85 f'c
0.85 x 24 2 x 0.096
= 1 - 1- = 0.00023
420 0.85 x 24
As(min.2) = 0.25 x √f'c x b x d / fy = 0.25 x √24 x 1000 x 940.5 / 420 = 2743 mm2
As(min) = Max ( As(min.1) , As(min.2) ) = 3135 mm2
- Determine Φb
Depth of nominal strength equivalent stress block a = fy x As / (0.85 x f'c x B) = 29.50 mm
Net tensile strain in extreme layer εt = 0.003 × (H - a/β1 - dc) / (a/β1)
0.003 x ( 941 - 29.50 / 0.85 )/( 29.50 / 0.85 )
⇒ 0.00525 ≤ εt = 0.0783 , Tension-controlled section
∴ φ = 0.90 used
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 43 of 58
Crack control
- Maximum spacing for cracking consideration
fs = Ms / ( As x j x d) = 46.97 N/mm²
280 280
s1 = 380 - 2.5Cc = 380 - 2.5 x 150 = 1890.1 mm
fs 46.97
280 280
s2 = 380 = 380 = 2265.1 mm
fs 46.97
6) Shear Check
Vu = 253.42 kN
f'c = 24 MPa , Φs = 0.75
b= 1,000 mm , d= 941 mm
1000 (d)
100
Pile
· SDS = 2/3 x Fa x Ss
= 2/3 x 1.14 x 0.797 = 0.608
· SD1 = 2/3 x Fv x S1
= 2/3 x 2.66 x 0.335 = 0.594
Doc. No. : LINE-905-CI-4-1101
EQUIPMENT FOUNDATION
CALCULATION FOR Rev. No. : 0
90-TK-502 Page : 47 of 58
- In Empty Condition
Vertical Force : Vee = 0.2 x SDS x We = 0.200 x 0.608 x 49.41 = 6.00 kN
- In Operating Condition
Vertical Force : Veo = 0.2 x SDS x Wo = 0.200 x 0.608 x 1029.09 = 125.06 kN