You are on page 1of 2

August 2020

Compact Ni-Cd batteries


Type CPM and CPL
Installation and operating instructions
Important recommendations Storage of a filled battery at temperatures
above +30°C (+86°F) can result in
 ARNING: Risk of fire, explosion,
W
permanent change and loss of product
or burns. Do not disassemble, heat
performance, depending on the duration
above 70°C, or incinerate
of the storage above the maximum
 ever smoke while performing any
N recommended temperature. Never drain
operation on the battery. the electrolyte from the cells. To ensure
 or protection, wear rubber gloves,
F maximum protection of the cells always
long sleeves and appropriate splash store the product in its original packaging.
goggles or face shield.
 he electrolyte is harmful to skin
T
3. Installation
and eyes. In the event of contact 3.1. General
with skin or eyes, wash immediately
Compact batteries are delivered filled with The step by step procedures will vary with
with plenty of water. If eyes are
electrolyte. application and layout, but the following
affected, flush with water, and
should be observed:
obtain immediate medical attention. Do not top up batteries with water before,
during or after initial installation. Measuring the cell Open Circuit Voltage
 emove all rings, watches and
R
(OCV) is recommended to check for normal
other items with metal parts before Batteries can be charged according to cell condition (according to chapter 5).
working on the battery. “In Service Charging” prior to installation. Before installation, measure the OCV of
Use insulated tools. See chapter 3.6. each battery cell and note the values.
 void static electricity and take
A In case of abnormal events or operating The sum of the individual cell voltages will
measurements for protection be used to compare with the assembled
outside recommended procedures,
against electric shocks. battery string voltage.
measuring the cell Open Circuit Voltage
 ischarge any possible static
D (OCV) is recommended to check for Where applicable, place trays in position
electricity from clothing and/ normal cell condition before installation. to allow installation with battery modules.
or tools by touching an earth- See paragraph “Troubleshooting and Temporarily position the battery modules
connected part “ground” before abnormal operation”. in final position in accordance with the
working on the battery. provided layout diagram. Make sure to
3.2 Operating environment
 entilation, in accordance with the
V orient the positive and negative terminals
IEC 62485-2, is mandatory during For tight spaces and to use a front correctly.
commissioning and operation. accessible connection, make sure to install Use only the accessory kit parts provided.
all back cable connections, first, while When a string barcode label is used,
1.Receiving the shipment blocks are staged outside. To prevent, orient the module that has the affixed
Upon receipt of the goods, any inadvertent short circuit, make sure the label so it can be accessed in its final
transportation damage, electrolyte spillage loose cable end is insulated. position in the application.
or irregularities must be reported to the
Compact should never be installed in a When installing a cable, torque the
carrier and to Saft.
sealed space without ventilation. terminal bolts to 10 ± 1 N.m
The battery is shipped filled and charged, (96 ± 9 in.lbs).
and is ready for immediate use. Storage of To prevent inadvertent short circuit, make
sure the connector ends are insulated. Apply generous amounts of corrosion
cells must not exceed the maximum storage
inhibitor, supplied with the accessory kit,
time indicated on the packing case (first in, 3.3. Recommended tools to all terminal connections made before
first out).
The following tools will facilitate installation: and after applying torque.
2. Storage The modules can then be slid into place
Insulated 10 mm socket (in their trays if provided) and all front
The battery must be stored in a dry indoor
Insulated torque wrench capable connections, cabled from the back,
location, on open, well ventilated shelves
of 10 ± 1 N.m (96 ± 9 in.lbs) can subsequently be made.
away from direct sunlight between -20°C and
+35°C (-4°F and +95°F). Do not at this stage connect the system’s
Digital Multi Meter (DMM), with an
power cables.
Compact batteries are supplied filled with accuracy of +/-10mVDC
electrolyte and 10% state of charge. Connect each battery module using
They can be stored in this condition for Clamp-on current meter, with an accuracy the accessory kit parts in accordance
maximum 12 months from date of shipment of ±25mA (optional) with the string layout diagram.
in accordance with the recommendations Heat shrink gun (optional) After completing terminal connections
set forth in this I&O. and corrosion inhibitor application, make
3.4. String assembly sure to install the battery top covers.
If fully charge
the battery should not be stored for more Battery configurations vary depending on Battery module handles should remain
than 2 months. (if long storage is the application. A battery string layout is in place unless it is obstructing module
required, discharge the string to 10% provided with each string. placement or connection. In that case
state of charge). remove them.
Compact Ni-Cd batteries
3.5. Connecting power •C
 harge at constant voltage with a 4.4. Floating current monitoring
Use lugs and sealable heat shrink maximum voltage set point of 1.65 V
When the battery is ageing, it is advisable
provided in the installation kit, when per cell and current limit of 0.2 C5 A
to check the float charging current. The
necessary, for connecting power cables as mentioned in the table A:
battery requires action if the float current
to the battery terminals. Table A is higher than 5 mA/Ah when charging
Make sure that the cables are properly Cell Capacity Charging at 1.39 V/cell. See Table A for values.
secured and supported. Type C5Ah current A current clamp with an accuracy
Measure the battery string overall voltage (Ah) 0.2 C5 A of ± 0.025 Amps is a way to measure the
and compare this with the sum of all the (A) floating charge current.
module OCV’s measured previously. CPL 80 83 16.6
If values show a discrepancy of 1.0V 5. T
 roubleshooting and
CPL 100 103 20.6
or more, verify the polarity, position abnormal operation
and connection of each module. CPL 150 152 30.4
Reassemble as required. It is recommended to measure the cell open
CPL 180 185 37.0 circuit voltage if:
Temperature compensated voltage
CPM 80 76 15.2 Stored at too high or too low of
control is not recommended.
Disengage temperature compensation CPM 100 98 19.6 temperature.
circuit if activated. Stored for too long of time.
CPM 150 147 29.4
Make sure the output of the rectifier is Batteries visibly OK but shipping crate
adjusted between 1.39 to 1.45 VPC. CPM 180 180 36.0
excessively damaged.
Note the polarity of the battery terminals •C ontinue charging for a minimum To measure the cell OCV:
and verify the polarity of the power cables of 30 hours. Gain access to the cell terminals by
before connecting these to the battery. • Maximum 30 minute pause is allowed. removing the battery top covers.
Using standard practice and rectifier • Apply the load mentioned in the Table A Set aside for re-use.
manufacturers recommendations as a and discharge to a cut-off of 1.0 V per cell Using a multimeter measure each cell
guideline, connect the power cables to the (measured at the string terminals) and and check that each is greater than
string terminals and secure hardware: verify that the 5 hours of runtime are or equal to 1.10 VPC per cell.
M6 Terminal Torque 10 ± 1N·m delivered.
(96 ± 9 in·lbs). If a cell is below 1.10 VDC per cell,
4. Maintenance and Inspection set the battery module aside and call
Apply approved corrosion preventative
4.1. Topping-Up Saft for further instructions.
compound on string terminals.
If a battery must be connected to a Topping-up is not required over the
live system (adding additional capacity), operational life of the Compact. 6. Removal and recycling
it must be necessary to charge the Make sure appropriate packing materials
4.2. Cleaning
batteries prior to the installation to are available.
minimize the inrush current. It is good practice to visually inspect the
Make sure each cell cap is installed to
string during periodic site visits. Vacuuming
3.6. In Service Charging prevent spillage.
or dusting with a soft brush is adequate if
Constant voltage charging is the string is dirty. A wet rag may be used, All local laws and regulations must be
recommended and should be done at but do not use any detergent, chemicals or respected when removing, transporting
1.39 to 1.45 VPC per cell. cleaning aids, only water. Do not use metal and storing used batteries.
In order to re-charge fully in 24 hours, brushes or hard bristles risk of static Contact your local Saft representative
the minimum current available for each electricity for instructions on recycling.
battery string should be 0.2 C5 A. See
Table A for values. 4.3. Periodic inspection and control
Temperature compensated voltage control
Measure rectifier output voltage and make
is not recommended. Check with rectifier
sure it is adjusted correctly. See
manufacturer for instructions.
paragraph “In Service Charging”.
In case we need to check the IEC capacity
(IEC 60623) the following procedure must Re-torquing the terminal bolts is not
be applied: recommended. The hardware is
constructed from nickel plated steel and
• Make sure that the string is discharged
stainless steel which requires no torquing
fully and each cell is at the same SOC.
maintenance.

Saft
Industrial Standby Division Doc N° 22044-0820-2
26, quai Charles Pasqua Data in this document is subject to change without
notice and becomes contractual only after written
92300 Levallois-Perret - France confirmation.
Tel: +33 1 58 63 16 00 Société Anonyme au capital de 26 300 205 €
Fax: +33 1 58 63 16 18 / +33 1 58 63 16 19 RCS Nanterre 481 480 465
www.saftbatteries.com Le Révérend Imprimeur - Printed in France