NOTES:

1. ALL DIMENSION IN MILLIMETERS.


2. THE WORDS "HIGH PRESSURE PIPELINE" SHALL BE
CAST INTO SLAB IN LETTERS AT LEAST 80mm
HIGH AND AT THREE LOCATION PER SLAB.
BE OR 3. CONCRETE TO HAVE A MINIMUM DENSITY OF 2320kg/m3

T O T AND A COMPRESSIVE STRENGTH OF 25 MPa AT 28 DAYS.

S RA C
E
EY ONT
T G C
I N Y S T
I F F B C A
L G N E -
S I R
D E P
BE
T O
A B
SL
75
0

H
IG
E
0

H
0

LI
15 .

P
R
E

E
IP
N

S
I

S
M

U
R

R
U

E
S

P
S

IP
E

E
R
P

LI
k
H

N
0
IG

E
30
H

M m
H
E 0m
100

S
E
IR 15
H

W F
IG

#9 R O
H

m E
P

Y
R

0m LA
E

8th.6.2022
S
S

x NE
U
R

15
O
E
P
IP
E
LI
N
E

Date Sign:
REINFORCED CONCRETE Code I Information only Submission - Accepted
Code R Rejected – Major Comments – Data Provider to revise and re-submit.
PROTECTION SLAB Work should NOT proceed in the affected areas until comments are
resolved.

Code C Comments Returned – Data provider to revise and re-submit for the
further review.
DIA. 12 LIFTING EYE Code A Accepted – Approved – No further submission required
Client: EPCC CONTRACTOR :

EBS OILFIELD PROJECT

MESH PROJECT TITLE:


Provision of Flow lines and OHTL EPCC Project

CONTRACT NO. : 031-SC-21


DOCUMENT NUMBER : EBS1-FSFA11-SAPN-DWPR-1007-D00
V=1.5X0.75X0.1=0.1125M3 DETAIL -A DOCUMENT TITLE :

M=0.1125X2320=261kg TYPICAL DETAILS


CONCRETE PROTECTION SLAB

D00 25.05.22 ISSUE FOR APPROVAL Bharat Yousef Ahmed Hythem


REV Date Issue Status Draw By Checked By Reviewed By Approved By
Scale : 1:1 Paper size A1 SH: 1 OF 1