Province: Badghis
Province(s): Badghis
Change
Areas of Low Responsibl Means of Details of
SN Root Cause(s) Improvement Action Expected Change Timeline Happened
Performance e Authority Verification Improvement
(Yes/No)
1. Staff should be
oriented to consider
1. Lack of staff IPC measures at the
IPC measures have awareness on IPC HF level. IPC measures will
TPM report,
6 not been met in standards. 2. Proper follow-up be met at the HF MMRCA 30-Sep-23
SP report
some HFs. 2. Lack of proper follow- should be done to level.
up. ensure IPC measures
are taken into
consideration.
Submitted to: UNICEF
Submitted by:
MgtWell Consulting Services, Kabul,
Afghanistan