You are on page 1of 15

PARTS & SERVICES –

EHS

EHS Performance Report


October-2023
Our number 1 priority

Safety first

Emergency Assembly Protective


exit point equipment

Emergency First In case


number aid kit of emergency

Psychological Health and Cyber


safety well-being security

2
Review of TRIs and controls quality index
Quality Index >3 2 <2
Control Description Good Moderate Low

Effectiveness
Index
Actions
Date Inc Location Con Incident Summary
Control To
Type tal

1. Awareness to be conduct
with team for Usage of Proper 1
tools & resource
On 08-10-2023 In A shift, IP was deployed for opening rotary
actuator from SD-01 which was out of fleet machine and was at - 2. Implementation of PTW/
open pit scrap yard while opening rotary actuator bolt with help of JRA for non-working area.
2
combination of spanner. While tonguing to open the bolt spanner
HZL- Agucha Restricted Work Injuries slipped and IP sustained injury in left hand ring finger. IP was 3. Non routine work must be
8.10.2023 INC-64237 carried out under supervision. 5
MIne Site {RWI} provided first at site and then sent to HZL hospital further sent to
city hospital
4. Refresher Risk assessment
training to be provide to site 1
Standard process – Torque wrench with socket to use for opening
the bolt team.

QI Description of Controls
0 No Actions/Controls
1 Behavioral,Training, Use of PPE
2 System Controls; JRA,WPI,WP 3
3 Engineering Control: Physical, Guards,Alarma, Tools & Fixtures
EHS League Table: Sales Area Level

4
EHS League Table: Service Centre Customer Site:≥ 25 Workers

3 HZL sites are at top 5 positions for service center customer sites > 25 workers

5
EHS League Table: SMR SA India – NON HZL

Sl.No Weighting effect 20% 20% 20% 20% 20% 100%

SMR-SA India TRI Score Waste Circularity score EHS Plan Reporting Local Leading Total Score
Completion Process Score Indicator

1 Region East 16.5 15 20 20 20 91.5

2 Region South 16.5 15 20 20 20 91.5

3 Region North & West 16.5 15 20 20 20 91.5

4 Mechanical Cutting 16.5 15 20 0 20 71.5

6
EHS OPERATIONAL REPORT Oct’
2023 MONTHLY SAFETY Topics FTM Open YTD Closed
STATISTICS (ALL SITES)

HINDUSTAN Total number of HC on Site 725 TRI’s 0 0 1 1

EHS Activity
ZINC Total Hazard reported (FPH) 185 Incident investigation 14 0 65 65
OPERATIONS
Near Miss reported 18 Occ. Health Incidences 0 0 0 0
Injuries reported 01

MH1 Verifications 211 0 720 720


MONTHLY SAFETY Topics FTM Open YTD Closed
STATISTICS (ALL SITES)
TRI’s 0 0 0 0
Total number of HC on Site 123

EHS Activity
REST OF INDIA Incident Investigation 0 0 15 15
Total Hazard reported (FPH) 60
Near Miss reported 01 Occ. Health Incidences 0 0 0 0

LTI or MTI or MI reported 00

Monthly Hazard
MH1 Analysis
Verifications 52 0 404 461

Description Action Scope/Status


Top Major Hazards
7
LTI & LTIFR 12MMA LTIFR by Year

LTIFR is 0 in Oct’’ 2023


8
TRI & TRIFR 12MMA TRIFR by Year

No TRI Reported in Oct-2023, SA India SMR is 1.0 (Target is < 2.7)


9
HAZARDS – Vs – CLOSE OUT RATIO
(≥ 95% CLOSED OUT WITHIN 2 MONTHS AFTER THE MONTH IN WHICH IT OCCURRED)

Hazard Close out ratio is 52.2% for the month of Oct-2023.


10
Monthly safety summary Oct - 2023

11
EHS plan 2023 progress – SMR SA-India

Plan Progress-Oct-2023
Location: Global
BA/BU/SA:SMR-SA India

Region North & West (India) 100.0%

Hindusthan Zinc - SK 100.0%

Hindusthan Zinc - Agucha - UG 100.0%

Hindusthan Zinc - Kayad 100.0%

Region South (India) 100.0%

Zawar Group 100.0%

Hindusthan Zinc - Dariba 98.8%

12
EHS ENGAGEMENT ACTIVITY (HZL) –Oct-2023
Site Main Topics Activities Remarks

1. AECT 1. Training conducted on Action Employee Can Take. 40 Employees Covered


2. Hand Tools Safety 2. Training conducted on Hand Tools safety. 48 Employees Covered
3. LOTO 3. Training conducted on Lock Out & Tag Out. 39 Employees Covered
SK 4-VDDS 4-Training conducted on VDDS. 74 Employees Covered
5-PTW 5-Training conducted on PTW. 39 Employees Covered
6-Work at height 6-Training conducted on Work at height. 74 Employees Covered

1.Hand Tools Safety


1.Training conducted On Hand Tools Safety. 21 Employees Covered
RA 2.Lifting Tools Safety
2.Tarining conducted lifting tools safety 06 Employees Covered

1.Training conducted on LOTO.


1.LOTO 30 Employees Covered
RDM 2.Hand Tools Safety 27 Employees Covered
2.Training conducted on Hand Tools Safety.

1. Training conducted on Lock Out & Tag Out. 75 Employees Covered


1. LOTO
2. Training conducted on FOG. 75 Employees Covered
2. FOG
ZWR 3. First aid
3. Training conducted on First aid. 75 Employees Covered
4. Training conducted on Risk Assessment. 75 Employees Covered
4. Risk Assessment

1. FOG 1. Training conducted on FOG. 15 Employees Covered


2. Battery Maintenance 2. Training conducted on Battery Maintenance safety. 08 Employees Covered
KYD 3. Risk Assessment 3. Training conducted on Risk Assessment. 12 Employees Covered

13
EHS ENGAGEMENT ACTIVITY (ROI) –Oct-2023
Site Main Topics Activities Remarks

ROI 1-Risk Assessment 1. Training conducted on Risk Assessment. 57 Employees covered


2-Hand Tools Safety 2. Training conducted on Hand Tools safety. 52 Employees covered

14
Thank You

15

You might also like