UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
1. Sector: Global Emergency Coordination (internal and external coordination)
Business owner(s): EMOPS
Prior to activation
Global Broadcast
First 24 hours
4. Consider ‘step aside’ procedure as This is an exceptional measure to be taken by the organisation and ED RD(s) ED
required uses established criteria. GEC
On basis of RD’s recommendation, ED decides whether CO DEDs
leadership has to change. EMOPS
If current CO Rep confirmed, RD and CO Rep define working DHR
methods between IRT members and current CO team.
If ‘step aside’ is invoked, IRT leader or RD temporarily leads
response at country level until new senior designated official arrives
Link HR SSOP #7 ‘Step aside’ protocol and Annex on ‘Step
aside’protocol).
5. Designate OPSCEN as the Monitor critical emergency developments and alert key staff at CO, OPSCEN GEC PSA
centralized 24/7 information and RO and HQ levels; Manager CO, RO
1 Established by IASC, the IARRM is a roster of experts who can be deployed at very short notice to provide technical and management support in support of RC/HC and HCT, especially in the early phases of a
large scale emergency.
2
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
telecommunications hub to Assess needs for real-time information products and compile data Dir EMOPs
support humanitarian action, sources;
coordination and staff security Confirm Key contacts, distribution and mailing lists with HFSS and
HPS to support coordination at CO, RO and HQ;
Develop OPSCEN key instructions specific to the emergency.
6. Establish clear communication Mailing lists and focal points established for clear lines of EMOPS Chief HQ Divisions GEC
lines and information-sharing communication between HQ, ROs, and COs. HFSS as GEC RO
between HQ, RO, CO Clear lines established for i) information-sharing and ii) decision- Secretariat CO
making at HQ, RO, CO levels.
Initiate L3 Teamsite2 for information sharing HPS
Refer to EWEA Key Action #6 ‘Who does what in first 72 hours of
emergency in CO context’
7. Appoint HQ emergency focal Leads coordination with GEC at HQ. EMOPS Chief EMOPS GEC
point, serving as GEC Secretariat Information focal point. HFSS
8. Establish Emergency According to ToRs for EMT (directors' level) and TEMT (technical EMOPS DD NY CO GEC
Management Team (EMT), and level), establish focal points for EMT and TEMT with staff that will With support RDs
Technical EMT as needed cover the emergency. from HFSS as OED
Use standard agenda Secretariat to HQ Division
EMT Arrange first conference call and set forward agendas (during course GEC Directors
of emergency should include discussions on: sequence of plans,
integrated programming, Supply, CLA, Risk Management and
Tool: EMT/TEMT ToRs
communications).
EMT:
Tool: EMT Standard Agenda Primary decision-making forum.
Any EMT member can ask for ‘deep dives’ i.e. in depth programme
discussion focusing on particular sector/s and linked to the
operational/supply strategy
TEMT:
Main forum for technical trouble-shooting, information sharing, and
preparing proposals for EMT decisions as needed.
Will include focused discussions and ‘deep dives’ looking closely at
sectors and specific operational issues.
2
Can be accessed by EMT/TEMT members in HQ, RO and CO, for coordination and information sharing on a specific L3. Contains policies/guidelines, sitreps, EMT minutes, contacts and
other relevant information. Managed by HPS/KM (EMOPS). Accessed through the main EMOPS managed Teamsites page.
3
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Ensure sector specific calls feed into TEMT/EMT as relevant
9. Brief ED on evolving situation Identify key areas of concern and recommended actions. EMOPS EMT GEC
Identify areas in which high level advocacy may be needed and Director CO
support ED’s intervention. RO
First 48 hours (in addition to those listed above)
10. Establish HQ level daily working Daily 10 min briefs/info exchange for key staff working on key GEC HQ Divisions None
level briefs actions; quick review of evolving situation; actions of the day and (working level
update of actions taken; gaps and bottlenecks that need to be focal points)
addressed.
11. Conduct session with CO on L3 Normally via webinar EMOPS RO None
procedures CO
12. Establish regular conference calls Establish daily conference call. EMOPS DD, EMT members GEC
with EMT Situation update and overview of response strategy, highlighting any NY
programmatic issues requiring support or follow up, key gaps and
on-ground capacity for programme delivery, supplies, HR,
communications, advocacy, resource mobilisation, inter-agency
issues, etc.
Monitor application of L3 SSOPs.
Oversight over deployment of ERT and IRT.
13. Establish inter-agency OCHA, DPA, DPKO, other key agencies and partners. EMOPS DD, EMOPS
communication lines NY Director
14. Provide 24/7 information and Track critical emergency developments/trends and alert EMT OPSCEN GEC, EMT PSA
telecommunications services to members and other key staff. Manager IRT
support humanitarian action, Facilitate telecommunications and information dissemination for CO
coordination and staff security EMT meetings. RO
Develop real-time information products to support EMT (daily EMOPS Dir
emergency update, infographics, snapshots, etc.)
Draft pre-deployment briefing note to provide country-level
background information (e.g. history, economy, geography, politics,
etc.) to IRT members.
Disseminate SitReps and upload to UNICEF HAC and ReliefWeb
websites.
Update OPSCEN key instructions specific to the emergency.
15. Brief ED and OED Decide what information is needed internally including formats and EMOPS DD, All divisions/ GEC
schedules to help decision-making processes. NY RO/CO
4
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
OED
First week (in addition to those listed above)
16. Continue regular conference calls Continued as above. EMOPS Chief EMT GEC
with EMT Include forward planning. HFSS as
Include policy implications. Secretariat to
GEC
17. Establish appropriate technical To support programme strategy development and technical work and Dep Rep RO (DRD) GEC
programme support surge requirements. PD DD EMOPS
communication mechanism PD DD to oversee coordinated strategic support from programmes,
between CO (Dep Rep)/ RO calling as needed on the section chiefs and PD emergency focal
(DRD)/ HQ (PD DD) points.
Provide updates to TEMT/EMT.
18. Ensure coordinated Consider sector specific in depth calls between HQ and RO for PD DD EMT/TEMT GEC
programmatic support coordination purposes Dep Rep
PD to communicate to CO, a list of programme focal points for
specific emergency in HQ and RO. The focal points should be added
to TEMT mailing list.
Continue sector specific calls as needed
Feed into any ‘deep dives’ and EMT/TEMT as needed
19. Moment of Strategic Reflection #1 First discussion to take place during development of inter-agency PD Director/ CO N/A
(Special EMT): Integrated Humanitarian Response Plan (HRP) and UNICEF Response Plan to Chief HATIS RO
Programme Strategy ensure integrated programme strategy. The scope of the plan, (prepare session) PD
(Same as Planning SSOP #9) programmatic priorities and format, if other than the standard, will GEC (convene EMOPS
be determined and agreed during the EMT. session)
EMT will discuss and agree on integrated strategies to promote
synergy across programme sectors in the response and early
recovery, with the appropriate operational support. Where possible
jointly assess with programme stakeholders existing capacity/
arrangements for programme delivery to affected population/area to
determine comparative advantages, potential partnerships. Identify
what elements of ongoing work might be postponed.
Ideally the plan should build on rapid assessment, and aligned with
inter-agency plans, highlighting critical gaps in human resources,
supplies, including those to be pre-positioned and operational
arrangements to facilitate scaling up of UNICEF intervention
affected areas.
5
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Preparations at TEMT levels in advance have proven to support a
more strategic discussion.
Undertake monthly during first 3 months and as required thereafter.
Link SSOPs HR #12, Cluster Coordination #3, and GEC #18
20. Ensure inter-agency coordination Emergency Directors Meeting. EMOPS DDs GEC
Engage at the IA meetings/briefings (ECHA/IASC etc.)3 (NY/ Geneva)
Chief GCCU
21. Define risk management strategy Define overarching coordinated risk management strategy across CO Rep4 GEC
business sectors, focusing on the risks arising from emergency
situation (risks that did not exist prior to the situation leading to L3).
Request GEC for ERM simplification for the duration of L3,
providing rationale and mitigating measures to limit the duration and
impact intensity of risks arising from simplified processes.
See Compedium of Best Practices: UNICEF approach to Comprehensive
Risk Management and Due Diligence on Complex and Hight Threat
Environments
22. Plan emergency site visits
Start considering travel to emergency location(s) for OED/ED and/or GEC OED/RO ED
GEC and relevant EMOPS staff. EMOPS/SD
Following weeks (in addition to those listed above)
23. Continue regular conference calls As above. EMOPS Chief EMT GEC
with EMT Adjust frequency of calls as needed (daily to twice weekly or weekly HFSS as GEC
as needed). Secretariat
24. Ensure inter-agency coordination As above –focus on ECHA/IASC/PC. EMOPS DDs GEC
Potential HQ inter-agency missions. (NY/Geneva)
Possible PCNA/PDNA. Chief GCCU
Ensure adequate coordination/IM capacity is in place
25. Brief ED and OED Review at this stage what information is needed internally, and EMOPS Chief All divisions/ GEC
establish briefing schedules to help decision-making processes. HFSS RO/CO
26. Moment of Strategic Reflection Decide whether to suspend any parts of the Country Programme and CO Rep EMT DRD
#2: Decide on adjustments which to continue for an initial period (recommend 1 months) PD Section GEC
required to the Country Other activities to be renegotiated with national partners and donors Heads
Programme for an initial period accordingly to allow re-allocation of resources.
Identify any gaps
3 Depending on emergencies may include inter-agency task forces or ITF in mission settings, donor meetings (HLWG) and so on.
4 For the remainder of the SSOPs where the term ‘CO Rep’ is used, this denotes the current CO Rep or, if ‘step aside’ has been invoked, the OIC designated by the ED.
6
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Ensure integrated programmatic and operational approaches
Ensure realignment is fed into rolling PBR
27. Develop a plan for handover and Should happen in week 3 or 4 Outline handovers and next steps. RD PD Relevant GEC
transition out of an L3 (if not (refer to minimum requirements of transition strategy outlined in the IRT Coordinator Section Heads
extended) template). CO Rep
Tool: transition Include context specific agreed transition benchmarks to track
L3 Transition Strategy strategy template progress towards readiness to transition.
Should be ‘forward-leaning’ and integrate strategies that contribute
to resilience building and longer term interventions
28. Review period of application of Decision whether to recommend L3 extension, simple de-activation GEC OED ED
the L3 corporate emergency of L3 or transition to L2, based on analysis and benchmarks (GEC RO
SSOP#26). EMOPS
Communicate recommendation to ED using same memo format as CO Rep
original L3. If transition out of L3, be clear on handover to
respective divisions and key actions pending.
Risk Management Strategy
Potential GECs to be briefed and familiar with SSOPs and TORs.
SSOPs to be reviewed by each division to establish who does what where (and when) within their divisions.
Transition Strategy
The transition strategy from the L3 CEAP must be defined by the GEC and approved by the ED during the weeks following activation.
7
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
2. Sector: Immediate Response Team (IRT)
Business Owner: EMOPS and DHR
Prior to activation
2. Initiate IRT deployment on ‘no Engage, brief and deploy staff. GEC RD ED
regrets’ basis (IRT should be Standard IRT Job Descriptions for each IRT function to be made available DHR
deployed within 48 hours of prior to deployment (see below). CO Rep
emergency) Review needs based on initial information received and country capacity.
Deployment kit is being developed.
IRT deployment Link HR SSOP #2
4. Issue EPF for fast deployment of Issuance of minimum $1 million EPF (in addition to regular EPF EMOPS PPD DED
IRT within 48 hours requests). Director PD Emergencies
To be reimbursed by CO when funds become available. RO
Issue EPF 8
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Link RM SSOP #1 CO
6. Prepare handover from IRT Should happen at least 3 weeks before the end of deployment RD PD Relevant GEC
L3 Transition Strategy Outline handovers and next steps. IRT Section
to other surge and CO staff
Coordinator Heads
Related Procedures, Guidance, Rules, Policies and Regulations
Risk Management Strategy
Draft TOR for IRT Overall IRT Communication TOR
IRT Child Protection TOR IRT Information Manager TOR
IRT Education TOR IRT HPM TOR
IRT Programme Education TOR IRT HR TOR
IRT Health TOR IRT Supply Chain Manager TOR
IRT Nutrition TOR IRT OPS TOR
IRT WASH TOR IRT Team Coordinator TOR
IRT HPS TOR
Exit Strategy
9
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
3. Sector: Planning, Programme Support, Performance Monitoring and Evaluation
Business owner(s): PD, FRG, EO and EMOPS
The UNICEF humanitarian response is based on the priority Core Commitments for Children in Humanitarian Action (CCCs) that are relevant to the country
context and UNICEF targets based on needs; priorities; government, partner and UNICEF capacities to meet those needs. Target-setting guidance will shortly be
available in the CCC e-resource.
Sector specific emergency programme guidance is available in the Emergencies Intranet.
First 24 hours
Refer to Early Warning Early Action Key actions: Key Action #5 ‘Humanitarian scenarios for priority risk and UNICEF response plan’; Key Action # 7 ‘Baseline data and Inter-agency
needs assessments’; Key Action #13 ‘Results-based performance monitoring in humanitarian situations’; Key Action #14 ‘C4D and communications’; Key Action #16 ‘Education’; Key
Action #17 ‘Child Protection’; Key Action #18 ‘Health’; Key Action #19 ‘WASH’; Key Action #20 ‘Nutrition’
5Applied in protracted emergencies, Humanitarian Needs Overview (HNO) is a joint analysis of existing humanitarian information on the impact of the humanitarian crisis, which provides/explains an estimate of
affected groups and an overview of the situation and operating environment.
10
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Tool: Timeline
Expansion of this work to decentralised levels may be considered.
Exercise
First 48 hours (in addition to those listed above)
5. Decide on UNICEF role in various UNICEF is committed to Inter-Agency rapid assessment processes. The CO Rep RO (DRD) GEC
Inter-Agency / Government led level of CO engagement should be contingent on potential usefulness (Deputy Rep) PD
Rapid Assessments6 including and relevance of the collected needs assessment data (i.e. scope, method, EMOPS
MIRA, and contribute as required timeliness). PPD
Participate in the IA assessments (MIRA and others), and ensure that the
existing information is fully incorporated.
Tool: Cluster & AoR Common challenges: overall IA assessment capacity; other agencies'
Rapid Assessment external/newly arrived staff's limited knowledge on local context,
Tools
resulting in heavy dependence on UNICEF CO capacity; assessment not
taking into account secondary data analysis.
6. Develop and issue UNICEF appeal IA/flash appeal serves as the main fundraising/appeal document. The CO Rep RO (DRD) GEC
(HAC) HAC7 is subsequently issued/updated aligning funding needs with IA (Deputy PD/EMOPS
appeal, highlighting UNICEF needs and establishing ORE planning Rep.) PPD
Tool: HAC Guidance target. PFP
and Template UNICEF may issue HAC as the first/main appeal (a) in absence or delay DOC
of an IA appeal, or (b) if the IA appeal requirement/ amount needs a SD
revision. CO to obtain RO/EMOPS clearance.
The HAC shoud be short (2 pages). In a level 3, speed should be
prioritized even if it means a 'good enough' document, for UNICEF to
communicate its plans and support required early on.
The HAC conveys initial overview of the situation and a broad outline
of priority response actions, cross-cutting issues, immediate
programmatic needs and priority targets against CCCs, that justify the
funding requirement.
Ensure cluster coordination costs are factored into UNICEF appeal.
HAC should be aligned with inter-agency appeals and plans.
6 The primary inter-agency assessment process is MIRA (Multi-Sector initial Rapid Assessment), implemented through a phased process (1) Initial secondary data analsysi (within 72 hours); (2) primary data
collection, analysis and report (within the first 14 days). See Reference Module for the Implementation of the Huanitarian Programme Cycle (IASC 2015) and Multi-Sector Initial rapid Assessment Guidance
(Revision July 2015).
7 In addition to annual Humanitarian Action for Children appeal/process, HAC now serves as an appeal for immediate and sudden onset emergencies, replacing Immediate Needs Documents (IND) and
streamlining the two processes. Funding for major emergency programmes outside of CPD/CPAP will be usually raised through Inter-agency appeals. The HAC will be issued/updated afterwards to align the
appeal amount with the IA appeal, establishing ORE planning target. If IA appeal is not issued or delayed, HAC will serve as the main appeal for UNICEF. See 'Rolling' Humanitarian Action for Children: Guidance
Note (15 May 2013).
11
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Decide who will draft the CO HAC (CO, RO or EMOPS). Draw on
programme capacity of RO and PD.
7. Assess CO capacity for response, Where possible, jointly assess with programme stakeholders existing CO Rep RO (DRD) GEC
including supply, HR and capacity for programme delivery arrangement for affected population/ IRT PD/EMOPS
partnership area to determine comparative advantages, potential partnerships. Coordinator GCCs/DHR
Idenfiy what elements of ongoing work might be postponed. SD
Ideally the plan should build on rapid assessments, aligned with inter-
agency plans, highlighting critical gaps in human resources, supplies,
including those to be pre-positioned, and operational arrangements to
facilitate scaling up of UNICEF intervention in affected areas.
Assess current programme supply stocks, locations, warehousing jointly
with SD.
Review existing programme PCAs and LTAs (link PCA SSOP)
First draft of UNICEF HR capacity gaps to feed into OSM (Link HR
SSOP #4), including programme, PRM, operations and admin support.
First week (in addition to those listed above)
8. Develop Inter-agency Response Inter-agency humanitarian response plan is developed or updated (if one CO Head of CO GEC
Plan exists) within 30 days of the flash appeal. Programmes programme
CO/Cluster Cordinators to work with partners to draft cluster/sector CCs (country staff
strategy, initial targets, response plans, including M&E. level) SAG/cluster
Link to Planning SSOP #5 & 6 Ensure integration of cross-cutting issues and inter-sector/cluster issues partners
Scoping of overall UNICEF response programme strategy and scale of GCCs
contribution to overall response to be discussed as part of response plan RO
development process. PD
Ensure cluster coordination costs are factored into appeals as well as EMOPS
cross-cutting needs assessment, monitoring and evaluation. PPD
Appeal targets to be monitored and revised as necessary. See Response PFP
Plan Guide and Target Population Calculator.
Important for UNICEF to lobby for limited high frequency monitoring
indicators. See Humanitarian Performance Monitoring: Indicator Guide.
Discuss in dedicated EMT session on integrated programme strategy as
necessary (See Moment of Strategic Reflection #1 SSOP GEC #19)
9. Moment of Strategic Reflection First discussion to take place during development of inter-agency PD Director/ CO N/A
#1 (Special EMT): Integrated Humanitarian Response Plan (HRP) and UNICEF Response Plan to PD Chief RO
Programme Strategy ensure integrated programme strategy. The scope of the plan, HATIS PD
(Same as GEC SSOP #19) EMOPS
12
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
programmatic priorities and format, if other than the standard, will be (prepare
determined and agreed during the EMT. session)
EMT will discuss and agree on integrated strategies to promote synergy GEC
across programme sectors in the response and early recovery, with the (convene
appropriate operational support. session)
Preparations at TEMT levels in advance have proven to support a more
strategic discussion.
Undertake monthly during first 3 months and as required thereafter.
Link SSOPs HR #7, 12, Cluster Coordination #3, and GEC #18, 19
10. Determine humanitarian
Create specific humanitarian output results in line with Response Plan CO Rep EMT DRD
results structure in VISION Result Areas (i.e. sectors) to allow immediate transfer of resources to (CO PME) DPS
CO. PPD
Ensure link to the PBR RO
A correctly structured results structure in VISION will allow ease of (Planning)
financial tracking of appeals and funds received and reporting to OCHA
Financial Tracking System
Following weeks (in addition to those listed above)
11. Establish a plan for knowledge Consolidate a plan for Knowledge Management, Learning and EMOPS chief CO GEC
management, learning and Evaluation, which identifies knowledge sharing platforms and HPS RO
evaluation, with clear processes, including activities around acquiring and sharing lessons, PD
responsibility and time frame with clear accountability identified. EO
assigned. Lessons are targeted primarily to EMT and supporting HQ working SD
level focal points so that they may bring lessons forward in engagement
with RO and CO.
EMOPS knowledge management focal point consults with working
level focal points under EMT to identify key meetings/processes and
issues where lessons from past emergencies can usefully inform
decisions and processes.
12. Moment of Strategic Decide whether to suspend any parts of the Country Programme and CO Rep EMT DRD
Reflection #2: Decide on which to continue for an initial period (recommend 1 months) PD Section GEC
adjustments required to the Other activities to be renegotiated with national partners and donors Heads
Country Programme for an accordingly to allow re-allocation of resources.
initial period Identify any gaps
Ensure integrated programmatic and operational approaches
Ensure realignment is fed into rolling PBR
13
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
13. Agree on strategic priorities UNICEF Response Plan should be aligned with inter-agency priorities CO Rep RO GEC
and timeframe for the and plan. EMT
UNICEF Response Plan within CO to refer to contingency and preparedness planning exercises to PD (DD and
week 2 articulate UNICEF Response Plan. PD Section
UNICEF Response Plan to include CCC aligned interventions, targets, Heads)
output level indicators, programme convergence, supply needs, human SD
resource needs, funding requirements. DHR
Provide cross-sectoral technical programme inputs to: (A) overall supply
plan; and (B) technical capacity requirements for inclusion in OSM.
Ensure strategic inter-sectoral and cross-cutting aspects are included,
integrated programme strategy entry points)
To be discussed and agreed in the MoSR (preceded by TEMT), with
review from PD and RO.
Ideally the Response Plan to be completed in 3 weeks following
declaration of Level 3. However, it may not be finalised if UNICEF
funding appeal through the IA HRP/HAC is delayed.
14. Agree on approach to Review of CO PME capacity and need for additional medium-long term CO (Rep, EMOPS GEC
Humanitarian Performance HPM capacity (NB. HPM/planning function is part of the IRT) PME, PD
Monitoring including timing of Agree when UNICEF results tables will be in the CO SitRep (ideally 6 Programme PPD
transition to results (output) weeks from declaration of Level 3) Chiefs, Heads RO
reporting in SitRep Determine approach to Field Monitoring (i) UNICEF staff; ii) Direct of Zone
hire of additional PME monitors; iii) 3rd party Field Monitors offices/ hubs)
Humanitarian Tool: Humanitarian
Performance MoRES
Monitoring
15. Develop UNICEF Response UNICEF Response Plan remains a working document, revised as PME RO GEC
Plan strategy and targets are clarified and context shifts. CO Head of EMT
Ensure cross-cutting and inter-sectoral/integrated aspects are included Programmes PD
UNICEF Tool: Response (e.g. identification of geographical focus areas and programme IRT
Response Plan Plan
interventions linked and aligned across sectors) Coordinator
16. Agree on Humanitarian Focus on use of information and timing of other UNICEF and external CO PME and RO GEC
Integrated M&E Plan monitoring and reporting products Head of EMT
(including reporting) with lead See Simplified Humanitarian IMEP Guidance and Templates. Programmes
roles defined
M&E Plan Tool: M&E Plan
14
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
17. Put in place institutional Consider access for field monitoring, who are UNICEF’s main CO Rep CO Rep
approach to field monitoring implementing partners (i.e. Govt or INGOs) PME
Consider using institutional contract.
Tool: Field Monitoring ToR See tool on proposed template ToR for field monitoring.
15
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
16
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Refer to EWEA Key Action # 2 ‘Internal-external emergency
coordination mechanisms and contacts’
4. Initiate deployment of CC surge Based on recommendations made in previous step as part DHR Chief, HR in CO Rep GEC
of overall surge deployment plan. emergencies GCCs
GCCs to liaise with DHR to recommend/review EMOPS
candidates against OSM list.
Link HR SSOP #8, 9, 10
5. Provide HQ guidance on cluster Briefings required on CLA responsibilities for CO Rep EMOPS, GCCs, inter- EMOPS None
coordination and staff managing in country CCs. cluster advisor and IM PPD
Support CC management function including provision of expert CO Rep
latest guidance and tools.
Request for CC registration in SRP online system sent to
OCHA as soon as individuals identified.
6. Determine management/ Determine line of representation for CCs in HCT via CO CO rep GCCs CO Rep
supervisory line for CCs, IMs, and Rep
inter-cluster staff Ensure coherence between the IRT and CCs/ IM Officers
Ensure management lines allow for CO Rep to have a
consolidated understanding of cluster/AoR issues to
represent at HCT
Link to UNICEF Cluster Coordination Guidances for COs
7. Ensure CC function adequately Link RM SSOP #5 CO Rep CO Section GEC
costed and included in resource Chief/GCCs/
mobilisation tool EMOPS/PPD
8. Agree on UNICEF role in Ensure appropriate sector coordination mechanisms are CO Rep CCs GEC
sector/cluster coordination within established (and level of decentralisation defined), and CO Section
HCT UNICEF leadership accountabilities for the response are Chiefs
clearly defined and agreed by the HCT. GCCs
Ensure CO Rep raises relevant cluster issues at the HCT EMOPS/PD
Link HR SSOP #12 and RM SSOP #8
9. Establish data management system Generic google CC/IM email addresses; contact list; EMOPS, GCCs, inter- CC CO Rep
[in coordination with OCHA] information collection forms (needs assessment formats, cluster advisor and IM GCCs
Data management system
4W); web platform. expert EMOPS
OCHA
10. Provide mentoring/support to CCs Provide guidance and advice to country CC. GCCs and Cluster IM CCs GEC
17
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Ensure all incoming CC/IM staff have received the EMOPS
latest guidance and tools for CC function.
11. Agree and sign MoU on co- Ensure clear division of accountabilities and tasks are CO Rep GCCs GEC
leadership arrangements and defined and agreed in MoU with any co-lead agencies. CCs
division of responsibilities
MoU co-leadership
12. Prepare initial cluster response CO/CC to work with partners to draft cluster/sector Country Level CCs Programme GEC
strategy/plans strategy, initial targets, response plans (to feed into IA staff
Appeal). SAG/ Cluster
Mandatory consultation with cluster in country and/or partners
Cluster Response Plans
GCCs on the IA Strategic Statement, Scenario Inter-cluster
Development, Humanitarian Response Plan and other coordination
interagency statements of needs forum
Ensure integration of cross-cutting issues and inter- PD
sector/cluster linkages. GCCs
HQ/GCCs to provide technical guidance and feedback
on proposed cluster strategy and targets.
13. Ensure CC function adequately Decision should be made and applied consistently across CO Rep CCs GEC
costed and included in IA UNICEF led/co-led clusters/AoR on whether to have CO Section
plan/appeal CC costs as a separate project sheet or as a budget line Chiefs
in the sector sheet. PPD
Link RM SSOP #8 EMOPS
Following weeks (in addition to those listed above)
14. Continue to advocate on behalf of CCs to flag major funding shortages and capacity gaps CO Rep CO Section GEC
sector level needs at country and with CO Rep and HQ/GCCs. Chiefs, CCs,
global levels CO M&E
GCCs/PPD
EMOPS
15. Review CO capacity for CC To identify any unfilled surge requirements and to see if CO Rep CCs GEC
function on a regular basis (using structure created needs to be adjusted as response DHR/GCCs
Cluster / Sector Coordination evolves. EMOPS
Milestone Monitoring Tool for CC Ensure Cluster/AoR coordination capacity is reflected as CO M/E
function) part of the CO PBR.
Related Procedures, Guidance, Rules, Policies and Regulations
Cluster Approach Intranet page and Transformative Agenda Intranet page
18
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
UNICEF Cluster Coordination Guidances for COs
UNICEF Humanitarian Performance Monitoring Toolkit: Cluster / Sector Coordination Milestone Monitoring Tool
The Humanitarian Programme Cycle, Version 2.0, IASC (July 2015)
Inter-agency: Cluster Coordination Reference Module (July 2015)
Inter-agency: Cluster Coordination Performance Monitoring
19
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
5. Review Regional Rapid Identify staff within the region to be deployed immediately. Regional HR CO RD
Response Roster Chief DHR
6. Plan and hold Ensure rolling PBR, to be repeated as required. RD EMT GEC
Programme Budget Have a PBR within first month of emergency. Can be done by mail-poll.
Review(s) (PBR)
related to the
emergency
20
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
7. Consider ‘step aside’ See Annex to SSOP HR - Step Aside Protocol. ED RD(s)/GEC ED
procedure as required Link GEC #4 DEDs/EMOPS
DHR
First 48 hours (in addition to those listed above)
8. Coordinating with Identify SURGE needs for initial three months. DHR Chief HREMOPS DHR
standby partners, Travel visa for surge staff must be prioritised. in Emergencies
GEC Director
Geneva and CO to CO must send regular updates on procedures for visa to HQ travel unit, EMOPS, EMOPS Chief CO
identify and facilitate EMT. IAHP RO
timely SURGE Link Cluster Coordination #4, Planning SSOP #7 CO Chief HR ITSS
deployments SD
9. Obtain technical Technical clearance will have been arranged in advance at headquarters or by DHR Chief HR EMOPS SBP Emergency
clearance for SURGE regional advisers to facilitate quick deployment. in Emergencies PD and relevant FP in PD
deployments CO approves SURGE deployments within 24 hours. Divisions and other
Link Security SSOP #11, ICT SSOP #8 divisions
10. Issue CRQ for SURGE Issue CRQ to facilitate quick deployments of SURGE staff. CO Ops CO CO Rep
deployments (travel, Preposition external personnel for SURGE assignments. Officer DHR
DSA costs, and EMOPS to approve utilisation of $200,000 from EPF to increase DHR
backfills to releasing Emergency Unit capacity to facilitate deployments of international staff.
offices)
11. Develop template for Automatic application of fast-track human resource procedures, as per DHR Chief HR CO DHR
fast track recruitment CF/EXD/2010-005: ‘Recruitment and staffing in emergency situations’. in Emergencies Director
of FT/TA and SSA See Human Resources checklist.
First week (in addition to those listed above)
12. Assist the design of Consult with EMOPS cluster leadership on the design of the cluster management CO Chief HR PD GEC
cluster support within and support system. EMOPS
the existing CO Link Cluster Coord SSOP #8 CO
structure
13. Review CO staffing Assess the existing staff strengths of the CO for programme and operations to CO Chief HR CO/RO CO Rep
structure identify gaps. DHR/SD
14. Review SURGE needs This will include receiving inputs from DOC, Supply, Finance, IT and all other CO Rep EMT/DHR GEC
for the first three divisions into the SURGE plan. SBP/RO
months PD/EMOPS
ITSS/SD
21
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
15. Provide CO SURGE SURGE assignments clearance form should be signed before departure to ensure Chief HR in CO Programme None
assignment clearance PERs and end of mission handover notes are prepared and submitted to the HR Emergencies and Operation
form team in the CO. (DHR) Chiefs
CO arranges travel and payments of DSA for SBP. SBP (Geneva)
CO Chief HR
16. Establish reporting DHR to provide a simple format to CO to enable them to assess performance of CO Chief HR DHR CO Rep
structure for SURGE surge staff
staff within existing
organogram
17. Establish focal point at DHR gives the web link to the deployment kit to SURGE staff to prepare them CO Chief HR CO Programme CO Rep
CO for security & prior to departure. and Operation
programme briefings CO HR team to designate focal points for CO/programme specific briefings. Chiefs
for SURGE staff /SBP
deployments
Following weeks (in addition to those listed above)
22
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
is not well managed, it can have negative consequences on programme delivery and UNICEF reputation. The SURGE Plan includes both short and medium -term human
resources support to accelerate recruitment for FT & TA. The deployment of a dedicated IRT HR member will mitigate this risk.
Exit Strategy
The exit strategy needs to be built in to the scale-up framework of the programme to ensure that the CO structure will not be highly inflated, as this is not sustainable in the
long-run for the organisation. Given the high costs involved in downsizing of an office, developing a more realistic projection of the programme needs will be critical.
There is a need to carefully review the best modalities for contractual status during the scale up to ensure the exit strategy is incorporated in the design of the new office
structure.
23
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
8. Finalise departure of first Ensure first wave supply plane/charter reflects programme priorities and ship SD Snr. CO/EMOPS SD Director
wave supply plane within 48 hours. Emergency DOC/RO
Include deployment kits if necessary/possible Supply Mngr International
First wave supply plane
Transport Unit,
Forwarder
9. Prepare future The Supply Plan should be based on, and be part of, the overall Response SD Snr CO GEC
consolidated Supply Plan, Plan Emergency SD
based on draft supply Support CO in the elaboration of the supply plan Supply Mngr
requirements Collect supply requirements from CO, share with Procurement
Centres&TLC.
Alert suppliers of emergency materials.
Ensure supply activities (e.g. quantities, items, etc.) and plans are
documented for use by communication teams and resource mobilisation.
Identify optimal shipping locations.
25
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
CO to ensure that the supply plan and the corresponding logistics financial
needs are incorporated in any Flash Appeal (within the sectoral submissions
and within the logistics components).
10. Ensure CO/RO/EMOPS is For consistency of policy. SD DO CO GEC
consulted if military asset RO
support is offered EMOPS
11. Support local procurement Share emergency procurement practices. Snr Emergency CO SL Mngr SD Director
(according to the Deploy (or plan deployment of) SD Quality Assurance staff to develop local Supply Mngr RO
configuration of the CO) procurement arrangements (if required).
Share existing essential supplies standard through neighbouring procurement
arrangements.
12. Establish daily emergency Every morning all SD emergency focal points, communication, shipping and SD ECU None None
meeting of all SD the warehouse manager will convene to analyse the response strategy.
emergency focal points Immediately establish communication within SD on the situation and
requirements.
13. Establish Supply Establish both Supply and Inventory dashboards SD MFSDU8 SD None
monitoring tools Establish focal points with the CO for VISION data entry and maintenance CO CO
14. Keep UN and cluster Contact Logistics Cluster Coordinator&partners to ensure coordination Snr Emergency EMOPS None
partners informed about Debrief CO on GLC discussions. Supply Mngr
UNICEF Supply and Initiate weekly call with heads of logistics of WFP, WHO and UNHCR.
Logistics response Needs to be coordinated with EMOPS.
CO Supply Focal Person to attend Logistics Cluster meetings CO Supply FP
15. Develop first draft of the Update the Advisory Group Meeting and emergency focal point. Snr Emergency CO GEC
SD Emergency Response Share with EMOPS/RO/CO. Supply Mngr RO SD Director
Supply Strategy as an Link Planning SSOP #1
element of Response Plan
First Supply Strategy
8
Supply Division Market, Financing and Strategic Data Unit.
26
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
18. Ensure the CO has Support proper management of CIK. CO SL SD SD
adequate understanding of Link RM SSOP #13 Manager PPD PPD
CIK (Contribution In PFP PFP
Kind) procedures EMOPS
19. Ensure adequate Liaise with PFP, PPD and DOC to ensure adequate dissemination of needs SD KMU SD/CO/PPD CO/RO
communication to obtain for CIK of goods and services. PFP Snr Emerg.
CIK DOC Supply
Mngr
20. Support local or regional Share existing essential supplies standard through neighbouring procurement CO SL Mngr RO None
procurement arrangements. Snr Emergency
Ensure neighbouring COs LTAs are open for CO to access if required Supply Mngr
21. CO to initiate Supplier According to the supply requirements of CO to evaluate local market (if CO SL SD-Quality None
surveys required) for commodities in the supply plan where no LTAs exist. Manager Control/
Contracting
22. Identify additional staff for
Identify, clear and deploy logistics staff to UNICEF-managed programme CO SL Mngr RO CO Rep
recruitment clusters and/or CO if required. Supply Comm. EMOPS or/and IRT
Deployments to be coordinated via HR. Manager DHR Coordinator
23. Continue updates on Ensure internal information sharing (AGM, Emergency updates on the Snr Emergency CO SL Manager None
Supply and Logistics board). Supply Mngr
activities in SitReps and Review SD internal strategy.
updates to OED Weekly update to SD Director
External updates on supply movement and pipeline to EMOPS/RO/CO/DOC.
Following weeks (in addition to those listed above)
24. Continuous updates of the Ensure the Supply Plan is updated by CO and that re-orders and second wave CO SL SD Emg Coord CO Rep
Supply Strategy as part of orders are in place early enough to allow for most economical means of Manager RO/PD/EMOPS
Response Plan transportation.
25. Continue to monitor the Keep supply/shipping table and dashboards updated. SD ECU CO None
delivery of the supplies Share the information with CO, RO, EMOPS and DOC. SDMFSDU/ITU
26. Ensure the second wave Ensure all future staff are recruited or available. SD ECU/HR CO/RO DHR Chief
deployments are ready DHR/EMOPS HR in Emer.
27. Continue updates on SL Manager to share all relevant updates with CO SitRep focal point. CO None None
Supply and Logistics Ensure internal information sharing (AGM, Emergency updates on the SL Manager
activities in SitReps and board). Snr Emergency
updates to OED External updates on supply movement and pipeline to EMOPS/RO/CO/DOC. Supply Mngr
28. Reflection on emergency SD to engage in lessons learned post completion of the L3 SD CO
supply/logistics response RO
27
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
upon completion or
extension of the L3
Procedures, Guidance, Rules, Policies and Regulations
Supply and Logistics in Humanitarian Action
- Checklist for supply
- Emergency calculator
- Emergency Supply List
UNICEF Financial and Administrative Policy
Supply Manual, Chapter 10 (Emergency Section), and UNICEF on-line supply catalogue and on-line track & trace of supplies
Quick Reference Guide for procuring supplies via partners (PCAs) (forthcoming)
Risk Management Strategy
The major risks have been identified as:
a) Risk: Lack of availability of trained and experienced SL emergency response staff.
Mitigation strategy: SD has trained Supply and logistics (SL) staff in technical respective areas, developed a surge response database following required support and strengthened its
standby partners’ options with EMOPS. However specific emergency training is under consideration.
b) Risk: Local logistics service providers are affected by emergency/disaster and not able to provide services.
Mitigation strategy: CO have standardised multiple service providers LTAs to ensure adequate support to programmatic implementation
c) Risk: Lack of Logistics implementation capacity and high dependence on the Logistics Cluster.
Mitigation strategy: Establishment of a Logistics strategy at onset of emergency and ensure adequate funding for SL activities for adequate programmatic response.
d) Risk: Lack of sufficient funding to cover complex logistics operation
Mitigation strategy: Ensure inclusion of logistics budget in CO emergency response planning and appeal processes.
e) Risk: Lack of awareness of new Emergency Supply Logistics procedures.
Mitigation strategy: Supply Manual was updated and awareness established. SSOPs shared with all deployed staff.
f) Risk: Conflict or tension between surge responders and local staff.
Mitigation strategy: SD in collaboration with DHR, RO and CO identify and deploy adequate surge and ensure sustainable integration and coordination of the team. If required
deploy SD HR community focal point.
g) Risk: Monitoring and information sharing on supply and logistics movements.
Mitigation strategy: SD has created a new Supply/Logistics monitoring dashboard and organised a training. Information manager to be included in the first wave of surge to L3.
h) Risk: Lack of supplies at the onset of the emergency and delayed rapid assessment needs identification
Mitigation strategy: SD to support CO to identify a first full charter composition as a no regrets policy for L3
i) Risk: Impossibility to release commodities to partners through Vision, due to lack of acceptance of using VISION by all parties in the CO.
Mitigation strategy: SD has institutionalised deployment of VISION expert, undertake refreshment training prior to deployment, however the acceptance of using VISION by
UNICEF staff member is a burden to adequate activity implementation.
Exit Strategy
The main areas to consider in Supply Logistics exit strategy are:
Ensure adequate long term new staff are recruited in time.
Ensure exit strategy is clear about ownership of Supply manager function when response staff exit and hand-over to CO.
Ensure all transactions are in VISION.
28
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
7. Sector: Operations
Business owner(s): DFAM
All the following exceptional procedures take effect upon pronouncement of a level 3 emergency status and last for the duration of this status as per guidelines contained under CF/EXD/2011-
001, dated 21 March 2011 – UNICEF’s Corporate Emergency Activation Procedure. These procedures are specifically for level 3 emergencies and do not replace any other guidance.
These procedures are a simplification of the existing UNICEF Financial and Administrative Policies to allow an effective response in level 3 emergencies.
First 24 hours
30
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
6. Adopt simplified Processing of travel authorizations must be expedited for staff deployed in CO Rep DFAM CO Rep
procedures for travel emergencies. RO
arrangements The office may issue manual TAs, communicated to the traveller and EMOPS
subsequently entered into the system. An email from the Representative/Operations
Officer/Director, authorizing the travel would be considered a valid travel
authorization.
If a travel agency is not accessible, and for travel within the Country, traveller
can arrange travel with the airlines directly making all efforts to obtain lowest airfare.
Authorization to procure own ticket should be noted in the travel authorization (TA).
No travel should be undertaken without prior security clearance. Reimbursement
should be processed promptly upon arrival / return to the place of assignment.
Offices (HQ, RO, CO) must expedite international travel arrangements for staff
deployed to emergency locations when requested. They should ensure that staff
obtain required clearances, adequate briefing on the emergency situation including
familiarity of the SSOPs, prior to departure.
7. Authorize and assign Where the security situation permits, the Head of Office can authorize and CO Rep DFAM CO Rep
UNICEF vehicles for assign UNICEF vehicles (including motorcycles where applicable) for use by staff (Deputy
non-official use by staff members for official and non-official use: Director
members o Where non-official use has been authorized by the Head of Office, the CO should Admin)
purchase a comprehensive insurance policy for vehicles that will be occasionally used for RO
this purpose. (Regional
Tool: Vehicle Indemnity o Staff members must reimburse UNICEF for using a vehicle for personal reasons based on
Form
Operations
a flat rate established for the duty station. This rate should include an estimated number Officer)
of kilometres per month and prorated cost of the insurance premium and fuel costs.
o The staff member must sign the Vehicle Indemnity Form (in Section D), indemnifying the
Organization for any loss of property or life while the vehicle is used for personal reasons.
o In all cases, the Head of Office must ensure that staff members have a valid driver license
and comply with locally established security and safety procedures.
At the request of the Head of Office, the RO can authorize the transfer of vehicles
to emergency locations on loan or on reimbursable basis.
Offices should have in place standby agreements with local suppliers for maintenance
and renting of equipment & vehicles and for fuel supply (including generators where
applicable) and where feasible, for outsourcing of temporary drivers.
8. Assess the operation of The Deputy Director DFAM, Finance & Budget, must authorize the opening or CO Rep DFAM DFAM (DD
local banks closing of all UNICEF bank accounts, including the bank accounts for country RO of Finance
offices. An assessment of the creditworthiness of banks should be carried out prior to & Budget)
opening an account.
31
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Local bank accounts should be maintained at a level sufficient to cover only day-to-
day transactions, usually not exceeding the equivalent of one to two weeks' normal
requirements. The CO is not allowed to overdraw any of its current accounts.
In instances where there are fewerfewer than three staff with delegated financial
authority, a single signatory bank account can be used, with DFAM approval.
9. Review budget Budget allotments will be issued by DFAM in accordance with Business Continuity CO Rep DFAM CO Rep
allotments Plan – access to budgeting tool is ensured off-site outside NYHQ office hours. RO
To accommodate the requirement for swift deployment of emergency teams, access to
the approved country allotment of EPF loans is provided to EMOPS (GEC) directly,
when such access is necessary. This access is:
o time-bound – allotments have maximum validity of 12 months and must be reimbursed as
soon as possible and latest 12 months after the expiry of the EPF allotment;
o up to a financial limit as defined in SSOP for Corporate Emergency Activation Procedure
in Level 3 Emergencies;
o The Head of Office is accountable towards the full reimbursement of the EPF loan.
Cost recovery and requirements for payment of transportation costs by the donor is
waived for Contributions In Kind/CIKs (current policy requires a cost recovery for
Government donations and goods to be delivered to UNICEF free of cost).
As per current policy, the Head of Office has the authority, with the agreement of the
responsible national authorities, to reallocate RR from approved activities and
supplies already in the country for emergency relief and rehabilitation operations as
follows:
o Where the annual RR allotment for the country programme is $2 million or more, up to
$200,000; or
o Where the annual RR allotment for the country programme is less than $2 million, up to
$150,000.
The reallocation must be reported to the RO and the Directors, EMOPS and PD.
The reallocation of Other Resources Regular, is to be done in consultation and with
the agreement of the donor.
10. Review direct or If the system cannot be accessed directly or remotely for financial management and CO Rep DFAM CO Rep
remote access to accounting purposes, the Head of Office can: RO
UNICEF financial o Revert to manual accounting systems to prevent delay. This includes the use of ITSS
management and manual forms, e.g. cash book, payment request, receipts vouchers, travel authorizations
accounting system and travel claims, available on the ‘Finance and Admin’ Emergencies Intranet page.
These must be signed by the authorized official, sent to the designated office (normally
Tool: Manual Accounting the safe haven) and should be recorded promptly;
templates o Delegate the financial management and accounting function to an office which has
sufficient capacity to handle the additional workload and complexity.
32
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
First 48 hours (in addition to those listed above)
11. Review/ adjust Table If fewer than 4 staff with delegated authority are available at a location, a minimum of CO Rep DFAM CO Rep
of Authority (TOA) for 2 staff must process any individual transaction, for purposes of segregation of duties, RO Comptroller
Segregation of Duties e.g. data entry vs approval or entering committing document vs payment. (where
and Internal Controls If there is only one staff member, DFAM Comptroller’s Office should be notified and relevant)
Table of Authority
will provide guidance on internal controls.
The Head of Office may delegate the authority to another office to manage specific
Tool: Table of Authority components or the full budget allocated to the office (e.g. on behalf of and at the
request of the Head of Office, allow SD to raise supply requisitions, DHR to create a
cost distribution for payroll purposes, and issue travel authorizations and where office
location is not accessible, allow another office to process financial transactions, etc.).
Where required, consider providing financial authority to Immediate Response Team
(IRT) members and surge staff, including access to VISION.
Review and amend the Table of Authority as appropriate. The TOA must document
all Authorizing, PO Releasing, Receiving, Certifying, Approving and Paying Officers,
whether the approval is done in VISION or on paper.
12. Assess the need to The RD at the request of the CO Rep has the authority to endorse changes in the Posts CO Rep RO RO
change the and Organizational Structure (e.g. zone- & sub-offices). These include: DFAM
organisational o Creation of a new sub office GEC
structure o Closing of an existing sub office
o Change of office type
o Internal re-organization (section/unit)
o Establishment/abolishment/extension of programme funded posts
The process of endorsing and approving changes in the organizational structure (such
as creation of new sub-office locations) takes into account simplified criteria for
physical presence of UNICEF at specific locations:
o Staff accommodation
o Political environment
o Security, logistics, infrastructure, socio-economic indicators and programmatic strategy
o Government capacity
o UN coherence and coordination
The review and approval process takes into account changes to programmatic or
management results, strategies and activities. It may require adjustments to resource
requirements and revisions to the budget, including changes to the office, post
structure and/or non-post costs.
Link HR SSOP #4
33
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
13. Review/establish The Head of Office should assess level of operations to determine if Petty Cash or CO Rep DFAM CO Rep
process for managing Cash on Hand is required. RO
cash resources Petty cash accounts
A petty cash account of up to US$1,000 may be established in each office, sub-office
and sub-location, at the discretion of the Head of Office. Petty cash must be kept
secure under lock and under the control of the custodian.
Cash on hand accounts (COHA)
The request to open a Cash on Hand account must be sent by the Head of Office to
the Deputy Director, DFAM, Finance & Budget Section, which should include:
o Purpose / justification
o Location
o Custodian name
o Proposed ceiling based on security and local conditions
A COHA is used when the banks are not operating or the petty cash account is
insufficient for cash needs. Cash on hand must be kept secure under lock and under
the control of the custodian. A COHA may be established if more than US $1,000 is
needed
Decision to open a Cash on Hand account should be based on a systematic analysis of
risks and opportunities with appropriate action defined and taken to manage risks
identified and associated with maintaining a COHA.
Safety and security of the custodian must be ensured at all times.
Third party cash providers
Third party cash providers (including other UN Agencies and well-established
organizations) may be used to make payments or to replenish cash accounts with
approval from DFAM (Deputy Director, Finance & Budget Section). In situations
where there are no banking facilities, cash accounts must be replenished with
banknotes brought in from another area (another UNICEF country office in the region
or from well-established organizations).
14. Convene CRC The Head of Office can change the way the CRC works to help expedite the review CO Rep CRC CO Rep
according to simplified process including:
procedures Location: A sub-CRC can be convened at a zone office
Composition: The Composition of CRC can be changed by the CO Rep to include as
members/alternates any appropriately experienced staff member that would have
joined the country office following the emergency
Quorum of CRC: Must have three voting members even in emergency; but members
can be ‘polled’ to approve contracts. Other UN agency staff members can be included
as members of the CRC when getting a quorum proves difficult.
34
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
The emergency submission must be submitted to the next meeting to be recorded.
Frequency of meeting: As frequently as needed in an emergency.
Changes in CRC composition should be recorded/ reported.
15. Manage change of Where offices have charged spending to one source of funding and need to move it to CO Rep DFAM CO Rep
funding source another, there are two processes: one for current year payroll and another for all other RO
spending.
Tool: Change of For payroll, offices can update the cost distribution of a post (new WBS, grant and
funding source
effective dates), provided that the transaction is executed within the same fiscal year
and the grant has not expired.
Other than those related to current year payroll, changes to the funding source of
financial transactions, including from EPF, will be facilitated by DFAM-Accounts.
The "Request to change funding source" template should be filled out and submitted
to DFAM-Accounts (Simon Cope, scope@unicef.org or Menaka Pokhrel,
mpokhrel@unicef.org).
Changes to the funding source of commitments and disbursements is not permitted if:
o The final financial and narrative reports have been submitted to the donor; or
o The grant, or funding source or budgetary allotment, is financially closed (i.e. the final
donor statement is ready for issuance);
o Cash advances (DCTs) are partially liquidated.
In all cases, the authorising officer of the receiving grant must approve and ensure
that the justification for changes to funding source is documented.
DFAM Accounts will carry out the change in VISION on behalf othe reuesting office.
16. Ensure safety of staff, If possible, with approval from DFAM (Deputy Director Finance & Budget), the CO Rep DFAM CO Rep
cash and financial office should hire a service provider for transportation, handling and disbursement of RO
assets cash, especially when cash must be disbursed outside of the main office. Options Security
might be money dealers, any traditional money service, a company, or even a bank.
If cash funds must be transferred, the office should consider the following:
o Minimize the number of people who know about the transfer or storage of the funds.
o Plan carefully all movements of the money – from start to finish – with contingency plans
in case the plan agreed upon cannot be carried out due to unforeseen circumstances. Staff
security must never be compromised or put at risk.
Following weeks (in addition to those listed above)
17. Process CIKs CIKs associated with emergencies must be given priority treatment. See Joint PPD DD SD DED
(Contributions In PARMO/PFP Fundraising Instruction (Nov/2013) that sets out parameters and DFAM Emergencies
Kind) procedures for implementing the aforementioned CIK policy. GEC
Tool:
Executive Directive on UNICEF Policy on Contributions in Kind (CIK) issued in Nov/2013
Fundraising Tool: EXD on CIK LINK RM SSOP #12
Instruction
35
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
18. Conduct spot checks Re-assess financial risk and recommend corrective actions where applicable. CO Rep DFAM CO Rep
on financial,
accounting and
inventory records
Related Procedures, Guidance, Rules, Policies and Regulations
These procedures are specifically for level 3 emergencies and do not replace any other guidance.
These procedures are a simplification of the existing Financial and Administrative Policy to allow an effective response in level 3 emergencies.
Finance and Administration in Humanitarian Action Intranet site*
Executive Directive on UNICEF Policy on Contributions in Kind
Joint PPD/PFP Fundraising Instruction
UN Standard Lease Agreement (approved by UN Office of Legal Affairs)
Template: Request to DFAM for Change the Funding Source
Vehicle Indemnity Form
DFAM Templates and Forms (including manual forms)
Risk Management Strategy
To balance UNICEF’s objectives of rapid delivery and sound financial accountability, these Level 3 emergency procedures provide for options that:
a) Reduce the number of preventative controls, which speeds up the operational response but also increases risk.
b) Increase detective controls to mitigate the increased risk, which can be implemented once the immediate programmatic response is underway.
Exit Strategy
At the end of the Emergency level 3 status, normal internal controls as documented in UNICEF Financial and Administrative Policies to be reintroduced.
36
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
9
The UNICEF Procedure for Country and Regional Office Transfer of Resources to Civil Society Organizations (CSOs) (FRG/Procedure/2015/001), effective 01 April 2015, incorporates a
number of simplifications to fast track emergency response working with CSOs, in particular: a simplified programme document form for use in humanitarian situations (Annex B) and the
possibility to SSFAs for transferring supplies required for up to three months of humanitarian response (with no ceiling on value).
37
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
o
If more than one CSO is present / can be mobilised for the humanitarian response,
the office can consider using a short timeframed “closed” call for expression of
interest to solicit proposals from these CSO & select the one(s) providing the best
comparative advantage.
o A review of existing CSO may result in identification of only one present and able to
mobilise the emergency response with the required quality and timeframe (direct
selection).
Additional consideration for selection include:
o Prioritize national and international CSOs registered in country;
o Ensure CSOs are assessed against core values and integrity before initiating the
partnership (done by HQ for INGOs and by CO for national CSOs), using Annex E
of the UNICEF CSO Procedure) 201506
Humanitarian response with CSOs vers7.docx
o Implementation can start without undertaking a micro-assessment even if an
assessment is required as per the UNICEF HACT Procedure (i.e. the partner is expected
to receive more than $100,000 during the year). In such cases, “high risk” is
assumed until the assessment is completed, triggering additional assurance activities.
See details “Options&Considerations for working with CSO in Humaitarian Response”
First 48 hours (in addition to those listed above)
3. Jointly develop the If there is an ongoing partnership with the selected CSO the following options are available: CO Rep CO CO Rep
humanitarian An existing programme document can be revised to include the emenrgency interventions Sections
response (new outputs or new activities); this may be appropriate depending on the scale of the GEC
intervention with emergency; or
CSOs A new programme document can be added to an existing PCA, using the Simplified
Humanitarian Programme Document (Annex B of the UNICEF CSO Procedure);
When there is an ongoing SSFA with an CSO, this can be re-signed to cover up to $50,000 in
the 12 months period and the transfer of up to three months of supplies required for the
emergency response or a new PCA and Simplified Humanitarian Programme Document can
be signed with the partner.
Activate the contingency PCA if in place, revise the workplan activiates and budget based on
actual scenario.
38
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
If a CSO is to procure more than $2,500 worth of supplies, an assessment of the CSO's
procurement capacity is required. No additional procurement assessment is required if a micro
assessment or an EU/ECHO assessment10 exists. If these assessments do not exist, the CO can
complete the simplified financial management checklist (Annex IV of HACT Procedure) to
assess procurement capacities.
4. Adopt simplified The composition, meeting modalities (in person/ online) and frequency of the Partnership CO Rep CO CO Rep
management of Review Committee can be adjusted as deemed necessary by the Representative. Sections
PCA reviews and For new and existing partnerships, CO has the authority, with CO Rep’s sign off, to:
approvals within o Use more than 1 SSFA for transfer of supplies in the 12 month period with the
the CO same partner where performance was satisfactory and based on an assessment of
risks.
o Adopt a flat, uniform, percentage at any level up to 25% of programme
management costs instead of parsing through each relationship to determine
individualized percentages (the simplified humanitarian programme document
(annex B) is structured to allow for a flat rate).
o Increase the threshold for partnership requiring review by PRC or replace review
by PRC with review by the Deputy Rep. before signature by the Representative.
o The Representative has the authority to delegate signature of partnership
agreements, revising the existing practice as deemed necessary by the situation.
o The Representative has the authority to authorize transfer of cash for CSO
procurement over $2,500 required within the first 30 days of the response without an
assessment of the procurement capacity. Such a decision takes into account
UNICEF’s precious experience working with the CSO and the needs of the response.
However, the simplified procurement assessment has to be undertaken within 30
days and the results used to inform whether the CSO should undertake further
procurement using UNICEF funds.
Simplified management of PCA reviews and approvals within the CO should be clearly
communicated by the Rep to all staff.
All decisions must be documented for the sake of transparency and accountability.
First week (in addition to those listed above)
5. Authorise selected In line with the revised work plan. CO Rep PARMO CO Rep
implementing UNICEF can commit to refinance original agreed activity after the emergency where PFP
partners to re- applicable.
programme unused
10
Partners listed here do not require an assessment: http://ec.europa.eu/echo/files/partners/humanitarian_aid/HPC-register_en.pdf;
http://ec.europa.eu/echo/files/partners/humanitarian_aid/fpa_partners.pdf
39
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
cash balances and
supplies
6. Disburse funds The Head of Office is authorized to disburse funds to implementing partners with Direct CO Rep DFAMRO GEC
and/or provide Cash Transfers (DCT) outstanding for periods over 6 months but not exceeding 9 months. In
supplies to selected exceptional situations, authorization can be provided by the RD for disbursements to partners
implementing with reports outstanding for periods over 9 months.
partners Where required, the Head of Office is authorized to release cash to implementing partners
for periods up to six months providing strengthened monitoring and assurance activities.
As in the standard procedure, the Head of Office is authorized to re-programme unutilized
funds in the context of the revised work-plan priorities. The due date for the submission of
the FACE is extended for the duration of the agreed implementation period (three months or
exceptionally, up to six months).
Where required and applicable, funds can be disbursed to an NGO’s offshore account
primarily when the NGO does not have a local bank account or local banking facilities are
not operational (payment to be processed through the Inter Office payment facility).
Following weeks (in addition to those listed above)
7. Follow-up/monitor
Conduct regular meetings and field monitoring visits to review programmatic progress and CO Rep FRG CO Rep
implementation identify any adjustments which may be required. The minimum frequency is dependant on GEC
the risk rating and amount of cash transferred to partners as per minimum requirements of
the UNICEF HACT procedure.
Consider use of third party monitors if access for UNICEF staff is constrained due to access
considerations, or to complement office capacities.
8. Conduct spot Review accuracy of amounts rerportedon FACE forms against financial records in the office CO Rep DFAM CO Rep
checks on financial of the partner, and ensure follow-up of issues raised, as applicable. The minimum frequency FRG
and inventory is dependant on the risk rating and amount of cash transferred to partners as per minimum
records requirements of the UNICEF HACT Procedure.
Related Procedures, Guidance, Rules, Policies and Regulations
FRG/PROCEDURE/2015/001 UNICEF Procedure For Country And Regional Office Transfer Of Resources To Civil Society Organizations
Simplified Humanitarian Programme Document and Simplified Report (Annex B of UNICEF CSO Procedure)
Options&Considerations for working with CSO in Humaitarian Response
UNICEF HACT Policy and HACT Procedure
UNICEF Financial and Administrative Policy 5, Supplement 3 Cash Disbursements (under revision)
Small-scale Funding Agreement Form
Sample Contingency PCA Activation Protocols available in Working with CSOs Toolkit
Risk Management Strategy
40
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
As part of emergency preparedness activities, offices are encouraged to develop contingency PCA/programme documents that can be quickly activated when an emergency
occurs. During implementation of the emergency response, field monitoring and spot check are conducted by the Office in accordance with minimum requirements defined
in the HACT Procedure to allow prompt detection and correction of any issues related to programme and financial management.
Exit Strategy
On receipt of instructions of conclusion of level 3 emergency, CO inform the NGOs of specific simplifications of financial and programmatic policies and procedures
which no longer apply. New/revised programme documents are prepared for new or continuation of activities or those which had to be stopped due to the emergency. The
Office reviews and updates the table of authority and guidelines.
41
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
First 24 hours
42
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
4. Communicate Funding update document produced by PPD EMOPS (EPF) PFP None
contributions pledged Including updates on EPF (from EMOPS) and summary table on overall CO CO Rep (CO
and received from all budget implementation (from CO) budget
funding sources implementation)
directly to the CCs PPD emer. FP
First 48 hours (in addition to those listed above)
IA/Flash appeal serves as the main fundraising/appeal document. The HAC CO Rep RO (DRD) GEC
5. Develop and issue is subsequently issued/updated aligning funding needs with IA appeal, (Deputy Rep) PD
UNICEF Appeal highlighting UNICEF needs and establishing ORE planning target. EMOPS
(HAC) (if applicable) UNICEF may issue HAC as the first/main appeal (a) in absence or delay of an PPD
IA appeal or (b) if the IA requirement/ amount needs a revision. CO to obtain PFP
RO/EMOPS clearance. DOC
The HAC shoud be short (2 pages). In a level 3, speed should be prioritized SD
even if it means a 'good enough' document, for UNICEF to communicate
early on its plans and support required.
The HAC conveys initial overview of the situation and a broad outline of
priority response actions, cross-cutting issues, immediate programmatic needs
and priority targets against CCCs, that justify the funding requirement.
Ensure cluster coordination costs are factored into UNICEF appeal.
HAC should be aligned with inter-agency appeals and plans.
Decide who will draft the CO HAC (CO, RO or EMOPS). Draw on
programme capacity of RO and PD.
Same as Planning SSOP #6. Link to Cluster Coord SSOP #7
6. Align country
Revise programme results structure by aligning Outcomes/Outputs in CO Head of Field Results CO Rep
programme results VISION with the emergency response. In some cases new Outcomes/Outputs Programmes Group
framework in VISION are created and in other cases the CO can use existing ones.
with appeal to ensure Required to allow immediate transfer of resources to CO.
accurate funds Decision must balance ease of tracking and reporting on financial
monitoring implementation against the Appeal, simplicity for programmatic
implementation and coherence in terms of evolution of the CP.
First week (in addition to those listed above)
7. Disseminate Develop and disseminate key messages to donors. DOC Director PPD CO Rep
information to donors Align fundraising approaches (message, quality funding, appeal ceilings) CO
based on common Align funding targets of Humanitarian Action for Children (HAC)/IA EMOPS
humanitarian Appeals and PFP/EMOPS silent or underfunded emergencies list, if exist. PPD Director CO CO Rep
43
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
advocacy priorities Link Advocacy SSOP #1 PFP Director RO
document
8. Develop Inter-Agency See Planning SSOP # 8 CCs (CO level) CO/SAG/ GCCs/ GEC
Response Plan CO Head of Cluster partners/
Programme RO/EMOPS/PPD
PFP/PD
9. Draft and submit Coordination at country level. CO Head of RO CO Rep
CERF proposals (and Include funding for cluster coordination if needed. Programmes EMOPS
ERF if available) to PD
HC PPD
CERF Proposals
10. Update Financial Montly update to FTS on funds received against the emergency appeal. FTS PPD CO None
Tracking System also receives information from donors, agencies and NGOs directly. COs to
frequently be copied on correspondence between PPD and FTS.
FTS to receive sector-based reports from all countries with emergency
appeals on a quarterly basis. COs to send the information to PPD
Humanitarian Unit for processing and onward submission to FTS.
11. Produce/maintain Funds tracking table to include funds received against the appeal, carry-over PPD CO None
funds tracking table budget balance, pipeline and utilization data. RO
Funds tracking table PPD to produce funding updates that include funds received against the PFP
appeal, carry-forward budget balance, utilization and pipeline data.
COs are encouraged to use this data for resource mobilization efforts as well
as humanitarian funds tracking and monitoringmonitoring.
12. Ensure Sector Sectoral analysis, i.e. funds received and gap tracking, is required for all PPD CO None
Reporting emergencies. It is crucial that all COs ensure that their results structure in HQ
VISION is aligned with the emergency response (point 6 above). PFP
The data from the result of the analysis can also be used for SitRep/HAC
monitoring and reporting.
PPD/EMOPS to issue joint guidance note on how to report and track
humanitarian funding.
Following weeks (in addition to those listed above)
13. Identify any in-kind If CIK involves military assets EMOPS needs to clear it. CO Rep SD/PPD SD/PPD
assistance (CIK) If CIK involves any programme supplies not on the ‘emergency supply list’ PFP /PFP/
or in the CO’s supply plan, then their suitability/appropriateness should be DFAM DFAM
reviewed and cleared by relevant PD sectors. RO/PD Directors
Consider waiver of cost recovery for CIK [link Operations SSOP #9] EMOPS
44
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Link Supply SSOP#18, 19 and Operations SSOP #10
14. Develop information Share with PPD and PFP for donor follow-up accordingly. CO Head of PPD None
products for Needs to be linked to overall advocacy plan. Programmes PFP
humanitarian Many include local donor engagement table, infographics etc. EMOPS
advocacy and RO
fundraising
15. Issue periodic reports Clear delineation between UNICEF-specific results and cluster achievements CO (drafts in EMT members GEC
(standard is 90-day, needed in all reports, based on HPMs. Word)/CO Rep
six months, one year) Highlight funding gap for both UNICEF programmes and UNICEF-led (oversight)
reflecting results clusters. DOC (fine-tune
monitored through the Establish capacity for production of the progress report (expertise needed in design/layout
HPMs publishing software). before
Periodic Reports distributing)
16. Issue financial
The HAC appeal summary and details report should be used to track funding CO Head of FRG, PFP GEC
utilization reports (if received against the appeal as well as finanicial utilization. Programmes PPD
asked by donors) Establish responsibility and frequency. EMOPS
Recipient offices to ensure high level utilization of donor funding.
Constraints and bottlenecks should be noted in cases of low spending.
17. Support OED Using donor capital visits and special briefings for PRs in New York. CO Rep PD DED
engagement and Refer to resource mobilization calendar of meetings and events to ensure PPD Director EMOPS Emergencies
influencing timely UNICEF engagement with donors. PPDPPD ED
Resource Mobilisation calendar on donor engagement for a given crisis is part DOC
of the ad-hoc issued Targeted Fundraising document, jointly maintained by PFP
PPDPPD/CO. Additional RM calendar of meetings/events now maintained in
EMOPS SharePoint site for L2/L3 crises.
Related Procedures, Guidance, Rules, Policies and Regulations
CF/EXD/2004-012 In-Kind Assistance
Resource Mobilization in Humanitarian Action
Who does what in PPD
Who does what in PFP [update link]
SitRep templates for Level 3 emergencies
Risk Management Strategy
In a competitive fundraising environment, risk management in resource mobilization will involve the proactive sharing of credible and relevant information to donors and
partners (both at HQ and field levels), including clear UNICEF positions on difficult issues that may arise. Timely reporting on outcomes/results, value for money,
expenditure rates, and analysis of trends related to the situation of children and women, etc. will impact either favourably or unfavourably on donor funding.
Exit Strategy
Resource mobilization best practices will be incorporated into country office procedures and fundraising strategy.
45
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
10. Sector: Communication
Business Owner: DOC
First 24 hours
46
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
4. Collect information and Identify UNICEF spokespersons for media interviews in consultation with the CO Comms CO Rep CO Rep (for
prepare key messages CO Rep. Include languages spoken, nationality and areas of expertise and share Officer DOC single
across UNICEF. EMOPS country)
Key Messages
Draft talking points and brief UNICEF spokespersons for press interviews. PFP
Acquire information from external and internal sources, including demographic PPD GEC (for
data on children, in order to prepare key messages, Q&As to be shared with RO multi
DOC, EMOPS, GEC, PFP, PPD and RO SD country)
Ensure consistency of messaging and numbers (data) with major humanitarian PD
actors, especially Govt and OCHA.
Liaise with Supply Division/Operations for supply updates.
Link Advocacy SSOPs
5. Issue UNICEF UNICEF statement/news note should be issued within 24 hours, aligned with CO Comms CO Rep CO Rep (for
statement advocacy messages, if any. Officer DOC single
Statement should be shared with DOC, RO, PFP and PPD who will distribute to EMOPS country)
UNICEF Statement
National Committees, donors. RO Comms PFP
Link Advocacy SSOPs Officer PPD GEC (for
if any regional RO multi
statements SD country)
PD
First 48 hours (in addition to those listed above)
6. Prepare list of Respond to initial and ongoing media queries and identify locations for media CO Comms DOC CO Rep (for
spokespersons and interviews officer PFP single
contact on-ground Clarify procedure for sign-off of communications outputs with CO Rep, GEC DOC EMOPS country)
international media to and DOC emergency cell lead HPS
offer scene-setting DOC to assist to map media presence and pitch (also via twitter) international RO GEC (for
interview correspondents and outlets, and wire agencies in country. multi
DOC may assist in identifying appropriate hashtag(s) or create new one for the country)
emergency response.
List of Spokespersons Establish focal point for logging media coverage, liaising with DOC emergency
cell to utilise global media monitoring services
7. Disseminate emergency- In materials shared with media, ensure that quotes from Representative or CO Comms CO Rep None
related information to approved spokesperson are included and if possible, quotes from affected officer for local DOC
media and other population (mother/child). media/ DOC for PFP
partners (including UN Update fact sheets, facts on emergency and response based on SitReps and global media EMOPS
agencies) reports from the field. RO
PPD
47
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Share interview highlights with DOC, PFP, EMOPS and ROs to avoid possible
confusion in messaging.
Ensure information shared with media is aligned to humanitarian advocacy
messages. Link Advocacy SSOP
Closely liaise with relevant UN agencies, partner communication officers, and
government counterparts responsible for communication to ensure coordinated,
coherent communication.
UNICEF’s overall messaging should be complementary to the UN line
Aagreed with UNCT or OCHA.
8. Prepare external Use the Global Communication Strategy and Global Humanitarian CO Comms CO CO Rep
communication for Communication & Public Advocacy Strategy (under finalisation) to guide officer RO
visibility and direction of external communication, including message development, story- DOC-
fundraising purposes telling techniques, and audience outreach and engagement activities. Digital
Arrange via CO/DOC-Digital for video/photography/stories for external PFP
communication/advocacy/fundraising for international distribution to EMOPS
broadcasters and National Committees.
Possible assets include blogs written by staff on the ground, briefings or
factsheets on key issues for children (e.g., protection, education), press releases.
Liaison between Comms Officer and Reports Officer to ensure that key
messages, information in SitRep and Fact Sheet are consistent and accurate.
Link Advocacy SSOP #1
9. Establish daily contact Short, focused calls with clear agendas involving Country, Regional HQ (NY,
with HQ and RO SD and PFP) comms teams to agree storyplans, message iteration, HR issues,
communication teams potential risks etc.
First week (in addition to those listed above)
10. Build/strengthen media Logistical support will be needed to sustain communication work on the ground CO Comms CO CO Rep
relations and assist (vehicles, drivers, interpreters etc) in order to raise profile of children in officer RO
media in gaining access emergency. Where possible, offer media a place on missions carrying supplies DOC
to emergency area or going on assessment/ programme missions. PFP
Assist journalists to get the story out but not at the expense of interference in
emergency operations.
Negotiate with journalists/media that UNICEF can use published stories after
first publication, as well as use b-roll footage and photos.
When in the field with journalists, also take photos that can be shared with
DOC and disseminated to NatComs through PFP.
48
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Coordinate NatCom media requests and prioritize NatCom media requests with
PFP.
11. Ensure visibility Where appropriate, visibility items such as UNICEF T-shirts, caps, banners, CO Comms CO GEC
flags, stickers, etc. should be transported in at the start of an L3 crisis, along officer SD
with donor recognition materials (ECHO, DfiD, USAID, Japan etc).
All UNICEF supplies should already be branded prior to arrival in the
emergency (e.g. Copenhagen).
12. Organise conference call Organize regular (daily, weekly, bi-weekly) conference calls with RO/HQ and PFP Geneva RO PFP
with HQ, RO and the CO on comms issues. Communica-tion DOC Director
National Committees Arrange conference call with National Committee to update them on the Officer GEC CO Rep
situation on the ground in support of their advocacy and fundraising efforts. EMOPS
Identify with National Committee possible international dates and visibility
Conference Call with
opportunities to tie the emergency response to the global news agenda, as well
NatComms
as national journalists to target.
Following weeks (in addition to those listed above)
13. Identify suitable Prepare handover note for new communication officer. DHR Chief HR CO DHR
communication staff to in Emergencies RO Director
be deployed for up to CO Comms DOC DOC
three months officer EMOPS Director
PFP
14. Continue to create new Press releases, blogs, human interest stories and digital media to consider new DHR Chief HR CO DHR
content/angles to drive angles to keep the crisis in the public domain in Emergencies RO Director
donor support, Organize donor, NatCom, Goodwill Ambassador and high-level visits (e.g. ED) CO Comms DOC DOC
including Work with UN Communication Team to leverage outreach and raise visibility officer EMOPS Director
donor/NatCom visits to of the UN’s work PFP
keep the crisis at top of
the agenda
Related Procedures, Guidance, Rules, Policies and Regulations
Core Commitments for Children in Humanitarian Action (p. 44-45)
Division of Communication core guidance on communication products and tools in emergencies
Risk Management Strategy
The in-country Risk Management Strategy should inform communication in emergencies. Country Office with support of DOC should pay particular attention to managing
reputational risks.
Exit Strategy
Responsibility for the communication function will revert back to the Country Office Communication Officer with ongoing RO and HQ support as needed.
49
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
11. Sector: Humanitarian Advocacy
Business owner(s): EMOPS
First 48 hours
Action Considerations Responsibility Consult Approval /
/engage clearance
1. Initial Advocacy priorities
GEC/EMOPS Director/ RD/ DOC/CO Rep/ IRT Coordinator discuss CO Rep OED/RD GEC
discussed and agreed initial advocacy points EMOPS Dir.
Informs immediate messaging by CO, RO and HQ Communications IRT Coord.r
and feed to programmes and communications as appropriate DOC
First week (in addition to those listed above)
2. Discussion in EMT on Agree on CO/RO/HQ leads for developing advocacy strategy and agree CO Rep RD/RO GEC
Advocacy Strategy on timelines GEC Secretariat EMOPS Dir.
Advocacy strategy to include advocacy priorities and plan of action EMT/DOC
Ensure advocacy priorities are reflected in UNICEF communications as
Advocacy Strategy appropriate.
See advocacy strategy template [attached] and advocacy “golden rules”
[attached]
Link Communications #8 and RM SSOP #7
Following weeks (in addition to those listed above)
3. Revisit and Update Advocacy Advocacy priorities do not remain fixed and priorities to be adjusted as CO Rep RD GEC
Strategy regularly as needed and when context changes or issues emerge. GEC Secretariat EMOPS Dir.
Advocacy strategy should be standing agenda item in EMT EMT/DOC
Related Procedures, Guidance, Rules, Policies and Regulations
These procedures are designed for more effective humanitarian advocacy (public and private) towards common Humanitarian Outcomes:
Advocacy Toolkits http://intranet.unicef.org/pd/pdc.nsf/0/ba8fe1ed01f2ad4085257537006cc904?OpenDocumentAdvocacy Toolkit
Checklist for advocacy
Advocacy strategy template
Golden Rules on Advocacy
Further guidance is forthcoming on Communication and Public Positioning in Humanitarian Advocacy
Risk Management Strategy
Lack of corporate policy and accountabilities on advocacy creates risks to UNICEF programmes and reputation, especially in the urgency of emergencies. These simplified
procedures are intended to fill this void and guide public and private advocacy at all levels.
Exit Strategy
Advocacy becomes the responsibility of a small team supporting the Representative at country level, including relevant sections. Focal points from task force can support,
as needed.
50
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
10. Participate in local and global If local ICT working group does not exist, consider initiating (TOR for CO ICT RCICT CO Ops
interagency ICT coordination local ICT working group available on Oneresponse.info) manager officer
meetings; seek to identify
opportunities for interagency
shared ICT services
11. Prepare ICT Response plan and For quick delivery: order standard UNICEF equipment, preferably from CO ICT RCICT/HQ CO Ops
budget Supply Division’s Emergency Supply List; use emergency SO option; manager ITSS officer
Tools: ICT Response Plan
order complete kits.
Consider requesting ITSS emergency kits pre-stocked in Copenhagen.
Tools: ICT Budget Link Supply SSOP #16
52
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
12. Implement file sharing solution
File sharing solutions can be a local shared drive or MS CO ICT RCICT / HQ CO Ops
OneDrive/Sharepoint for MS Office documents. In addition, an FTP or manager ITSS officer
WeShare are recommended for pictures/videos.
13. Ensure fast-track of requests for As appropriate, agree on higher priority ICT Service Level Agreement HQ ITSS RCICT/DHR CO Ops
assignment of email and intranet (SLA) for all other service requests by the affected CO. Director officer
access for new staff and E-saf (Standard Access Form) requests from emergency office to be
consultants immediately flagged and prioritized.
Emergency GHD numbers: Help Desk Officer: +1- 917-605-1601 and
Help Desk Manager: +1- 917-605-1816
Following weeks (in addition to those listed above)
14. Determine additional ICT Take advantage of ITSS and DHR roster of internal and external RCICT CO ICT CO Ops
staffing requirements and emergency ICT trained staff as well as local ICT roster (if available) manager/DHR officer
initiate action to obtain Link HR SSOP #18
necessary staff (second week)
15. Provide key UNICEF users with Consider requesting emergency telecoms response kit from ITSS in-house CO ICT RCICT/HQ CO ops
corporate network access; pre-stock manager ITSS officer
implement core UNICEF
information systems and
associated infrastructure to
support the operation.
16. Perform follow-up ICT Assessment tools available in ‘ICT emergency toolbox’ on ITSS CO ICT RCICT/HQ CO ops
assessment to determine gaps in Emergency Portal. manager ITSS officer
longer-term response
54
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
11
Relocation (within the country) is determined at the country level. Evacuation (outside the country/applies to international staff and their dependants only) is determined by the Under
Secretary General (USG) of the UN Department of Safety and Security (UNDSS) on behalf of the UN Secretary General.
55
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Identify focal points and create mailing lists for exchange of critical Ops Officer
security information.
Establish protocols and/or lines of communication for sharing time-
sensitive information with other 24/7 UN centres (e.g. UNOCC, UNDSS,
DPKO, etc.) as needed.
Link ICT SSOP #1, 3, 4
5. Analyse the security situation and Obtain SRA and other relevant security documents. CO Rep PSA DSS (HQ/ EMOPS
determine security posture for Consult CO and Regional Security Adviser (RSA) on developments/ Country) Director
UNICEF updates on the ground. RO RSA or
Liaise with UNDSS DRO and C/SA for additional information. SFP
Analyse threats, vulnerabilities, risks, appropriate mitigating measures CO SA/SFP
and identify residual risk to UNICEF operation. OPSCEN
Determine appropriate security posture for UNICEF and provide
programme delivery options.
Advise planning team on minimum requirements e.g. MOSS, RSM and
other mitigating measures that impact operation.
6. Alert Staff Counsellors Define best location and modatlity to provide support to staff. PSA DHR none
Link HR SSOPs #1
First 48 hours (in addition to those listed above)
7. Ensure 24/7 tracking of events and Consolidate real-time security information from diverse sources, OPSCEN PSA N/A
trends with implications for including UNICEF/UN, news media, security information/analysis RO/CO
security of staff sources and social media; HFSS
Disseminate alerts and advisories, as appropriate.
8. IImmediate follow-up of critical Immediately notify Principal Officer, Security Coordination and other key OPSCEN EMOPS Dir N/A
security incidents (or increased security staff at HQ, RO and CO levels; PSA
risk of critical security incident) In case of situation requiring medical evacuation, facilitate coordination RO
between UNICEF staff and external partners to accelerate the process; CO
Maintain log of actions taken.
9. Support tracking of staff Initiate OPSCEN L2/L3 staff tracking protocols to reflect changes in staff OPSCEN DHR N/A
movements in and out of country numbers and locations (as per agreed frequency); RO
Develop maps of staff locations and numbers CO
10. Provide short-term surge Security Regional Security Adviser to provide immediate surge. RO Security CO
Officer until recruitment of OSC to provide Security Advisor if none available within region or Advisor DHR PSA
Security Adviser in line with Security ERT Advisor. RD CO Rep
overall SURGE deployment plan Assessment of scale and duration of security support to be conducted by EMOPS Dir
surge advisor.
56
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
11. Recruit/deploy Security Advisor if Alert OSC if additional security capacity/recruitment of a security advisor CO Rep RO CO Rep
needed is required or the possible deployment of the Scurity ERT Advisor CO SA/SFP DHR
Identify suitable candidate. Ensure technical clearance as agreed through PSA
Inter-Agency Security Management Network (IASMN).
Deployment to be done via DHR. Link HR SSOP #9
12. Identify security equipment needs Liaise/follow-up with Supply Division to order equipment (e.g. personal CO SA/SFP OSC PSA
for CO protective equipment, armoured vehicles) and ensure delivery in country. RO
Link Supply SSOP #8 Logistics
13. Determine rotation/relief of surge Assessment done by Surge Security Advisor to determine need. CO SA/SFP OSC/RO/ CO Rep
security adviser CO/GEC PSA
First week (in addition to those listed above)
14. Determine if the residual risk level Programme criticality assessments are mandatory in situations where the CO Rep UNCT ED via
in country requires an inter-agency residual risk is ‘high’ or ‘very high’ as defined in the Security Risk EMOPS OSC OED for
Programme Criticality (PC) Assessment (SRA), and it is beneficial also in ‘medium’ residual risk (HPS, HFSS) GEC all PC1
Exercise to be conducted situations. See Programme Criticality framework below. PSA activities
PC assessments must be done at the inter-agency level. RC/HC or
Tool: PC Framework
Outcome of PC Assessment to inform decision-making related to SRSG
acceptable risk
15. Follow-up on the status of security Medical clearances. DHR OSC CO
officer deployment UNLP/visa applications. CO HR
16. Identify need for respite for surge Determine intensity of the emergency and stress levels. CO Rep OSC Dir
security officer Identification of a replacement Security Advisor. RO SA/SFP Security EMOPS
PSA Surge
Advisor
Following weeks (in addition to those listed above)
17. Identify lessons learned Should form part of the post activity report. Security CO PSA
Post activity report completed and submitted to OSC prior to departure. Advisor on OSC
Surge support
Related Procedures, Guidance, Rules, Policies and Regulations
Security in Humanitarian Action Intranet page
Programme Criticality Framework
Risk Management Strategy
ERT Security Advisor can be deployed. The establishment of a stand-by list of appropriately qualified and trained security officers medically cleared in advance is critical
to provide emergency security officers in a timely manner (forthcoming). Without funding to allow for yearly medical clearances of the stand-by list security officers there
will continue to be delays in recruitment.
Exit Strategy
Emergency support ceases once Surge Security Officer is withdrawn or the CO establishes and recruits a permanent post.
57
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
14. List of Tools
Global Emergency Coordination IRT Human Resources
Emergency Response Toolkit IRT TOR Overall Executive Directive CF/EXD/2010-005 dated 31 December
ExDir 2011-1 on Corporate Emergency Activation IRT Team Coordinator TOR 2010 will be applied to accelerate recruitment of TA or FT.
Procedure IRT Communication TOR The regular staff selection policy will be suspended and all
Core Commitments for Children in Humanitarian Action IRT WASH TOR recruitment will be fast tracked to speed up recruitment of
(CCCs) IRT Child Protection TOR medium-term human resources needs of the CO.
GEC Terms of Reference IRT Education TOR Sick leave entitlements policy
Draft TOR for IRT Overall IRT Programme Education TOR Checklist for Human Resources
EMT and working level network ToRs IRT Health TOR Annex on Step Aside Protocol
EMT Standard Agenda IRT Nutrition TOR
Exit Strategy template IRT HPM TOR
Annex on Step Aside Protocol IRT Information Manager TOR
Compedium of Best Practices: UNICEF approach to IRT HR TOR
Comprehensive Risk Management and Due Diligence in IRT Supply Chain Manager TOR
Complex and Hight Threat Environments IRT OPS TOR
Planning, Programme Support, Performance Monitoring Cluster Coordination Implementation Modalities
and Evaluation
Situation Report (SitRep) Template and CO QA checklist Cluster Approach Intranet page and FRG/PROCEDURE/2015/001 UNICEF Procedure For
Humanitarian Planning one pager Transformative Agenda Intranet page` Country And Regional Office Transfer Of Resources To
Model Terms of Reference: Level 3 and major Level 2 UNICEF Cluster Coordination Guidances for Civil Society Organizations
Emergencies -- Timeline Exercise COs Simplified Humanitarian Programme Document and
Inter-Agency Standing Committee Need Assessment UNICEF Humanitarian Performance Monitoring Simplified Report (Annex B of UNICEF CSO Procedure)
Guidance and Tools Toolkit: Cluster / Sector Coordination Milestone Options&Considerations for working with CSO in
The Humanitarian Programme Cycle, ver.2, IASC (July Monitoring Tool Humaitarian Response
2015) The Humanitarian Programme Cycle, Version UNICEF HACT Policy and HACT Procedure
Multi-Sector Initial Rapid Assessment (MIRA): Guidance, 2.0, IASC (July 2015) UNICEF Financial and Administrative Policy 5,
IASC (Revised July 2015) Inter-agency: Cluster Coordination Reference Supplement 3 Cash Disbursements (under revision)
Consolidated Appeal Process (CAP): UNICEF Checklist Module (July 2015) Small-scale Funding Agreement Form
2011 for Country Offices, Regional Offices and Inter-agency: Cluster Coordination Performance Sample Contingency PCA Activation Protocols available in
Headquarters (Working Document- revision ongoing) Monitoring Working with CSOs Toolkit
Response Plan Guidance and Template including Target
Population Calculator
Humanitarian Performance Monitoring Toolkit: Indicator
Guide
Template ToR for field monitoring
Communications Operations Supply and Logistics
58
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
Core Commitments for Children in Humanitarian Action
DFAM Simplified Standard Operating Checklist for supply
(p44-45) Procedures (SSOPs) in Level 3 Emergencies Emergency calculator
Media and Communications in Humanitarian Action: Executive Directive on UNICEF Policy on Emergency Supply List
Tools and Resources Contributions in Kind UNICEF Financial and Administrative Policy
UNICEF Video Production Guidelines and Web photo Joint PARMO/PFP Fundraising Instruction Supply Manual, Chapter 10 (Emergency Section), and
Guidelines UN Standard Lease Agreement (approved by UNICEF on-line supply catalogue and on-line track &
UNICEF Brand Toolkit UN Office of Legal Affairs) trace of supplies
Template: Request to DFAM for Change the Quick Reference Guide for procuring supplies via
Funding Source partners (PCAs) (forthcoming)
Vehicle Indemnity Form
Template: Table of Authority
Simplified Financial Management
Assessment
Advocacy Resource Mobilisation Security/ OPSCEN
Advocacy Toolkits CF/EXD/2004-012 In-Kind Assistance Security Toolkit
http://intranet.unicef.org/pd/pdc.nsf/0/ba8fe1ed01f2ad4085 Resource Mobilization in Humanitarian Action Security in Humanitarian Action
257537006cc904?OpenDocumentAdvocacy Toolkit Who does what in PPD
Checklist for advocacy Who does what in PFP
Advocacy strategy template Response Toolkit
Golden Rules on Advocacy SitRep templates for Level 3 emergencies
Further guidance is forthcoming on Communication and
Public Positioning in Humanitarian Advocacy
ICT EWEA Key Actions
ITSS Emergency Portal Key Action # 2 ‘Internal-external emergency Key Action #11 ‘Supply and logistics emergency readiness’
coordination mechanisms and contacts’ Key Action # 12 ‘Mapping of potential donors’
Key Action # 3 ‘Security Checklist’ Key Action #13 ‘Results-based performance monitoring in
Key Action #4 ‘Key elements of business humanitarian situations’
continuity plan’ (CO Ops Manager, CO rep). Key Action #14 ‘C4D and communications’
Key Action #5 ‘Humanitarian scenarios for Key Action # 15 ‘Finance and Admin Emergency
priority risk and UNICEF response plan’ Readiness’
Key Action #6 ‘Who does what in first 72 hours Key Action #16 ‘Education’
of emergency in CO context’ Key Action #17 ‘Child Protection’
Key Action # 7 ‘Baseline data and Inter-agency Key Action #18 ‘Health’
needs assessments’ Key Action #19 ‘WASH’
Key Action # 9 ‘Mapping of potential partners’ Key Action #20 ‘Nutrition’
Key Action # 10 ‘Staff Mobilisation table’
59
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
ECHA Executive Committee on Humanitarian Affairs
15. List of Acronyms
EMOPS Office of Emergency Programmes
60
UNICEF’s Corporate Emergency Activation Procedure for Level 3 Emergencies
Simplified Standard Operating Procedures (08 Oct 2015)
IM Information Management RRTs Rapid Response Team
ITSS Information Technology Solutions and Services Division SBP Stand By Partners
PFP Private Fundraising and Partnerships TRIP Travel Request Information Process
PSA Principal Security Advisor WBS Work Breakdown Structure (in VISION)
RA Rapid Assessment
RD Regional Director
RO Regional Office
61