Professional Documents
Culture Documents
429/4312
Spring 2022
Course Instructors:
Dr Basil Kamel
Dr Sameh El Feki
Dr Basil Kamel
Dr Sameh ElFiky
Design II Project
BOQ, Schedules
Project number 0001
Date 3 April 2022
Drawn by Lina Mohamed
Checked by
A000
Scale
2. Floor Plans & Layout
OWNER
A-301
A B C E2
D E F G
S 1
A-202
31.13
0.125 6.00 6.00 4.00 5.00 5.00 5.00
21.25 9.88
0.97 1.80 0.84 1.80 1.56 1.80 4.00 0.61 1.43 0.61 2.66 1.80 1.37 9.88
W1 W1 W1 W2 W2 W1 PROJECT
0.125
0.125
1 1 ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
0.72 1.80 0.84 1.80 0.72 0.72 1.80 3.36 0.60 0.61 1.35 0.61 0.59 2.00 1.80 1.08
1.73
1.73
DR. BASIL KAMEL
1.48
1.48
3.57
3.57
3.88
Seminar Room Wood Workshop Storage Metal Workshop
F.F.L +0.00
F.F.L +2.00 ROOM SCHEDULE
4.75
4.75
4.75
4.75
4.75
4.75
4.75
4.75
5.00
5.00
5.25
5.25
1.80
1.80
1.80
1.80
W1 W1
GF 4 GF 3 GF 2 GF 1
5.88 5.88 3.76 4.88
4.42 0.90 0.56 0.36 0.90 4.62 0.46 0.90 3.26 0.50 9.88
1.34
1.48
0.90
0.90
D2'
1.73
1.73
0.87
DOORS SCHEDULE
0.28
0.28
0.14
2 D2' D2 D2 2
WINDOW SCHEDULE
E1
E3
A-201
A-203
F.F.L +1.70 F.F.L +0.00
F.F.L +0.00 F.F.L +1.70
2' WALL FINISHES SCHEDULE
4.00
4.00
3.75
3.75
3.75
3.75
0.
05
CURTAIN WALL SCHEDULE
1.
26
3 D4 3
3.
0.12 0.630.17 0.31 0.63 0.20
42
1.15 1.49 1.90 1.44 3'
19.25
5.88
19.30
1.15
D3
1.
4.82
1.73
W2
2.33 D3
80
1.48
38 37 36 35 34
1.
15 33
05
16 1.46 32
D3 D3
1.
3.32
3.32
W2
3.44
17 31
3
5
3.72
0.12
0.60 0.12 18 30
Historical Gallery
1.
80
0.90 0.11
19 29
2.30
4.75
4.75
5.00
5.00
5.25
1.80
1.80
4.75
0.20
W1
3.
20 28
0.20
1.
42
80
4'
0.10 0.90
0.10 0.90
36
22 26
0.
1.
0.22
27
6.
S 2
A-302
23
24
25
F.F.L +1.70
Exhibition Lobby 83
1.
0.
2.10 1.56 2.34 1.15
0
1.46 1.15
12
0
6
1.48
2.
5
GF 6
0.13 0.90
1.32
1.32
1.73
5.88 D2 9.93
1.
80
0.38 5.12 0.38 3.38 1.80 1.84 1.80 1.11 F.F.L +0.60
10.30
10.30
4 4
2. 82
1.
05
6.
05
0.
CW2 W1 W1
05
KEY PLAN
11
1.
35
10
CW1 9
1'
0.
D1
00
8
2'
28
6.
3.
2.
6
88
42
0.
28
5
0.
3.
4
28
51
5.00
5.00
0.
3
5.00
5.00
28
42
2
0.
0.
5
28
68
12
0.
3.
0.
0.
28
05
21
0.
0.
28
F.F.L +1.70
0.
28
7.
00
92
1.
B'
D'
50
3'
3.
3.
CW1
60
42
3.
5
0.125
0.125
7. .00 5
7 .9
1
25
05
0.
0.
12
5 F.F.L +0.00
DRAWN BY:
1' A' LINA MOHAMED
92
ID: 900182678
1.
4' DATE: 14/2/2022
S
A-
2
5 8
30
Design II Project
12 0.6
2
0.
0.56 5.12 3.94 1.80 1.84 1.80 1.01 10.23 4.82
16.13 5.00 5.18 4.82
A-101
0.125 6.00 6.00 4.00 5.00 5.00 5.00
31.13
E4
A B C A-204 D E F F 1:50
GROUND FLOOR PLAN
1 SCALE 1:50
A B C A204 1
A301
D E F G
31.13
0.125 6.00 6.00 1
4.00 5.00 5.00 5.00
21.25 9.88
0.97 1.80 0.84 1.80 1.56 1.80 4.00 0.61 1.43 0.61 2.71 1.80 1.33 9.88
W01 W01 W01 W2 W2 W01
0.125
0.125
1 1
0.72 1.80 0.84 1.80 0.72 0.72 1.80 3.36 0.60 0.61 1.35 0.61 0.59 2.00 1.80 1.08
5.88 5.88 3.76 4.88
1.73
1.73
1.48
1.48
Participatory Seminar Room Wood Workshop Storage Metal Sculpture Workshop
3.57
3.57
3.85
4 3 2 1
Lina Naguib
5.00
5.25
1.80
1.80
4.75
4.75
4.75
4.75
4.75
4.75
4.75
1.80
5.25
5.00
W01 28 m² 28 m² 18 m² 23 m² W01
1.80
0.0
5.88 5.88 3.76 4.88
Mohamed
4.42 0.90 0.56 0.36 0.90 4.62 0.46 0.90 3.26 0.50 9.88
900182678
1.34
1.48
0.90
0.90
D2'
1.73
1.73
0.90
0.28
0.28
0.14
2 D2' D2 D2 2
2'
4.00
3.75
3.75
3.75
3.75
4.00
0.0 1.70
0.
+1.70 0.0
1.05 2
6
3.
42
3'
1.
3 3
80
D4
0.10 0.70 0.10 0.06 0.70 0.39
0.39
7.
5.88 1.15
19.25
19.25
0
1.49 1.70 1.44
0
1.15
1.73
2.39 W2 2.38
1.48
1.
D3 D3 1.00
1.
05
2.09
3
5
W01
8
16
3.32
3.32
W2
3.44
D3 D3 7
3.
17
3.72
0.60
42
1.
1.
-
80
- 18
6
80
Historical Gallery
19 29
4'
5.00
5.25
1.80
1.80
4.75
4.75
4.75
5.00
0.22 0.90 0.11
W01 5 28
1 A203
20
29 m² D2' D2 21 27
1.
1.
0.
2.00 2.00
6
22
6.
26
12
.3
2
22
6
8
5
3
25 W01
1 23 UP
A302 +1.70
0
2.10 1.56 2.34 1.15 1.50 1.15
.0
1.48
1.
2
1.32
5.88
1.32
9.93
1.73
80
0.90
10.25
10.25
4 60 m² 4
1.
2
0
.8
5
0.
5
.0
12
W01
2
5
W01
1
.3
Dr Basil Kamel
5
2' Dr Sameh ElFiky
11
10
0
9
.2
3.
80
8
6 CW1
0
.8 3 .2
.0
6
8 .5 80
5
1 .2
4
80
5.00
5.00
D01 .2
3
5.00
5.00
80
2
.4
.2
05
1
0
3 8
0.
5
.2 0
8
12
.2
.6
1
8
0.
0
7.
0
0
3' D'
2
.9
50 B'
1
3.
3.
60 Design II Project
42
3.
+ 1.70
0.125
0.125
5 UP
5
05
5
0.
0.
.9
12
0
1
5
.0
5
2
7
7.
1' 4'
A' Ground Floor
2
.9
1
0.0 Project number 0001
68
0.
2
5
12
A302 Date 3 April 2022
0.
3.94 1.80 1.84 1.80 1.01 10.23 4.82
16.13 5.00 5.18 C' 4.82
Drawn by Lina Mohamed
0.125 6.00 6.00 4.00 5.00 5.00 5.00
31.13 Checked by
-
A B C
-
1
D E F G A101
A301
Ground Floor
1 1 : 50
Scale 1 : 50
OWNER
E2
A-301
A B C A-202 D E F
S 1
26.25
0.125 6.00 6.00 4.00 5.00 5.00 0.125
0.97 1.80 0.84 1.80 1.56 1.80 4.00 0.61 1.43 0.61 10.83
16.18 10.07
PROJECT
W1 W1 W2 W2 E' ARCH429/4312 - DESIGN
0.125
0.125
DEVELOPMENT &
1 1 CONSTRUCTION DOCUMENTS
80
DR. BASIL KAMEL
1.
9.27
0.72 1.80 0.84 1.80 0.72 0.72 1.80 4.00 0.61 1.43 0.61 0.66
1.74
90
0.
0. 9
26
2
6.
2.
85
D2
W1 Admin. Room Model Studio Terrace
63
4.75
4.75
4.45
5.00
5.00
5.25
5.25
1.80
1.80
3.
ROOM SCHEDULE
90
1F 2 5.88 1F 1 1F 7
0.
27
50
0.
2.
47
6.64
W3
0.
4.42 0.90 0.56
09
3.
14
3. .50
25
1.48
4.46 3.
0.
2
22
4.82
8.75
0.64 0.90 2.92
DOOR SCHEDULE
2 D2' D2' 2
5 4
0.
3.87 0.52 0.90 2.97
1.15
1.05
0.97
4.39
1.64
WINDOW SCHEDULE
Focus Pod
2'
4.00
3.88
3.88
3D Printing
3.82
7.13
4.00
4.00
4.00
3.75
1.80
1.80
1.80
3.82
1F 3 W1
CURTAIN WALL SCHEDULE
1F 6
1.90
D4 1.90 E1
E3
A-201 FINISHES SCHEDULE
A-203
0.97
0.97
3.87
1.05
05
2.55 0.90 0.42 5.75 8.88
0.
0.22
3 D2' 3
3'
0.37
1.15 4.82
8.88
19.30
1.15
3.87
D3 D3
0.73 0.29 0.73
2 4
F.F.L +6.65
3.
2.33 2.33
2.22
40 1.46 56
3.69
D3 D3
3.32
3.32
W2 41 55
68
00
3.86
7.
3.
0.12
0.12
42 54
0.60
W1 43 53
2.30
4.88
1.80
1.80
5.05
5.05
5.00
5.00
5.00
0.22 0.90 0.11
0.20
44 52
4'
0.20
0.10 0.90
0.10 0.90
D2' D2 45 51
2
36
50
4
46
83
3.
0.
6.
S 2 47 49
2.54
A-302
2.10 1.56 2.34 1.15
48
1.46
F.F.L +5.30
1.15 1F 5
5
1.32
12
21
0.12 0.90
D2'
0.
11.82
3.
5
0.43 0.90 4.18 1.80 1.84 1.80 0.87 12
00
0.
3.
E'
9.88
3.22
3.22
00
4 D2 4
3.
0.33
00
0.20
6. .82
3.
09
6
0.55 0.90 0.43 W1 W1
1.88
5 0
65
0.
0.
7
W1
5
3.
1.80
1.80
2.50
12
2.47
0.
Coworking Space 1' D'
88
2'
6.
42
3.
0.37
0.48
W1
1F 4
1.80
1.80
5.00
5.00
5.18
5.18
79
37
0.
0.
CW1 5
.2
37 10
3.
95
5.
05
80
21
90
25
0.
00
1.
3.
0.
7.
7.
00
7.
B'
1.52
W1
1.77
3.37
79
3'
80
0.
42
0.35
1.
2.50 0.52
3.
50
3.
60
0.125
5 5
0.125
3.
90
W3
0.
65
0.
5
12
DRAWN BY:
05
0.
0.
LINA MOHAMED
5
12
1' ID: 900182678
0.
A'
DATE: 22/2/2022
4' C'
Design II Project
S
A-
0.60 2.50 0.62 2.53 3.50 1.80 1.84 1.80 0.94 5.00 5.18
2
30
2
3.72 2.53 9.88 5.00 5.18
0.125 6.00 6.00 4.00 5.00 5.00 0.125 FIRST FLOOR PLAN 1:50
26.30
A-301
1
A B C E4 D E F
S
A-204 A-102
FIRST FLOOR PLAN
1 SCALE 1:50
OWNER
PROJECT
A B C D E F G
ARCH429/4312 - DESIGN
31.27 DEVELOPMENT &
0.265 6.00 6.00 4.00 5.00 5.00 5.00
CONSTRUCTION DOCUMENTS
3.75 1.80 1.56 1.80 4.42 1.80 16.13 DR. BASIL KAMEL
DR. SAMEH EL FEKI
W4 W4 W4
0.265
0.265
1 1
0.25
0.25
0.25
ROOM SCHEDULE
1.87
30.88
DOOR SCHEDULE
B 4
4.25
4.75
4.25
5.00
5.53
5.53
5.00
1.80
W4
2.50
W4 FINISHES SCHEDULE
0.25
1.81
2 2
1.12 1.80 2.57 3.26
0.97
5.50
0.84
11.75
1.93
0.25 5.45 5.50 0.30 0.25
2.69
1.50
B 4 0.34 0.90 0.25
14.53
14.53
13.75
13.75
4.00
4.00
2.50
7.20
3.75
3.75
3.75
1.80
1.80
Parking Mech. Room D2' Fire Tank W4
0.64
0.22 0.90 0.25
B 3 1.37
B 2
1.82
0.90
0.16 0.90
D2'
0.97
7.56
1.58
4.00 3.26
0.45
3 3
0.50
1.15 3.26
1.15
0.90
0.25 5.45 5.50 0.30 0.25
9.00
5.38
F.F.L -0.85
2.50
1.40
1.40
3.93
14 13 12 11 10
15 9
6.70
16 1.46 8
17 7
3.81
18 6
0.50
19 5
2.30
4.88
1.10
1.40
Water Tank
5.00
5.00
1.80
S 2 S 2
W4 20 4
0.50
A-302 F.F.L -2.00 m A-302
21 3 B 1
22 2
23 1
F.F.L -1.85 m
2.50
1.40
1.40
F.F.L -2.20
1.15 1.46 1.15
1.69
1.69
1.32
D2'
0.16 0.90
0.16 0.90
1.87
17.37
0.50
9.38 1.80 1.84 1.80 2.55 3.26
0.88
4 4
0.265
0.265
W4 W4
A B C D E F G
DRAWN BY:
LINA MOHAMED
BASEMENT FLOOR PLAN ID: 900182678
1 SCALE 1:50
DATE: 01/03/2022
Design II Project
A-103
BASEMENT PLAN
1:50
OWNER
A B C D E F G 2'
31.13
0.125 6.00 6.00 4.00 5.00 5.00 5.00
0.
16.18 10.07 4.87
05
PROJECT
3.
3'
42
ARCH429/4312 - DESIGN
7.
DEVELOPMENT &
00
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
3.
4'
42
DR. SAMEH EL FEKI
0.
12
5
0.125
0.125
1 1
LIGHTING
5.00
5.00
5.25
F.F.L 0.0
F.F.L -2.20
REF MANUFACTURER HEIGHT DIAMETER COLOR COUNT DESCRIPTION PICTURE
# SYMBOL NAME
OR EQUIVALENT
F.F.L +4.05
5 Degree Beam Angle In-Ground
1 IN GROUND KISCHLER 0.30 m 0.7 m BRASS 6 Accent Centennial Brass
F.F.L +0.30 WELL LIGHT 70-W MH
2 2
UPLIGHT FXLUMINAIRE Solid brass and can be powder
1283-072 0.40 m 0.6 m BRASS 23 coated to match your FX fixture
2 WITH SPIKE
4.00
4.00
3.82
POST LIGHT W/ FXLUMINAIRE 0.8 m 0.8 m Natural, powder coated, or
3 COPPER 4 antiqued copper/brass
FOOTER MOUNT 12383-034
F.F.L +0.60
WATERPROOF SUBMERS KISCHLER Stainless with removable and
3 3 0.4 m 0.4 m STAIN 30 adjustable cowl and mounting
4 FOUNTAIN SPOTLIGHT VLO 2700K -LESS
19.30
bracket
19.25
5.05
5.00
5.00
HARDSCAPE
4 4 MOONSTONE GRAVEL
1 OR
SUGILITE STONE Rare Healing Natural Stones
11
GRAVEL PURPLE 5-7 mm 80 m2 and Minerals Crystal
10
9
8
6
5
4
5.00
5.00
5.18
3
Exotic hardwood that is
2
0
1
IPE DECKING BROWN 4 cm x 40 cm 205 m2
.7
Naturally resistant to decay
+1
L
2
F.
OR
F.
BALAU FLOORING BROWN 5 cm x 35 cm 205 m2 Dense timber hardwood decking
0.125
0.125
5 5
0
.6
CARRARA MARBLE
+0
F.F.L +0.60 Grey 30 cm x 30 cm 30 m2 White Smooth Marble
HERRINGBONE
L
F.
F.
3 OR
0
0.
IVORY
L
F.
F.
F.F.L +0.60 SOFTSCAPE
5
12
0.
A medium to large tree, of multi-
D' 1 ALBIZIA LEBBECK 20 m 1.5 m GREEN 2 stemmed widely spreading habit
7. .00
F
F.
25
7
F.F.L 0.0
MOUTAIN WITCH ALDER 0.8 m 0.8 m Large woody shrub has rounded
3 GREEN 6 leathery and ribbed leaves
F.F.L 0.0 F.F.L 0.0
5
12
CANDELABRA CACTUS 0.4 m 0.4 m Cup-shaped flowers open during
GREEN 8
0.
GENERAL LAYOUT A B C D E F G
A SCALE 1:100
HARDSCAPE REFERENCES SOFTSCAPE REFERENCES
LIGHTING REFERENCES DRAWN BY:
REF MANUFACTURER REF MANUFACTURER REF MANUFACTURER
#
OR EQUIVALENT
LINK #
OR EQUIVALENT
LINK #
OR EQUIVALENT
LINK LINA MOHAMED
ID: 900182678
THE YARD GROUP KISCHLER NABAT
1 HEEQING AE216
https://www.theyardgroup.com.au/gravel-suppliers-near-me/
1 70-W MH
https://www.kichler.com/kichler/products/landscape-lighting/accent-lights/in-ground-landscape-lights/vlo-in-ground-15-degree-spot-2700k-d56a1dc0/
1 ALBIZIA
https://nabatdelivery.com/lebbeck/
DATE: 22/2/2022
0.
16.18 10.07 4.87
05
3.
3'
42
PROJECT
7.
00
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
3.
4'
42
DR. BASIL KAMEL
DR. SAMEH EL FEKI
0.
12
5
0.125
1 0.125
5.00 1
5.00
5.25
F.F.L 0.0
F.F.L -2.20
F.F.L +4.05
F.F.L +0.30
2 2
4.00
4.00
3.82
F.F.L +0.60
3 3
19.30
19.25
5.05
5.00
5.00
F.F.L +8.85 F.F.L +12.50
0.20
0.20
4 4
11
10
9
8
6
5
4
5.00
5.00
5.18
3
2
0
1
.7
+1
L
F.
F.
0.125
0.125
5 5
0
.6
+0
F.F.L +0.60
L
F.
F.
0
0.
L
F.
F.
F.F.L +0.60
5
12
0.
0
0.
L
F.
D'
F.
7. .00
F.F.L 0.0 F.F.L 0.0
25
7
3.72 2.53 9.88 5.00 5.18 4.95
0.125 6.00 6.00 4.00 5.00 5.00 5.00 0.125 5
31.25 12
0.
REF MANUFACTURER
# SYMBOL NAME HEIGHT WIDTH COLOR COUNT DESCRIPTION PICTURE # LINK
OR EQUIVALENT
NABAT DRAWN BY:
A medium to large tree, of multi- 1 https://nabatdelivery.com/lebbeck/
PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
A B C D E F G 2'
CONSTRUCTION DOCUMENTS
31.13 DR. BASIL KAMEL
0.125 6.00 6.00 4.00 5.00 5.00 5.00
DR. SAMEH EL FEKI
0.
16.18 10.07 4.87
05
3.
42
3'
7.
00
3.
4'
42
0.
12
5
0.125
0.125
1 1
5.00
5.00
5.25
F.F.L 0.0
F.F.L -2.20
F.F.L +4.05
F.F.L +0.30
2 2
4.00
4.00
3.82
F.F.L +0.60
3 3
19.30
19.25
5.05
5.00
5.00
F.F.L +8.85 F.F.L +12.50
0.20
0.20
4 4
11
HARDSCAPE
10
9
8
6
5
4
# HATCH MATERIAL NAME COLOR DIMENSIONS AREA DESCRIPTION PICTURE
5.00
5.00
5.18
3
2
0
1
.7
+1
Reiki Healing Stone Natural
L
WHITE LABRADORITE WHITE 9-10 mm 80 m2
F.
Stones and Minerals Crystal
F.
MOONSTONE GRAVEL
1 OR
0.125
0.125
SUGILITE STONE Rare Healing Natural Stones
5 5 GRAVEL PURPLE 5-7 mm 80 m2 and Minerals Crystal
0
.6
F.F.L +0.60 +0
L
F.
F. IPE DECKING BROWN 4 cm x 40 cm 205 m2
Exotic hardwood that is
Naturally resistant to decay
2 OR
0
0.
L
F.
CARRARA MARBLE White Smooth Marble
F.
Grey 30 cm x 30 cm 30 m2
HERRINGBONE
F.F.L +0.60 3 OR
5
12
0.
D' HARDSCAPE REFERENCES
0
0.
L
F.
REF MANUFACTURER
F.
# LINK
OR EQUIVALENT
F.F.L 0.0 THE YARD GROUP
7. .00
F.F.L 0.0 1 https://www.theyardgroup.com.au/gravel-suppliers-near-me/
25
HEEQING AE216
7
2 DECKING SUPPLIERS https://ipedeckingsuppliers.co.uk/
18383-65
4.00 DRAWN BY:
3.72 2.53 9.88 5.00 5.18 4.95 3 MANDARIN STORE https://www.mandarinstone.com/product/terrazzo-nouveau-ivory-matt-porcelain/
0.125 6.00 6.00 5.00 5.00 5.00 0.125 T5324 LINA MOHAMED
5
12
31.25
0.
A-106
OWNER
A B C D E F G 2'
31.13
0.125 6.00 6.00 4.00 5.00 5.00 5.00
0.
16.18 10.07 4.87
05
3.
42
3'
PROJECT
ARCH429/4312 - DESIGN
7.
DEVELOPMENT &
00
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
3.
4'
42
DR. SAMEH EL FEKI
0.
12
5
0.125
0.125
1 1
5.00
5.00
5.25
F.F.L 0.0
F.F.L -2.20
F.F.L +4.05
2 F.F.L +0.30 2
4.00
4.00
3.82
F.F.L +0.60
3 3
19.30
19.25
5.05
5.00
5.00
F.F.L +8.85 F.F.L +12.50
0.20
0.20
4 4
11
10
9
8
6
5
4
5.00
5.00
3
2
0
1
.7
5.18
+1
L
F.
F.
0.125
0.125
5 5
0
.6
+0
F.F.L +0.60
L
F.
F.
0
0.
L
F.
F.
F.F.L +0.60
5
12
0
0.
0.
L
F.
F. D'
F.F.L 0.0
7. .00
F.F.L 0.0
25
7
3.72 2.53 9.88 5.00 5.18 4.95
0.125 6.00 6.00 4.00 5.00 5.00 5.00 0.125
5
31.25
12
0.
A B C D E F G
LIGHTING LAYOUT C'
A SCALE 1:100
LIGHTING LIGHTING REFERENCES
REF MANUFACTURER HEIGHT REF MANUFACTURER
# SYMBOL NAME DIAMETER COLOR COUNT DESCRIPTION PICTURE # LINK DRAWN BY:
OR EQUIVALENT OR EQUIVALENT
LINA MOHAMED
KISCHLER
IN GROUND KISCHLER 0.30 m 0.7 m BRASS 6
5 Degree Beam Angle In-Ground 1 70-W MH
https://www.kichler.com/kichler/products/landscape-lighting/accent-lights/in-ground-landscape-lights/vlo-in-ground-15-degree-spot-2700k-d56a1dc0/
ID: 900182678
1 Accent Centennial Brass
WELL LIGHT 70-W MH DATE: 22/2/2022
2 FXLUMINAIRE https://www.fxl.com/support/mounting-options-lights
1283-072
Solid brass and can be powder
2
UPLIGHT FXLUMINAIRE
1283-072 0.40 m 0.6 m BRASS 23 coated to match your FX fixture FXLUMINAIRE
Design II Project
WITH SPIKE 3 https://www.fxl.com/product/path-and-area-lights/designer/dm
12383-034
FXLUMINAIRE
LIGHTING LAYOUT 1:100
POST LIGHT W/ FXLUMINAIRE Natural, powder coated, or 4 https://www.kichler.com/kichler/products/landscape-lighting/water-lights/vlo-2700k-12v-led-underwater-accent-stainless-steel/
0.8 m 0.8 m COPPER 4 12383-034
3 FOOTER MOUNT 12383-034 antiqued copper/brass
PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
1 2 3 4 5 DR. SAMEH EL FEKI
WINDOW SCHEDULE
T.O.C T.O.C
+12.35 +12.35
4.05
4.05
4.05
4.05
4.05
F1
T.O.C T.O.C
2.39
2.47
2.48
2.48
2.48
+8.75 +8.75
W1 W1 W1
5.59
5.59
13.97
13.97
13.97
1.30
1.30
1.30
1.30
1.48
1.81
F.F.L. +5.30 F.F.L. +5.30
2.30
2.30
2.30
2.17
9.93
9.93
9.93
9.93
W1 W1
1.72
1.75
1.30
1.30
1.30
1.48
2.64
F3 F3
0.93
0.89
1.40
1.45
1.31
2.55
1.70
1.70
1.70
0.75
0.96
0.96
F1
0.40
0.15
0.15
DRAWN BY:
WEST ELEVATION LINA MOHAMED
1 ID: 900182678
SCALE 1:50 DATE: 21/3/2022
Design II Project
ELEVATION 1:50
A-201
OWNER
PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
A B C D E F CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI
DOOR SCHEDULE
WINDOW SCHEDULE
4.05
4.05
4.05
4.05
6.52
2.15
2.15
2.15
T.O.C T.O.C
2.48
2.48
2.48
2.48
+8.75 F1 F1 F3 +8.75
CW1
W3 W1 W1 W1
13.97
13.97
1.30
1.30
1.30
1.30
1.30
3.59
3.59
3.59
8.23
8.23
1.70
1.70
1.70
2.30
9.93
9.93
9.93
9.93
9.93
9.93
9.93
CW2
F2 F3
D1
W1 W1
1.59
1.59
1.30
1.30
2.74
2.74
2.49
4.46
0.90
0.90
1.45
1.45
0.81
F3
1.71
1.71
1.70
1.70
1.70
1.70
0.96
0.96
0.89
0.15
0.15
DRAWN BY:
SOUTH ELEVATION LINA MOHAMED
1 ID: 900182678
SCALE 1:50 DATE: 21/3/2022
Design II Project
ELEVATION 1:50
A-202
5 4 3 2 1
Lina Naguib
Mohamed
900182678
1.23
1.23
F2
T.O.C2 T.O.C2
12.35 12.35
3.60
3.60
3.60
3.60
3.60
3.60
3.64
3.60
3.60
F2 F3 F1 F3
1.87
2.00
T.O.C T.O.C
2.40
2.48
8.75 CW1 8.75
3.51
W01 W02 D2
5.48
3.45
3.45
1.15
1.07
6.08
13.58
13.57
13.58
8.28
4.38
F2
First Floor First Floor
2.53
2.53
5.30 5.30
9.98
9.97
9.98
6.41
1.87
3.60
3.60
1.30
1.30
1.30
6.43
1.90
D01
Dr Basil Kamel
0.93
Ground Floor Ground Floor Dr Sameh ElFiky
1.70
1.70
1.70 1.70
2.59
W04 W04
1.70
1.70
1.70
1.70
1.70
1.70
0.15 0.75
0.15 0.75
Street Level Street Level
0.00 0.00
Design II Project
East Elevation
Project number 0001
Date 3 April 2022
A203
Scale 1 : 50
F E D C B A
Lina Naguib
Mohamed
900182678
1.23
1.23
F2
2.03
2.03
T.O.C2 T.O.C2
12.35 12.35
W01
3.60
3.60
3.60
3.60
0.93
1.30
3.60
3.60
0.64
0.27
F3 F3 F1
T.O.C T.O.C
2.48
2.48
2.48
2.48
2.48
2.44
8.75 8.75
3.55
3.55
0.60
3.45
3.45
1.07
1.07
1.30
1.30
1.30
13.57
13.58
F2
1.97
1.97
3.00
First Floor First Floor
2.53
2.53
2.30
2.30
2.30
5.30 5.30
9.97
9.97
9.97
9.97
9.97
9.98
Dr Basil Kamel
0.56
Dr Sameh ElFiky
0.60
3.60
3.60
1.30
1.30
1.30
1.30
1.30
1.30
2.76
0.90
1.70
1.70
1.70
3.29
1.70 1.70
2.59
2.60
1.70
1.70
1.70
Design II Project
0 . 1 5 0.75
0 . 1 5 0.75
0.14 0.75
Street Level Street Level
0.00 0.00
North Elevation
Project number 0001
Date 3 April 2022
North Elevation Author
1 1 : 50
Drawn by
Checked by Checker
A204
Scale 1 : 50
4. Sections
OWNER
20 CM SKIRTING
2 CM CEMENT TILES
PROJECT
2 CM CEMENT MORTAR
5 4 6 CM SAND 3 2 1 ARCH429/4312 - DESIGN
6 CM THERMAL INSULATION DEVELOPMENT &
5-7 CM SLOPED PLAIN CONCRETE CONSTRUCTION DOCUMENTS
2 CM DAMP PROOFING DR. BASIL KAMEL
25 CM REINFORCED CONCRETE
DR. SAMEH EL FEKI
1.00
1.00
1.23
1.23
+12.35
20 CM SKIRTING
2 CM CEMENT TILES ROOM SCHEDULE
T.O.C 2 2 CM CEMENT MORTAR T.O.C 2
+12.35 +12.35
6 CM SAND
3.53
3.53
3.53
3.53
6 CM THERMAL INSULATION
1.09
1.00
5-7 CM SLOPED PLAIN CONCRETE
D2 2 CM DAMP PROOFING
DOOR SCHEDULE
25 CM REINFORCED CONCRETE
3.51
3.51
3.29
1.30
W1
3.69
2.20
WINDOW SCHEDULE
1.00
1.00
5.53
+8.75
0.90
72
T.O.C T.O.C
2.48
2.48
71
+8.75 70 +8.75
69
1.09
1.09
67
0.94
66
W1 W1 65
64
63
62
1F 6 1F 1
61
10 CM SKIRTING
10 CM SKIRTING
0.90
3.45
3.45
60
3.29
3.29
3.29
3.29
3.29
6 CM SAND
1.30
1.30
1.30
1.30
2 CM TILES
13.46
13.46
59
W1 W2
58
2 CM CEMENT MORTAR
57 2 CM CEMENT MORTAR
56 2 CM TILES
55
6 CM SAND
20 CM REINFORCED CONCRETE
54 20 CM REINFORCED CONCRETE
53 2 CM PLASTER
0.90 52 2 CM PLASTER
0.90
51
+5.30 +5.30
1.46
50
49
FIRST FLOOR FIRST FLOOR
F.F.L. +5.30 F.F.L. +5.30
2.25
2.25
9.93
9.93
46
45
3.30
44
1.09
1.09
1.09
43
Storage
0.94
42
41
40 D2'
39 10 CM SKIRTING GF 2
2.53
38
2 CM TILES
37
10 CM SKIRTING
3.60
3.60
2 CM CEMENT MORTAR
0.90
36
3.29
3.29
3.29
3.29
3.29
2 CM TILES
1.30
1.30
1.30
1.30
35
W1 34
6 CM SAND W2
33 20 CM REINFORCED CONCRETE 2 CM CEMENT MORTAR
6 CM SAND
2.20
32
31
2 CM PLASTER
30 20 CM REINFORCED CONCRETE
29
2 CM PLASTER
28
0.90
0.90
0.90
27
+1.70 +1.70
1.46
26
1.70
1.70
25
GROUND FLOOR GROUND FLOOR
F.F.L. +1.70 F.F.L. +1.70
22
21
0.54
0.55
20
19
1.70
1.70
0.94
18
17
D2
0.74
0.15 0.75
0.15 0.75
0.74
W4 B 4 B 5 W4
5.00
16
15
2.53
14
1.15
3.45
3.45
3.45
3.45
11
10
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR
9 6 CM SAND 6 CM SAND
2.20
8
30 CM REINFORCED CONCRETE
2.00
7 30 CM REINFORCED CONCRETE
2.15
6
2 CM DPC 2 CM DPC
5
15 CM OC
1.04
4
15 CM OC
3
-1.85
0.90
1
2
-2.00 -2.00
BASEMENT
F.F.L. -2.00 BASEMENT
F.F.L. -2.00
10 CM SKIRTING
6 CM INTERLOCK TILES 2 CM CEMENGT TILES 6 CM INTERLOCK TILES
6 CM SAND 2 CM CEMENT MORTAR 6 CM SAND
10 CM SKIRTING
10 CM OC PAD 21 CM SAND 15 CM OC PAD
2 CM CERAMIC TILES
BACKFILL 30 CM REINFORCED CONCRETE BACKFILL
2 CM CEMENT MORTAR
2 CM DPC DRAWN BY:
15 CM OC 6 CM SAND
30 CM REINFORCED CONCRETE LINA MOHAMED
2 CM DAMP PROOFING ID: 900182678
15 CM PLAIN CONCRETE DATE: 22/2/2022
BACKFILL
Design II Project
SECTION 1:50
SECTION 1
1
SCALE 1:50
A-301
A B C 20 CM SKIRTING
D 3' 4'
2CM CEMENT TILES
2CM MORTAR
6 CM SAND
6 CM INSULATION
7 CM SLOPED OC
2 CM DAMP-PROOFING
25 CM RC SLAB
2 CM PLASTER
Lina Naguib
Mohamed
1.23
1.23
12.45
T.O.C2
20 CM SKIRTING
2CM CEMENT TILES
20 CM SKIRTING
2CM CEMENT TILES T.O.C2
900182678
2CM MORTAR 2CM MORTAR
12.35 12.35
0.64
6 CM SAND 6 CM SAND
3.60
3.59
3.59
W04
6 CM INSULATION 6 CM INSULATION
7 CM SLOPED OC 7 CM SLOPED OC
4.83
2.40
2 CM DAMP-PROOFING 2 CM DAMP-PROOFING
1.30
25 CM RC SLAB 25 CM RC SLAB
3.20
3.20
3.60
3.60
2 CM PLASTER 2 CM PLASTER
1.26
8.85
0.80
8.85
2.03
T.O.C T.O.C
2.48
8.75 8.75
0.54
0.50
Design CoWorking Space
1.09
1.09
4 D2' D2'
2.00
2.39
44 m² 62
Digital Studio
10 CM SKIRTING 10 CM SKIRTING
2.00
61
10 CM SKIRTING
3.45
3.45
3.45
60
3.34
3.34
3.29
3.29
3.29
3.29
3.29
3.29
3.29
2 CM CEMENT TILES 5
3.25
2 CM CEMENT TILES
13.46
59
13.46
1.30
1.30
2.80
2 CM CEMENT MORTAR 57 2 CM CEMENT MORTAR
2 CM CEMENT MORTAR 61 m²
2.20
56
6 CM SAND 6 CM SAND
7.38
55
6 CM SAND 54
20 CM RC
1.29
53 20 CM RC
20 CM RC 52
0.80
0.90
0.90
5.30 5.30 2 CM PLASTER 51 2 CM PLASTER
2 CM DPC 50
5.30
CW1
First Floor 49
First Floor
6.85
2.30
5.30 5.30
6.25
0.54
0.50
0.50
1.40
1.09
Exhibition Lobby
1.09
2.00
38
Historical Gallery 10 CM SKIRTING 36
10 CM SKIRTING 60 m²
10 CM SKIRTING
3.60
3.60
2.00
3.60
36
3.29
3.29
3.29
3.29
3.29
3.29
3.34
3.34
1.16
2 CM CEMENT TILES 35
2 CM CEMENT TILES
1.30
1.30
1.30
W04 2 CM CEMENT TILES 34
2.79
2.80
29 m² 2 CM CEMENT MORTAR 33
2 CM CEMENT MORTAR
2 CM CEMENT MORTAR 32
6 CM SAND 31 6 CM SAND
6 CM SAND 30
1.29
20 CM RC 29 20 CM RC
20 CM RC 28
1.04
0.90
0.90
1.70
0.80
1.58
25
Ground Floor Ground Floor
1.70
11
1.70
10
9 1.70 Dr Basil Kamel
0.55
0.55
Dr Sameh ElFiky
8
0.50
0.50
0.50
W04 7
1.09
6
1.70
1.70
1.70
1.70
5
1.49
4
0.15 0.75
0.75
0.75
1.02
W04
2.00
3
Street Level
14
Water Tank 2
1
Street Level 13 0.00
12 1
3.29
3.29
3.29
3.29
3.29
3.29
3.25
3.29
3.29
0.00 11
2.79
2.79
2.79
10
9
16 m²
2.20
8
2.00
2.00
1.80
7
6
1.29
5
4
-1.85 -1.85 -1.85 3 -1.85
2
1
6 CM INTERLOCK TILES
2 CM CEMENT MORTAR
21 CM SAND
2 CM CEMENT MORTAR
21 CM SAND
2 CM CEMENT MORTAR
21 CM SAND
2 CM CEMENT MORTAR
21 CM SAND 6 CM INTERLOCK TILES
Section 2
6 CM SAND 30 CM RC 30 CM RC 30 CM RC 30 CM RC 6 CM SAND
10 CM OC 2 CM DPC 2 CM DPC 2 CM DPC 2 CM DPC 10 CM OC
BACKFILL 15 CM OC 15 CM OC 15 CM OC 15 CM OC BACKFILL
Project number 0001
Date 3 April 2022
Section 2
1 1 : 50
Drawn by Lina Mohamed
Checked by
A302
Scale 1 : 50
5. Wall Section
OWNER
20 CM SKIRTING
A 2 CM CEMENT TILES
2 CM CEMENT MORTAR
6 CM SAND
5 CM THERMAL INSULATION
PARAPET CAP 5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
20 CM REINFORCED CONCRETE PROJECT
2 CM PLASTER
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI
+8.75
T.O.C
+ 8.75
10 CM SKIRTING
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
16 CM REINFORCED CONCRETE
2 CM PLASTER
CONSULTANTS
MEP CONSULTANT
+5.30
FIRST FLOOR
F.F.L.+5.30
LANDSCAPE CONSULTANT
+1.70
GROUND LEVEL
F.F.L. +1.70
0.55
KEY PLAN
0.74
W1
STREET LEVEL
F.F.L. +0.00 3.44
2.15
10 CM SKIRTING
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
30 CM RC RAFT DRAWN BY: LINA MOHAMED
2 CM DPC ID: 900182678
15 CM OC
DATE: 15/2/2022
-2.00
F.F.L. -2.00
BASEMENT LEVEL
WALL SECTION 1:20
A-401
WALL SECTION
1 SCALE 1:20
WALL SECTION
6. Details & Blowups
A 1 2 OWNER
F.F.L+8.75
0.58
0.58
2 2 2 2 2 2 2 2 2 2 2
0.58
PARAPET CAP
1.35
1.35
2 2 2 2 2 2 2 2 2 2 2 ARCH429/4312 - DESIGN
DEVELOPMENT &
1.77
CONSTRUCTION DOCUMENTS
20 CM SKIRTING
2 CM CEMENT TILES DR. BASIL KAMEL
2 CM CEMENT MORTAR
2 2 2 2 2 2 2 2 2 2 2 DR. SAMEH EL FEKI
1.19
6 CM SAND
5 CM THERMAL INSULATION W1 WINDOW SCHEDULE
5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING 1 2 1 1 3
20 CM REINFORCED CONCRETE
2 CM PLASTER
F1 FINISHES SCHEDULE
2 2 2 2 2 2
1.66
1.66
Admin. Room CLADDING SCHEDULE
3.53
3.53
3.53
3.29
2 2 2 2 2 2
1F 2
1.32
1.30
W1
10 CM SKIRTING
1 2 1 1 3
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
16 CM REINFORCED CONCRETE
1 2 1 2 2 2 1 2 1
2 CM PLASTER
0.80
2 2 2 2 2 2 2 2 2 2 2
F.F.L+5.15
7.62
7.62
FIRST FLOOR FIRST FLOOR FIRST FLOOR
F.F.L. +5.30 F.F.L. +5.25 F.F.L. +5.25
1.99
1.99
2 2 2 2 2 2 2 2 2 2 2
2.13
METAL HOOK
5 MM THICK 2 2 2 2 2 2 2 2 2 2 2
9.05
1.19
1 2 1 2 2 2 1 2 1
W1
1 2 1 1 3
Seminar Room
GF 4
2 2 2 2 2 2
3.55
3.55
3.55
3.29
1.66
1.66
1.30
1.30
W1
2 2 2 2 2 2
10 CM SKIRTING
2 CM DPC
2 CM TILES
2 CM CEMENT MORTAR
1 2 1 1 3
6 CM SAND
SILICONE 16 CM REINFORCED CONCRETE
SEALANT 2 CM PLASTER
2 2 2 2 2 2 2 2 2 2 2
0.80
0.99
0.99
F.F.L+1.70
0.24
CLADDED WALL ELEVATION
2
0.55
SCALE 1:20
6 CM SAND A-301
10 CM OC PAD B 5 1
0.40
BACKFILL
4.75
0.75
0.75
W4
10 CM SKIRTING 1.48 1.80 1.48
0.40
2 CM TILES
2 CM CEMENT MORTAR 2 DRAWN BY: LINA MOHAMED
ID: 900182678
6 CM SAND
A A
0.15
0.65
W1
F.F.L-1.85 1.75 1.80 1.75
BASEMENT LEVEL 0.15 5.00 0.14 CLADDING BLOWUPS 1:20
F.F.L. -1.85
0.20
5.29
3
1 1
A-301
2 A-501
WALL SECTION AT CLADDING GROUND FLOOR PLAN VIEW
1 SCALE 1:20 3 SCALE 1:20
4' +8.75
C' D' OWNER
1.21
0.58
0.58
PARAPET
CAP
T.O.C T.O.C T.O.C
+ 8.78 + 8.78 + 8.78
PROJECT
ARCH429/4312 - DESIGN
1.81
DEVELOPMENT &
0.56
20 CM SKIRTING CONSTRUCTION DOCUMENTS
2 CM CEMENT TILES CW1
2 CM CEMENT MORTAR DR. BASIL KAMEL
6 CM SAND DR. SAMEH EL FEKI
0.12
5 CM THERMAL INSULATION
CURTAIN WALL SCHEDULE
5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
20 CM REINFORCED CONCRETE
2 CM PLASTER MAIN MULLION MAIN MULLION MAIN MULLION MAIN MULLION DOORS SCHEDULE
26.5 X 11 CM 26.5 X 11 CM, 7 MM THICK 26.5 X 11 CM, 7 MM THICK 26.5 X 11 CM, 7 MM THICK
7 MM THICK
5.52
FINISHES SCHEDULE
3.53
3.35
3.48
1.84
4.90
1.32
8.01
Digital Studio
7.38
FIRST FLOOR FIRST FLOOR FIRST FLOOR
F.F.L. +5.25 1F 5 F.F.L. +5.25 F.F.L. +5.25
6.64
2.13
1.83
9.08
3.45
3.45
1.30
2.49
2.49
1.83
10 CM SKIRTING
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
16 CM REINFORCED CONCRETE
2 CM PLASTER
+1.70
SOURCE: SAFTI FIRST
GROUND LEVEL GROUND LEVEL GROUND LEVEL https://safti.com/details/
1.61
A-301
0.55
6 CM SAND
0.45 0.12 1.60 0.11 2.05 0.11 1.60 0.12 0.45
10 CM OC PAD B 5 D1
BACKFILL
0.75
0.75
W1
10 CM SKIRTING
2 CM TILES
4' 4'
2 CM CEMENT MORTAR
DRAWN BY: LINA MOHAMED
6 CM SAND CW1
0.15
ID: 900182678
STREET LEVEL 30 CM RC RAFT
F.F.L. +0.00
2 CM DPC
DATE: 3/12/2022
15 CM OC C' 1
D'
-1.85 A-301
Decr
easi
ngPer
for
ati
ons I
ncr
easi
ngdept
h
DAYL
IGHTANAL
YSI
S SOL
ARANAL
YSI
S
DAYL
IGHTANAL
YSI
S-BEFORE SOL
ARANAL
YSI
S-BEFORE
DAYL
IGHTANAL
YSI
S-AFTER
SOL
ARANAL
YSI
S-AFTER
L
OUVERSANAL
YSI
S
503
A-301
4' C' 1 D' OWNER
0.08
0.08
+8.45
0.58
0.58
0.58
PARAPET
CAP
1.13
T.O.C T.O.C T.O.C
+ 8.78 + 8.78 + 8.78 PROJECT
1.29
1.29
ARCH429/4312 - DESIGN
DEVELOPMENT &
1.81
CONSTRUCTION DOCUMENTS
0.56
20 CM SKIRTING
2 CM CEMENT TILES CW1 DR. BASIL KAMEL
2 CM CEMENT MORTAR
DR. SAMEH EL FEKI
0.29
6 CM SAND
0.12
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.09
0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.09
CURTAIN WALL SCHEDULE
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
5 CM THERMAL INSULATION
5-7 CM SLOPED PLAIN CONCRETE
0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12
2 CM DAMP PROOFING
20 CM REINFORCED CONCRETE DOORS SCHEDULE
2 CM PLASTER
FINISHES SCHEDULE
3.53
3.35
3.35
DT1
A-501
1.84
4.90
4.90
1.32
CW1
0.11
0.47
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
0.12 0.12 0.12 0.12 0.12 0.12 0.12
Digital Studio
7.38
7.38
FIRST FLOOR FIRST FLOOR FIRST FLOOR
F.F.L. +5.25 1F 5 F.F.L. +5.25 F.F.L. +5.25
6.64
2.13
1.83
9.08
D1
0.47
0.11
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12
3.55
3.45
3.45
1.30
10 CM SKIRTING
2 CM TILES
2.49
2.49
2 CM CEMENT MORTAR
1.83
6 CM SAND
16 CM REINFORCED CONCRETE
2 CM PLASTER
DT2
A-501
0.80
0.12 0.12
0.12 0.12
0.120.12
https://safti.com/details/
GROUND LEVEL GROUND LEVEL GROUND LEVEL
F.F.L. +1.70 F.F.L. +1.70 F.F.L. +1.70
MODEL: GPX Builders Series
SOUTH LOUVERS ELEVATION or eequivalent
2 SCALE 1:20
0.88
0.81
A-301
0.55
1
Parking
1.70
6.82
B 5
0.40 0.12 1.60 0.11 1.60 0.11 1.60 0.12 0.40
6 CM INTERLOCK TILES
0.75
0.75
0.75
6 CM SAND W1
10 CM OC PAD 10 CM SKIRTING
BACKFILL 2 CM TILES
2 CM CEMENT MORTAR 4' 4' DRAWN BY: LINA MOHAMED
6 CM SAND ID: 900182678
0.15
0.15
20 CM SKIRTING
2 CM CEMENT TILES
2 CM CEMENT MORTAR PROJECT
6 CM SAND ARCH429/4312 - DESIGN
DEVELOPMENT &
6 CM THERMAL INSULATION CONSTRUCTION DOCUMENTS
5-7 CM SLOPED PLAIN CONCRETE DR. BASIL KAMEL
2 CM DAMP PROOFING DR. SAMEH EL FEKI
DOORS SCHEDULE
10 CM SKIRTING
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
16 CM REINFORCED CONCRETE
2 CM PLASTER
A-501
DT2
GROUND FLOOR
STEEL BOLTS F.F.L + 1.70
DIA 10 MM
STEEL BOLTS
DIA 5 MM
STEEL ANGLE
45 X 45 X 5 MM STEEL ANGLE
STEEL ANGLE 45 X 45 X 5 MM
130 X 130 X 12 MM
STEEL BOLTS STEEL ANGLE
DIA 5 MM 130 X 130 X 12 MM
STEEL BOLTS
DIA 10 MM
STEEL PLATE
236 X 130 X 12 MM
DT1
TOP OF SOUTH LOUVER TO WALL CONNECTION A-501
1 A-505
SCALE 1:5
OWNER
PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI
3
A-506
STEEL CUP
10 X 15 CM, 5 MM THICK
4 CM MARBLE
2 CM MORTAR
6 CM SAND
15 CM PC
BACKFILL STEEL BOLT
DIA 10 MM
BRICK WALL
25 mm
DRAWN BY:
LINA MOHAMED
ID: 900182678
3 QTC004 - BENCH LEG CONNECTION TO GROUND 4 POST-BEAM-LOUVERS CONNECTION 5 PERGOLA-WALL CONNECTION DATE: 22/2/2022
A-506
SCALE 1:10 A-506
SCALE 1:10 A-506
SCALE 1:10 Design II Project
HARDSCAPE DETAILS 1:10
A-506
OWNER
TREE TRUNK
30 CM PLANTING MEDIUM
PERFORATED SOIL SEPARATOR TIMBER STAKES
30 CM PLANTING MEDIUM
4 CM MARBLE PLUGS OR STOLONS 30X30X190 MM
PERFORATED SOIL SEPARATOR
2 CM MORTAR 30X30X280 MM
STONE CAP STONE MULCH PLUGS OR STOLONS
4 CM MARBLE
6 CM SAND 80 MM
2 CM MORTAR 30X30X400 MM STONE CAP
15 CM PC
6 CM SAND
BACKFILL
15 CM PC
DRAIN DRAIN
BACKFILL
Design II Project
SOFTSCAPE DETAILS 1:10
A-507
OWNER
PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI
REF:FX LUMINAIRE 1283-072 UPLIGHT WITH SPIKE OR EQUIVALENT REF: KISCHLER 70-W NGROUND WELL-LIGHT OR EQUIVALENT
30 CM PLANTING MEDIUM
FX LUMINAIRE CC FIXTURE UPLIGHT OR EQUIVALENT
PERFORATED SOIL SEPARATOR DIA 3 CM
FX LUMINAIRE LONG SLOT SPIKE MOUNT OR EQUIVALENT
DEPTH 17.5 CM
4 CM MARBLE
DIRECT BURY CABLE
2 CM MORTAR 4 CM MARBLE
6 CM SAND 2 CM MORTAR LENS
DIA 25 MM
15 CM PC 6 CM SAND KISCHLER 70-W MH
OR EQUIVALENT
BACKFILL 15 CM PC
FIXTURE CAN
BACKFILL DIA 17.5 CM
ELEVATION
GRAVEL TRENCH
FOR DRAINAGE
PLAN
CONDUIT ATTACHMENT
DIA 3 CM PLAN
8 CM THICK AGGREGATE
POLYPROPLENE FLEECE
4 CM WATER DRAINAGE
2 CM DPC
20 CM RC
2 CM DPC
4 CM MARBLE
15 CM PC
BACKFILL
DRAWN BY:
LINA MOHAMED
ID: 900182678
DATE: 22/2/2022
Design II Project
LIGHTING DETAILS 1:10
A-508
OWNER
PROJECT
A-407
S1
D E D ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
10.25
DR. BASIL KAMEL
0.125 5.00 5.00 0.125 DR. SAMEH EL FEKI
W1 W1
0.125
1
0.14
1.80
0.26
9.84
0.60
1.46
SYMBOL NAME
0.12 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.12
0.60
LIGHTING
0.60
SMOKE DETECTOR
1.80
4.71
4.71
0.60
5.00
5.25
1.80
AIR INLET
4.57
W1
0.60
AIR OUTLET
0.60
9.84
1.46
SPRINKLER
0.60
KEY PLAN
F.F.L +2.93
0.26
F.F.L +2.93
0.125
0.125 5.00 5.00 0.125
10.25
DRAWN BY:
LINA MOHAMED
D E D ID: 900182678
A-407
S1
DATE: 14/2/2022
REFLECTED CEILING PLAN
1 SCALE 1:20 Design II Project
A-509
PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
A-407
S1
CONSTRUCTION DOCUMENTS
D E D DR. BASIL KAMEL
DR. SAMEH EL FEKI
10.25
W1 W1
0.125
1
0.14
9.84
1.46
SYMBOL NAME
AIR INLET
AIR OUTLET
4.71
4.71
5.00
5.25
1.80
4.57
W1
SPRINKLER
SUPPLY DUCT
RETURN DUCT
1.46
WATER PIPE KEY PLAN
9.84
0.125
DRAWN BY:
0.125 5.00 5.00 0.125
LINA MOHAMED
10.25 ID: 900182678
DATE: 14/2/2022
D E D Design II Project
A-407
S1
PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI
10 CM SKIRTING
2 2 CM TILES 1
2 CM CEMENT MORTAR
6 CM SAND
20 CM REINFORCED CONCRETE
2 CM PLASTER MAIN WATER SUPPLY PIPE
DIA 10 CM
+5.25
FIRST FLOOR FIRST FLOOR
F.F.L. +5.25 F.F.L. +5.25
0.60
1.35
1.09
0.03
LIGHT
FIXTURE
SPRINKLER SPRINKLER
RANGE 2.0 M
AIR INLET RANGE 2.0 M
LIGHT FIXTURE
AIR OUTLET
SPRINKLER
RANGE 2.0 M
3.55
3.55
AIR INLET
3.29
3.29
1.30
W2
1.30
SEC WATER SUPPLY PIPE
DIA 6 CM
2.66
10 CM SKIRTING
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
KEY PLAN
20 CM REINFORCED CONCRETE
0.90
0.90
2 CM PLASTER
+1.70
GROUND FLOOR GROUND FLOOR
F.F.L. +1.70 F.F.L. +1.70
SECTION 1
1 SCALE 1:20
DRAWN BY:
LINA MOHAMED
ID: 900182678
DATE: 14/2/2022
Design II Project
A-511
SECTION
1:20
OWNER
MANHOLE
60X60
PROJECT
GULLY TRAP
S 1 S 2 30X30 ARCH429/4312 - DESIGN
A-403 A-403 DEVELOPMENT &
S 1 S 2 CONSTRUCTION DOCUMENTS
A-403 A-403 DR. BASIL KAMEL
DR. SAMEH EL FEKI
B VENT PIPE
B
WATER SUPPLY 2"
1"
CONTROL VALVE SOLID WASTE PIPE
WATER WASTE PIPE 4"
ROOM SCHEDULE
CONTROL VALVE
3.30 3.30
0.145
0.145
0.14
0.14
3 3
0.29
0.29
3 3
0.18
0.18
0.77 1.51
0.24
2.29
0.46
0.63
0.63
W1 W1
1.64
2.50
2.50
0.62
CONSULTANTS
0.51
0.51
MEP CONSULTANT
S 1 S 1 S 1 S 1
A-404 A-404 A-404 A-404
3.73
3.73
3.73
3.73
W1 W1
3.28
3.28
0.63
0.63
0.63
3.59
3.59
3.58
3.58
0.16
S 2 S 2 S 2 S 2
0.32
0.25 0.10
A-404 WATER HEATER A-404 A-404 A-404
0.09 0.26
0.09 0.26
ROADS CONSULTANT
1.15
0.90
0.90
0.90
D2' D2'
1.23
1.23
1.94
0.45 0.10 0.60 0.79
LANDSCAPE CONSULTANT
0.08
0.24
0.24
2.26 1.04 2.26 1.04
3.30 3.30
S 1 S 2 S 1 S 2
A-403 A-403 A-403 A-403
PLUMBING PLAN FIXTURES PLAN
1 SCALE 1:20 2 SCALE 1:20
KEY PLAN
DRAWN BY:
CONTROL VALVE 3" HOT WATER SUPPLY 1" LINA MOHAMED
KOHLER TOWEL HOLDER KOHLER REVE SINK BASIN
ID: 900182678
OR EQUIVALENT 4 4
1" OR EQUIVALENT DATE: 14/2/2022
DRAIN COLD WATER SUPPLY
Design II Project
PLUMBING SCHEDULE
3 KOHLER TRESHAM FRAMED
OR EQUIVALENT
1
TOILET BLOWUPS 1:20
PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI
ROOM SCHEDULE
S 1 S 2
A-403 A-403
3.30
0.145
0.14
3
0.29
3 SYMBOL NAME
DESCRIPTION COUNT FOR ALL
BATHROOMS PICTURE SYMBOL NAME
COUNT FOR ALL
BATHROOMS PICTURE
CONSULTANTS
0.18
0.10 0.60 0.60 0.24
KOHLER ALCOVE BATHTUB MEP CONSULTANT
KOHLER DEVONSHIRE FAUCET Stainless Faucets
0.60
0.60
4 OR EQUIVALENT 4
OR EQUIVALENT
0.63
T1
W1
0.30
OR EQUIVALENT OR EQUIVALENT
2.50
0.30
A-404 A-404
3.73
3.73
W1
0.63
3.59
3.58
0.30
0.25
T2 T3 OR EQUIVALENT OR EQUIVALENT
A-404 A-404
0.09 0.26
T4
0.90
D2'
1.23
0.60
0.24
KEY PLAN
DESCRIPTION DIMENSIONS (CM) COUNT
DRAWN BY:
LINA MOHAMED
ID: 900182678
DATE: 14/2/2022
Design II Project
TOILET BLOWUPS 1:20
A-513
OWNER
20 CM SKIRTING 20 CM SKIRTING
2 CM CEMENT TILES 2 CM CEMENT TILES
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR
6 CM SAND 6 CM SAND
5 CM THERMAL INSULATION 5 CM THERMAL INSULATION
PROJECT
B 5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
B ARCH429/4312 - DESIGN
DEVELOPMENT &
20 CM REINFORCED CONCRETE 20 CM REINFORCED CONCRETE CONSTRUCTION DOCUMENTS
2 CM PLASTER 2 CM PLASTER
PARAPET CAP PARAPET CAP DR. BASIL KAMEL
DR. SAMEH EL FEKI
ROOM SCHEDULE
0.20
T5 T7 T5
0.80
0.60
0.60
CONSULTANTS
1.25
0.60
0.60
KOHLER TRESHAM MIRROR
2.47
OR EQUIVALENT
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
0.60
0.60
KOHLER TOILET PAPER HOLDER
0.69
0.30 0.10
0.30 0.10
T9 T13
KOHLER DEVONSHIRE FAUCET
OR EQUIVALENT
0.47
0.30
LANDSCAPE CONSULTANT
0.30
0.30
0.82
0.73
0.47
0.30
0.30
+5.15 +5.15 +5.15 +5.15
FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR
F.F.L. +5.15 F.F.L. +5.15 F.F.L. +5.15 F.F.L. +5.15
KEY PLAN
SECTION 1 SECTION 2
1 SCALE 1:20
10 CM SKIRTING
2 SCALE 1:20
10 CM SKIRTING
2 CM TILES 2 CM TILES
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR
14 CM SAND 14 CM SAND
16 CM REINFORCED CONCRETE 16 CM REINFORCED CONCRETE
2 CM PLASTER 2 CM PLASTER
WALLTILING SCHEDULE
3 A-514
OWNER
20 CM SKIRTING 20 CM SKIRTING
2 CM CEMENT TILES 2 CM CEMENT TILES
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR
6 CM SAND 6 CM SAND
5 CM THERMAL INSULATION 5 CM THERMAL INSULATION PROJECT
5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
3 3 5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
ARCH429/4312 - DESIGN
DEVELOPMENT &
20 CM REINFORCED CONCRETE 20 CM REINFORCED CONCRETE CONSTRUCTION DOCUMENTS
2 CM PLASTER 2 CM PLASTER
DR. BASIL KAMEL
DR. SAMEH EL FEKI
ROOM SCHEDULE
+8.75 +8.75
0.20
0.20
T15 T5 T5
0.75
0.80
0.60
0.60
1.15
CONSULTANTS
1.22
T12 T8 W1 W1
T6 T12 T12 T6 MEP CONSULTANT
0.60
0.60
HEATER OR EQUIVALENT
1.34
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
3.35
0.60
0.60
0.69
KOHLER TRESHAM MIRROR
OR EQUIVALENT
KOHLER AWAKEN SHOWER SLIDEBAR ROADS CONSULTANT
1.59
0.30 0.10
0.30 0.10
KOHLER DEVONSHIRE FAUCET T9 T13 OR EQUIVALENT T13 T13 T15
OR EQUIVALENT
2.20
0.35
0.47
OR EQUIVALENT T10 T14 T14 T16
0.11
0.30
OR EQUIVALENT OR EQUIVALENT
LANDSCAPE CONSULTANT
0.30
0.30
0.73
0.73
0.48
0.30
0.30
+5.15 +5.15
FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR
F.F.L. +5.15 F.F.L. +5.15 F.F.L. +5.15 F.F.L. +5.15
KEY PLAN
SECTION 3 SECTION 3
1 SCALE 1:20
10 CM SKIRTING
2 SCALE 1:20
10 CM SKIRTING
2 CM TILES 2 CM TILES
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR
14 CM SAND 14 CM SAND
16 CM REINFORCED CONCRETE 16 CM REINFORCED CONCRETE
2 CM PLASTER 2 CM PLASTER
PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI
CONSULTANTS
VENT PIPE 2" SOLID WASTE 4"
PLUMBING SCHEDULE
1 KOHLER TRESHAM FRAMED
OR EQUIVALENT
1
ROADS CONSULTANT
T2 LIGHT GREY CERAMIC TILE 24.25 x 30 13 T6 BEIGE CERAMIC TILE 60 x 60 31 KEY PLAN
T3 LIGHT GREY CERAMIC TILE 24.25 x 24.25 1 T7 LIGHT GREY CERAMIC TILE 20 x 18 13
WALLTILING SCHEDULE
4
DRAWN BY:
LINA MOHAMED
ID: 900182678
DATE: 14/2/2022
Design II Project
TOILET BLOWUPS 1:20
A-516
OWNER
PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI
ROOM SCHEDULE
20 CM SKIRTING 20 CM SKIRTING 20 CM SKIRTING
2 CM CEMENT TILES 2 CM CEMENT TILES 2 CM CEMENT TILES
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR 85 CM SOIL 2 CM CEMENT MORTAR
6 CM SAND 6 CM SAND 2 MM ROOT BARRIER 6 CM SAND
6 CM THERMAL INSULATION 6 CM THERMAL INSULATION 2 MM GEOTEXTILE MEMBRANE 6 CM THERMAL INSULATION
5-7 CM SLOPED PLAIN CONCRETE 5-7 CM SLOPED PLAIN CONCRETE 15 CM GRAVEL 5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING 2 CM DAMP PROOFING 2 CM DPC 2 CM DAMP PROOFING
25 CM REINFORCED CONCRETE 25 CM REINFORCED CONCRETE 25 CM REINFORCED CONCRETE 25 CM REINFORCED CONCRETE
2 CM PLASTER 2 CM PLASTER 2 CM PLASTER 2 CM PLASTER
PARAPET CAP
PARAPET CAP
CONSULTANTS
MARBLE TILE
4 CM MEP CONSULTANT
0.10
0.10
0.10
0.25
0.75
0.75
0.65
0.65
DRAIN CAP
DIA 15"
ZURN Z100 OR EQUIVALENT
ROADS CONSULTANT
KANT
LANDSCAPE CONSULTANT
T.O.C T.O.C T.O.C T.O.C
+8.75 +8.75 +8.75 +8.75
GRAVEL
DRAIN
DIA 15"
ZURN Z100 OR EQUIVALENT
KEY PLAN
FOAM FILLER
DRAIN
DIA 17" (W/ FLANGE)
ZURN Z1719 OR EQUIVALENT
DRAIN USED:
Deck Drain with Wide Flange
SOURCE: ZURN
https://www.zurn.com/products/building-drainage/stainless-steel-drainage/z1719
DRAWN BY:
LINA MOHAMED
ID: 900182678
DATE: 14/2/2022
Design II Project
PLANTER AND DRAIN DETAILS
1:10
A-505