Design Development and Construction Documents - ARCH

429/4312
Spring 2022

Course Instructors:
Dr Basil Kamel
Dr Sameh El Feki

Project Final Submission:


Part II – Compiled Project

Lina Naguib Mohamed


900182678
Table Of Contents
1. BOQ & Schedules
2. Floor Plans
- Ground Floor Plan
- First Floor Plan
- Basement Plan
- Layout Drawings
3. Elevations
- South Elevation
- West Elevation
- East Elevation
- North Elevation
3. Sections
- Section 1
- Section 2
5. Wall Section
6. Details & Blowups
- Cladding blowup
- Curtain Wall Blowup
- Louvers Blowup
- Landscape
- Ceiling
- Toilet Blowup
- Roof Details
1. BOQ & Schedules
Lina Naguib
Mohamed
900182678

Dr Basil Kamel
Dr Sameh ElFiky

Design II Project

BOQ, Schedules
Project number 0001
Date 3 April 2022
Drawn by Lina Mohamed
Checked by

A000
Scale
2. Floor Plans & Layout
OWNER

A-301
A B C E2
D E F G

S 1
A-202
31.13
0.125 6.00 6.00 4.00 5.00 5.00 5.00
21.25 9.88
0.97 1.80 0.84 1.80 1.56 1.80 4.00 0.61 1.43 0.61 2.66 1.80 1.37 9.88

W1 W1 W1 W2 W2 W1 PROJECT
0.125

0.125
1 1 ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
0.72 1.80 0.84 1.80 0.72 0.72 1.80 3.36 0.60 0.61 1.35 0.61 0.59 2.00 1.80 1.08
1.73

1.73
DR. BASIL KAMEL

1.48
1.48

5.88 5.88 3.76 4.88


DR. SAMEH EL FEKI

3.57

3.57

3.88
Seminar Room Wood Workshop Storage Metal Workshop

F.F.L +0.00
F.F.L +2.00 ROOM SCHEDULE
4.75

4.75

4.75

4.75

4.75

4.75

4.75

4.75
5.00

5.00
5.25

5.25
1.80

1.80

1.80

1.80
W1 W1
GF 4 GF 3 GF 2 GF 1
5.88 5.88 3.76 4.88
4.42 0.90 0.56 0.36 0.90 4.62 0.46 0.90 3.26 0.50 9.88

1.34
1.48

0.90

0.90
D2'
1.73

1.73
0.87
DOORS SCHEDULE

0.28

0.28

0.14
2 D2' D2 D2 2
WINDOW SCHEDULE

E1
E3
A-201
A-203
F.F.L +1.70 F.F.L +0.00
F.F.L +0.00 F.F.L +1.70
2' WALL FINISHES SCHEDULE
4.00

4.00
3.75
3.75

3.75

3.75
0.
05
CURTAIN WALL SCHEDULE

1.
26
3 D4 3

3.
0.12 0.630.17 0.31 0.63 0.20

0.12 0.630.17 0.31 0.63 0.20


0.73 0.29 0.73 0.24

0.73 0.29 0.73 0.24

42
1.15 1.49 1.90 1.44 3'
19.25

5.88

19.30
1.15
D3

1.
4.82
1.73

W2
2.33 D3

80
1.48

2.33 F.F.L +3.05 W1 7.


0.94 1.39 1.39 0.93 00 ROADS CONSULTANT
2.09

38 37 36 35 34

1.
15 33

05
16 1.46 32

D3 D3

1.
3.32

3.32
W2

3.44
17 31

3
5
3.72

0.12

0.60 0.12 18 30

Historical Gallery

1.
80
0.90 0.11

19 29

2.30
4.75

4.75
5.00

5.00
5.25
1.80

1.80

4.75
0.20

W1

3.
20 28
0.20

1.

42
80
4'
0.10 0.90

0.10 0.90

GF 5 D2' D2 21 27 LANDSCAPE CONSULTANT


2.00 2.00 W1

36
22 26

0.
1.
0.22

27
6.
S 2
A-302
23

24
25

F.F.L +1.70
Exhibition Lobby 83

1.

0.
2.10 1.56 2.34 1.15

0
1.46 1.15

12
0

6
1.48

2.

5
GF 6
0.13 0.90

1.32

1.32
1.73

5.88 D2 9.93

1.
80
0.38 5.12 0.38 3.38 1.80 1.84 1.80 1.11 F.F.L +0.60

10.30

10.30
4 4

2. 82

1.
05
6.

05
0.
CW2 W1 W1

05
KEY PLAN

11
1.
35

10
CW1 9

1'

0.
D1

00

8
2'

28
6.
3.

2.

6
88
42

0.
28

5
0.
3.

4
28
51
5.00

5.00
0.

3
5.00
5.00

28
42

2
0.
0.

5
28

68
12
0.
3.

0.
0.
28
05

21

0.
0.

28
F.F.L +1.70

0.
28
7.
00

92
1.
B'
D'
50

3'
3.
3.

CW1
60

42
3.

5
0.125

0.125
7. .00 5
7 .9
1
25
05
0.

0.
12
5 F.F.L +0.00
DRAWN BY:
1' A' LINA MOHAMED

92
ID: 900182678

1.
4' DATE: 14/2/2022

S
A-

2
5 8

30
Design II Project

12 0.6

2
0.
0.56 5.12 3.94 1.80 1.84 1.80 1.01 10.23 4.82
16.13 5.00 5.18 4.82
A-101
0.125 6.00 6.00 4.00 5.00 5.00 5.00
31.13

C' GROUND FLOOR PLAN


A-301
S 1

E4
A B C A-204 D E F F 1:50
GROUND FLOOR PLAN
1 SCALE 1:50
A B C A204 1
A301
D E F G
31.13
0.125 6.00 6.00 1
4.00 5.00 5.00 5.00

21.25 9.88
0.97 1.80 0.84 1.80 1.56 1.80 4.00 0.61 1.43 0.61 2.71 1.80 1.33 9.88
W01 W01 W01 W2 W2 W01
0.125

0.125
1 1
0.72 1.80 0.84 1.80 0.72 0.72 1.80 3.36 0.60 0.61 1.35 0.61 0.59 2.00 1.80 1.08
5.88 5.88 3.76 4.88
1.73

1.73
1.48

1.48
Participatory Seminar Room Wood Workshop Storage Metal Sculpture Workshop

3.57

3.57

3.85
4 3 2 1
Lina Naguib
5.00
5.25
1.80

1.80
4.75

4.75

4.75

4.75

4.75

4.75

4.75
1.80

5.25
5.00
W01 28 m² 28 m² 18 m² 23 m² W01

1.80
0.0
5.88 5.88 3.76 4.88
Mohamed
4.42 0.90 0.56 0.36 0.90 4.62 0.46 0.90 3.26 0.50 9.88
900182678

1.34
1.48

0.90

0.90
D2'
1.73

1.73
0.90
0.28

0.28

0.14
2 D2' D2 D2 2

2'
4.00
3.75
3.75

3.75
3.75
4.00
0.0 1.70

0.
+1.70 0.0

1.05 2
6

3.
42
3'

1.
3 3

80
D4
0.10 0.70 0.10 0.06 0.70 0.39

0.10 0.70 0.10 0.06 0.70 0.39


0.39

0.39

7.
5.88 1.15
19.25

19.25
0
1.49 1.70 1.44

0
1.15
1.73

2.39 W2 2.38
1.48

0.10 0.900.22 0.12 0.70 0.18 0.70

0.10 0.900.22 0.12 0.70 0.18 0.70


+3.05 4.82

1.
D3 D3 1.00

1.
05
2.09

1.01 1.38 1.38 15 14 13 12 11 10 9

3
5
W01
8
16

3.32
3.32

W2

3.44
D3 D3 7

3.
17
3.72

0.60

42
1.

1.
-

80
- 18
6

80
Historical Gallery
19 29
4'
5.00
5.25
1.80

1.80
4.75

4.75

4.75

5.00
0.22 0.90 0.11

W01 5 28
1 A203
20

29 m² D2' D2 21 27

1.

1.

0.
2.00 2.00

6
22
6.
26

12
.3

2
22

6
8

5
3
25 W01
1 23 UP
A302 +1.70

0
2.10 1.56 2.34 1.15 1.50 1.15

.0
1.48

1.
2
1.32
5.88
1.32

9.93
1.73

80
0.90

D03 Exhibition Lobby


5.12 0.38 3.38 1.80 1.84 1.80 1.11
6
0.13

10.25
10.25
4 60 m² 4

1.
2

0
.8

5
0.

5
.0
12
W01

2
5
W01
1
.3
Dr Basil Kamel
5
2' Dr Sameh ElFiky

11
10
0

9
.2

3.
80

8
6 CW1

0
.8 3 .2

.0

6
8 .5 80

5
1 .2

4
80
5.00

5.00
D01 .2

3
5.00
5.00

80

2
.4
.2
05

1
0
3 8
0.

5
.2 0

8
12
.2

.6
1
8

0.
0
7.
0
0

3' D'

2
.9
50 B'

1
3.
3.
60 Design II Project
42
3.
+ 1.70
0.125

0.125
5 UP
5
05

5
0.
0.

.9
12

0
1
5

.0
5
2

7
7.

1' 4'
A' Ground Floor

2
.9
1
0.0 Project number 0001

68
0.
2

5
12
A302 Date 3 April 2022

0.
3.94 1.80 1.84 1.80 1.01 10.23 4.82
16.13 5.00 5.18 C' 4.82
Drawn by Lina Mohamed
0.125 6.00 6.00 4.00 5.00 5.00 5.00

31.13 Checked by

-
A B C
-
1
D E F G A101
A301
Ground Floor
1 1 : 50
Scale 1 : 50
OWNER
E2

A-301
A B C A-202 D E F

S 1
26.25
0.125 6.00 6.00 4.00 5.00 5.00 0.125
0.97 1.80 0.84 1.80 1.56 1.80 4.00 0.61 1.43 0.61 10.83
16.18 10.07
PROJECT
W1 W1 W2 W2 E' ARCH429/4312 - DESIGN
0.125

0.125
DEVELOPMENT &
1 1 CONSTRUCTION DOCUMENTS

80
DR. BASIL KAMEL

1.
9.27
0.72 1.80 0.84 1.80 0.72 0.72 1.80 4.00 0.61 1.43 0.61 0.66
1.74

DR. SAMEH EL FEKI


1.48
5.88 9.82

90
0.

0. 9
26

2
6.
2.

85
D2
W1 Admin. Room Model Studio Terrace

63
4.75

4.75

4.45
5.00

5.00
5.25

5.25
1.80
1.80

3.
ROOM SCHEDULE

90
1F 2 5.88 1F 1 1F 7

0.

27
50

0.
2.

47
6.64
W3

0.
4.42 0.90 0.56

09
3.
14

3. .50

25
1.48

4.46 3.

0.
2
22
4.82

8.75
0.64 0.90 2.92

DOOR SCHEDULE
2 D2' D2' 2

5 4
0.
3.87 0.52 0.90 2.97

1.15
1.05

0.97
4.39
1.64

WINDOW SCHEDULE
Focus Pod
2'

4.00
3.88

3.88

3D Printing

3.82
7.13

4.00
4.00

4.00
3.75

1.80

1.80
1.80

3.82
1F 3 W1
CURTAIN WALL SCHEDULE

1F 6
1.90

D4 1.90 E1
E3
A-201 FINISHES SCHEDULE
A-203

0.97

0.97
3.87

1.05
05
2.55 0.90 0.42 5.75 8.88

0.
0.22

0.12 0.630.17 0.31 0.63 0.33 0.22


7.44

3 D2' 3
3'

0.12 0.630.17 0.31 0.63 0.33


0.37

0.37
1.15 4.82
8.88

2.55 0.90 0.42


19.25

19.30
1.15
3.87
D3 D3
0.73 0.29 0.73

0.73 0.29 0.73


W2
1.55

2 4
F.F.L +6.65

3.
2.33 2.33
2.22

0.94 1.39 1.39 0.93 62 61 60 59 58


39 57

40 1.46 56
3.69

D3 D3
3.32

3.32
W2 41 55

68
00

3.86
7.

3.
0.12

0.12
42 54
0.60
W1 43 53

2.30

4.88
1.80

1.80

5.05

5.05
5.00
5.00

5.00
0.22 0.90 0.11
0.20

44 52
4'
0.20
0.10 0.90

0.10 0.90

D2' D2 45 51

2.00 2.00 Digital Studio

2
36
50

4
46

83

3.
0.
6.
S 2 47 49
2.54

A-302
2.10 1.56 2.34 1.15
48
1.46
F.F.L +5.30
1.15 1F 5

5
1.32

12
21
0.12 0.90
D2'

0.
11.82

3.
5
0.43 0.90 4.18 1.80 1.84 1.80 0.87 12

00
0.

3.
E'
9.88
3.22

3.22

00
4 D2 4

3.
0.33

00
0.20

6. .82

3.
09
6
0.55 0.90 0.43 W1 W1
1.88

5 0

65
0.

0.
7
W1

5
3.
1.80

1.80
2.50

12
2.47

0.
Coworking Space 1' D'

88
2'

6.
42
3.
0.37

0.48

W1
1F 4
1.80
1.80
5.00

5.00
5.18

5.18
79

37
0.

0.
CW1 5
.2
37 10
3.

95
5.
05
80

21
90

25
0.

00
1.

3.
0.

7.
7.

00
7.
B'
1.52

W1
1.77

3.37
79

3'
80
0.

42
0.35
1.

2.50 0.52

3.
50
3.
60
0.125

5 5

0.125
3.
90

W3
0.

65
0.
5
12
DRAWN BY:
05

0.
0.

LINA MOHAMED

5
12
1' ID: 900182678

0.
A'
DATE: 22/2/2022
4' C'
Design II Project

S
A-
0.60 2.50 0.62 2.53 3.50 1.80 1.84 1.80 0.94 5.00 5.18

2
30
2
3.72 2.53 9.88 5.00 5.18
0.125 6.00 6.00 4.00 5.00 5.00 0.125 FIRST FLOOR PLAN 1:50
26.30
A-301
1

A B C E4 D E F
S

A-204 A-102
FIRST FLOOR PLAN
1 SCALE 1:50
OWNER

PROJECT
A B C D E F G
ARCH429/4312 - DESIGN
31.27 DEVELOPMENT &
0.265 6.00 6.00 4.00 5.00 5.00 5.00
CONSTRUCTION DOCUMENTS
3.75 1.80 1.56 1.80 4.42 1.80 16.13 DR. BASIL KAMEL
DR. SAMEH EL FEKI

W4 W4 W4
0.265

0.265
1 1
0.25

0.25

0.25
ROOM SCHEDULE
1.87

3.36 1.80 1.56 1.80 4.42 1.80 16.13


1.06

30.88

DOOR SCHEDULE

B 4

4.25

4.75

4.25
5.00

5.53

5.53

5.00
1.80

W4
2.50

S 1 Parking F.F.L -2.00 m S 1


A-301 A-301 WINDOW SCHEDULE

0.25 0.25 5.50 6.99 1.80 16.08

W4 FINISHES SCHEDULE

0.25
1.81

2 2
1.12 1.80 2.57 3.26

0.97
5.50

0.84
11.75

1.93
0.25 5.45 5.50 0.30 0.25

2.69
1.50
B 4 0.34 0.90 0.25
14.53

14.53
13.75

13.75
4.00

4.00
2.50
7.20

3.75

3.75

3.75
1.80

1.80
Parking Mech. Room D2' Fire Tank W4

0.64
0.22 0.90 0.25
B 3 1.37
B 2

1.82

0.90

0.16 0.90
D2'

0.97
7.56

1.58
4.00 3.26

0.45
3 3

0.50
1.15 3.26

1.15

0.90
0.25 5.45 5.50 0.30 0.25

9.00
5.38
F.F.L -0.85

2.50
1.40

1.40
3.93

14 13 12 11 10
15 9

6.70
16 1.46 8

17 7

3.81
18 6

0.50
19 5
2.30

4.88

1.10
1.40
Water Tank
5.00

5.00
1.80

S 2 S 2
W4 20 4

0.50
A-302 F.F.L -2.00 m A-302
21 3 B 1
22 2

23 1
F.F.L -1.85 m

2.50
1.40

1.40
F.F.L -2.20
1.15 1.46 1.15
1.69

1.69

1.32
D2'

0.16 0.90

0.16 0.90
1.87

17.37

0.50
9.38 1.80 1.84 1.80 2.55 3.26

0.88
4 4

0.265
0.265

W4 W4

9.77 1.80 1.84 1.80 6.33 9.74


21.53 9.74
0.265 6.00 6.00 4.00 5.00 5.00 5.00
31.27

A B C D E F G

DRAWN BY:
LINA MOHAMED
BASEMENT FLOOR PLAN ID: 900182678
1 SCALE 1:50
DATE: 01/03/2022

Design II Project
A-103

BASEMENT PLAN
1:50
OWNER

A B C D E F G 2'
31.13
0.125 6.00 6.00 4.00 5.00 5.00 5.00

0.
16.18 10.07 4.87

05
PROJECT

3.
3'

42
ARCH429/4312 - DESIGN

7.
DEVELOPMENT &

00
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL

3.
4'

42
DR. SAMEH EL FEKI

0.
12
5
0.125
0.125

1 1

LIGHTING
5.00

5.00
5.25
F.F.L 0.0
F.F.L -2.20
REF MANUFACTURER HEIGHT DIAMETER COLOR COUNT DESCRIPTION PICTURE
# SYMBOL NAME
OR EQUIVALENT
F.F.L +4.05
5 Degree Beam Angle In-Ground
1 IN GROUND KISCHLER 0.30 m 0.7 m BRASS 6 Accent Centennial Brass
F.F.L +0.30 WELL LIGHT 70-W MH
2 2
UPLIGHT FXLUMINAIRE Solid brass and can be powder
1283-072 0.40 m 0.6 m BRASS 23 coated to match your FX fixture
2 WITH SPIKE
4.00

4.00
3.82
POST LIGHT W/ FXLUMINAIRE 0.8 m 0.8 m Natural, powder coated, or
3 COPPER 4 antiqued copper/brass
FOOTER MOUNT 12383-034
F.F.L +0.60
WATERPROOF SUBMERS KISCHLER Stainless with removable and
3 3 0.4 m 0.4 m STAIN 30 adjustable cowl and mounting
4 FOUNTAIN SPOTLIGHT VLO 2700K -LESS

19.30
bracket
19.25

5.05
5.00

5.00
HARDSCAPE

# HATCH MATERIAL NAME COLOR DIMENSIONS AREA DESCRIPTION PICTURE


F.F.L +8.85 F.F.L +12.50
Reiki Healing Stone Natural
0.20
WHITE LABRADORITE WHITE 9-10 mm 80 m2 Stones and Minerals Crystal
0.20

4 4 MOONSTONE GRAVEL
1 OR
SUGILITE STONE Rare Healing Natural Stones
11
GRAVEL PURPLE 5-7 mm 80 m2 and Minerals Crystal

10
9

8
6
5
4
5.00

5.00
5.18
3
Exotic hardwood that is

2
0

1
IPE DECKING BROWN 4 cm x 40 cm 205 m2

.7
Naturally resistant to decay

+1
L
2

F.
OR

F.
BALAU FLOORING BROWN 5 cm x 35 cm 205 m2 Dense timber hardwood decking
0.125

0.125
5 5

0
.6
CARRARA MARBLE

+0
F.F.L +0.60 Grey 30 cm x 30 cm 30 m2 White Smooth Marble
HERRINGBONE

L
F.
F.
3 OR

TERAZZO NOUVAEU WHITE 20 cm x 20 cm 30 m2 White Smooth Terazzo Flooring

0
0.
IVORY

L
F.
F.
F.F.L +0.60 SOFTSCAPE

# SYMBOL NAME HEIGHT WIDTH COLOR COUNT DESCRIPTION PICTURE

5
12
0.
A medium to large tree, of multi-
D' 1 ALBIZIA LEBBECK 20 m 1.5 m GREEN 2 stemmed widely spreading habit

0 Small tree adapted to sunny area


0. BRAHEA ARMATA
6-12 m 0.6 m GREEN 16
.L 2

7. .00
F
F.

25
7
F.F.L 0.0
MOUTAIN WITCH ALDER 0.8 m 0.8 m Large woody shrub has rounded
3 GREEN 6 leathery and ribbed leaves
F.F.L 0.0 F.F.L 0.0
5
12
CANDELABRA CACTUS 0.4 m 0.4 m Cup-shaped flowers open during
GREEN 8
0.

4 the day and close in the evening


C'
3.72 2.53 9.88 5.00 5.18 4.95
0.125 6.00 6.00 4.00 5.00 5.00 5.00 0.125 TALL FESCUE Warm-season grass for heavy
5 - - GREEN - foot traffic
31.25

GENERAL LAYOUT A B C D E F G
A SCALE 1:100
HARDSCAPE REFERENCES SOFTSCAPE REFERENCES
LIGHTING REFERENCES DRAWN BY:
REF MANUFACTURER REF MANUFACTURER REF MANUFACTURER
#
OR EQUIVALENT
LINK #
OR EQUIVALENT
LINK #
OR EQUIVALENT
LINK LINA MOHAMED
ID: 900182678
THE YARD GROUP KISCHLER NABAT
1 HEEQING AE216
https://www.theyardgroup.com.au/gravel-suppliers-near-me/
1 70-W MH
https://www.kichler.com/kichler/products/landscape-lighting/accent-lights/in-ground-landscape-lights/vlo-in-ground-15-degree-spot-2700k-d56a1dc0/
1 ALBIZIA
https://nabatdelivery.com/lebbeck/
DATE: 22/2/2022

DECKING SUPPLIERS FXLUMINAIRE GARDENIA


2
18383-65
https://ipedeckingsuppliers.co.uk/
2
1283-072
https://www.fxl.com/support/mounting-options-lights
2
ARMATA
https://www.gardenia.net/plant/brahea-armata
Design II Project
3 MANDARIN STORE https://www.mandarinstone.com/product/terrazzo-nouveau-ivory-matt-porcelain/
3 FXLUMINAIRE https://www.fxl.com/product/path-and-area-lights/designer/dm
3 GARDENIA https://www.gardenia.net/plant/fothergilla-major-mountain-witch-alder
T5324 12383-034 ALDER GENERAL LAYOUT 1:100
4 FXLUMINAIRE https://www.kichler.com/kichler/products/landscape-lighting/water-lights/vlo-2700k-12v-led-underwater-accent-stainless-steel/ 4 GDNC https://www.gdncnursery.com/candelabra-cactus
12383-034 CANDELABRA

5 NATURE SEED https://www.naturesseed.com/grass-seed/fescue-grass/


FESCUE
A-104
OWNER
A B C D E F G 2'
31.13
0.125 6.00 6.00 4.00 5.00 5.00 5.00

0.
16.18 10.07 4.87

05

3.
3'

42
PROJECT

7.
00
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS

3.
4'

42
DR. BASIL KAMEL
DR. SAMEH EL FEKI

0.
12
5
0.125
1 0.125
5.00 1

5.00
5.25
F.F.L 0.0
F.F.L -2.20

F.F.L +4.05

F.F.L +0.30
2 2
4.00

4.00
3.82
F.F.L +0.60

3 3

19.30
19.25

5.05
5.00

5.00
F.F.L +8.85 F.F.L +12.50

0.20
0.20

4 4

11
10
9
8
6
5

4
5.00

5.00
5.18
3
2
0

1
.7
+1
L
F.
F.
0.125

0.125
5 5

0
.6
+0
F.F.L +0.60

L
F.
F.

0
0.
L
F.
F.
F.F.L +0.60

5
12
0.

0
0.
L
F.
D'

F.

7. .00
F.F.L 0.0 F.F.L 0.0

25
7
3.72 2.53 9.88 5.00 5.18 4.95
0.125 6.00 6.00 4.00 5.00 5.00 5.00 0.125 5
31.25 12
0.

SOFTSCAPE LAYOUT A B C D E F G C'


A SCALE 1:100 SOFTSCAPE SOFTSCAPE REFERENCES

REF MANUFACTURER
# SYMBOL NAME HEIGHT WIDTH COLOR COUNT DESCRIPTION PICTURE # LINK
OR EQUIVALENT
NABAT DRAWN BY:
A medium to large tree, of multi- 1 https://nabatdelivery.com/lebbeck/

20 m 1.5 m GREEN 2 ALBIZIA


1 ALBIZIA LEBBECK stemmed widely spreading habit LINA MOHAMED
2 GARDENIA https://www.gardenia.net/plant/brahea-armata ID: 900182678
ARMATA
BRAHEA ARMATA Small tree adapted to sunny area DATE: 22/2/2022
6-12 m 0.6 m GREEN 16
2 3 GARDENIA https://www.gardenia.net/plant/fothergilla-major-mountain-witch-alder
ALDER
Design II Project
4 GDNC https://www.gdncnursery.com/candelabra-cactus
MOUTAIN WITCH ALDER 0.8 m 0.8 m Large woody shrub has rounded
3 GREEN 6 CANDELABRA
leathery and ribbed leaves
NATURE SEED
SOFTSCAPE LAYOUT 1:100
5 https://www.naturesseed.com/grass-seed/fescue-grass/
FESCUE
CANDELABRA CACTUS 0.4 m 0.4 m Cup-shaped flowers open during
4 GREEN 8 the day and close in the evening

TALL FESCUE Warm-season grass for heavy


A-105
5 - - GREEN - foot traffic
OWNER

PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
A B C D E F G 2'
CONSTRUCTION DOCUMENTS
31.13 DR. BASIL KAMEL
0.125 6.00 6.00 4.00 5.00 5.00 5.00
DR. SAMEH EL FEKI

0.
16.18 10.07 4.87

05
3.
42
3'
7.
00

3.
4'

42

0.
12
5
0.125
0.125

1 1
5.00

5.00
5.25
F.F.L 0.0
F.F.L -2.20

F.F.L +4.05
F.F.L +0.30
2 2
4.00

4.00
3.82
F.F.L +0.60

3 3

19.30
19.25

5.05
5.00

5.00
F.F.L +8.85 F.F.L +12.50

0.20
0.20

4 4

11
HARDSCAPE

10
9
8
6
5
4
# HATCH MATERIAL NAME COLOR DIMENSIONS AREA DESCRIPTION PICTURE
5.00

5.00
5.18
3
2
0

1
.7
+1
Reiki Healing Stone Natural

L
WHITE LABRADORITE WHITE 9-10 mm 80 m2

F.
Stones and Minerals Crystal

F.
MOONSTONE GRAVEL
1 OR
0.125

0.125
SUGILITE STONE Rare Healing Natural Stones
5 5 GRAVEL PURPLE 5-7 mm 80 m2 and Minerals Crystal
0
.6
F.F.L +0.60 +0
L
F.
F. IPE DECKING BROWN 4 cm x 40 cm 205 m2
Exotic hardwood that is
Naturally resistant to decay

2 OR

BALAU FLOORING BROWN 5 cm x 35 cm 205 m2 Dense timber hardwood decking

0
0.
L
F.
CARRARA MARBLE White Smooth Marble

F.
Grey 30 cm x 30 cm 30 m2
HERRINGBONE
F.F.L +0.60 3 OR

TERAZZO NOUVAEU WHITE 20 cm x 20 cm 30 m2 White Smooth Terazzo Flooring


IVORY

5
12
0.
D' HARDSCAPE REFERENCES
0
0.
L
F.

REF MANUFACTURER
F.

# LINK
OR EQUIVALENT
F.F.L 0.0 THE YARD GROUP

7. .00
F.F.L 0.0 1 https://www.theyardgroup.com.au/gravel-suppliers-near-me/

25
HEEQING AE216

7
2 DECKING SUPPLIERS https://ipedeckingsuppliers.co.uk/
18383-65
4.00 DRAWN BY:
3.72 2.53 9.88 5.00 5.18 4.95 3 MANDARIN STORE https://www.mandarinstone.com/product/terrazzo-nouveau-ivory-matt-porcelain/
0.125 6.00 6.00 5.00 5.00 5.00 0.125 T5324 LINA MOHAMED
5
12

31.25
0.

C' ID: 900182678


HARDSCAPE LAYOUT A B C D E F G DATE: 22/2/2022
A SCALE 1:100
Design II Project
HARDSCAPE LAYOUT 1:100

A-106
OWNER

A B C D E F G 2'
31.13
0.125 6.00 6.00 4.00 5.00 5.00 5.00

0.
16.18 10.07 4.87

05
3.
42
3'
PROJECT
ARCH429/4312 - DESIGN

7.
DEVELOPMENT &

00
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL

3.
4'

42
DR. SAMEH EL FEKI

0.
12
5
0.125
0.125

1 1
5.00

5.00
5.25
F.F.L 0.0
F.F.L -2.20

F.F.L +4.05

2 F.F.L +0.30 2
4.00

4.00
3.82
F.F.L +0.60

3 3

19.30
19.25

5.05
5.00

5.00
F.F.L +8.85 F.F.L +12.50

0.20
0.20

4 4

11
10
9

8
6
5
4
5.00

5.00
3
2
0

1
.7

5.18
+1
L
F.
F.
0.125

0.125
5 5

0
.6
+0
F.F.L +0.60

L
F.
F.

0
0.
L
F.
F.
F.F.L +0.60

5
12
0
0.

0.
L
F.
F. D'

F.F.L 0.0

7. .00
F.F.L 0.0

25
7
3.72 2.53 9.88 5.00 5.18 4.95
0.125 6.00 6.00 4.00 5.00 5.00 5.00 0.125

5
31.25

12
0.
A B C D E F G
LIGHTING LAYOUT C'
A SCALE 1:100
LIGHTING LIGHTING REFERENCES
REF MANUFACTURER HEIGHT REF MANUFACTURER
# SYMBOL NAME DIAMETER COLOR COUNT DESCRIPTION PICTURE # LINK DRAWN BY:
OR EQUIVALENT OR EQUIVALENT
LINA MOHAMED
KISCHLER
IN GROUND KISCHLER 0.30 m 0.7 m BRASS 6
5 Degree Beam Angle In-Ground 1 70-W MH
https://www.kichler.com/kichler/products/landscape-lighting/accent-lights/in-ground-landscape-lights/vlo-in-ground-15-degree-spot-2700k-d56a1dc0/
ID: 900182678
1 Accent Centennial Brass
WELL LIGHT 70-W MH DATE: 22/2/2022
2 FXLUMINAIRE https://www.fxl.com/support/mounting-options-lights
1283-072
Solid brass and can be powder
2
UPLIGHT FXLUMINAIRE
1283-072 0.40 m 0.6 m BRASS 23 coated to match your FX fixture FXLUMINAIRE
Design II Project
WITH SPIKE 3 https://www.fxl.com/product/path-and-area-lights/designer/dm
12383-034
FXLUMINAIRE
LIGHTING LAYOUT 1:100
POST LIGHT W/ FXLUMINAIRE Natural, powder coated, or 4 https://www.kichler.com/kichler/products/landscape-lighting/water-lights/vlo-2700k-12v-led-underwater-accent-stainless-steel/
0.8 m 0.8 m COPPER 4 12383-034
3 FOOTER MOUNT 12383-034 antiqued copper/brass

WATERPROOF SUBMERS KISCHLER Stainless with removable and


0.4 m 0.4 m STAIN 30 adjustable cowl and mounting
4 FOUNTAIN SPOTLIGHT VLO 2700K -LESS bracket A-107
3. Elevations
OWNER

PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
1 2 3 4 5 DR. SAMEH EL FEKI

WINDOW SCHEDULE

WALL FINISHES SCHEDULE

T.O.C T.O.C
+12.35 +12.35
4.05

4.05

4.05

4.05

4.05
F1

T.O.C T.O.C
2.39

2.47
2.48

2.48

2.48
+8.75 +8.75

W1 W1 W1

5.59

5.59
13.97

13.97

13.97
1.30

1.30

1.30

1.30
1.48

FIRST FLOOR F4 F1 F1 F2 FIRST FLOOR

1.81
F.F.L. +5.30 F.F.L. +5.30
2.30

2.30

2.30
2.17
9.93

9.93

9.93

9.93
W1 W1
1.72

1.75
1.30

1.30

1.30
1.48

2.64
F3 F3
0.93

0.89
1.40

1.45
1.31

GROUND FLOOR GROUND FLOOR


F.F.L. +1.70 F.F.L. +1.70
W4 W4

2.55
1.70

1.70

1.70
0.75

0.96

0.96

F1
0.40

0.15

0.15

STREET LEVEL STREET LEVEL


F.F.L. +0.00 F.F.L. +0.00

DRAWN BY:
WEST ELEVATION LINA MOHAMED
1 ID: 900182678
SCALE 1:50 DATE: 21/3/2022

Design II Project
ELEVATION 1:50

A-201
OWNER

PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
A B C D E F CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI
DOOR SCHEDULE

WINDOW SCHEDULE

CURTAIN WALL SCHEDULE

WALL FINISHES SCHEDULE


T.O.C T.O.C
+12.35 +12.35
4.05

4.05

4.05

4.05

4.05
6.52

2.15

2.15

2.15
T.O.C T.O.C
2.48

2.48

2.48

2.48
+8.75 F1 F1 F3 +8.75

CW1
W3 W1 W1 W1
13.97

13.97
1.30

1.30

1.30

1.30

1.30

3.59

3.59

3.59

8.23

8.23
1.70

1.70

1.70

FIRST FLOOR FIRST FLOOR


F.F.L. +5.30 F.F.L. +5.30
2.30

2.30
9.93

9.93

9.93

9.93

9.93

9.93

9.93
CW2
F2 F3
D1
W1 W1

1.59

1.59
1.30

1.30
2.74

2.74

2.49
4.46

0.90

0.90
1.45

1.45

GROUND FLOOR GROUND FLOOR


F.F.L. +1.70 F.F.L. +1.70
W4 W4

0.81
F3
1.71

1.71

1.70

1.70

1.70

1.70
0.96

0.96

0.89
0.15

0.15

STREET LEVEL STREET LEVEL


F.F.L. +0.00 F.F.L. +0.00

DRAWN BY:
SOUTH ELEVATION LINA MOHAMED
1 ID: 900182678
SCALE 1:50 DATE: 21/3/2022

Design II Project
ELEVATION 1:50

A-202
5 4 3 2 1
Lina Naguib
Mohamed
900182678
1.23

1.23
F2

T.O.C2 T.O.C2
12.35 12.35
3.60

3.60

3.60

3.60

3.60

3.60
3.64
3.60

3.60
F2 F3 F1 F3

1.87
2.00

T.O.C T.O.C

2.40
2.48
8.75 CW1 8.75

3.51
W01 W02 D2

5.48
3.45

3.45
1.15
1.07
6.08
13.58

13.57

13.58
8.28

4.38

F2
First Floor First Floor

2.53

2.53
5.30 5.30

9.98

9.97

9.98
6.41

W01 W01 W01

1.87
3.60

3.60
1.30

1.30

1.30

6.43
1.90

D01
Dr Basil Kamel

0.93
Ground Floor Ground Floor Dr Sameh ElFiky

1.70

1.70
1.70 1.70
2.59

W04 W04
1.70
1.70

1.70

1.70

1.70

1.70
0.15 0.75

0.15 0.75
Street Level Street Level
0.00 0.00

Design II Project

East Elevation
Project number 0001
Date 3 April 2022

East Elevation Drawn by Lina Mohamed


1 1 : 50 Checked by Checker

A203
Scale 1 : 50
F E D C B A
Lina Naguib
Mohamed
900182678
1.23

1.23
F2
2.03

2.03
T.O.C2 T.O.C2
12.35 12.35
W01
3.60

3.60

3.60
3.60
0.93

1.30
3.60

3.60
0.64

0.27
F3 F3 F1

T.O.C T.O.C
2.48

2.48

2.48

2.48

2.48
2.44
8.75 8.75
3.55

3.55

W02 W2 W2 W01 W01 W01


D2

0.60
3.45

3.45
1.07

1.07

1.30

1.30

1.30

13.57
13.58

F2
1.97

1.97

3.00
First Floor First Floor
2.53

2.53

2.30

2.30

2.30
5.30 5.30
9.97

9.97

9.97

9.97

9.97

9.98
Dr Basil Kamel
0.56

W01 W01 W01 W2 W2 W01 W01 W01

Dr Sameh ElFiky
0.60
3.60

3.60
1.30

1.30

1.30

1.30

1.30

1.30
2.76

0.90

Ground Floor Ground Floor

1.70

1.70

1.70
3.29

1.70 1.70
2.59
2.60

W04 W04 W04


1.70

1.70

1.70

1.70
Design II Project

0 . 1 5 0.75

0 . 1 5 0.75

0.14 0.75
Street Level Street Level
0.00 0.00

North Elevation
Project number 0001
Date 3 April 2022
North Elevation Author
1 1 : 50
Drawn by

Checked by Checker

A204
Scale 1 : 50
4. Sections
OWNER

20 CM SKIRTING
2 CM CEMENT TILES
PROJECT
2 CM CEMENT MORTAR
5 4 6 CM SAND 3 2 1 ARCH429/4312 - DESIGN
6 CM THERMAL INSULATION DEVELOPMENT &
5-7 CM SLOPED PLAIN CONCRETE CONSTRUCTION DOCUMENTS
2 CM DAMP PROOFING DR. BASIL KAMEL
25 CM REINFORCED CONCRETE
DR. SAMEH EL FEKI

1.00

1.00
1.23

1.23
+12.35
20 CM SKIRTING
2 CM CEMENT TILES ROOM SCHEDULE
T.O.C 2 2 CM CEMENT MORTAR T.O.C 2
+12.35 +12.35
6 CM SAND
3.53

3.53

3.53

3.53
6 CM THERMAL INSULATION

1.09

1.00
5-7 CM SLOPED PLAIN CONCRETE
D2 2 CM DAMP PROOFING
DOOR SCHEDULE
25 CM REINFORCED CONCRETE
3.51

3.51
3.29
1.30
W1

3.69
2.20
WINDOW SCHEDULE

1.00

1.00
5.53
+8.75

0.90
72
T.O.C T.O.C
2.48

2.48
71
+8.75 70 +8.75
69

68 FLOOR FINISHES SCHEDULE

1.09

1.09
67

3D Printing Model Studio

0.94
66

W1 W1 65

64

63

62
1F 6 1F 1
61
10 CM SKIRTING
10 CM SKIRTING

0.90
3.45

3.45
60

3.29

3.29

3.29

3.29

3.29
6 CM SAND
1.30

1.30

1.30

1.30
2 CM TILES
13.46

13.46
59
W1 W2
58
2 CM CEMENT MORTAR
57 2 CM CEMENT MORTAR
56 2 CM TILES
55
6 CM SAND
20 CM REINFORCED CONCRETE
54 20 CM REINFORCED CONCRETE
53 2 CM PLASTER
0.90 52 2 CM PLASTER

0.90
51
+5.30 +5.30

1.46
50

49
FIRST FLOOR FIRST FLOOR
F.F.L. +5.30 F.F.L. +5.30
2.25

2.25
9.93

9.93
46

45

3.30
44
1.09

1.09

1.09
43

Storage

0.94
42

41

40 D2'
39 10 CM SKIRTING GF 2

2.53
38
2 CM TILES
37
10 CM SKIRTING
3.60

3.60
2 CM CEMENT MORTAR

0.90
36
3.29

3.29

3.29

3.29

3.29
2 CM TILES
1.30

1.30

1.30

1.30
35
W1 34
6 CM SAND W2
33 20 CM REINFORCED CONCRETE 2 CM CEMENT MORTAR
6 CM SAND

2.20
32

31
2 CM PLASTER
30 20 CM REINFORCED CONCRETE
29
2 CM PLASTER
28
0.90

0.90
0.90
27
+1.70 +1.70

1.46
26
1.70

1.70
25
GROUND FLOOR GROUND FLOOR
F.F.L. +1.70 F.F.L. +1.70
22

21

0.54
0.55

20

Mech. Room Parking


1.09

19
1.70

1.70
0.94

18

17

D2

0.74
0.15 0.75

0.15 0.75
0.74

W4 B 4 B 5 W4
5.00

16

15

2.53
14

STREET LEVEL 13 10 CM SKIRTING STREET LEVEL


F.F.L. +0.00 12 2 CM TERRACOTTA TILES 2 CM TILES F.F.L. +0.00
3.29

1.15

3.45

3.45

3.45

3.45
11

10
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR
9 6 CM SAND 6 CM SAND
2.20

8
30 CM REINFORCED CONCRETE
2.00

7 30 CM REINFORCED CONCRETE

2.15
6
2 CM DPC 2 CM DPC
5

15 CM OC
1.04

4
15 CM OC
3
-1.85

0.90
1
2
-2.00 -2.00
BASEMENT
F.F.L. -2.00 BASEMENT
F.F.L. -2.00

10 CM SKIRTING
6 CM INTERLOCK TILES 2 CM CEMENGT TILES 6 CM INTERLOCK TILES
6 CM SAND 2 CM CEMENT MORTAR 6 CM SAND
10 CM SKIRTING
10 CM OC PAD 21 CM SAND 15 CM OC PAD
2 CM CERAMIC TILES
BACKFILL 30 CM REINFORCED CONCRETE BACKFILL
2 CM CEMENT MORTAR
2 CM DPC DRAWN BY:
15 CM OC 6 CM SAND
30 CM REINFORCED CONCRETE LINA MOHAMED
2 CM DAMP PROOFING ID: 900182678
15 CM PLAIN CONCRETE DATE: 22/2/2022
BACKFILL

Design II Project
SECTION 1:50
SECTION 1
1
SCALE 1:50
A-301
A B C 20 CM SKIRTING
D 3' 4'
2CM CEMENT TILES
2CM MORTAR
6 CM SAND
6 CM INSULATION
7 CM SLOPED OC
2 CM DAMP-PROOFING
25 CM RC SLAB
2 CM PLASTER
Lina Naguib
Mohamed

1.23
1.23

12.45

T.O.C2
20 CM SKIRTING
2CM CEMENT TILES
20 CM SKIRTING
2CM CEMENT TILES T.O.C2
900182678
2CM MORTAR 2CM MORTAR
12.35 12.35

0.64
6 CM SAND 6 CM SAND
3.60

3.59
3.59
W04
6 CM INSULATION 6 CM INSULATION
7 CM SLOPED OC 7 CM SLOPED OC
4.83

2.40
2 CM DAMP-PROOFING 2 CM DAMP-PROOFING

1.30
25 CM RC SLAB 25 CM RC SLAB

3.20

3.20
3.60

3.60
2 CM PLASTER 2 CM PLASTER

1.26
8.85

0.80
8.85

2.03
T.O.C T.O.C
2.48

8.75 8.75

0.54

0.50
Design CoWorking Space
1.09

1.09

4 D2' D2'

2.00

2.39
44 m² 62
Digital Studio
10 CM SKIRTING 10 CM SKIRTING

2.00
61
10 CM SKIRTING
3.45
3.45

3.45
60
3.34

3.34
3.29

3.29

3.29

3.29

3.29

3.29

3.29
2 CM CEMENT TILES 5

3.25
2 CM CEMENT TILES

13.46
59
13.46

1.30

1.30

W04 2 CM CEMENT TILES 58

2.80
2 CM CEMENT MORTAR 57 2 CM CEMENT MORTAR
2 CM CEMENT MORTAR 61 m²
2.20

56
6 CM SAND 6 CM SAND

7.38
55
6 CM SAND 54
20 CM RC

1.29
53 20 CM RC
20 CM RC 52

0.80
0.90

0.90
5.30 5.30 2 CM PLASTER 51 2 CM PLASTER
2 CM DPC 50
5.30
CW1
First Floor 49
First Floor

6.85
2.30

5.30 5.30

6.25
0.54

0.50

0.50

1.40
1.09
Exhibition Lobby
1.09

2.00
38
Historical Gallery 10 CM SKIRTING 36
10 CM SKIRTING 60 m²
10 CM SKIRTING
3.60
3.60

2.00

3.60
36
3.29

3.29

3.29

3.29

3.29

3.29
3.34

3.34

1.16
2 CM CEMENT TILES 35
2 CM CEMENT TILES
1.30

1.30

1.30
W04 2 CM CEMENT TILES 34

2.79
2.80

29 m² 2 CM CEMENT MORTAR 33
2 CM CEMENT MORTAR
2 CM CEMENT MORTAR 32

6 CM SAND 31 6 CM SAND
6 CM SAND 30

1.29
20 CM RC 29 20 CM RC
20 CM RC 28

1.04
0.90

0.90
1.70
0.80

1.70 2 CM PLASTER 1.70 27 2 CM PLASTER 1.70


2 CM DPC 26

1.58
25
Ground Floor Ground Floor
1.70

11

1.70
10
9 1.70 Dr Basil Kamel
0.55

0.55

Dr Sameh ElFiky
8
0.50

0.50

0.50
W04 7

1.09
6
1.70
1.70

1.70

1.70
5
1.49

4
0.15 0.75

0.75

0.75

1.02
W04

2.00
3
Street Level
14
Water Tank 2
1
Street Level 13 0.00
12 1
3.29

3.29

3.29

3.29

3.29
3.29

3.25
3.29

3.29

0.00 11
2.79

2.79

2.79
10
9
16 m²

2.20
8
2.00

2.00

1.80

7
6
1.29

5
4
-1.85 -1.85 -1.85 3 -1.85
2
1

Basement Level Basement Level


-2.00 -2.00
Design II Project

10 CM SKIRTING 10 CM SKIRTING 10 CM SKIRTING 10 CM SKIRTING


2 CM CEMENT TILES 2 CM CEMENT TILES 2 CM CEMENT TILES 2 CM LINOLEUM

6 CM INTERLOCK TILES
2 CM CEMENT MORTAR
21 CM SAND
2 CM CEMENT MORTAR
21 CM SAND
2 CM CEMENT MORTAR
21 CM SAND
2 CM CEMENT MORTAR
21 CM SAND 6 CM INTERLOCK TILES
Section 2
6 CM SAND 30 CM RC 30 CM RC 30 CM RC 30 CM RC 6 CM SAND
10 CM OC 2 CM DPC 2 CM DPC 2 CM DPC 2 CM DPC 10 CM OC
BACKFILL 15 CM OC 15 CM OC 15 CM OC 15 CM OC BACKFILL
Project number 0001
Date 3 April 2022
Section 2
1 1 : 50
Drawn by Lina Mohamed
Checked by

A302
Scale 1 : 50
5. Wall Section
OWNER
20 CM SKIRTING

A 2 CM CEMENT TILES
2 CM CEMENT MORTAR
6 CM SAND
5 CM THERMAL INSULATION
PARAPET CAP 5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
20 CM REINFORCED CONCRETE PROJECT
2 CM PLASTER
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI

+8.75

T.O.C
+ 8.75

10 CM SKIRTING
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
16 CM REINFORCED CONCRETE
2 CM PLASTER
CONSULTANTS

MEP CONSULTANT
+5.30
FIRST FLOOR
F.F.L.+5.30

10 CM SKIRTING ROADS CONSULTANT


2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
16 CM REINFORCED CONCRETE
2 CM PLASTER

LANDSCAPE CONSULTANT
+1.70
GROUND LEVEL
F.F.L. +1.70

0.55
KEY PLAN

0.74
W1

STREET LEVEL
F.F.L. +0.00 3.44
2.15

10 CM SKIRTING
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
30 CM RC RAFT DRAWN BY: LINA MOHAMED
2 CM DPC ID: 900182678
15 CM OC

DATE: 15/2/2022
-2.00

F.F.L. -2.00
BASEMENT LEVEL
WALL SECTION 1:20

A-401
WALL SECTION

1 SCALE 1:20
WALL SECTION
6. Details & Blowups
A 1 2 OWNER

F.F.L+8.75

0.58

0.58
2 2 2 2 2 2 2 2 2 2 2

0.58
PARAPET CAP

T.O.C T.O.C T.O.C


+ 8.75 + 8.78 + 8.78 PROJECT

1.35

1.35
2 2 2 2 2 2 2 2 2 2 2 ARCH429/4312 - DESIGN
DEVELOPMENT &

1.77
CONSTRUCTION DOCUMENTS
20 CM SKIRTING
2 CM CEMENT TILES DR. BASIL KAMEL
2 CM CEMENT MORTAR
2 2 2 2 2 2 2 2 2 2 2 DR. SAMEH EL FEKI

1.19
6 CM SAND
5 CM THERMAL INSULATION W1 WINDOW SCHEDULE
5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING 1 2 1 1 3
20 CM REINFORCED CONCRETE
2 CM PLASTER
F1 FINISHES SCHEDULE

2 2 2 2 2 2

1.66

1.66
Admin. Room CLADDING SCHEDULE
3.53

3.53

3.53
3.29
2 2 2 2 2 2
1F 2
1.32

1.30
W1

10 CM SKIRTING
1 2 1 1 3
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
16 CM REINFORCED CONCRETE
1 2 1 2 2 2 1 2 1
2 CM PLASTER
0.80

2 2 2 2 2 2 2 2 2 2 2
F.F.L+5.15

7.62

7.62
FIRST FLOOR FIRST FLOOR FIRST FLOOR
F.F.L. +5.30 F.F.L. +5.25 F.F.L. +5.25

1.99

1.99
2 2 2 2 2 2 2 2 2 2 2
2.13

METAL HOOK
5 MM THICK 2 2 2 2 2 2 2 2 2 2 2
9.05

1.19

1 2 1 2 2 2 1 2 1
W1

1 2 1 1 3
Seminar Room
GF 4
2 2 2 2 2 2
3.55

3.55

3.55
3.29

1.66

1.66
1.30

1.30

W1
2 2 2 2 2 2
10 CM SKIRTING
2 CM DPC
2 CM TILES
2 CM CEMENT MORTAR
1 2 1 1 3
6 CM SAND
SILICONE 16 CM REINFORCED CONCRETE
SEALANT 2 CM PLASTER
2 2 2 2 2 2 2 2 2 2 2
0.80

0.99

0.99
F.F.L+1.70

GROUND LEVEL GROUND LEVEL


1 2 1 2 2 2 1 2 1 GROUND LEVEL
1.61

F.F.L. +1.70 F.F.L. +1.70 F.F.L. +1.70


0.24

0.24
CLADDED WALL ELEVATION
2
0.55

SCALE 1:20

6 CM INTERLOCK TILES Parking


1.70

6 CM SAND A-301
10 CM OC PAD B 5 1
0.40
BACKFILL
4.75
0.75

0.75

W4
10 CM SKIRTING 1.48 1.80 1.48

0.40
2 CM TILES
2 CM CEMENT MORTAR 2 DRAWN BY: LINA MOHAMED
ID: 900182678
6 CM SAND
A A
0.15

STREET LEVEL 30 CM RC RAFT


F.F.L. +0.00
2 CM DPC
DATE: 3/12/2022
15 CM OC
1

0.65
W1
F.F.L-1.85 1.75 1.80 1.75
BASEMENT LEVEL 0.15 5.00 0.14 CLADDING BLOWUPS 1:20
F.F.L. -1.85

0.20
5.29
3
1 1
A-301
2 A-501
WALL SECTION AT CLADDING GROUND FLOOR PLAN VIEW
1 SCALE 1:20 3 SCALE 1:20
4' +8.75
C' D' OWNER

1.21
0.58
0.58
PARAPET
CAP
T.O.C T.O.C T.O.C
+ 8.78 + 8.78 + 8.78
PROJECT
ARCH429/4312 - DESIGN

1.81
DEVELOPMENT &

0.56
20 CM SKIRTING CONSTRUCTION DOCUMENTS
2 CM CEMENT TILES CW1
2 CM CEMENT MORTAR DR. BASIL KAMEL
6 CM SAND DR. SAMEH EL FEKI

0.12
5 CM THERMAL INSULATION
CURTAIN WALL SCHEDULE
5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
20 CM REINFORCED CONCRETE
2 CM PLASTER MAIN MULLION MAIN MULLION MAIN MULLION MAIN MULLION DOORS SCHEDULE
26.5 X 11 CM 26.5 X 11 CM, 7 MM THICK 26.5 X 11 CM, 7 MM THICK 26.5 X 11 CM, 7 MM THICK
7 MM THICK

5.52
FINISHES SCHEDULE
3.53

3.35

3.48
1.84

4.90
1.32

SECONDARY MULLION SECONDARY MULLION SECONDARY MULLION


CW1 26.5 X 11 CM, 5 MM THICK 26.5 X 11 CM, 5 MM THICK 26.5 X 11 CM, 5 MM THICK
0.11

8.01
Digital Studio

7.38
FIRST FLOOR FIRST FLOOR FIRST FLOOR
F.F.L. +5.25 1F 5 F.F.L. +5.25 F.F.L. +5.25
6.64
2.13

1.83
9.08

SECONDARY MULLION SECONDARY MULLION


26.5 X 11 CM, 5 MM THICK D1 26.5 X 11 CM, 5 MM THICK
0.11
3.55

3.45

3.45
1.30

2.49

2.49
1.83

10 CM SKIRTING
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
16 CM REINFORCED CONCRETE
2 CM PLASTER

SECONDARY MULLION SECONDARY MULLION


26.5 X 11 CM, 5 MM THICK 26.5 X 11 CM, 5 MM THICK
0.120.12

+1.70
SOURCE: SAFTI FIRST
GROUND LEVEL GROUND LEVEL GROUND LEVEL https://safti.com/details/
1.61

F.F.L. +1.70 F.F.L. +1.70 F.F.L. +1.70


CURTAIN WALL ELEVATION MODEL: GPX Builders Series
2 SCALE 1:20
or equivalent

A-301
0.55

6 CM INTERLOCK TILES Parking


6.80
1.70

6 CM SAND
0.45 0.12 1.60 0.11 2.05 0.11 1.60 0.12 0.45
10 CM OC PAD B 5 D1
BACKFILL
0.75

0.75

W1
10 CM SKIRTING
2 CM TILES
4' 4'
2 CM CEMENT MORTAR
DRAWN BY: LINA MOHAMED
6 CM SAND CW1
0.15

ID: 900182678
STREET LEVEL 30 CM RC RAFT
F.F.L. +0.00
2 CM DPC
DATE: 3/12/2022
15 CM OC C' 1
D'
-1.85 A-301

F.F.L. -1.85 CURTAIN WALL BLOWUP 1:20


BASEMENT LEVEL
0.68 0.12 1.60 0.11 2.05 0.11 1.60 0.12 0.68

0.15 7.00 0.15


7.25 A-502
GROUND FLOOR PLAN VIEW
1
WALL SECTION AT CURTAIN WALL
SCALE 1:20
3 SCALE 1:20
I
NSPI
RATI
ON I
TERATI
ONS
Fi
nali
ter
ati
on

Decr
easi
ngPer
for
ati
ons I
ncr
easi
ngdept
h
DAYL
IGHTANAL
YSI
S SOL
ARANAL
YSI
S
DAYL
IGHTANAL
YSI
S-BEFORE SOL
ARANAL
YSI
S-BEFORE

DAYL
IGHTANAL
YSI
S-AFTER

SOL
ARANAL
YSI
S-AFTER

L
OUVERSANAL
YSI
S

503
A-301
4' C' 1 D' OWNER

0.08

0.08
+8.45

0.58

0.58
0.58
PARAPET
CAP

1.13
T.O.C T.O.C T.O.C
+ 8.78 + 8.78 + 8.78 PROJECT

1.29

1.29
ARCH429/4312 - DESIGN
DEVELOPMENT &
1.81

CONSTRUCTION DOCUMENTS

0.56
20 CM SKIRTING
2 CM CEMENT TILES CW1 DR. BASIL KAMEL
2 CM CEMENT MORTAR
DR. SAMEH EL FEKI
0.29

6 CM SAND

0.12
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09

0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.09

0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.09
CURTAIN WALL SCHEDULE

0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09

0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
5 CM THERMAL INSULATION
5-7 CM SLOPED PLAIN CONCRETE
0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12

2 CM DAMP PROOFING
20 CM REINFORCED CONCRETE DOORS SCHEDULE
2 CM PLASTER

FINISHES SCHEDULE
3.53

3.35

3.35
DT1
A-501
1.84

4.90

4.90
1.32

CW1
0.11
0.47
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
0.12 0.12 0.12 0.12 0.12 0.12 0.12

Digital Studio

7.38

7.38
FIRST FLOOR FIRST FLOOR FIRST FLOOR
F.F.L. +5.25 1F 5 F.F.L. +5.25 F.F.L. +5.25
6.64
2.13

1.83
9.08

D1
0.47

0.11
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12
3.55

3.45

3.45
1.30

10 CM SKIRTING
2 CM TILES
2.49

2.49
2 CM CEMENT MORTAR
1.83

6 CM SAND
16 CM REINFORCED CONCRETE
2 CM PLASTER

DT2
A-501
0.80

0.12 0.12

0.12 0.12
0.120.12

+1.70 CURTAIN WALL SOURCE: SAFTI FIRST


0.10

https://safti.com/details/
GROUND LEVEL GROUND LEVEL GROUND LEVEL
F.F.L. +1.70 F.F.L. +1.70 F.F.L. +1.70
MODEL: GPX Builders Series
SOUTH LOUVERS ELEVATION or eequivalent
2 SCALE 1:20
0.88
0.81

A-301
0.55

1
Parking
1.70

6.82
B 5
0.40 0.12 1.60 0.11 1.60 0.11 1.60 0.12 0.40
6 CM INTERLOCK TILES
0.75

0.75

0.75

6 CM SAND W1
10 CM OC PAD 10 CM SKIRTING
BACKFILL 2 CM TILES
2 CM CEMENT MORTAR 4' 4' DRAWN BY: LINA MOHAMED
6 CM SAND ID: 900182678
0.15

0.15

STREET LEVEL 30 CM RC RAFT


F.F.L. +0.00 DATE: 3/22/2022
2 CM DPC
15 CM OC

-1.85 0.43 2.05 2.30 2.17 0.37


LOUVERS BLOWUP 1:20
F.F.L. -1.85 0.15 7.00 0.15
BASEMENT LEVEL
7.25

C' 1 D' A-504


A-301
SOUTH LOUVERS SECTION SOUTH LOUVERS PLAN
1 SCALE 1:20 3 SCALE 1:20
OWNER

20 CM SKIRTING
2 CM CEMENT TILES
2 CM CEMENT MORTAR PROJECT
6 CM SAND ARCH429/4312 - DESIGN
DEVELOPMENT &
6 CM THERMAL INSULATION CONSTRUCTION DOCUMENTS
5-7 CM SLOPED PLAIN CONCRETE DR. BASIL KAMEL
2 CM DAMP PROOFING DR. SAMEH EL FEKI

25 CM REINFORCED CONCRETE CURTAIN WALL SCHEDULE

DOORS SCHEDULE

4' FINISHES SCHEDULE

10 CM SKIRTING
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
16 CM REINFORCED CONCRETE
2 CM PLASTER
A-501
DT2

PC PARAPET CAP DOUBLE GLAZING


10 MM EACH
CW1
VERICAL TEAK LOUVER
50 X 150 X 2000 MM ALUMINIUM CURTAIN WALL MULLION
260 X 130 MM
ARCADIA OR EQUIVALENT
HORIZONTAL TEAK LOUVER
T.O.C
+ 8.75
50 X 150 X 2000 MM

GROUND FLOOR
STEEL BOLTS F.F.L + 1.70

DIA 10 MM
STEEL BOLTS
DIA 5 MM
STEEL ANGLE
45 X 45 X 5 MM STEEL ANGLE
STEEL ANGLE 45 X 45 X 5 MM
130 X 130 X 12 MM
STEEL BOLTS STEEL ANGLE
DIA 5 MM 130 X 130 X 12 MM

STEEL BOLTS
DIA 10 MM
STEEL PLATE
236 X 130 X 12 MM

ALUMINIUM CURTAIN WALL MULLION


VERTICAL TEAK LOUVER 260 X 130 MM BOTTOM OF SOUTH LOUVER TO WALL CONNECTION
50 X 150 X 2000 MM ARCADIA OR EQUIVALENT 2
SCALE 1:5
DRAWN BY: LINA MOHAMED
CW1 ID: 900182678

DOUBLE GLAZING DATE: 3/22/2022


HORIZONTAL TEAK LOUVER
10 MM EACH
50 X 150 X 2000 MM

LOUVERS DETAILS 1:5

DT1
TOP OF SOUTH LOUVER TO WALL CONNECTION A-501

1 A-505
SCALE 1:5
OWNER

PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI

REF: RoHS QTC004 - Bench OR EQUIVALENT


https://cad-block.com/410-benches.html

3
A-506

1 QTC004 - BENCH SECTION 2 QTC004 - BENCH ELEVATION


A-506 A-506
SCALE 1:10 SCALE 1:10

LAG SCREW ANCHORS


LAG SCREW FIXING LUMBER WOODEN LOUVER STEEL PLATE ANGLE
WOODEN PIECE TO WALL
CLT BENCH LEG BEAM TO POST 300 x 70 mm 150 x 150 mm
10 X 15 CM DIA 8 mm
DIA 8 mm

STEEL CUP
10 X 15 CM, 5 MM THICK

4 CM MARBLE
2 CM MORTAR
6 CM SAND
15 CM PC
BACKFILL STEEL BOLT
DIA 10 MM
BRICK WALL
25 mm

LUMBER WOODEN BEAM LUMBER WOODEN BEAM


300 x 70 mm 300 x 70 mm

METAL HANGER LUMBER WOODEN LOUVER


300 X 70 mm

LUMBER WOODEN PIECE


300 X 70 mm
LUMBER WOODEN POST
200 mm

DRAWN BY:
LINA MOHAMED
ID: 900182678
3 QTC004 - BENCH LEG CONNECTION TO GROUND 4 POST-BEAM-LOUVERS CONNECTION 5 PERGOLA-WALL CONNECTION DATE: 22/2/2022

A-506
SCALE 1:10 A-506
SCALE 1:10 A-506
SCALE 1:10 Design II Project
HARDSCAPE DETAILS 1:10

A-506
OWNER

REF: TORO PLANTERS OR EQUIVALENT REF: TORO PLANTERS OR EQUIVALENT


PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI

TREE TRUNK
30 CM PLANTING MEDIUM
PERFORATED SOIL SEPARATOR TIMBER STAKES
30 CM PLANTING MEDIUM
4 CM MARBLE PLUGS OR STOLONS 30X30X190 MM
PERFORATED SOIL SEPARATOR
2 CM MORTAR 30X30X280 MM
STONE CAP STONE MULCH PLUGS OR STOLONS
4 CM MARBLE
6 CM SAND 80 MM
2 CM MORTAR 30X30X400 MM STONE CAP
15 CM PC
6 CM SAND
BACKFILL
15 CM PC
DRAIN DRAIN
BACKFILL

8 CM THICK AGGREGATE 8 CM THICK AGGREGATE


POLYPROPLENE FLEECE POLYPROPLENE FLEECE
4 CM WATER DRAINAGE 4 CM WATER DRAINAGE
2 CM DPC 2 CM DPC
20 CM RC 20 CM RC
2 CM DPC 2 CM DPC
4 CM MARBLE 4 CM MARBLE
15 CM PC 15 CM PC
BACKFILL BACKFILL

1 GRASS IN PLANTER 2 TREE IN PLANTER


DRAWN BY:
A-507 A-507
SCALE 1:10 SCALE 1:10 LINA MOHAMED
ID: 900182678
DATE: 22/2/2022

Design II Project
SOFTSCAPE DETAILS 1:10

A-507
OWNER

PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI

REF:FX LUMINAIRE 1283-072 UPLIGHT WITH SPIKE OR EQUIVALENT REF: KISCHLER 70-W NGROUND WELL-LIGHT OR EQUIVALENT

30 CM PLANTING MEDIUM
FX LUMINAIRE CC FIXTURE UPLIGHT OR EQUIVALENT
PERFORATED SOIL SEPARATOR DIA 3 CM
FX LUMINAIRE LONG SLOT SPIKE MOUNT OR EQUIVALENT
DEPTH 17.5 CM
4 CM MARBLE
DIRECT BURY CABLE
2 CM MORTAR 4 CM MARBLE
6 CM SAND 2 CM MORTAR LENS
DIA 25 MM
15 CM PC 6 CM SAND KISCHLER 70-W MH
OR EQUIVALENT
BACKFILL 15 CM PC
FIXTURE CAN
BACKFILL DIA 17.5 CM

ELEVATION MOUNTING STAKE ATTACHMENT

ELEVATION

GRAVEL TRENCH
FOR DRAINAGE

PLAN

CONDUIT ATTACHMENT
DIA 3 CM PLAN

8 CM THICK AGGREGATE
POLYPROPLENE FLEECE
4 CM WATER DRAINAGE
2 CM DPC
20 CM RC
2 CM DPC
4 CM MARBLE
15 CM PC
BACKFILL

1 FX LUMINAIRE SPIKE MOUNT UPLIGHT 2 KISCHLER INGROUND WELL LIGHT


A-508 A-508
SCALE 1:10 SCALE 1:10

DRAWN BY:
LINA MOHAMED
ID: 900182678
DATE: 22/2/2022

Design II Project
LIGHTING DETAILS 1:10

A-508
OWNER

PROJECT

A-407
S1
D E D ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
10.25
DR. BASIL KAMEL
0.125 5.00 5.00 0.125 DR. SAMEH EL FEKI

2.08 1.80 2.30 1.80 2.27

W1 W1

0.125
1
0.14

1.80
0.26

1.98 1.80 2.28 1.80 1.98

9.84
0.60

1.46
SYMBOL NAME
0.12 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.12
0.60

LIGHTING
0.60

SMOKE DETECTOR
1.80
4.71

4.71
0.60

5.00

5.25
1.80
AIR INLET
4.57

W1
0.60

AIR OUTLET
0.60

9.84

1.98 1.80 2.28 1.80 1.98

1.46
SPRINKLER
0.60

KEY PLAN
F.F.L +2.93
0.26

F.F.L +2.93

0.125
0.125 5.00 5.00 0.125

10.25
DRAWN BY:
LINA MOHAMED
D E D ID: 900182678
A-407
S1

DATE: 14/2/2022
REFLECTED CEILING PLAN
1 SCALE 1:20 Design II Project
A-509

REFLECTED CEILING PLAN


1:20
OWNER

PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &

A-407
S1
CONSTRUCTION DOCUMENTS
D E D DR. BASIL KAMEL
DR. SAMEH EL FEKI
10.25

0.125 5.00 5.00 0.125

2.08 1.80 2.30 1.80 2.27

W1 W1

0.125
1
0.14

1.98 1.80 2.28 1.80 1.98

9.84

1.46
SYMBOL NAME

AIR INLET

AIR OUTLET
4.71

4.71

5.00
5.25
1.80
4.57

W1

SPRINKLER

SUPPLY DUCT

RETURN DUCT

1.46
WATER PIPE KEY PLAN

9.84

1.98 1.80 2.28 1.80 1.98

0.125
DRAWN BY:
0.125 5.00 5.00 0.125
LINA MOHAMED
10.25 ID: 900182678
DATE: 14/2/2022

D E D Design II Project
A-407
S1

MEP CEILING PLAN A-510


2 SCALE 1:20

MEP CEILING PLAN


1:20
OWNER

PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI

10 CM SKIRTING
2 2 CM TILES 1
2 CM CEMENT MORTAR
6 CM SAND
20 CM REINFORCED CONCRETE
2 CM PLASTER MAIN WATER SUPPLY PIPE
DIA 10 CM

MAIN AIR SUPPLY DUCT


58 X 25 CM
B.O.D. +4.15
SEC AIR SUPPLY DUCT SEC AIR SUPPLY DUCT
25 X 25 CM 50 X 25 CM
B.O.D. +4.15 B.O.D. +4.20

+5.25
FIRST FLOOR FIRST FLOOR
F.F.L. +5.25 F.F.L. +5.25

0.60

1.35
1.09
0.03

LIGHT
FIXTURE
SPRINKLER SPRINKLER
RANGE 2.0 M
AIR INLET RANGE 2.0 M
LIGHT FIXTURE
AIR OUTLET
SPRINKLER
RANGE 2.0 M
3.55

3.55
AIR INLET
3.29

3.29
1.30
W2

1.30
SEC WATER SUPPLY PIPE
DIA 6 CM
2.66

10 CM SKIRTING
2 CM TILES
2 CM CEMENT MORTAR
6 CM SAND
KEY PLAN
20 CM REINFORCED CONCRETE

0.90

0.90
2 CM PLASTER

+1.70
GROUND FLOOR GROUND FLOOR
F.F.L. +1.70 F.F.L. +1.70

SECTION 1
1 SCALE 1:20

DRAWN BY:
LINA MOHAMED
ID: 900182678
DATE: 14/2/2022

Design II Project
A-511

SECTION
1:20
OWNER
MANHOLE
60X60

PROJECT
GULLY TRAP
S 1 S 2 30X30 ARCH429/4312 - DESIGN
A-403 A-403 DEVELOPMENT &
S 1 S 2 CONSTRUCTION DOCUMENTS
A-403 A-403 DR. BASIL KAMEL
DR. SAMEH EL FEKI
B VENT PIPE
B
WATER SUPPLY 2"
1"
CONTROL VALVE SOLID WASTE PIPE
WATER WASTE PIPE 4"
ROOM SCHEDULE
CONTROL VALVE
3.30 3.30
0.145

0.145
0.14

0.14
3 3

0.29

0.29
3 3

0.18

0.18
0.77 1.51

0.24
2.29

0.46
0.63

0.63
W1 W1

1.64
2.50

2.50
0.62
CONSULTANTS

0.51

0.51
MEP CONSULTANT
S 1 S 1 S 1 S 1
A-404 A-404 A-404 A-404
3.73

3.73

3.73

3.73
W1 W1

3.28

3.28
0.63

0.63

0.63
3.59

3.59
3.58

3.58
0.16
S 2 S 2 S 2 S 2

0.32

0.25 0.10
A-404 WATER HEATER A-404 A-404 A-404

0.09 0.26

0.09 0.26
ROADS CONSULTANT

1.15
0.90

0.90

0.90
D2' D2'

1.23

1.23
1.94
0.45 0.10 0.60 0.79
LANDSCAPE CONSULTANT

0.08
0.24

0.24
2.26 1.04 2.26 1.04
3.30 3.30

S 1 S 2 S 1 S 2
A-403 A-403 A-403 A-403
PLUMBING PLAN FIXTURES PLAN
1 SCALE 1:20 2 SCALE 1:20
KEY PLAN

COUNT FOR ALL COUNT FOR ALL


SYMBOL NAME BATHROOMS PICTURE SYMBOL NAME BATHROOMS PICTURE

KOHLER ALCOVE BATHTUB


KOHLER DEVONSHIRE FAUCET
SYMBOL NAME SIZE SYMBOL NAME SIZE OR EQUIVALENT
(inch) OR EQUIVALENT 4 4

SOLID WASTE PIPE 4" GULLY TRAP 30X30 cm

KOHLER CIMARRON TOILET 4 KOHLER AWAKEN SHOWER SLIDEBAR 4


WATER WASTE PIPE 3" MANHOLE 60X60 cm OR EQUIVALENT OR EQUIVALENT

VENT PIPE 2" SOLID WASTE 4"

KOHLER MEMOIRS TOILET PAPER HOLDER KOHLER MARGAUX SHOWER HEAD


4 4
WATER SUPPLY 1" WATER WASTE 3" OR EQUIVALENT OR EQUIVALENT

DRAWN BY:
CONTROL VALVE 3" HOT WATER SUPPLY 1" LINA MOHAMED
KOHLER TOWEL HOLDER KOHLER REVE SINK BASIN
ID: 900182678
OR EQUIVALENT 4 4
1" OR EQUIVALENT DATE: 14/2/2022
DRAIN COLD WATER SUPPLY

Design II Project
PLUMBING SCHEDULE
3 KOHLER TRESHAM FRAMED
OR EQUIVALENT
1
TOILET BLOWUPS 1:20

BATHROOM FIXTURES SCHEDULE


A-512
4
OWNER

PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI

ROOM SCHEDULE

S 1 S 2
A-403 A-403

3.30
0.145

0.14
3

0.29
3 SYMBOL NAME
DESCRIPTION COUNT FOR ALL
BATHROOMS PICTURE SYMBOL NAME
COUNT FOR ALL
BATHROOMS PICTURE
CONSULTANTS

0.18
0.10 0.60 0.60 0.24
KOHLER ALCOVE BATHTUB MEP CONSULTANT
KOHLER DEVONSHIRE FAUCET Stainless Faucets
0.60

0.60

4 OR EQUIVALENT 4
OR EQUIVALENT

0.63
T1
W1
0.30

KOHLER CIMARRON TOILET Stainless Faucets KOHLER AWAKEN SHOWER SLIDEBAR


4 4
0.60

OR EQUIVALENT OR EQUIVALENT

2.50
0.30

0.51 Stainless Faucets


0.30

KOHLER MEMOIRS TOILET PAPER HOLDER KOHLER MARGAUX SHOWER HEAD


S 1 S 1 4 4
OR EQUIVALENT OR EQUIVALENT ROADS CONSULTANT
0.60

A-404 A-404
3.73

3.73
W1
0.63
3.59

3.58
0.30

KOHLER TOWEL HOLDER Stainless Faucets KOHLER REVE SINK BASIN


S 2 S 2 4 4
0.25

0.25

T2 T3 OR EQUIVALENT OR EQUIVALENT
A-404 A-404
0.09 0.26

0.25 0.60 0.60 0.33 0.16 LANDSCAPE CONSULTANT


0.60
0.60

KOHLER TRESHAM FRAMED 1


OR EQUIVALENT

T4
0.90

D2'
1.23

BATHROOM FIXTURES SCHEDULE


2
0.60

0.60

0.24

KEY PLAN
DESCRIPTION DIMENSIONS (CM) COUNT

2.26 1.04 T1 WHITE CERAMIC TILE 60 x 60 13


T2 LIGHT GREY CERAMIC TILE 24.25 x 30 13
3.30
T3 LIGHT GREY CERAMIC TILE 24.25 x 24.25 1
T4 WHITE CERAMIC TILE 60 x 50 2
S 1 S 2
A-403 A-403
ARCHITECTURAL PLAN
1 SCALE 1:20
3
FLOOR TILING SCHEDULE

DRAWN BY:
LINA MOHAMED
ID: 900182678
DATE: 14/2/2022

Design II Project
TOILET BLOWUPS 1:20

A-513
OWNER

20 CM SKIRTING 20 CM SKIRTING
2 CM CEMENT TILES 2 CM CEMENT TILES
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR
6 CM SAND 6 CM SAND
5 CM THERMAL INSULATION 5 CM THERMAL INSULATION
PROJECT
B 5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
B ARCH429/4312 - DESIGN
DEVELOPMENT &
20 CM REINFORCED CONCRETE 20 CM REINFORCED CONCRETE CONSTRUCTION DOCUMENTS
2 CM PLASTER 2 CM PLASTER
PARAPET CAP PARAPET CAP DR. BASIL KAMEL
DR. SAMEH EL FEKI

ROOM SCHEDULE

+8.75 +8.75 +8.75 +8.75

T.O.C T.O.C T.O.C T.O.C


+ 8.75 + 8.75 + 8.75 + 8.75
0.20

0.20
T5 T7 T5

0.80
0.60

0.60
CONSULTANTS
1.25

T6 T8 T12 T6 MEP CONSULTANT


0.60

0.60

0.60
KOHLER TRESHAM MIRROR

2.47
OR EQUIVALENT
3.35

3.35

3.35

3.35

3.35

3.35

3.35

3.35
0.60

0.60
KOHLER TOILET PAPER HOLDER
0.69

OR EQUIVALENT KOHLER TOWEL HOLDER


KOHLER ALCOVE BATHTUB OR EQUIVALENT
OR EQUIVALENT KOHLER CIMARRON TOILET
ROADS CONSULTANT
OR EQUIVALENT
1.56

0.30 0.10

0.30 0.10
T9 T13
KOHLER DEVONSHIRE FAUCET
OR EQUIVALENT
0.47

T11 T10 T14


KOHLER REVE SINK BASIN
OR EQUIVALENT
0.30

0.30
LANDSCAPE CONSULTANT
0.30

0.30

0.82
0.73
0.47

0.30

0.30
+5.15 +5.15 +5.15 +5.15
FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR
F.F.L. +5.15 F.F.L. +5.15 F.F.L. +5.15 F.F.L. +5.15

KEY PLAN

SECTION 1 SECTION 2
1 SCALE 1:20
10 CM SKIRTING
2 SCALE 1:20
10 CM SKIRTING
2 CM TILES 2 CM TILES
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR
14 CM SAND 14 CM SAND
16 CM REINFORCED CONCRETE 16 CM REINFORCED CONCRETE
2 CM PLASTER 2 CM PLASTER

DESCRIPTION DIMENSIONS (CM) COUNT


T5 LIGHT GREY CERAMIC TILE 30 x 20 29
T6 BEIGE CERAMIC TILE 60 x 60 31
T7 LIGHT GREY CERAMIC TILE 20 x 18 13
T8 BEIGE CERAMIC TILE 60 x 50 6
DRAWN BY:
T9 LIGHT GREY CERAMIC TILE 10 x 50 8
LINA MOHAMED
T10 WHITE CERAMIC TILE 30 x 18 8 ID: 900182678
T11 WHITE CERAMIC TILE 30 x 30 104
DATE: 14/2/2022
T12 BEIGE CERAMIC TILE 60 x 35 15
T13 LIGHT GREY CERAMIC TILE 35 x 10 6 Design II Project
T14 WHITE CERAMIC TILE 35 x 30 16
T15 LIGHT GREY CERAMIC TILE 10 x 10 1 TOILET BLOWUPS 1:20
T16 WHITE CERAMIC TILE 10 x 30 4

WALLTILING SCHEDULE
3 A-514
OWNER

20 CM SKIRTING 20 CM SKIRTING
2 CM CEMENT TILES 2 CM CEMENT TILES
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR
6 CM SAND 6 CM SAND
5 CM THERMAL INSULATION 5 CM THERMAL INSULATION PROJECT
5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
3 3 5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING
ARCH429/4312 - DESIGN
DEVELOPMENT &
20 CM REINFORCED CONCRETE 20 CM REINFORCED CONCRETE CONSTRUCTION DOCUMENTS
2 CM PLASTER 2 CM PLASTER
DR. BASIL KAMEL
DR. SAMEH EL FEKI

ROOM SCHEDULE

+8.75 +8.75

T.O.C T.O.C T.O.C T.O.C


+ 8.75 + 8.75 + 8.75 + 8.75

0.20

0.20
T15 T5 T5
0.75

0.80
0.60

0.60

1.15
CONSULTANTS

1.22
T12 T8 W1 W1
T6 T12 T12 T6 MEP CONSULTANT

KOHLER MARGAUX SHOWER HEAD


0.60

0.60

0.60
HEATER OR EQUIVALENT
1.34
3.35

3.35

3.35

3.35

3.35

3.35

3.35

3.35

3.35
0.60

0.60
0.69
KOHLER TRESHAM MIRROR
OR EQUIVALENT
KOHLER AWAKEN SHOWER SLIDEBAR ROADS CONSULTANT
1.59
0.30 0.10

0.30 0.10
KOHLER DEVONSHIRE FAUCET T9 T13 OR EQUIVALENT T13 T13 T15
OR EQUIVALENT

2.20
0.35

KOHLER REVE SINK BASIN

0.47
OR EQUIVALENT T10 T14 T14 T16
0.11

KOHLER TOWEL HOLDER KOHLER ALCOVE BATHTUB


0.30

0.30
OR EQUIVALENT OR EQUIVALENT
LANDSCAPE CONSULTANT
0.30

0.30
0.73

0.73
0.48
0.30

0.30
+5.15 +5.15
FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR
F.F.L. +5.15 F.F.L. +5.15 F.F.L. +5.15 F.F.L. +5.15

KEY PLAN

SECTION 3 SECTION 3
1 SCALE 1:20
10 CM SKIRTING
2 SCALE 1:20
10 CM SKIRTING
2 CM TILES 2 CM TILES
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR
14 CM SAND 14 CM SAND
16 CM REINFORCED CONCRETE 16 CM REINFORCED CONCRETE
2 CM PLASTER 2 CM PLASTER

DESCRIPTION DIMENSIONS (CM) COUNT


T5 LIGHT GREY CERAMIC TILE 30 x 20 29
T6 BEIGE CERAMIC TILE 60 x 60 31
T7 LIGHT GREY CERAMIC TILE 20 x 18 13
T8 BEIGE CERAMIC TILE 60 x 50 6 DRAWN BY:
T9 LIGHT GREY CERAMIC TILE 10 x 50 8 LINA MOHAMED
T10 WHITE CERAMIC TILE 30 x 18 8 ID: 900182678
T11 WHITE CERAMIC TILE 30 x 30 104 DATE: 14/2/2022
T12 BEIGE CERAMIC TILE 60 x 35 15
T13 LIGHT GREY CERAMIC TILE 35 x 10 6 Design II Project
T14 WHITE CERAMIC TILE 35 x 30 16
T15 LIGHT GREY CERAMIC TILE 10 x 10 1 TOILET BLOWUPS 1:20
T16 WHITE CERAMIC TILE 10 x 30 4

WALLTILING SCHEDULE A-515


3
OWNER

PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI

COUNT FOR ALL COUNT FOR ALL


SYMBOL NAME Description BATHROOMS PICTURE SYMBOL NAME BATHROOMS PICTURE

KOHLER ALCOVE BATHTUB


KOHLER DEVONSHIRE FAUCET
SYMBOL NAME SIZE SYMBOL NAME SIZE OR EQUIVALENT
(inch) OR EQUIVALENT 4 4

SOLID WASTE PIPE 4" GULLY TRAP 30X30 cm

KOHLER CIMARRON TOILET 4 KOHLER AWAKEN SHOWER SLIDEBAR 4


WATER WASTE PIPE 3" MANHOLE 60X60 cm OR EQUIVALENT OR EQUIVALENT

CONSULTANTS
VENT PIPE 2" SOLID WASTE 4"

KOHLER MARGAUX SHOWER HEAD


MEP CONSULTANT
KOHLER MEMOIRS TOILET PAPER HOLDER 4 4
WATER SUPPLY 1" WATER WASTE 3" OR EQUIVALENT OR EQUIVALENT

CONTROL VALVE 3" HOT WATER SUPPLY 1"


KOHLER TOWEL HOLDER KOHLER REVE SINK BASIN
OR EQUIVALENT 4 4
1" OR EQUIVALENT
DRAIN COLD WATER SUPPLY

PLUMBING SCHEDULE
1 KOHLER TRESHAM FRAMED
OR EQUIVALENT
1
ROADS CONSULTANT

BATHROOM FIXTURES SCHEDULE


2
LANDSCAPE CONSULTANT

DESCRIPTION DIMENSIONS (CM) COUNT DESCRIPTION DIMENSIONS (CM) COUNT

T1 WHITE CERAMIC TILE 60 x 60 13 T5 LIGHT GREY CERAMIC TILE 30 x 20 29

T2 LIGHT GREY CERAMIC TILE 24.25 x 30 13 T6 BEIGE CERAMIC TILE 60 x 60 31 KEY PLAN
T3 LIGHT GREY CERAMIC TILE 24.25 x 24.25 1 T7 LIGHT GREY CERAMIC TILE 20 x 18 13

T4 WHITE CERAMIC TILE 60 x 50 2 T8 BEIGE CERAMIC TILE 60 x 50 6


T9 LIGHT GREY CERAMIC TILE 10 x 50 8
T10 WHITE CERAMIC TILE 30 x 18 8

FLOOR TILING SCHEDULE T11 WHITE CERAMIC TILE 30 x 30 104


3 T12 BEIGE CERAMIC TILE 60 x 35 15
T13 LIGHT GREY CERAMIC TILE 35 x 10 6
T14 WHITE CERAMIC TILE 35 x 30 16
T15 LIGHT GREY CERAMIC TILE 10 x 10 1
T16 WHITE CERAMIC TILE 10 x 30 4

WALLTILING SCHEDULE
4
DRAWN BY:
LINA MOHAMED
ID: 900182678
DATE: 14/2/2022

Design II Project
TOILET BLOWUPS 1:20

A-516
OWNER

PROJECT
ARCH429/4312 - DESIGN
DEVELOPMENT &
CONSTRUCTION DOCUMENTS
DR. BASIL KAMEL
DR. SAMEH EL FEKI

ROOM SCHEDULE
20 CM SKIRTING 20 CM SKIRTING 20 CM SKIRTING
2 CM CEMENT TILES 2 CM CEMENT TILES 2 CM CEMENT TILES
2 CM CEMENT MORTAR 2 CM CEMENT MORTAR 85 CM SOIL 2 CM CEMENT MORTAR
6 CM SAND 6 CM SAND 2 MM ROOT BARRIER 6 CM SAND
6 CM THERMAL INSULATION 6 CM THERMAL INSULATION 2 MM GEOTEXTILE MEMBRANE 6 CM THERMAL INSULATION
5-7 CM SLOPED PLAIN CONCRETE 5-7 CM SLOPED PLAIN CONCRETE 15 CM GRAVEL 5-7 CM SLOPED PLAIN CONCRETE
2 CM DAMP PROOFING 2 CM DAMP PROOFING 2 CM DPC 2 CM DAMP PROOFING
25 CM REINFORCED CONCRETE 25 CM REINFORCED CONCRETE 25 CM REINFORCED CONCRETE 25 CM REINFORCED CONCRETE
2 CM PLASTER 2 CM PLASTER 2 CM PLASTER 2 CM PLASTER

PARAPET CAP

PARAPET CAP
CONSULTANTS
MARBLE TILE
4 CM MEP CONSULTANT
0.10

0.10

0.10
0.25
0.75

0.75
0.65

0.65
DRAIN CAP
DIA 15"
ZURN Z100 OR EQUIVALENT

ROADS CONSULTANT

KANT

LANDSCAPE CONSULTANT
T.O.C T.O.C T.O.C T.O.C
+8.75 +8.75 +8.75 +8.75

GRAVEL

DRAIN
DIA 15"
ZURN Z100 OR EQUIVALENT
KEY PLAN
FOAM FILLER

WATER DRAINAGE PIPE


DIA 5" DIA 4.5"

DRAIN
DIA 17" (W/ FLANGE)
ZURN Z1719 OR EQUIVALENT

ZURN Z100 15" DIAMETER FOAM FILLER ROOT BARRIER


MAIN ROOF DRAIN GEOTEXTILE MEMBRANE DRAIN USED:
WATER DRAINAGE PIPE 15" Diameter Main Roof Drain
DIA 5" ZURN Z1719
DECK DRAIN WITH WIDE FLANGE SOURCE: ZURN
https://www.zurn.com/products/building-drainage/roof-drains/primary/z100

DRAIN USED:
Deck Drain with Wide Flange

SOURCE: ZURN
https://www.zurn.com/products/building-drainage/stainless-steel-drainage/z1719

DRAWN BY:
LINA MOHAMED
ID: 900182678
DATE: 14/2/2022

Design II Project
PLANTER AND DRAIN DETAILS
1:10

A-505