You are on page 1of 144

Mines Solar PV - Phase 1

Package 05: General Contractor

Lot 2 - Khouribga

Project No: Q2270021-00


Client: OCP Green Energy
Project Name: Mines Solar PV
Sub-Project Name: Khouribga
JESA Document No: JEC-Q2270021-00-02-III/E.06h/00501
Client Document No:
Revision: B

Prepared Checked Discipline Project


Rev. Issue date Revision description
by by Approval Approval
A For Comments
B 20-juin-23 For Inquiry
Project
Approval
SHORE 27 CASABLANCA NEARSHORE PARK 1100 BD AL QODS CASABLANCA, Casablanca – Maroc
Tel +212.5.22.87.7000 / +212.5.22.87.7150
ANNEXE B - BILL OF QUANTITIES
INDEX - LOT 2 - KHOURIBGA

PV PLANT: PV-BG
LOT 2 - KHOURIBGA

Section Description

0 Bill of Quantities - Construction


Bill of Quantities - O&M
Units Important Notes

1 Bill of Quantities - Free Issue Material FT

2 Bill of Quantities - Electrical Part FT

3 Bill of Quantities - Civil Part FT

4 Bill of Quantities - VDS Part FT

5 Bill of Quantities - SID Part FT

6 Bill of Quantities - HVAC Part FT

7 Bill of Quantities - O&M Warehouse FT

8 Bill of Quantities - Free Issue Material OF

9 Bill of Quantities - Electrical Part OF

10 Bill of Quantities - Civil Part OF

11 Bill of Quantities - VDS Part OF

12 Bill of Quantities - SID Part OF

13 Bill of Quantities - HVAC Part OF

14 Bill of Quantities - O&M Warehouse OF


15 Bill of Quantities - GENERAL SERVICES
Mines Solar PV - Phase 1
Package 05: General Contractor
Lot 2 - Khouribga
BoQ Construction

Etude, fourniture, essais en ateliers fournisseurs, pose, montage, raccordement, programmation, essais
et mise en service (toutes sujéstions et accessoires compris) conformémment aux spécifications des
fournitures, prestations et travaux objet de cet Appel d'offres, des équipements désignés ci-après :

Id. Description Total Price

I FOUM TIZI PV PLANT


1 BoQ - FREE ISSUE MATERIAL FT 8 974 772,22 MAD
2 BoQ - ELECTRICAL FT 23 060 986,70 MAD
3 BoQ - CIVIL FT 83 920 579,33 MAD
4 BoQ - VDS FT 7 865 149,89 MAD
5 BoQ - SID FT 1 993 497,97 MAD
6 BoQ - HVAC FT 884 553,09 MAD
7 BoQ - O&M Warehouse 806 461,52 MAD
TOTAL PRICE (excl. Taxes) (I) 127 506 000,72 MAD

II OULED FARES PV PLANT


8 BoQ - FREE ISSUE MATERIAL OF 31 112 938,89 MAD
9 BoQ - ELECTRICAL OF 66 616 755,25 MAD
10 BoQ - CIVIL OF 83 128 791,30 MAD
11 BoQ - VDS OF 14 290 405,31 MAD
12 BoQ - SID OF 4 074 873,74 MAD
13 BoQ - HVAC OF 1 273 926,39 MAD
14 BoQ - O&M Warehouse 1 066 805,31 MAD
TOTAL PRICE (excl. Taxes) (2) 201 564 496,20 MAD

III GENERAL SERIVCES


15 BoQ General Services 45 668 332,40 MAD
TOTAL PRICE (excl. Taxes) (3) 45 668 332,40 MAD

TOTAL PRICE (excl. Taxes) (1+2+3) 374 738 829,32 MAD


TOTAL PRICE (incl. Taxes) 449 686 595,18 MAD
Mines Solar PV - Phase 1
Package 05: General Contractor
Lot 2 - Khouribga
BoQ O&M

Complete Services of O&M during Operation phase of Khouribga PV Plants (Foum Tizi + Ouled Fares) including MV & Contr
to the connection point with the Grid. O&M Services shall cover:
i) the required operation activities, warrantees management, Performance testing, PV Modules onsite testing, Spare Parts
with the Grid;
ii) Routine maintenance, Preventive and Predictive Maintenance, Corrective Maintenance
iii) Supply of water, consummables and tools to perform the O&M activities

Id. Description Unit Quantity

BENGUERIR PV PLANT + DEFICIT SAFI PV PLANT


O&M Services preparation (pre-operation period) Lumpsum 1
O&M Services for Year 1 Month 12
O&M Services for Year 2 Month 12
O&M Services for Year 3 (Optional) Month 12
O&M Services for Year 4 (Optional) Month 12
O&M Services for Year 5 (Optional) Month 12

TOTAL PRICE (excl. Taxes)

TOTAL PRICE (incl. Taxes)


r

es) including MV & Control Building and HV Substation up

nsite testing, Spare Parts management and coordination

Unit Price Total Price

0,00
0,00
0,00
0,00
0,00
0,00

0,00
ANNEXE B - BILL OF QUANTITIES
1. UNITS AND IMPORTANT NOTES
1.1 Units:
Unit Description Unit Description Abbreviations
% percent m metre SCB: String Combiner Box
h hour mm millimetre IS: Inverter Station
ha hectare m2 square metre MV: Medium Voltage
kg kilogram m3 cubic metre LV: Low Voltage
kl kilolitre No. number AC: Alternating current
km kilometre PS provisional sum DC: Direct current
kW kilowatt PC-sum prime cost sum BOM: Bill of Materials
l litre R/only Rate only BOQ: Bill of Quantities
LOT Lump sum t ton (1000kg) Aux.: Auxiliary services
U Unit / Set W/day Work day ITB: Invitation to Bid (tender)
1.2. Important Notes:
1.2.1 Prices to include the followings:
(a) All necessary liaisoning with supplier/client for design, sizing, selection, approval, inspection offers, getting
approval of drawings, inspection, testing, site testing, shop testing, the necessary technical inputs, drawings, quality
documents, submitting as built drawings, operation and maintenance manuals, and material test certificates etc.
(b) All Installation according to drawings as per associated fit up with base support, cables, wiring, glands,
termination, site testing, interlocking, cable tray, tag ferrule, lug and accessories etc.
(c) All required tools, machinery, consumables, necessary hardwares, bulk material and labour etc.
(d) Work at all elevations Including steel scaffolding, man lift truck if required
(e) All nut/bolts, screws, couplers and necessary hardwares as per specification including commissioning spares.
(f) All necessary activities including commissionning startup assistance including commissionning startup spare
parts.
(g) Fabrication & Erection of Conduits and Cable Tray, Including bends, reducers, tees, couplers and all
accessories.

1.2.2 Combiner boxes, panels and junction boxes shall have bottom cable entry and shall be with blind plugs for
spare cable entries. String cable entries solution to combiner box (either QC4 connectors or cable glands) to be
determined by the General Contractor.

1.2.3 Some of the items and the quantity to be Supplied also can vary, as based on detailed engineering drawings
to be Issued to the Contractor.
Final payment Would Be is based on Established rates and the quantities Actually installed.
1.2.4 Except when it is specifed otherwise in some items, payment is based on quantities actually installed.
1.2.5 The "Description" of the Indicated items are brief and the Bidder shall account for all the requirements of the
relevant technical specification / datasheet / installation standard / Codes / ITB folder and technical clarifications etc.
1.2.6 Electrical work subject of this document are indicative. The Supplier shall assess the overall work and perform
all the necessary services to supply all consumers in the context of this lot.
All works will be as per approved drawings, specifications and direction of Client/Engineer-In-Charge.
1.2.7 All works will be as per approved drawings, specifications and direction of engineer-in-charge.
1.2.8 All required steel supports are considered as included with each items.
1.2.9 Supplier is aware of all the technical requirements contained in the documents that this ITB (Requisition,
Specifications, Drawings, Datasheets, ...), and is committed to providing all equipment as required.
1.2.10 All BOQ items quantity and datasheets shall be submitted to Client/Engineer-In-Charge for review/approval
before any purshace order placement by Contractor.

1.2.11 MV OH Lines at Ouled Fares site connecting south to North sector to be designed by the General Contractor.
Considerations: OHLs route as per site Layout / Two different lines L1: double circuit, L2: Single circuit / Voltage
level 33kV / Length per line: 100 m approx./ Bare conductor size on each circuit: 181.6 mm2 Almelec / Suitable
towers/poles complete with foundation, civil works, earthing, etc./ OPGW 24 single mode fibers (on each line) and
associated junction boxes and connections on both sides / MV cable terminations and connections on both sides /
Clamps and all necessary accessories.
Abbreviations
SCB: String Combiner Box
IS: Inverter Station
MV: Medium Voltage
LV: Low Voltage
AC: Alternating current
DC: Direct current
BOM: Bill of Materials
BOQ: Bill of Quantities
Aux.: Auxiliary services
ITB: Invitation to Bid (tender)

pection offers, getting


cal inputs, drawings, quality
erial test certificates etc.
es, wiring, glands,

labour etc.

g commissioning spares.
ssionning startup spare

couplers and all

ll be with blind plugs for


s or cable glands) to be

iled engineering drawings

led.
s actually installed.
all the requirements of the
d technical clarifications etc.
he overall work and perform

er-In-Charge.
r-in-charge.

this ITB (Requisition,


s required.
harge for review/approval

d by the General Contractor.


: Single circuit / Voltage
mm2 Almelec / Suitable
e fibers (on each line) and
onnections on both sides /
Heading 1 Blue
Heading 2 Red
Heading 3 White
Heading 4 Black
Dark Gray
Linked Cell Light Gray
Note Green
Explanatory Light Blue
Calculation Orange
PROJET: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR
ELECTRICAL BILL OF QUANTITY (FOUM TIZI)
SECTIO
DESCRIPTION
N
1.A FREE ISSUE MATERIAL
Installation/connections, programming/configuration, testing & commissioning of following equipments and systems (Supplied
required to complete the installation/mounting/connections, steel supports, civil Works, etc. Contractor shall prepare final BOM
per Manufacturer instructions, approved drawings, specifications and directions of Client/Engineer-In-Charge & putting into co
plan.

PV Modules, JA SOLAR - JAM72D30-545/MB - Bifacial PERC Mono crystalline. No


A.1
contingency considered.
PVH - AXONE DUO - 108M. Single Axis dual-row tracker ±55º with configuration 1P for 54
A.2 modules (2 strings per structure). The total amount is given by rows / trackers (each
tracker is comprised by 2 rows). No contingency considered
PVH - AXONE DUO control systems (NCUs, T-boxes). Typically one NCU per IS (mounting
A.3
support to be supplied by the Contractor)
Central Inverter 4400KVA, complete outdoor station with Inverter, 0.6kV/33kV transformer,
A.4
RMU and Auxiliary transformer. No contingency considered.

PRIX TOTAL HT (A)

PRIX TOTAL TTC


SUPPLY INSTALLATION
Unit Quantity
Unit price Total price Unit price Total price

ents and systems (Supplied by Client/Others), including supply of all necessary hardware, screws, bolts, washers & all necessary consum
actor shall prepare final BOM and schedules and get that approved by Client/Engineer-In-Charge. Installation/mounting/connections shall b
er-In-Charge & putting into commercial operation. Testing and precommissioning shall be done as per Specifications, and Inspection and te

U 55512 0,00 MAD 0,00 MAD 31,94 MAD 1 773 300,00 MAD

U 514 0,00 MAD 0,00 MAD 12 555,56 MAD 6 453 555,56 MAD

LOT 1 0,00 MAD 0,00 MAD 39 583,33 MAD 39 583,33 MAD

U 6 0,00 MAD 0,00 MAD 118 055,56 MAD 708 333,33 MAD

TOTAL HT (A)

TOTAL TTC
TOTAL PRICE OF
SUPPLY & INSTALLATION
8 974 772,22 MAD
ws, bolts, washers & all necessary consumable
Installation/mounting/connections shall be as
per Specifications, and Inspection and test

1 773 300,00 MAD

6 453 555,56 MAD

39 583,33 MAD

708 333,33 MAD

8 974 772,22

10 769 726,67
PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR
ELECTRICAL BILL OF QUANTITIES (FOUM TIZI)
SECTIO
DESCRIPTION
N
2.A MV, LV, AUX AND FO CABLING WORKS
A.1 CABLING WORKS FOR PV FIELDS
A.1.1 MV CABLES

Supply & delivery to site, Installation/connections, testing & commissioning of following MV cables laid on Underground trenche
Tags, Clamps, Ferrule, Shrouds, cable tray sections and supports, etc.) required to complete the installation / laying, drilling of
of wall, Cutouts, etc.). Contractor shall prepare final BOM and cable drum schedule and get that approved by Client/Engineer-I
putting into commercial operation. Testing and precommissioning of cables shall be done as per Specifications and Inspection

Single-core aluminium cable. Section: 150 mm2. Insulation: crosslinked polyethylene (XLPE)
A.1.1.1 type A, 90ºC. Rated voltage: 33 kV. Insulation voltage: 36 kV. Sheat: halogen free.
2% of contingency included
Single-core aluminium cable. Section: 240 mm2. Insulation: crosslinked polyethylene (XLPE)
A.1.1.2 type A, 90ºC. Rated voltage: 33 kV. Insulation voltage: 36 kV. Sheat: halogen free.
2% of contingency included
A.1.2 MV CABLE TERMINATIONS
Supply & delivery to site, installation/connections, testing & commissioning of following MV termination kits, including supply of
supply and installation of all required steel supports including anti corrosion paint, mionr civil works (i.e. chipping of floor, break
fixing of galnd plate, drilling, sealing for unused hole/spare hole. Contractor shall prepare final BOM and get that approved by C
Client/Engineer-In-Charge & putting into commercial operation. Testing and precommissioning of cables shall be done as per S
Preparation and execution of MV terminations shall be carried out by qualified and trained staff, in full compliance with manufa
Kit of 3 terminations (IS RMU side). MV plugin Connectors "C" type (630 A: interface type C with
bolt M16). Conductors size: Single Core 150 mm2. Insulation: crosslinked polyethylene (XLPE),
A.1.2.1
90ºC, unarmoured. Insulation voltage: 36 kV.
With contingency according to MTO.
Kit of 3 terminations (IS RMU side). MV plugin Connectors "C" type (630 A: interface type C with
bolt M16). Conductors size: Single Core 240 mm2. Insulation: crosslinked polyethylene (XLPE),
A.1.2.2
90ºC, unarmoured. Insulation voltage: 36 kV.
With contingency according to MTO.
Kit of 3 terminations (Main Substation AIS side). MV connections to Substation main switchgear
(Primary Air Insulated Switchgear). Conductors size: Single Core 240 mm2. Insulation:
A.1.2.3
crosslinked polyethylene (XLPE), 90ºC, unarmoured. Insulation voltage: 36 kV.
With contingency according to MTO.
A.1.3 AUXILIARY LV AC CABLES (CCTV Auxiliary power system, Weather stations' Auxiliary power cable, Gates
Supply & delivery to site, Installation/connections, testing & commissioning of following Aux. LV AC cables laid on Underground
Cable Tags, Ties, Clamps, Trefoil clamps, Ferrule, Shrouds, cable tray sections and supports, etc.) required to complete the in
breaking, making & sealing of wall, Cutouts, etc.). Contractor shall prepare final BOM and cable drum schedule and get that ap
Client/Engineer-In-Charge & putting into commercial operation. Testing and precommissioning of cables shall be done as per S
Main Power cables 3P+N+G multi-core copper cables 0.6/1 kV XLPE. Section 4 mm2, , including
A.1.3.1 complete routings.
LV Cables For Field UPS supply from IS.
1P+N multi-core copper cables 0.6/1 kV XLPE. Section 2,5 mm2, including complete routings.
A.1.3.2 For Perimeter Security Communication Boxes from Field UPS panel.
2% of contingency included.
1P+N multi-core copper cables 0.6/1 kV XLPE. Section 2.5 mm2, including complete routings.
A.1.3.3 For Weather Stations from Field UPS panel.
2% of contingency included.
1P+N multi-core copper cables 0.6/1 kV XLPE. Section 2.5 mm2, including complete routings.
A.1.3.4 For Tracker NCUs from Field UPS panel.
2% of contingency included.
1P+N multi-core copper cables 0.6/1 kV XLPE. Section 2.5 mm2, including complete routings.
A.1.3.5 For VDS from Field UPS panel.
2% of contingency included.
SUPPLY INSTALLATION
Unit Quantity
Unit price Total price Unit price

s laid on Underground trenches & through ductbank/conduits/trays, including supply of all necessary hardware & all necessary consumable
installation / laying, drilling of gland plates, sealing of all unused spare entries, steel supports, Civil Works(i.e. chipping of floor, breaking, m
approved by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of Client/Engin
Specifications and Inspection and test plan.

m 3718 79,22 MAD 294 524,51 MAD 4,50 MAD

m 4269 103,77 MAD 442 985,30 MAD 5,40 MAD

nation kits, including supply of all necessary consumables and hardware (i.e. cable lugs, PVC tapes, ferrules, Nut Bolts, anchor fastener, sh
ks (i.e. chipping of floor, breaking, making & sealing of wall, Cutouts, etc.) for complete installation/termination & commissioning. Scope cove
OM and get that approved by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions
cables shall be done as per Specifications and Inspection and test plan.
n full compliance with manufacturer instructions.

U 7 11 076,59 MAD 77 536,11 MAD 8 125,00 MAD

U 4 11 731,69 MAD 46 926,77 MAD 8 750,00 MAD

U 4 12 386,80 MAD 49 547,19 MAD 9 375,00 MAD

uxiliary power cable, Gates Auxiliary power cables, Tracker NCU power cable)
C cables laid on Underground trenches & through ductbank/conduits/trays, including supply of all necessary hardware & all necessary cons
c.) required to complete the installation / laying, drilling of gland plates, sealing of all unused spare entries, steel supports, Civil Works(i.e. ch
drum schedule and get that approved by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications an
cables shall be done as per Specifications and Inspection and test plan.

m 150 48,31 MAD 7 245,75 MAD 12,50 MAD

m 3086 12,91 MAD 39 829,24 MAD 4,38 MAD

m 75 12,91 MAD 967,98 MAD 4,38 MAD

m 162 12,91 MAD 2 090,84 MAD 4,38 MAD

m 579 12,91 MAD 7 472,82 MAD 4,38 MAD


INSTALLATION TOTAL PRICE OF
SUPPLY &
Total price INSTALLATION
12 021 757,81
11 776 034,91 MAD
777 293,42 MAD

essary hardware & all necessary consumable (i.e. Cable


Civil Works(i.e. chipping of floor, breaking, making & sealing
s, specifications and directions of Client/Engineer-In-Charge &

16 731,00 MAD 311 255,51 MAD

23 052,60 MAD 466 037,90 MAD

303 385,07 MAD


tapes, ferrules, Nut Bolts, anchor fastener, shrouds, etc),
tion/termination & commissioning. Scope covers removal, re-
proved drawings, specifications and directions of

56 875,00 MAD 134 411,11 MAD

35 000,00 MAD 81 926,77 MAD

37 500,00 MAD 87 047,19 MAD

105 674,01 MAD


of all necessary hardware & all necessary consumable (i.e.
pare entries, steel supports, Civil Works(i.e. chipping of floor,
e as per approved drawings, specifications and directions of

1 875,00 MAD 9 120,75 MAD Not calculated yet. Estimated.

13 501,25 MAD 53 330,49 MAD Not calculated yet. Estimated.

328,13 MAD 1 296,11 MAD Not calculated yet. Estimated.

708,75 MAD 2 799,59 MAD Not calculated yet. Estimated.

2 533,13 MAD 10 005,95 MAD Not calculated yet. Estimated. New Item
Main Power cable [3P+N+PE, 5G6mm²] from inverter station to "380-220V Non UPS Panel",
A.1.3.6 Located in Main Access Area, including complete routings.
For Main access area (Guard's house+Gate) from Inverter Station.
Main Power cable [1P+N+PE, 3G6mm²] from inverter station to "220V UPS Panel", Located in
A.1.3.7 Main Access Area, including complete routings.
For Main access area (Guard's house+Gate) from Inverter Station.
Distribution cables from "380-220V Non UPS Panel" to Lighting, socket outlets, HVAC, ancillary,
A.1.3.8 etc. located in Main Access Area, including complete routings and terminations.
380-220V Distribution cables within Main access area (Guard's house+Gate)
Distribution cables from "220V UPS Panel" to CCTV/VDS, Fire Alarm Panels and other Package
A.1.3.9 P05 users located in Main Access Area, including complete routings and terminations.
220V UPS Distribution cables within Main access area (Guard's house+Gate)
A.1.4 AUXILIARY LV AC CABLE TERMINATIONS
Supply & delivery to site, installation/connections, testing & commissioning of following LV terminations for power cables, contr
Nut Bolts, anchor fastener, shrouds, terminal blocks, etc), supply and installation of all required steel supports including anti co
installation/termination & commissioning. Scope covers removal, re-fixing of galnd plate, drilling, sealing for unused hole/spare
per approved drawings, specifications and directions of Client/Engineer-In-Charge & putting into commercial operation. Testing
Complete terminations and Connectors for 3P+N+G multi-core copper cable 0.6/1 kV XLPE.
A.1.4.1 Section 4 mm2
For Field UPS supply from IS.
Complete terminations and Connectors for 1P+N multi-core copper cable 0.6/1 kV XLPE.
A.1.4.2 Section 2,5 mm2.
For Perimeter Security Communication Boxes from Field UPS panel.
Complete terminations and Connectors for 1P+N multi-core copper cable 0.6/1 kV XLPE.
A.1.4.3 Section 2.5 mm2.
For Weather Stations from Field UPS panel.
Complete terminations and Connectors for 1P+N multi-core copper cable 0.6/1 kV XLPE.
A.1.4.4 Section 2.5 mm2.
For Tracker NCUs from Field UPS panel.
Complete terminations and Connectors for 1P+N multi-core copper cable 0.6/1 kV XLPE.
A.1.4.5 Section 2.5 mm2.
For VDS from Field UPS panel.
Complete terminations and Connectors for 3P+N+G multi-core copper cable 0.6/1 kV XLPE.
A.1.4.6 Section 6 mm2.
For Main access area (Guard's house+Gate) from Inverter Station.
Complete terminations and Connectors for 1P+N+G multi-core copper cable 0.6/1 kV XLPE.
A.1.4.7 Section 6 mm2.
For Main access area (Guard's house+Gate) from Inverter Station.
A.1.5 LV DC CABLES
Supply & delivery to site, Installation/connections, testing & commissioning of following LV DC cables laid on Underground tren
Tags, Clamps, Ferrule, Shrouds, cable tray sections and supports, etc.) required to complete the installation / laying, drilling of
of wall, Cutouts, etc.). Contractor shall prepare final BOM and cable drum schedule and get that approved by Client/Engineer-I
putting into commercial operation. Testing and precommissioning of cables shall be done as per Specifications and Inspection
LV DC Cable ST-SCB: Single-core copper cable 1.5kV. Section: 6 mm2. Insulation: crosslinked
polyethylene (XLPE) type A, 90ºC, installed in air or conduits. Nominal voltage: 1500VDC,
A.1.5.1 maximum permitted operating dc voltage 1800VDC. Unarmored, not screened, flame retardant
sheat. UV resistant PV string cables.
2% of contingency included.
SCB to IS cable: Single-core aluminium cable 1.5kV. Section: 150 mm2. Insulation: crosslinked
polyethylene (XLPE) type A, 90ºC, unarmoured. Nominal voltage: 1500VDC, maximum
A.1.5.2
permitted operating DC voltage 1800VDC. Flame retardant sheat.
2% of contingency included.
SCB to IS cable: Single-core aluminium cable 1.5kV. Section: 185 mm2. Insulation: crosslinked
polyethylene (XLPE) type A, 90ºC, unarmoured. Nominal voltage: 1500VDC, maximum
A.1.5.3
permitted operating DC voltage 1800VDC. Flame retardant Sheat.
2% of contingency included.
SCB to IS cable: Single-core aluminium cable 1.5kV. Section: 240 mm2. Insulation: crosslinked
polyethylene (XLPE) type A, 90ºC, unarmoured. Nominal voltage: 1500VDC, maximum
A.1.5.4
permitted operating DC voltage 1800VDC. Flame retardant Sheat.
2% of contingency included.
A.1.6 LV DC CABLE TERMINATIONS
m 130 73,46 MAD 9 549,21 MAD 4,38 MAD

m 130 29,55 MAD 3 841,21 MAD 4,38 MAD

LOT 1 7 341,76 MAD 7 341,76 MAD 1 875,00 MAD

LOT 1 3 501,44 MAD 3 501,44 MAD 1 875,00 MAD

ations for power cables, control & instrumentation cables, including supply of all necessary consumables and hardware (i.e. cable lugs, PVC
eel supports including anti corrosion paint, mionr civil works (i.e. chipping of floor, breaking, making & sealing of wall, Cutouts, etc.) for com
sealing for unused hole/spare hole. Contractor shall prepare final BOM and get that approved by Client/Engineer-In-Charge. Installation/Lay
commercial operation. Testing and precommissioning of cables shall be done as per Specifications and Inspection and test plan.

U 36 32,45 MAD 1 168,35 MAD 18,75 MAD

U 96 26,05 MAD 2 501,16 MAD 18,75 MAD

U 12 26,05 MAD 312,64 MAD 18,75 MAD

U 36 26,05 MAD 937,93 MAD 18,75 MAD

U 12 26,05 MAD 312,64 MAD 18,75 MAD

U 2 26,05 MAD 52,11 MAD 18,75 MAD

U 2 26,05 MAD 52,11 MAD 18,75 MAD

bles laid on Underground trenches & through ductbank/conduits/trays, including supply of all necessary hardware & all necessary consuma
installation / laying, drilling of gland plates, sealing of all unused spare entries, steel supports, Civil Works(i.e. chipping of floor, breaking, m
approved by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of Client/Engin
Specifications and Inspection and test plan.

m 322585 9,17 MAD 2 957 460,20 MAD 2,70 MAD

m 19012 81,69 MAD 1 553 066,76 MAD 5,00 MAD

m 11127 83,55 MAD 929 629,34 MAD 5,63 MAD

m 18831 84,95 MAD 1 599 675,30 MAD 6,43 MAD


568,75 MAD 10 117,96 MAD

568,75 MAD 4 409,96 MAD

1 875,00 MAD 9 216,76 MAD

1 875,00 MAD 5 376,44 MAD

9 011,94 MAD
nsumables and hardware (i.e. cable lugs, PVC tapes, ferrules,
making & sealing of wall, Cutouts, etc.) for complete
by Client/Engineer-In-Charge. Installation/Laying shall be as
ations and Inspection and test plan.

675,00 MAD 1 843,35 MAD

1 800,00 MAD 4 301,16 MAD

225,00 MAD 537,64 MAD

675,00 MAD 1 612,93 MAD

225,00 MAD 537,64 MAD

37,50 MAD 89,61 MAD

37,50 MAD 89,61 MAD

8 189 516,91 MAD


necessary hardware & all necessary consumable (i.e. Cable
Civil Works(i.e. chipping of floor, breaking, making & sealing
s, specifications and directions of Client/Engineer-In-Charge &

870 979,50 MAD 3 828 439,70 MAD

95 060,00 MAD 1 648 126,76 MAD

62 589,38 MAD 992 218,72 MAD

121 056,43 MAD 1 720 731,73 MAD New Item

527 601,74 MAD


Supply & delivery to site, installation/connections, testing & commissioning of following LV terminations for power cables, contr
Nut Bolts, anchor fastener, shrouds, terminal blocks, etc), supply and installation of all required steel supports including anti co
installation/termination & commissioning. Scope covers removal, re-fixing of galnd plate, drilling, sealing for unused hole/spare
per approved drawings, specifications and directions of Client/Engineer-In-Charge & putting into commercial operation. Testin
String Connectors:
A.1.6.1 QC4 connectors. 6 mm2.
With contingency according to MTO.
SCB to IS cable: Complete termination and Bimetallic Connector. Conductors size: Single Core
150 mm2. Insulation: crosslinked polyethylene (XLPE) type A, 90ºC, unarmoured. Insulation
A.1.6.2
voltage: 3.6 kV AC. Maximum width of the palm of 43mm.
With contingency according to MTO.
SCB to IS cable: Complete termination and Bimetallic Connector. Conductors size: Single Core
185 mm2. Insulation: crosslinked polyethylene (XLPE) type A, 90ºC, unarmoured. Insulation
A.1.6.3
voltage: 3.6 kV AC. Maximum width of the palm of 43mm.
With contingency according to MTO.
SCB to IS cable: Complete termination and Bimetallic Connector. Conductors size: Single Core
240 mm2. Insulation: crosslinked polyethylene (XLPE) type A, 90ºC, unarmoured. Insulation
A.1.6.4
voltage: 3.6 kV AC. Maximum width of the palm of 43mm.
With contingency according to MTO.
A.1.7 FO AND DATA COMMUNICATION CABLES & TERMINATIONS
Supply & delivery to site, Installation/connections, Welding/terminations, testing & commissioning of following Fiber optic and D
kits (From both sides), FO drawers, patch cords, all required steel supports, and all necessary hardware and consumable (i.e.
complete the installation / laying, drilling of gland plates, sealing of all unused spare entries, steel supports, Civil Works(i.e. chi
and get that approved by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and
done as per Specifications and Inspection and test plan.
Armored Single Mode Fibre Optic Loose Tube - OS2 Cable (12 cores), direct buried.
A.1.7.1
To be installed in MV trenches to establish communication through Inverter Stations.
Data cable RS-485. Shielded twisted pair (min 24AWG). Suitable for directly buried.
A.1.7.2
For daisy chain connection between Combiner boxes and IS.
Data Ethernet Cable S/FTP Cat 6A/7. Suitable for directly buried.
A.1.7.3
For direct connections of NCUs and Weather Stations to Inverter Stations.
A.1.8 CONDUITS
Supply and Installation of the following conduits with all accessories for cable protection on walls, road crossings, structures, b
good the same. Installation charges shall include cutting, threading, welding/ joints, bending of pipes. All consumables such as
Sealing with fireproof/ waterproof compound wherever required shall be carried out by the Contractor.
String Conduits:
A.1.8.1 High Density Polyethylene (HDPE) conduit 63mm of exterior diameter.
2% of contingency included.
Road Conduits:
A.1.8.2 High Density Polyethylene (HDPE) conduit 160mm of exterior diameter.
2% of contingency included.
Inverter Station Conduits / Input Conduits:
A.1.8.3 High Density Polyethylene (HDPE) conduit 160mm of exterior diameter.
2% of contingency included.
Inverter Station Conduits / Output Conduits:
A.1.8.4 High Density Polyethylene (HDPE) conduit 160mm of exterior diameter.
2% of contingency included.
Weather Station Conduits:
A.1.8.5
High Density Polyethylene (HDPE) conduit 63mm of exterior diameter.
A.1.9 CABLE TRENCHES
Cable trenches and excavations in all types of soil, backfilling the excavated area after cable laying, consolidation after backfill
same for cable entries. Warning grids and all necessary consumables/hardware such as clamps, tags, route markers, hardwar
compaction in layers, concrete tiles protection and backfilling)
LV Trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
A.1.9.1 It includes material carried off, loading and transport to landfill. It includes also extension on
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
LV Road Trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
A.1.9.2 It includes material carried off, loading and transport to landfill. It includes also extension on
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
ations for power cables, control & instrumentation cables, including supply of all necessary consumables and hardware (i.e. cable lugs, PVC
eel supports including anti corrosion paint, mionr civil works (i.e. chipping of floor, breaking, making & sealing of wall, Cutouts, etc.) for com
sealing for unused hole/spare hole. Contractor shall prepare final BOM and get that approved by Client/Engineer-In-Charge. Installation/Lay
commercial operation. Testing and precommissioning of cables shall be done as per Specifications and Inspection and test plan.

U 4112 12,98 MAD 53 380,72 MAD 7,50 MAD

U 460 705,32 MAD 324 448,40 MAD 52,50 MAD

U 236 83,40 MAD 19 681,44 MAD 61,00 MAD

U 362 97,69 MAD 35 365,18 MAD 70,00 MAD

of following Fiber optic and Data cables laid on Underground trenches & through ductbank/conduits/trays, including supply of connectors a
rdware and consumable (i.e. Cable Tags, Ties, Clamps, Trefoil clamps, Ferrule, Shrouds, conduits, cable tray sections and supports, etc.) r
supports, Civil Works(i.e. chipping of floor, breaking, making & sealing of wall, Cutouts, etc.). Contractor shall prepare final BOM and cable
drawings, specifications and directions of Client/Engineer-In-Charge & putting into commercial operation. Testing and precommissioning o

m 2000 16,25 MAD 32 500,00 MAD 5,14 MAD

m 3800 12,50 MAD 47 500,00 MAD 4,50 MAD

m 250 8,75 MAD 2 187,50 MAD 8,13 MAD

road crossings, structures, buried or through floors / walls including installation in floor slab before casting, chipping or breaking of floor / w
pes. All consumables such as clamps, along with associated fixing hardware, bushes, couplers, elbows, bends, etc. are in the scope of the
ctor.

m 10263 23,59 MAD 242 059,10 MAD 6,25 MAD

m 783 154,21 MAD 120 750,19 MAD 25,00 MAD

m 431 154,37 MAD 66 531,46 MAD 31,25 MAD

m 56 154,37 MAD 8 644,46 MAD 31,25 MAD

m 360 23,59 MAD 8 490,82 MAD 6,25 MAD

ng, consolidation after backfilling, including chipping / drilling of concrete floor / beam, and Breaking of brick masonry walls, making good an
tags, route markers, hardware, sealing, etc. are in the scope of the Contractor. (as per drawings, shall be inclusive of excavation, sand bed

m 1382 97,27 MAD 134 430,76 MAD 31,25 MAD

m 126 397,59 MAD 50 095,76 MAD 62,50 MAD


nsumables and hardware (i.e. cable lugs, PVC tapes, ferrules,
making & sealing of wall, Cutouts, etc.) for complete
by Client/Engineer-In-Charge. Installation/Laying shall be as
ations and Inspection and test plan.

30 840,00 MAD 84 220,72 MAD

24 150,00 MAD 348 598,40 MAD

14 396,00 MAD 34 077,44 MAD

25 340,00 MAD 60 705,18 MAD New Item

111 604,46 MAD


onduits/trays, including supply of connectors and termination
nduits, cable tray sections and supports, etc.) required to
Contractor shall prepare final BOM and cable drum schedule
al operation. Testing and precommissioning of cables shall be

10 285,71 MAD 42 785,71 MAD

17 100,00 MAD 64 600,00 MAD

2 031,25 MAD 4 218,75 MAD


547 663,53 MAD
efore casting, chipping or breaking of floor / walls and making
s, elbows, bends, etc. are in the scope of the Contractor.

64 143,75 MAD 306 202,85 MAD Not calculated yet. Estimated

19 575,00 MAD 140 325,19 MAD Not calculated yet. Estimated

13 468,75 MAD 80 000,21 MAD Not calculated yet. Estimated

1 750,00 MAD 10 394,46 MAD Not calculated yet. Estimated

2 250,00 MAD 10 740,82 MAD Not calculated yet. Estimated. New Item
1 138 628,61 MAD
aking of brick masonry walls, making good and finishing the
ngs, shall be inclusive of excavation, sand bedding,

43 187,50 MAD 177 618,26 MAD

7 875,00 MAD 57 970,76 MAD


MV Trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
A.1.9.3 It includes material carried off, loading and transport to landfill. It includes also extension on
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
MV + LV AC trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
A.1.9.4 It includes material carried off, loading and transport to landfill. It includes also extension on
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
Aux + FO + Earthing Trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
A.1.9.5 It includes material carried off, loading and transport to landfill. It includes also extension on
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
MV Road Trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
A.1.9.6 It includes material carried off, loading and transport to landfill. It includes also extension on
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
Type A - MV Trenches
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
A.1.9.7
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
Dimension (LxW): 1134x826mm
Type B - MV + LV DC CB + LV DC String Trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
dumping site or similar area, if requested. It includes warning, beaconing and protection of
A.1.9.8
excavation, if required for health and safety standards.
LV DC CB cables in one layer up to 4 circuits.
Dimension (LxW): 1158x826mm

Type C - MV + LV DC CB + LV DC String Trenches:


Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
A.1.9.9 dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
LV DC CB cables in two layers up to 16 circuits.
Dimension (LxW): 1377x1498mm
Type D - LV DC CB + LV DC String Trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
A.1.9.10 dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
LV DC CB cables in one layer up to 4 circuits.
Dimension (LxW): 738x675mm
Type E - LV DC CB + LV DC String Trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
A.1.9.11 dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
LV DC CB cables in two layers up to 18 circuits.
Dimension (LxW): 963x1550mm
Type F - LV DC CB Trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
A.1.9.12 dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
LV DC CB cables in one layer up to 4 circuits.
Dimension (LxW): 676x675mm
m 473 183,81 MAD 86 941,08 MAD 50,00 MAD

m 1545 192,42 MAD 297 283,46 MAD 43,75 MAD

m 3177 56,18 MAD 178 487,75 MAD 25,00 MAD

m 21 303,47 MAD 6 372,78 MAD 88,75 MAD

m 50 133,04 MAD 6 651,78 MAD 88,75 MAD

m 50 137,66 MAD 6 883,00 MAD 88,75 MAD

m 50 292,46 MAD 14 622,84 MAD 101,25 MAD

m 50 79,70 MAD 3 985,16 MAD 62,50 MAD

m 50 218,82 MAD 10 940,93 MAD 101,25 MAD

m 50 79,70 MAD 3 985,16 MAD 43,75 MAD


23 650,00 MAD 110 591,08 MAD

67 593,75 MAD 364 877,21 MAD

79 425,00 MAD 257 912,75 MAD

1 863,75 MAD 8 236,53 MAD

No calculated yet. New Item

4 437,50 MAD 11 089,28 MAD

Not calculated yet. New Item

4 437,50 MAD 11 320,50 MAD

Not calculated yet. New Item

5 062,50 MAD 19 685,34 MAD

Not calculated yet. New Item

3 125,00 MAD 7 110,16 MAD

Not calculated yet. New Item

5 062,50 MAD 16 003,43 MAD

Not calculated yet. New Item

2 187,50 MAD 6 172,66 MAD


Type G - LV DC CB Trenches:
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
A.1.9.13 dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
LV DC CB cables in two layers up to 16 circuits.
Dimension (LxW): 738x1373mm
Type H - MV ROAD Trenches
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
A.1.9.14
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
Dimension (LxW): 896x920mm
Type I - LV DC CB ROAD Trenches
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
A.1.9.15
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
Dimension (LxW): 1020x690mm
Type J - LV DC String ROAD Trenches
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
A.1.9.16
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
Dimension (LxW): 513x500mm
Type K - Aux + FO + Earthing Trenches
Trench excavation in loose soils using mechanical means. With removal of land from the edges.
It includes material carried off, loading and transport to landfill. It includes also extension on
A.1.9.17
dumping site or similar area, if requested. It includes warning, beaconing and protection of
excavation, if required for health and safety standards.
Dimension (LxW): 600x400mm
Type L - TRENCH + DICTH + ROAD
Trench excavation in loose soils using mechanical means under ditch. With removal of land from
the edges. It includes material carried off, loading and transport to landfill. It includes also
A.1.9.18
extension on dumping site or similar area, if requested. It includes warning, beaconing and
protection of excavation, if required for health and safety standards.
Dimension (LxW): 738x675mm
A.1.10 CABLE TIES
Supply and installation of Cable ties PV specific (UV & moisture resistant and weather rated) and stainless steel
Cable zip ties PV specific (UV & moisture resistant and weather rated) and stainless steel
A.1.10.1 (rounded edges, no risk to damage of cable).
2% of contingency included
A.2 CABLING FOR SERVER/CONTROL/IT/TELECOM ROOMS
Supply & delivery to site, Installation/connections, terminations, testing & commissioning of following Halogen Free, Fire retard
including supply of all necessary hardware & all necessary consumable (i.e. terminations, Cable lugs, Tags, Ties, Clamps, Tre
drilling of gland plates, sealing of all unused spare entries, steel supports, Civil Works(i.e. chipping of floor, breaking, making &
Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of Client/Engin
Specifications and Inspection and test plan.
A.2.1 AUXILIARY LV AC CABLES & TERMINATIONS FOR SERVER/CONTROL/IT/TELECOM ROOMS
Main Power cable [3P+N+PE, 5G4mm²] from Substation "TGBT 380-220V" (located in LV&Aux.
Room) to "380-220V Non UPS Panel" (Located in Server Room), including complete routings
A2.1.1
and terminations.
For Server Room, PPC/SCADA, VDS, IT & Telecom from Substation.
Main Power cables [1P+N+PE, 3G4mm²] from Substation "MAIN UPS PANEL 220V AC"
(located in LV&Aux.Room) to "220V UPS Panel" (Located in Server Room), including complete
A2.1.2
routings and terminations.
For Server/Control Room, PPC/SCADA, VDS, IT/Telecom from Substation.
Distribution cables from "380-220V Non UPS Panel" to SCADA, PPC and CCTV panels, and
other Package P05 users located in Server/Control room and IT/Telecom, including complete
A2.1.3 routings and terminations.
380-220V Distribution cables within For Server/Control Room, PPC/SCADA, VDS,
IT/Telecom
m 50 125,63 MAD 6 281,35 MAD 75,00 MAD

m 50 351,31 MAD 17 565,48 MAD 101,25 MAD

m 50 294,98 MAD 14 749,25 MAD 101,25 MAD

m 50 184,93 MAD 9 246,39 MAD 101,25 MAD

m 50 75,00 MAD 3 749,94 MAD 31,25 MAD

m 50 270,21 MAD 13 510,75 MAD 88,75 MAD

stainless steel

U 78906 0,58 MAD 45 928,72 MAD 0,25 MAD

ing Halogen Free, Fire retardant cables LV cables laid on Gutters, underground trenches & through ductbank/conduits/trays, false ceiling/fa
ugs, Tags, Ties, Clamps, Trefoil clamps, Ferrule, Shrouds, Conduits, cable tray sections and supports, etc.) required to complete the install
g of floor, breaking, making & sealing of wall, Cutouts, etc.). Contractor shall prepare final BOM and cable drum schedule and get that appr
and directions of Client/Engineer-In-Charge & putting into commercial operation. Testing and precommissioning of cables shall be done as

COM ROOMS

m 40 48,18 MAD 1 927,08 MAD 12,50 MAD

m 80 20,22 MAD 1 617,50 MAD 8,75 MAD

LOT 1 96 760,58 MAD 96 760,58 MAD 31 250,00 MAD


Not calculated yet. New Item

3 750,00 MAD 10 031,35 MAD

Not calculated yet. New Item

5 062,50 MAD 22 627,98 MAD

Not calculated yet. New Item

5 062,50 MAD 19 811,75 MAD

Not calculated yet. New Item

5 062,50 MAD 14 308,89 MAD

Not calculated yet. New Item

1 562,50 MAD 5 312,44 MAD

Not calculated yet. New Item

4 437,50 MAD 17 948,25 MAD

65 655,22 MAD

19 726,50 MAD 65 655,22 MAD

245 722,91
rough ductbank/conduits/trays, false ceiling/false floor,
supports, etc.) required to complete the installation / laying,
M and cable drum schedule and get that approved by
precommissioning of cables shall be done as per

244 124,36 MAD

500,00 MAD 2 427,08 MAD

700,00 MAD 2 317,50 MAD

31 250,00 MAD 128 010,58 MAD


Distribution cables from "220V UPS Panel" to SCADA, PPC and CCTV panels, and other
Package P05 users located in Server/Control roomsand IT/Telecom, including complete routings
A2.1.4
and terminations.
220V UPS Distribution cables within Server/Control Room, PPC/SCADA, VDS, IT/Telecom
A.2.2 AUXILIARY LV AC CABLES & TERMINATIONS FOR O&M WAREHOUSE

Main Power cable [3P+N+PE, 5G6mm²] from Substation "TGBT 380-220V" (located in LV&Aux.
Room) to "380-220V Non UPS Panel" (Located in O&M Warehouse), including complete routings
A.2.2.1
and terminations.
For Server Room, PPC/SCADA, VDS, IT & Telecom from Substation.
Main Power cable [1P+N+PE, 3G6mm²] from Substation "MAIN UPS PANEL 220V AC" (located
in LV&Aux.Room) to "220V UPS Panel" (Located in O&M Warehouse), including complete
A.2.2.2
routings and terminations.
For O&M Warehouse from Substation.
Distribution cables from "380-220V Non UPS Panel" to Lighting, socket outlets, HVAC,
A.2.2.3 ancillary, etc. Located in O&M Warehouse, including complete routings and terminations.
380-220V Distribution cables within O&M Warehouse
Distribution cables from "220V UPS Panel" to CCTV, VDS, Fire Alarm Panels and other
A.2.2.4 Package P05 users located in O&M Warehouse, including complete routings and terminations.
220V UPS Distribution cables within Server/Control Room, PPC/SCADA, VDS, IT/Telecom
2.B EARTHING, LIGHTING AND SOCKET OUTLETS
B.1 EARTHING FOR PV FIELDS
Supply & delivery to site, Installation/connections, welding/terminations, testing & commissioning of complete Earthing and ligh
complete the installation/laying, welding, Civil Works. Contractor shall prepare the final BOM and earthing schedule and get tha
of Client/Engineers-in-Charge & putting into commercial operation. Testing and precommissioning of earthing system shall be
Bare stranded single core copper cable distributed in LV and MV trenches. Section 50mm².
B.1.1
2% of contingency included.
Bare stranded single core copper cable distributed at perimeter and MV trenches of the plant.
B.1.2 Section 95mm², including complete routings and connections/terminations.
2% of contingency included.
Bare stranded single core copper cable connecting the trackers between them and with the main
B.1.3 earthing grid. Section 16mm², including complete routings and connections/terminations.
2% of contingency included.
Earthing rods. Diameter 19mm. Length 2m, including complete connections/terminations.
B.1.4
With contingency according to MTO.
B.2 EARTHING, LIGHTING AND SOCKET OULTES FOR MAIN ACCESS AREA
B.2.1 EARTHING FOR O&M WAREHOUSES AND MAIN ACCESS AREA
Supply & delivery to site, Installation/connections, welding/terminations, testing & commissioning of complete Earthing system
Including civil works, clamping & necessary hardware and consumable (i.e. bituminous paint, insulators etc.), steel supports, w
commissioning will be as per approved drawings, standards and directions of Client/Engineers-in-Charge & putting into comm
Complete Earthing system for O&M Warehouse including Earth strip/Earth pit / Earth bus, with
B.2.1.1
test link, earthing cables, isolators, supports, test links, earth pits etc.
Complete Earthing system for Main Access Area (Guard's house + Gate) including Earth
B.2.1.2 strip/Earth pit / Earth bus, with test link, earthing cables, isolators, supports, test links, earth pits
etc.
B.2.2 LIGHTING SYSTEM (NORMAL + EMERGENCY + EXIT LIGHT)
Supply & delivery to site, Installation/connections, testing & commissioning of lighting system [Normal + Emergency + Exit light
complete with wire guard, and all other accessories etc., Lighting junction boxes, as per the suitable mounting type including su
supply & installation of steel supports including anti corossion painting, mionr civil works (i.e. chipping of floor, breaking, maki
fasteners/studs, footing. All installation, testing & precommissioning will be as per approved drawings, standards and direction
B.2.2.1 Indoor Lighting system for O&M Warehouse, LED type
B.2.2.1.1 Luminaire 1x36W LED 220V
B.2.2.2 Outdoor Lighting system for O&M Warehouse (Projectors mounted on buiding walls/structures)
B.2.2.2.1 LED projector (Equivalent to 70W 220V)
B.2.2.2.2 Single switch (interrupteur simple allumage)
B.2.2.2.3 Exit light (BAES)
B.2.2.3 Indoor Lighting system for Main access Area (Guard's Room), LED type
B.2.2.3.1 Réglette LED 22W 220V (Equivalent to 36W fluorescent)
B.2.2.3.2 Spot LED 6W 220V
LOT 1 83 869,20 MAD 83 869,20 MAD 27 500,00 MAD

m 120 0,17 MAD 20,05 MAD 4,50 MAD

m 120 0,15 MAD 18,23 MAD 5,14 MAD

LOT 1 111,63 MAD 111,63 MAD 4,05 MAD

LOT 1 99,94 MAD 99,94 MAD 187,50 MAD

of complete Earthing and lightning protection system for PV-fields, including supply of all necessary hardware & all necessary consumable
earthing schedule and get that approved by Client/Engineer-in charge. Installation/Laying shall be as per approved drawings, specification
g of earthing system shall be done as per Specifications and Inspection and test plan.
m 3282 82,15 MAD 269 605,72 MAD 4,50 MAD

m 6721 149,63 MAD 1 005 656,19 MAD 5,14 MAD

m 4670 24,90 MAD 116 282,29 MAD 4,05 MAD

U 26 1 156,61 MAD 30 071,89 MAD 187,50 MAD

of complete Earthing system for O&M Warehouses and Main Access Areas including Earth strip/Earth pit / Earth bus, with test links, earthin
ulators etc.), steel supports, welding and bolted connections and all required consumable and hardware for installation. All installation, testi
n-Charge & putting into commercial operation. The earthing loop shall be connected to the site main ground grid and to substation ground gr
LOT 1 117 441,52 MAD 117 441,52 MAD 24 375,00 MAD

LOT 1 40 334,11 MAD 40 334,11 MAD 11 875,00 MAD

rmal + Emergency + Exit light self powered with battery backup] with lighting fixtures and lamps including controlgear, integral driver/power
ble mounting type including supply and installation of all necessary mounting bracket / looping box / Glands / black enamel metalic conduit a
pping of floor, breaking, making & sealing of wall, Cutout etc.), civil foundation as per required mounting type, & other consumables like an
wings, standards and directions of Client/Engineers-in-Charge & putting into commercial operation.

U 15 705,56 MAD 10 583,45 MAD 62,50 MAD


walls/structures)
U 8 1 941,23 MAD 15 529,86 MAD 875,00 MAD
U 4 436,74 MAD 1 746,97 MAD 62,50 MAD
U 2 962,19 MAD 1 924,37 MAD 87,50 MAD

U 3 705,56 MAD 2 116,69 MAD 62,50 MAD


U 2 577,55 MAD 1 155,11 MAD 62,50 MAD
27 500,00 MAD 111 369,20 MAD

1 598,54

540,00 MAD 560,05 MAD

617,14 MAD 635,37 MAD

4,05 MAD 115,68 MAD

187,50 MAD 287,44 MAD

1 756 341,15 MAD


1 494 738,73 MAD
essary hardware & all necessary consumable required to
all be as per approved drawings, specifications and directions

14 769,00 MAD 284 374,72 MAD

34 565,14 MAD 1 040 221,34 MAD

18 913,50 MAD 135 195,79 MAD

4 875,00 MAD 34 946,89 MAD


261 602,42 MAD
194 025,63 MAD
rip/Earth pit / Earth bus, with test links, earthing cables.
hardware for installation. All installation, testing & pre
main ground grid and to substation ground grid.
24 375,00 MAD 141 816,52 MAD

11 875,00 MAD 52 209,11 MAD

59 704,13
ps including controlgear, integral driver/power supply unit,
box / Glands / black enamel metalic conduit as applicable,
d mounting type, & other consumables like anchor
tion.
11 520,95 MAD
937,50 MAD 11 520,95 MAD
26 626,20
7 000,00 MAD 22 529,86 MAD
250,00 MAD 1 996,97 MAD
175,00 MAD 2 099,37 MAD
3 584,30
187,50 MAD 2 304,19 MAD
125,00 MAD 1 280,11 MAD
B.2.2.4 Outdoor Lighting system for Main access Area (Projectors mounted on Guard's room and Main entrance wa
B.2.2.4.1 LED projector 38W 220V
B.2.2.4.2 Applique LED 15W 220V
B.2.2.4.3 Single switch (interrupteur simple allumage)
B.2.2.4.4 Exit light (BAES)
B.2.3 POWER AND SOCKET OUTLETS
Supply & delivery to site, Installation/connections, testing & commissioning of of Indoor/commercial/industrial sockets including
sealing of wall, cutout etc.) & other consumables like anchor fasteners/studs, footing, wire guards, and all other accessories et
standards and directions of Client/Engineers-in-Charge & putting into commercial operation.
B.2.3.1 Outlet sockets for O&M Warehouse (3P+N+PE 16A)
B.2.3.2 Outlet sockets for O&M Warehouse (1P+N 16A)
B.2.3.3 Outlet sockets for Main access Area (1P+N 16A)
2.C SOLAR/ELECTRICAL SYSTEMS & PANELS
C.1 SYSTEMS & PANELS FOR PV FIELDS
C.1.1 SCADA/PPC SYSTEMS AND WEATHER STATIONS
Supply & delivery to site, Installation/connections, programming/configuration, testing & commissioning of following equipments
required to complete the installation. Contractor shall prepare final BOM and schedules and get that approved by Client/Engine
Charge & putting into commercial operation. Testing and precommissioning shall be done as per Specifications, TSO/Grid cod
SCADA System
PV SCADA System: Rack, switches, patch panels, servers, workstations, printers, network
C.1.1.1
components, patch cords, software, licences, etc., fully supplied, tested, installed and
commissioned according to its technical specification.
PPC System
PV PPC System: Rack, switches, patch panels, PLC, workstation, network components, patch
C.1.1.2
cords, software, licences, etc., fully supplied, tested, installed and commissioned according to its
technical specification.
Weather Station
C.1.1.3 Weather Station (including foundation and foundation design): fully supplied, tested, installed and
commissioned according to its technical specification.
C.1.2 UPS SYSTEMS IN PV FIELDS (supplying Weather stations, NCUs and CCTV systems)
Supply & delivery to site, Installation/connections, programming/configuration,including reporting and integration of Status, alar
including all required furniture, steel supports, foundations, civil Works, and all necessary hardware and consumable, required
Charge. Installation/Laying shall be as per approved drawings, specifications and directions of Client/Engineer-In-Charge & pu
plan.
Field UPS systems:
C.1.2.1 4 kVA Outdoor UPS (IP65) with minimum duration of 1 hour, including protections, canopy,
connections, wiring, supports and installation on a concrete slab.
Field UPS Transformer:
C.1.2.2 Three to single phase converter transformer. 4kVA 400/230V, including protections,
enclosure/canopy, connections, wiring, supports and installation on a concrete slab.
Field UPS Distribution Panels:
IP65 Distribution board for supplying Weather stations, NCUs and CCTV systems, including
canopy, connection to UPS, protections, wiring, supports and installation on a concrete slab.
C.1.2.2
The board will include general automatic switchgear and distribution circuit-breakers / residual
current devices for each element. It will include as well enclosure, surge protection devices,
cable glands, terminals and connectors as needed
C.1.3 STRING COMBINER BOXES
Supply & delivery to site, Installation/connections, programming/configuration, testing & commissioning of following Combiner b
required to complete the installation. Contractor shall prepare final BOM and schedules and get that approved by Client/Engine
Charge & putting into commercial operation. Testing and precommissioning shall be done as per Specifications, and Inspection
Combiner box type I:
Combiner Boxes of sixteen (16) inputs/fuses, with one (1) string per fuse, two (2) cable gland or
QC4 / MC4 connector per input (1P+1N). gPV fuse-link according to IEC 60269-6, minimum size
25 A, 1500Vdc. Disconnector rating: ≥350 A. With 6mm² inputs section (copper) and output up to
C.1.3.1
2x1x300mm2/ph (aluminium). Glass Fiber Reinforced Polyester enclosure. Surge protection
device, type I+II. IP54 or above. Reference standard IEC Codes.
Including complete string cables terminations [two (2) cable gland or QC4 / MC4 connector per
input (1P+1N)], connections, wiring, supports and installation on a concrete slab.
C.2 SYSTEMS & PANELS FOR SERVER/CONTROL ROOMS AND MAIN ACCESS AREAS
C.2.1 SUBSTATION/ MV & CONTROL BUILDING
room and Main entrance walls/structures)
U 4 3 203,28 MAD 12 813,10 MAD 125,00 MAD
U 2 718,97 MAD 1 437,93 MAD 87,50 MAD
U 4 436,74 MAD 1 746,97 MAD 62,50 MAD
U 1 962,19 MAD 962,19 MAD 87,50 MAD

al/industrial sockets including all necessary mounting brackets, junction boxes, cable glands, conduits, civil works (i.e. chipping of floor, bre
s, and all other accessories etc., as per the suitable mounting type. All installation, testing & pre commissioning will be as per approved dra

LOT 2 1 543,65 MAD 3 087,31 MAD 312,50 MAD


U 2 769,57 MAD 1 539,14 MAD 62,50 MAD
U 3 769,57 MAD 2 308,71 MAD 62,50 MAD

oning of following equipments and systems, including all required furniture, steel supports, civil Works, and all necessary hardware and con
hat approved by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of Client/En
Specifications, TSO/Grid code requirements, and Inspection and test plan.

LOT 1 1 552 685,10 MAD 1 552 685,10 MAD 687 500,00 MAD

LOT 1 1 162 632,22 MAD 1 162 632,22 MAD 437 500,00 MAD

LOT 2 369 466,10 MAD 738 932,19 MAD 43 750,00 MAD

and integration of Status, alarms and faults into SCADA (through Inverter station SCU/SW), testing & commissioning of following equipmen
re and consumable, required to complete the installation. Contractor shall prepare final BOM and schedules and get that approved by Clien
lient/Engineer-In-Charge & putting into commercial operation. Testing and precommissioning shall be done as per Specifications, and Inspe

U 6 71 824,39 MAD 430 946,31 MAD 7 875,00 MAD

U 6 70 571,40 MAD 423 428,40 MAD 6 875,00 MAD

U 6 83 658,46 MAD 501 950,77 MAD 18 750,00 MAD

oning of following Combiner boxes, including all required furniture, steel supports, foundations, civil Works, and all necessary hardware and
hat approved by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of Client/En
Specifications, and Inspection and test plan.

U 132 14 751,32 MAD 1 947 174,53 MAD 1 250,00 MAD

SS AREAS
17 972,69
500,00 MAD 13 313,10 MAD
175,00 MAD 1 612,93 MAD
250,00 MAD 1 996,97 MAD
87,50 MAD 1 049,69 MAD
7 872,65 MAD
conduits, civil works (i.e. chipping of floor, breaking, making &
re commissioning will be as per approved drawings,

625,00 MAD 3 712,31 MAD


125,00 MAD 1 664,14 MAD
187,50 MAD 2 496,21 MAD
8 770 845,43 MAD
8 336 249,52 MAD
4 666 749,51 MAD
vil Works, and all necessary hardware and consumable,
wings, specifications and directions of Client/Engineer-In-

687 500,00 MAD 2 240 185,10 MAD

437 500,00 MAD 1 600 132,22 MAD

87 500,00 MAD 826 432,19 MAD

1 557 325,48 MAD


esting & commissioning of following equipments and systems,
and schedules and get that approved by Client/Engineer-In-
shall be done as per Specifications, and Inspection and test

47 250,00 MAD 478 196,31 MAD

41 250,00 MAD 464 678,40 MAD

112 500,00 MAD 614 450,77 MAD

2 112 174,53 MAD


s, civil Works, and all necessary hardware and consumable,
wings, specifications and directions of Client/Engineer-In-

165 000,00 MAD 2 112 174,53 MAD

434 595,91 MAD


122 890,15 MAD
Design, Supply, Installation, Testing & Commissionong of LV Panels (UPS and non-UPS distribution), as per equipment arrang
hardware (i.e. PVC tape, ferrule, anchor fastener lug, terminals, glands, etc.), supply and installation of all required steel suppo
sealing of wall, chipping of floor etc.), touch paint for panels. All installation, testing & pre-commissioning, labour, materials and
operation.
The indoor panels shall be IP41 minimum, and outdoor panels IP65 minimum.
"380-220V Non UPS Panel" for Server Room [3P+N] with one incomer, feeders for SCADA, PPC
C.2.1.1
and CCTV Panels ancillary services, etc. (including 20% equipped spare feeders).
"220V UPS Panel" for Server Room [1P+N] with two incomers (redundant), feeders for SCADA,
C.2.1.2
PPC and CCTV Panels (including 20% equipped spare feeders).
C.2.2 O&M WAREHOUSES
Design, Supply, Installation, Testing & Commissionong of LV Panels (UPS and non-UPS distribution), as per equipment arrang
hardware (i.e. PVC tape, ferrule, anchor fastener lug, terminals, glands, etc.), supply and installation of all required steel suppo
sealing of wall, chipping of floor etc.), touch paint for panels. All installation, testing & pre-commissioning, labour, materials and
operation.
The indoor panels shall be IP55 minimum, and outdoor panels IP65 minimum.
"380-220V Non UPS Panel" for O&M Warhouse [3P+N] with one incomer, feeders for Lighting,
C.2.1.1
socket outlets, HVAC, ancillary, etc. (including 20% equipped spare feeders).
"220V UPS Panel" for Server Room [1P+N] with one incomer, feeders for CCTV, VDS, Fire
C.2.1.2
Alarm Panels, etc. (including 20% equipped spare feeders)
C.2.3 MAIN ACCESS
Design, Supply, Installation, Testing & Commissionong of LV Panels (UPS and non-UPS distribution), as per equipment arrang
hardware (i.e. PVC tape, ferrule, anchor fastener lug, terminals, glands, etc.), supply and installation of all required steel suppo
sealing of wall, chipping of floor etc.), touch paint for panels. All installation, testing & pre-commissioning, labour, materials and
operation.
The indoor panels shall be IP55 minimum, and outdoor panels IP65 minimum.
"380-220V Non UPS Panel" for Main Access [3P+N] with one incomer, feeders for Lighting,
C.2.3.1
socket outlets, HVAC, ancillary, etc. (including 20% equipped spare feeders).
"220V UPS Panel" for Main Access [1P+N] with one incomer, feeders for CCTV, VDS, Fire Alarm
C.2.3.2
Panels, etc. (including 20% equipped spare feeders).
C.2.3.3 Main gate control panel (Industrial local control station mounted in Guard's Room
2.D ENGINEERING
Engineering documents, BOMs, Calculations (as applicable), Notes, sizing etc, Vendor
D.1 documents, Shop drawings preparation and submission, As-Builts and O&M preparation and
submission

D.2 Training and instruction to Client representatives and operators -As per Annexe J -

PRIX TOTAL HT (A+B+C


PRIX TOTAL TTC
ion), as per equipment arrangement drawings, SLDs, scope of work and all annexures attached with inquiry, including all wiring materials a
ion of all required steel supports for wall/floor mounting, baseframe (as applicable), including anti-corrosion paint, civil works (i.e. breaking,
sioning, labour, materials and all work will be as per approved drawings, specifications and directions of Engineers-in-Charge & putting into

LOT 1 57 890,76 MAD 57 890,76 MAD 11 875,00 MAD

LOT 1 44 999,39 MAD 44 999,39 MAD 8 125,00 MAD

ion), as per equipment arrangement drawings, SLDs, scope of work and all annexures attached with inquiry, including all wiring materials a
ion of all required steel supports for wall/floor mounting, baseframe (as applicable), including anti-corrosion paint, civil works (i.e. breaking,
sioning, labour, materials and all work will be as per approved drawings, specifications and directions of Engineers-in-Charge & putting into

LOT 1 57 890,76 MAD 57 890,76 MAD 11 875,00 MAD

LOT 1 44 999,39 MAD 44 999,39 MAD 8 125,00 MAD

ion), as per equipment arrangement drawings, SLDs, scope of work and all annexures attached with inquiry, including all wiring materials a
ion of all required steel supports for wall/floor mounting, baseframe (as applicable), including anti-corrosion paint, civil works (i.e. breaking,
sioning, labour, materials and all work will be as per approved drawings, specifications and directions of Engineers-in-Charge & putting into

LOT 1 70 691,82 MAD 70 691,82 MAD 11 875,00 MAD

LOT 1 44 999,39 MAD 44 999,39 MAD 8 125,00 MAD


LOT 1 44 999,39 MAD 44 999,39 MAD 8 125,00 MAD

LOT 1 0,00 MAD 0,00 MAD 153 612,69 MAD

LOT 1 0,00 MAD 0,00 MAD 358 429,62 MAD

X TOTAL HT (A+B+C+D)
PRIX TOTAL TTC
ed with inquiry, including all wiring materials and necessary
anti-corrosion paint, civil works (i.e. breaking, making and
rections of Engineers-in-Charge & putting into commercial

11 875,00 MAD 69 765,76 MAD

8 125,00 MAD 53 124,39 MAD


122 890,15 MAD
ed with inquiry, including all wiring materials and necessary
anti-corrosion paint, civil works (i.e. breaking, making and
rections of Engineers-in-Charge & putting into commercial

11 875,00 MAD 69 765,76 MAD

8 125,00 MAD 53 124,39 MAD


188 815,60 MAD
ed with inquiry, including all wiring materials and necessary
anti-corrosion paint, civil works (i.e. breaking, making and
rections of Engineers-in-Charge & putting into commercial

11 875,00 MAD 82 566,82 MAD

8 125,00 MAD 53 124,39 MAD


8 125,00 MAD 53 124,39 MAD
512 042,31 MAD

153 612,69 MAD 153 612,69 MAD

358 429,62 MAD 358 429,62 MAD

23 060 986,70 MAD


27 673 184,04 MAD
PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR

CIVIL BILL OF QUANTITY (CIVIL FOUM TIZI)

Id. DESCRIPTION Unit

3.A TRAVAUX DIVERS


A1 Guérite de gardiennage Lumpsum
A2 Débrouissaillage et Décapage m²
A3 Travaux de démolition m3
A4 Travaux Geoscan m²
3.B TERRASSEMENT
Terrassement en masse déblais ou en tranchée en tout terrain y
B1 m3
compris rocheux, avec évacuation des déblais à la décharge
B2 Plus-value au prix B1 pour terrassement en terrain rocheux m3
Remblais avec terres des déblais selectionnées et calibrées, avec
B3 m3
compactage à 95% OPM
B4 Remblais en matériaux d'apport m3
3.C VOIRIE ET DRAINAGE
C1 Couche de forme type F2 avec un indice CBR > 10 m3
C2 Matériau pour Couche de roulement MCR m3
C3 Couche de fondation GNF1 m3
C4 Couche de base GNA m3
C5 Revêtement superfciel en bicouche m²
C6 Couche d'imprégnation y compris sablage m²
C7 Couche d'accrochage m²
C8 Enrobé bitumineux EB T
C9 Matériaux sélectionnés MS pour accotement m3
C10 Béton de propreté de Classe C12/15 m3
C11 Béton armé de Classe C30/37 m3
C12 Béton de Classe C20/25 m3
C13 Aciers à haute adhérence kg
C14 BUSE en CAO de classe 135A de DIAMETRE 600 mm ml
C15 BUSE en CAO de classe 135A de DIAMETRE 800 mm ml
C16 BUSE en CAO de classe 135A de DIAMETRE 1000 mm ml
C17 BUSE en CAO de classe 135A de DIAMETRE 1200 mm ml
C18 Fossés trapèzoidal non-revêtus ml
C19 Lit de pose m3
SUPPLY INSTALLATION
Quantity
Unit price Total price Unit price

- 1- 96 737,59 MAD 96 737,59 MAD 0,00 MAD


- 250- 18,05 MAD 4 512,37 MAD 0,00 MAD
- 200- 515,88 MAD 103 176,53 MAD 0,00 MAD
- 100- 322,59 MAD 32 258,67 MAD 0,00 MAD

- 432 000- 51,59 MAD 22 286 129,47 MAD 0,00 MAD

- 130 000- 206,35 MAD 26 825 896,59 MAD 0,00 MAD

- 223 000- 45,14 MAD 10 065 446,09 MAD 0,00 MAD

- 95 600- 90,25 MAD 8 627 656,89 MAD 0,00 MAD

- 4 500- 257,94 MAD 1 160 735,91 MAD 0,00 MAD


- 1 600- 90,25 MAD 144 395,93 MAD 0,00 MAD
- 1 800- 283,67 MAD 510 608,59 MAD 0,00 MAD
- 1 100- 309,53 MAD 340 482,53 MAD 0,00 MAD
- 5 100- 51,59 MAD 263 100,14 MAD 0,00 MAD
- 47- 51,20 MAD 2 406,60 MAD 0,00 MAD
- 47- 257,94 MAD 12 123,24 MAD 0,00 MAD
- 5- 2 579,41 MAD 12 897,07 MAD 0,00 MAD
- 24- 154,89 MAD 3 717,43 MAD 0,00 MAD
- 820- 1 289,07 MAD 1 057 034,54 MAD 0,00 MAD
- 9- 2 188,98 MAD 19 700,83 MAD 0,00 MAD
- 770- 267,54 MAD 206 007,42 MAD 0,00 MAD
- 16 700- 16,64 MAD 277 910,96 MAD 0,00 MAD
- 10- 1 158,50 MAD 11 584,96 MAD 0,00 MAD
- 10- 1 740,94 MAD 17 409,44 MAD 0,00 MAD
- 10- 2 387,40 MAD 23 873,97 MAD 0,00 MAD
- 10- 4 512,37 MAD 45 123,73 MAD 0,00 MAD
- 47- 450,60 MAD 21 178,07 MAD 0,00 MAD
- 6- 258,58 MAD 1 551,49 MAD 0,00 MAD
INSTALLATION TOTAL PRICE OF
SUPPLY &
Total price INSTALLATION
236 685,16 MAD
0,00 MAD 96 737,59 MAD
0,00 MAD 4 512,37 MAD
0,00 MAD 103 176,53 MAD
0,00 MAD 32 258,67 MAD
67 805 129,04 MAD

0,00 MAD 22 286 129,47 MAD

0,00 MAD 26 825 896,59 MAD

0,00 MAD 10 065 446,09 MAD

0,00 MAD 8 627 656,89 MAD


4 807 137,05 MAD
0,00 MAD 1 160 735,91 MAD
0,00 MAD 144 395,93 MAD
0,00 MAD 510 608,59 MAD
0,00 MAD 340 482,53 MAD
0,00 MAD 263 100,14 MAD
0,00 MAD 2 406,60 MAD
0,00 MAD 12 123,24 MAD
0,00 MAD 12 897,07 MAD
0,00 MAD 3 717,43 MAD
0,00 MAD 1 057 034,54 MAD
0,00 MAD 19 700,83 MAD
0,00 MAD 206 007,42 MAD
0,00 MAD 277 910,96 MAD
0,00 MAD 11 584,96 MAD
0,00 MAD 17 409,44 MAD
0,00 MAD 23 873,97 MAD
0,00 MAD 45 123,73 MAD
0,00 MAD 21 178,07 MAD
0,00 MAD 1 551,49 MAD
C20 RIP RAP pour passage en ford m3
C21 Geotextile m²
C22 Gabions U
C23 Maçonnerie de moellons m3
C24 Enrochements m3
C25 Grillage m²
C26 Garde corps ml
3.D INVERTERS FOUNDATION
D1 Excavation m3
D2 Bottom excavation compaction m²
D3 Béton de propreté m3
D4 Formwork m²
D5 Reinforcement steel kg
D6 Béton de fondation m3
3.E TRACKERS FOUNDATION
Execution of Piles Civil Works for tracking mounting systems. Civil Works shall be as per Manufacturer instructions
(IPE) installation supplied by Trackers' manufacturer .Number of Piles per Tracker is 19 (i.e. a total of 9766 Piles)
E1 Installation of Steel Piles, directly driven m
E2 Pre-Drill and soil filling 0.12m diameter m
E3 Pre-Drill and soil filling 0.15m diameter m
E4 Pre-Drill 0.30 diameter m
E5 Concrete m3
3.F TANKS DE STOCKAGE DE L'EAU DE NETTOYAGE
Tank en acier galvanisé de volume égal ou supérieur à 36 m3, y compris
F1 Lumpsum
sa fondation et tous les accessoires

PRIX TOTAL HT (A+B+C

PRIX TOTAL TTC


- 300- 902,47 MAD 270 742,37 MAD 0,00 MAD
- 510- 108,81 MAD 55 492,59 MAD 0,00 MAD
- 60- 579,89 MAD 34 793,27 MAD 0,00 MAD
- 24- 748,86 MAD 17 972,69 MAD 0,00 MAD
- 100- 606,77 MAD 60 677,01 MAD 0,00 MAD
- 15- 645,17 MAD 9 677,60 MAD 0,00 MAD
- 50- 4 518,77 MAD 225 938,67 MAD 0,00 MAD

- 90- 193,30 MAD 17 396,64 MAD 0,00 MAD


- 60- 7,68 MAD 460,84 MAD 0,00 MAD
- 6- 1 289,07 MAD 7 734,40 MAD 0,00 MAD
- 134- 193,30 MAD 25 871,92 MAD 0,00 MAD
- 3 831- 16,64 MAD 63 749,27 MAD 0,00 MAD
- 28- 1 547,65 MAD 42 857,94 MAD 0,00 MAD

per Manufacturer instructions, approved drawings, specifications and directions of Client/Engineer-In-Charge. These works inc
19 (i.e. a total of 9766 Piles)
- 4 660- 277,50 MAD 1 293 150,00 MAD 0,00 MAD
362,50 MAD 0,00 MAD 0,00 MAD
381,25 MAD 0,00 MAD 0,00 MAD
- 12 783- 581,17 MAD 7 429 070,81 MAD 0,00 MAD
- 934- 1 612,93 MAD 1 506 479,68 MAD 0,00 MAD

- 1- 684 856,59 MAD 684 856,59 MAD 0,00 MAD

RIX TOTAL HT (A+B+C+D+E+F)

PRIX TOTAL TTC


0,00 MAD 270 742,37 MAD
0,00 MAD 55 492,59 MAD
0,00 MAD 34 793,27 MAD
0,00 MAD 17 972,69 MAD
0,00 MAD 60 677,01 MAD
0,00 MAD 9 677,60 MAD
0,00 MAD 225 938,67 MAD
158 071,01 MAD
0,00 MAD 17 396,64 MAD
0,00 MAD 460,84 MAD
0,00 MAD 7 734,40 MAD
0,00 MAD 25 871,92 MAD
0,00 MAD 63 749,27 MAD
0,00 MAD 42 857,94 MAD
10 228 700,49 MAD
/Engineer-In-Charge. These works include steel piles

0,00 MAD 1 293 150,00 MAD


0,00 MAD 0,00 MAD
0,00 MAD 0,00 MAD
0,00 MAD 7 429 070,81 MAD
0,00 MAD 1 506 479,68 MAD
684 856,59 MAD

0,00 MAD 684 856,59 MAD

83 920 579,33

100 704 695,20


PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR

VDS BILL OF QUANTITY (VDS FOUM TIZI)

Id. DESCRIPTION Unit Quantity

Study, supply, tests in manufacturer workshops, installation, assembly, connection,


systems' equipment or software listed below, in accordance with all the specification
included into this bid.
4.A Communication LAN WAN
Security Distribution switches :
A.1 * 24 x SFP ports fully equipped with 20 Gbics 1GbaseLX and 4 Gbics 1Gbase SX U 1
* 2 x SFP+ ports fully equipped with 2 Gbics 10GbaseSR
IT Distribution switches :
* 24 ports 1GbE SFP equipped with 12 FO ports modules & 12 Gbics modules
1000Base LX/LH each
A.2 U 2
* 4 x 10GbE SFP+ ports fully equipped with 2 Gbics 10G SM LR & 2 Gbics 10G SM
SR

A.3 Indoor access switche 24 ports with SFP modules U 3


A.4 Industrial switch 8 Ports With SFP modules U 1
A.5 Industrial switch 4 Ports With SFP modules U 21
A.6 Routers with all related licences U 2
A.7 Firewalls with all related licences U 2
4.B PAGA & Intecom system
PAGA & Intercom Central Exchange Unit, with redundant CPU, Redundant
B.1 U 1
Amplifiers and Redundant Power
PAGA System & Intercom management software with licences, and integration
B.2 U 1
with the existing PAGA system
B.3 PAGA & Intercom mobile application U 1
B.4 Outdoor Field Call Station IP U 5
B.5 Acoustic hood for outdoor Intercoms + Free standing mounting post U 5
B.6 Desktop intercom station (Main Call Station) (à voir poste de garde U 1
B.7 Industrial Horn Speaker U 2
B.8 Sirens with all their relative masts U 16
B.9 Beacon U 4
B.10 Speakers Junction Box U 5
4.C CCTV
Outdoor 5 MP fixed surveillance camera with line crossing analysiswith all
C.1 U 33
licences & IR projectors
C.2 Outdoor 5MP fixed surveillance camera U 2
C.3 Outdoor mobile PTZ 8MP surveillance camera U 3
C.5 LPR camera with all related licences U 1
C.6 Masts 6m U 19
Management & recording server and storage Supplied with monitoring software
C.7 U 1
and necessary licenses.
VMS with all necessary licences and modules( for video surveillance analysis,
C.8 Ens 1
wall screen, LPR, Access Control, thermal video analysis)
4.D Pre cabling
server cabinet 42U 19" 1200 width with modules, cable management and
D.1 U 2
accessoires
D.2 Rack cabinet 12 U with modules, cable management and accessoires U 1
SUPPLY INSTALLATION TOTAL PRICE OF
SUPPLY &
Unit price Total price Unit price Total price INSTALLATION

embly, connection, programming, testing and commissioning of all VDS


all the specifications, lists, drawings, annexures, and any other document

3 144 739,26 MAD

485 836,88 MAD 485 836,88 MAD 39 375,00 MAD 39 375,00 MAD 525 211,88 MAD

410 996,67 MAD 821 993,34 MAD 129 062,50 MAD 258 125,00 MAD 1 080 118,34 MAD

44 909,07 MAD 134 727,22 MAD 4 375,00 MAD 13 125,00 MAD 147 852,22 MAD
28 345,16 MAD 28 345,16 MAD 10 812,50 MAD 10 812,50 MAD 39 157,66 MAD
21 956,06 MAD 461 077,32 MAD 5 650,00 MAD 118 650,00 MAD 579 727,32 MAD
23 876,20 MAD 47 752,40 MAD 2 750,00 MAD 5 500,00 MAD 53 252,40 MAD
344 084,72 MAD 688 169,44 MAD 15 625,00 MAD 31 250,00 MAD 719 419,44 MAD
759 621,17
111 481,79 MAD 111 481,79 MAD 31 250,00 MAD 31 250,00 MAD 142 731,79 MAD

71 926,53 MAD 71 926,53 MAD 31 250,00 MAD 31 250,00 MAD 103 176,53 MAD
108 428,51 MAD 108 428,51 MAD 18 750,00 MAD 18 750,00 MAD 127 178,51 MAD
16 671,48 MAD 83 357,40 MAD 1 250,00 MAD 6 250,00 MAD 89 607,40 MAD
16 665,46 MAD 83 327,30 MAD 1 000,00 MAD 5 000,00 MAD 88 327,30 MAD
3 215,32 MAD 3 215,32 MAD 625,00 MAD 625,00 MAD 3 840,32 MAD
4 499,94 MAD 8 999,88 MAD 812,50 MAD 1 625,00 MAD 10 624,88 MAD
8 346,28 MAD 133 540,44 MAD 1 062,50 MAD 17 000,00 MAD 150 540,44 MAD
8 128,66 MAD 32 514,64 MAD 1 062,50 MAD 4 250,00 MAD 36 764,64 MAD
1 240,87 MAD 6 204,36 MAD 125,00 MAD 625,00 MAD 6 829,36 MAD
2 169 573,19
22 394,22 MAD 739 009,16 MAD 2 500,00 MAD 82 500,00 MAD 821 509,16 MAD
31 514,66 MAD 63 029,32 MAD 3 125,00 MAD 6 250,00 MAD 69 279,32 MAD
98 820,11 MAD 296 460,33 MAD 5 625,00 MAD 16 875,00 MAD 313 335,33 MAD
43 569,46 MAD 43 569,46 MAD 5 625,00 MAD 5 625,00 MAD 49 194,46 MAD
10 935,09 MAD 207 766,70 MAD 2 250,00 MAD 42 750,00 MAD 250 516,70 MAD
102 239,20 MAD 102 239,20 MAD 18 750,00 MAD 18 750,00 MAD 120 989,20 MAD

482 249,01 MAD 482 249,01 MAD 62 500,00 MAD 62 500,00 MAD 544 749,01 MAD
992 787,42
12 517,16 MAD 25 034,32 MAD 1 500,00 MAD 3 000,00 MAD 28 034,32 MAD
3 230,37 MAD 3 230,37 MAD 1 250,00 MAD 1 250,00 MAD 4 480,37 MAD
D.3 Waterproof outdoor cabinet Rail DIN with modules & accessoires U 21
D.4 Twisted pair cable (S/FTP Cat 6A with Fire retardant ) ML 676
D.5 IT Sockets U 4
D.6 Patch cord 1m/ 3m/ 5m RJ45 S/FTP Cat 6A ENS 1
D.7 Patch Panel Copper( 24 Ports 6A SFTP) U 3
D.8 Outdoor Fiber Optic Cables OS1 (12 brins) ML 4290
D.9 Indoor FO patch panel 24 SC/APC SM U 3
D.10 Optical fiber patch cord SC APC/LC UPC/ optic garter Single mode U 64
Industrial patch panel fiber optic Din Rail mouting 8 ports (Din Rail mounting 8
D.11 U 21
ports for outdoor deployment Type of ports : SC APC)
RJ45 Plugs to connect cameras, intercoms, access point, Access Control, Video
D.12 U 104
Wall and other IP equipment
D.13 Multipair cable between central exchange unit and outdoor cabinet ML 3120
D.14 Audio cable between sirens and outdoor cabinets ML 230
D.15 Goulottes et cheminement de cable ENS 1
4.E Access Control
E.1 Controller U 1
E.2 Card Reader U 1
Control access system for sliding access gate, including motors, controller, card
E.3 U 1
reader "range 10 m"
E.4 Smart card booster 2G U 20
E.5 100 printed badges pack, MIFARE/ DESFIRE EV2 U 1
E.6 Badge printer U 1
E.7 full height turnstil U 1
E.8 Access control Software with licenses and integration with VMS ENS 1
E.9 server for access control U 1

PRIX TOTAL HT (A+B+C+D+E)

PRIX TOTAL TTC


16 046,48 MAD 336 976,10 MAD 1 875,00 MAD 39 375,00 MAD 376 351,10 MAD
12,95 MAD 8 755,27 MAD 6,25 MAD 4 225,00 MAD 12 980,27 MAD
156,62 MAD 626,49 MAD 125,00 MAD 500,00 MAD 1 126,49 MAD
35 978,44 MAD 35 978,44 MAD 5 625,00 MAD 5 625,00 MAD 41 603,44 MAD
2 000,00 MAD 6 000,00 MAD 62,50 MAD 187,50 MAD 6 187,50 MAD
32,92 MAD 141 232,11 MAD 6,25 MAD 26 812,50 MAD 168 044,61 MAD
3 238,10 MAD 9 714,30 MAD 375,00 MAD 1 125,00 MAD 10 839,30 MAD
284,63 MAD 18 216,57 MAD 125,00 MAD 8 000,00 MAD 26 216,57 MAD
4 183,08 MAD 87 844,62 MAD 625,00 MAD 13 125,00 MAD 100 969,62 MAD

99,02 MAD 10 297,93 MAD 125,00 MAD 13 000,00 MAD 23 297,93 MAD
32,15 MAD 100 317,90 MAD 6,25 MAD 19 500,00 MAD 119 817,90 MAD
32,15 MAD 7 395,23 MAD 6,25 MAD 1 437,50 MAD 8 832,73 MAD
57 755,29 MAD 57 755,29 MAD 6 250,00 MAD 6 250,00 MAD 64 005,29 MAD
798 428,85
12 383,13 MAD 12 383,13 MAD 1 250,00 MAD 1 250,00 MAD 13 633,13 MAD
4 495,42 MAD 4 495,42 MAD 625,00 MAD 625,00 MAD 5 120,42 MAD
58 639,80 MAD 58 639,80 MAD 3 750,00 MAD 3 750,00 MAD 62 389,80 MAD
23 810,72 MAD 476 214,40 MAD 31,25 MAD 625,00 MAD 476 839,40 MAD
15 436,53 MAD 15 436,53 MAD 3 125,00 MAD 3 125,00 MAD 18 561,53 MAD
24 273,06 MAD 24 273,06 MAD 625,00 MAD 625,00 MAD 24 898,06 MAD
102 765,75 MAD 102 765,75 MAD 7 500,00 MAD 7 500,00 MAD 110 265,75 MAD
32 062,86 MAD 32 062,86 MAD 2 500,00 MAD 2 500,00 MAD 34 562,86 MAD
45 907,91 MAD 45 907,91 MAD 6 250,00 MAD 6 250,00 MAD 52 157,91 MAD

A+B+C+D+E) 7 865 149,89

L TTC 9 438 179,87


Id.

5.A

A1

A2

A3

A4

A5

A6

A7

5.B

B1

B3

B4

B5

5.C

C1

C2

C3

C4
5.D
D1
PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR

SID BILL OF QUANTITY (SID FOUM TIZI)

DESCRIPTION

Système de détection incendie et de report des alarmes et défauts

Fourniture, pose, programmation, paramétrage et raccordement des centrales de détection incendie adressable, y
compris alimentation électrique de secours, batteries, outils et logiciels de programmation et de paramétrage avec
licences, Modules et toutes sujétions nécessaires a une installation complète en ordre de marche.
Fourniture et pose de Détecteurs (Linéaire de fumée/Multicritères/Optique de fumée...) avec socles et tous les
accessoires de pose et de raccordement nécessaire pour une installation en ordre de marche.
Fourniture et pose de Déclencheur Manuel d'alarme avec capots de protection et tous les accessoires de pose et d
raccordement,
Fourniture et pose de Déclencheur Manuel d'alarme pour une utilisation à l'extérieur avec capots de protection et to
les accessoires de pose et de raccordement,
Fourniture et pose de Sirènes d'alarme avec flash avec module de commande et tous les accessoires de pose et d
raccordement, tous les accessoires nécessaires pour une installation en ordre de marche.
Fourniture et pose de Sirènes d'alarme avec flash, pour usage externe avec module de commande et tous les
accessoires de pose et de raccordement,
Fourniture et pose de câblages, circuits de fin de ligne, chemins de câble, tube métallique, flexible armée, support,
toutes sujétions et accessoires nécessaires à la pose et au raccordement d'une installation complète en ordre de
marche.
Système de protection à eau pour Warehouse
Connexion au réseau incendie existant (à partir du tie-in) : Fourniture et pose de tuyauterie en PEHD SDR9 Approu
FM assemblé par poly-fusion/en acier carbonne sans soudure SH40 avec bande de protection (pour la partie
enterrée), y compris fouille, terrassement, déblais, remblais, toutes pièces de raccordement, ancrages, butées, brid
coudes, vannes, tés, dérivations, raccords, réductions, regards, supports, essais et toutes fournitures et sujétions
réalisés selon les normes en vigueur et spécifications techniques.
Fourniture et pose des RIA DN33/30m avec armoire, vannes, clapet anti-retour, réducteur de pression, Tuyauteris,
coudes, tés, dérivations, raccords, réductions, Regards, supports, les accessoires de pose et de raccordement et
toutes sujétions nécessaires à une installation complète en ordre de marche

Rinçage et essais hydrostatiques avec PV délivré par un organisme (bureau de contrôle) agréé par l'Etat

Fourniture et pose des plaques signalétiques photoluminescentes de dimensions adéquates pour tous les composa
fixes des installations de protection à eau incendie conformément aux documents fournis (Spécifications technique
Réquisition…etc)
Extincteurs Pour Warehouse
Fourniture et pose d'extincteurs à Poudre ABC 9 Kg Approuvé NF y compris accessoires de montage, supports,
coffret en plastique…etc
Fourniture et pose d'extincteurs CO2 5 KG Approuvé NF y compris accessoires de montage, supports, coffret en
plastique…etc

Fourniture et pose d'extincteurs mobiles ABC 50 kg Approuvé NF avec housse de protection

Fourniture et pose des plaques signalétiques photoluminescentes de dimensions adéquates pour tous les extincteu
conformément aux documents fournis (Spécifications techniques, Réquisition…etc)
Extincteurs pour poste de garde
Fourniture et pose d'extincteurs à Poudre ABC 9 Kg Approuvé NF y compris accessoires de montage, supports,
coffret en plastique…etc
SUPPLY INSTALLATION
Unit Quantity
Unit price Total price Unit price Total price

Ens 1 159 941,51 MAD 159 941,51 MAD 15 625,00 MAD 15 625,00 MAD

Ens 1 189 660,35 MAD 189 660,35 MAD 10 625,00 MAD 10 625,00 MAD

Ens 1 12 517,16 MAD 12 517,16 MAD 1 500,00 MAD 1 500,00 MAD

Ens 1 14 000,12 MAD 14 000,12 MAD 1 950,00 MAD 1 950,00 MAD

Ens 1 8 365,85 MAD 8 365,85 MAD 1 875,00 MAD 1 875,00 MAD

Ens 1 16 496,92 MAD 16 496,92 MAD 2 187,50 MAD 2 187,50 MAD

Ens 1 58 960,36 MAD 58 960,36 MAD 15 625,00 MAD 15 625,00 MAD

Ens 1 102 709,52 MAD 102 709,52 MAD 12 500,00 MAD 12 500,00 MAD

Ens 1 25 752,64 MAD 25 752,64 MAD 6 250,00 MAD 6 250,00 MAD

Ens 1 32 108,01 MAD 32 108,01 MAD 4 375,00 MAD 4 375,00 MAD

Ens 1 6 445,69 MAD 6 445,69 MAD 1 875,00 MAD 1 875,00 MAD

Ens 1 51 354,76 MAD 51 354,76 MAD 6 250,00 MAD 6 250,00 MAD

Ens 1 12 364,28 MAD 12 364,28 MAD 3 125,00 MAD 3 125,00 MAD

Ens 1 122 362,69 MAD 122 362,69 MAD 31 250,00 MAD 31 250,00 MAD

Ens 1 43 583,81 MAD 43 583,81 MAD 2 500,00 MAD 2 500,00 MAD

Ens 1 12 500,00 MAD 12 500,00 MAD 2 221,22 MAD 2 221,22 MAD


TOTAL PRICE OF
SUPPLY &
INSTALLATION

509 329,77 MAD

175 566,51 MAD

200 285,35 MAD

14 017,16 MAD

15 950,12 MAD

10 240,85 MAD

18 684,42 MAD

74 585,36 MAD

192 015,87 MAD

115 209,52 MAD

32 002,64 MAD

36 483,01 MAD

8 320,69 MAD

272 790,54 MAD

57 604,76 MAD

15 489,28 MAD

153 612,69 MAD

46 083,81 MAD
35 458,93 MAD
14 721,22 MAD
D2

D3

5.E

E1

E2

E3

E4

5.F

F1

5.G

G1

G2

G3

PRIX TOTAL HT (A+B

PRIX TOTA
Fourniture et pose d'extincteurs CO2 5 KG Approuvé NF y compris accessoires de montage, supports, coffret en
plastique…etc
Fourniture et pose des plaques signalétiques photoluminescentes de dimensions adéquates pour tous les extincteu
conformément aux documents fournis (Spécifications techniques, Réquisition…etc)
Extincteurs pour Inverter stations

Fourniture et pose d'extincteurs à roues CO2 2x10 Kg, avec housse de protection

Fourniture et pose d'extincteurs CO2 5 KG Approuvé NF y compris accessoires de montage, supports, coffret en
plastique…etc
Fourniture et pose d'extincteurs à Poudre ABC 9 Kg Approuvé NF y compris accessoires de montage, supports,
coffret en plastique…etc
Fourniture et pose des plaques signalétiques photoluminescentes de dimensions adéquates pour tous les extincteu
conformément aux documents fournis (Spécifications techniques, Réquisition…etc)
Signalisation, Evacuation et Intervention

Fourniture et pose des plans de Signalisation, Evacuation et d'Intervention conformément au Spécification

PRESTATION DIVERSES
Ingénierie détail et d'exécution comprenant l'établissement de tous les plans, etc…..

Fourniture des pièces de rechange conformément à l'annexe D

Dossiers constructeurs As-Built (y compris tous les documents, plans, schémas, notes de calculs, etc.) de tous les
équipements et les ouvrages fournis/réalisés

PRIX TOTAL HT (A+B+C+D+

PRIX TOTAL TTC


Ens 1 6 171,60 MAD 6 171,60 MAD 1 125,00 MAD 1 125,00 MAD

Ens 1 12 500,00 MAD 12 500,00 MAD 941,11 MAD 941,11 MAD

Ens 1 50 000,00 MAD 50 000,00 MAD 7 604,76 MAD 7 604,76 MAD

Ens 1 12 364,28 MAD 12 364,28 MAD 3 125,00 MAD 3 125,00 MAD

Ens 1 22 500,00 MAD 22 500,00 MAD 5 278,30 MAD 5 278,30 MAD

Ens 1 42 500,00 MAD 42 500,00 MAD 3 583,81 MAD 3 583,81 MAD

Ens 1 0,00 MAD 0,00 MAD 580 925,57 MAD 580 925,57 MAD

Ens 1 0,00 MAD 0,00 MAD 128 010,58 MAD 128 010,58 MAD

Ens 1 0,00 MAD 0,00 MAD 0,00 MAD 0,00 MAD

Ens 1 0,00 MAD 0,00 MAD 128 010,58 MAD 128 010,58 MAD

C+D+E+F+G)

TTC
7 296,60 MAD

13 441,11 MAD

146 956,14 MAD

57 604,76 MAD

15 489,28 MAD

27 778,30 MAD

46 083,81 MAD

580 925,57 MAD

580 925,57 MAD

256 021,15 MAD

128 010,58 MAD

0,00 MAD

128 010,58 MAD

1 993 497,97 MAD

2 392 197,56 MAD


Id.

6.A

A1

A1.1

6.B

B1

B1.1

B2

B2.1

B3

B3.1

B4

B4.1

6.C

C1

C3

C4

PRIX TOTAL H

PRIX TOT
PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR

HVAC BILL OF QUANTITY (HVAC FOUM TIZI)

DESCRIPTION

Engineering, details and achievement

Engineering, details and achievement

Engineering of details and execution including the establishment of all plans, calculation notes, technical
specification,...etc.

Supply of equipment (including PDR for commissioning, start-up and warranty period) and assembly servic
as well as construction services (including tests, factory and on-site acceptance tests)

Non-return dampers
smoke vents with, including curbs and control devices, anti-vibration studs and sleeves supports and all accessorie
for a complete installation. effective area = 1.21 m2.
External grid galvanized steel
External grid galvanized steel (special treatment anticorision), for fixation in wall or external door with filter G4 and
accessories for a complete installation (Dimension 900*600)
Sealing
Sealing all walls, slabs and reservations for electrical equipment, with the same fire resistance rating as the
construction element
Electricity
Cable, cable duct, armed hose, support, all Electrical installation requirements and accessories for a complete
installation
Diverse
As-Built builders' records (including all documents, plans, diagrams, calculation notes, etc.) of all equipment and wo
supplied / produced
Inspection, testing and commissioning of the complete HVAC Systems, including all labour and all required testing
eauipment, testing equipment shall be calibrated. Testing shall be as per, specifications of this tender and direction
Engineers-in-Charge & putting into commercial operation.

Supply of Electrical Spare Parts - As per Annexe D -

PRIX TOTAL HT (A+B

PRIX TOTAL TTC


SUPPLY INSTALLATION
Unit Quantity
Unit price Total price Unit price Total price

Lumpsum - 1- 0,00 MAD 0,00 MAD 115 209,52 MAD 115 209,52 MAD

U - 4- 30 000,00 MAD 120 000,00 MAD 8 403,17 MAD 33 612,69 MAD

U - 8- 32 500,00 MAD 260 000,00 MAD 5 903,17 MAD 47 225,39 MAD

Lumpsum - 1- 30 000,00 MAD 30 000,00 MAD 12 883,54 MAD 12 883,54 MAD

Lumpsum - 1- 50 000,00 MAD 50 000,00 MAD 10 805,02 MAD 10 805,02 MAD

Lumpsum - 1- 0,00 MAD 0,00 MAD 115 209,52 MAD 115 209,52 MAD

Lumpsum - 1- 0,00 MAD 0,00 MAD 89 607,40 MAD 89 607,40 MAD

Lumpsum - 1- 0,00 MAD 0,00 MAD 0,00 MAD 0,00 MAD

(A+B+C)

TTC
TOTAL PRICE OF
SUPPLY &
INSTALLATION

115 209,52 MAD

115 209,52 MAD

115 209,52 MAD

564 526,65 MAD

153 612,69 MAD

153 612,69 MAD

307 225,39 MAD

307 225,39 MAD

42 883,54 MAD

42 883,54 MAD

60 805,02 MAD

60 805,02 MAD

204 816,92 MAD

115 209,52 MAD

89 607,40 MAD

0,00 MAD

884 553,09 MAD

1 061 463,71 MAD


Id.

7.A
A1
A2
A3
A4
A5
A6
7.B
B1
B2
B3
B4

PRIX TOTAL HT (A

PRIX TOTAL TTC


PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR
CHARPENTE METALLIQUE BILL OF QUANTITY
(O&M WAREHOUSE FOUM TIZI)
DESCRIPTION

CHARPENTE METALLIQUE
Charpente métallique
Couverture et bardage en toles NERVESCO
Couverture et bardage en panneaux translucides
Descentes d'eau pluviale(diametre 160mm )
Cheneaux
Portail coulissant 3m x 3.5m
BETON ET BETON ARME EN FONDATION
Béton de propreté
Béton pour semelles, radiers et massifs de fondations
Armatures en aciers HA FeE500S pour béton armé
Dallage

PRIX TOTAL HT (A+B)

PRIX TOTAL TTC


SUPPLY INSTALLATION
Unit Quantity
Unit price Total price Unit price Total price

kg - 12 043- 37,50 MAD 451 612,50 MAD 0,90 MAD 10 876,91 MAD
m2 - 439- 25,00 MAD 10 975,00 MAD 0,60 MAD 264,33 MAD
m2 - 58- 312,50 MAD 18 125,00 MAD 7,53 MAD 436,53 MAD
ML - 16- 300,00 MAD 4 800,00 MAD 7,23 MAD 115,61 MAD
ML - 40- 312,50 MAD 12 500,00 MAD 7,53 MAD 301,06 MAD
U - 2- 43 750,00 MAD 87 500,00 MAD 1 053,70 MAD 2 107,40 MAD

m3 - 3- 1 250,00 MAD 3 125,00 MAD 30,11 MAD 75,26 MAD


m3 - 49- 1 562,50 MAD 76 562,50 MAD 37,63 MAD 1 843,98 MAD
kg - 1 674- 17,50 MAD 29 295,00 MAD 0,42 MAD 705,56 MAD
m3 - 48- 1 937,50 MAD 93 000,00 MAD 46,66 MAD 2 239,87 MAD

OTAL HT (A+B)

TOTAL TTC
TOTAL PRICE OF
SUPPLY & INSTALLATION

599 614,35 MAD


462 489,41 MAD
11 239,33 MAD
18 561,53 MAD
4 915,61 MAD
12 801,06 MAD
89 607,40 MAD
206 847,17 MAD
3 200,26 MAD
78 406,48 MAD
30 000,56 MAD
95 239,87 MAD

806 461,52 MAD

967 753,82 MAD


PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR
ELECTRICAL BILL OF QUANTITY (OULED FARES)
SECTIO
DESCRIPTION
N
8.A FREE ISSUE MATERIAL
Installation/connections, programming/configuration, testing & commissioning of following equipments and systems (Supplied
consumable required to complete the installation/mounting/connections, steel supports, civil Works, etc. Contractor shall prepa
Installation/mounting/connections shall be as per Manufacturer instructions, approved drawings, specifications and directions
done as per Specifications, and Inspection and test plan.

PV Modules, JA SOLAR - JAM72D30-545/MB - Bifacial PERC Mono crystalline. No


A.1
contingency considered.
PVH - AXONE DUO - 108M. Single Axis dual-row tracker ±55º with configuration 1P for 54
A.2 modules (2 strings per structure). The total amount is given by rows / trackers (each
tracker is comprised by 2 rows). No contingency considered
PVH - AXONE DUO control systems (NCUs, T-boxes). Typically one NCU per IS (mounting
A.3
support to be supplied by the Contractor)
Central Inverter 4400KVA, complete outdoor station with Inverter, 0.6kV/33kV transformer,
A.4
RMU and Auxiliary transformer. No contingency considered.

PRIX TOTAL HT (A)

PRIX TOTAL TTC


SUPPLY INSTALLATION
Unit Quantity
Unit price Total price Unit price Total price

ents and systems (Supplied by Client/Others), including supply of all necessary hardware, screws, bolts, washers & all necessary
s, etc. Contractor shall prepare final BOM and schedules and get that approved by Client/Engineer-In-Charge.
specifications and directions of Client/Engineer-In-Charge & putting into commercial operation. Testing and precommissioning shall be

U 192672 0,00 MAD 0,00 MAD 31,94 MAD 6 154 800,00 MAD

U 1784 0,00 MAD 0,00 MAD 12 555,56 MAD 22 399 111,11 MAD

LOT 1 0,00 MAD 0,00 MAD 197 916,67 MAD 197 916,67 MAD

U 20 0,00 MAD 0,00 MAD 118 055,56 MAD 2 361 111,11 MAD

OTAL HT (A)

TOTAL TTC
TOTAL PRICE OF
SUPPLY & INSTALLATION
31 112 938,89 MAD
crews, bolts, washers & all necessary
neer-In-Charge.
Testing and precommissioning shall be

6 154 800,00 MAD

22 399 111,11 MAD

197 916,67 MAD

2 361 111,11 MAD

31 112 938,89 MAD

37 335 526,67 MAD


PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR
ELECTRICAL BILL OF QUANTITIES
(OULED FARES)
SECTIO
DESCRIPTION Unit Quantity
N
9.A MV, LV, AUX AND FO CABLING WORKS
A.1 CABLING WORKS FOR PV FIELDS
A.1.1 MV CABLES
Supply & delivery to site, Installation/connections, testing & commissioning of following MV cables laid on Underground trenche
& all necessary consumable (i.e. Cable Tags, Clamps, Ferrule, Shrouds, cable tray sections and supports, etc.) required to com
entries, steel supports, Civil Works(i.e. chipping of floor, breaking, making & sealing of wall, Cutouts, etc.). Contractor shall pre
Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of Client/Engin
precommissioning of cables shall be done as per Specifications and Inspection and test plan.
Single-core aluminium cable. Section: 150 mm2. Insulation:
crosslinked polyethylene (XLPE) type A, 90ºC. Rated voltage: 33 kV.
A.1.1.1 m 9094
Insulation voltage: 36 kV. Sheat: halogen free.
2% of contingency included.
Single-core aluminium cable. Section: 240 mm2. Insulation:
crosslinked polyethylene (XLPE) type A, 90ºC. Rated voltage: 33 kV.
A.1.1.2 m 22788
Insulation voltage: 36 kV. Sheat: halogen free.
2% of contingency included.
A.1.2 MV CABLE TERMINATIONS
Supply & delivery to site, installation/connections, testing & commissioning of following MV termination kits, including supply of
Nut Bolts, anchor fastener, shrouds, etc), supply and installation of all required steel supports including anti corrosion paint, mi
etc.) for complete installation/termination & commissioning. Scope covers removal, re-fixing of galnd plate, drilling, sealing for u
approved by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of
precommissioning of cables shall be done as per Specifications and Inspection and test plan.
Preparation and execution of MV terminations shall be carried out by qualified and trained staff, in full compliance with manufa
Kit of 3 terminations (IS RMU side). MV plugin Connectors "C" type
(630 A: interface type C with bolt M16). Conductors size: Single Core
A.1.2.1 150 mm2. Insulation: crosslinked polyethylene (XLPE), 90ºC, U 23
unarmoured. Insulation voltage: 36 kV.
With contingency according to MTO
Kit of 3 terminations (IS RMU side). MV plugin Connectors "C" type
(630 A: interface type C with bolt M16). Conductors size: Single Core
A.1.2.2 240 mm2. Insulation: crosslinked polyethylene (XLPE), 90ºC, U 10
unarmoured. Insulation voltage: 36 kV.
With contingency according to MTO.
Kit of 3 terminations (Main Substation AIS side). MV connections to
Substation main switchgear (Primary Air Insulated Switchgear).
A.1.2.3 Conductors size: Single Core 240 mm2. Insulation: crosslinked U 10
polyethylene (XLPE), 90ºC, unarmoured. Insulation voltage: 36 kV.
With contingency according to MTO.
A.1.3 AUXILIARY LV AC CABLES (CCTV Auxiliary power system, Weather stations' Auxiliary power cable, Gates
Supply & delivery to site, Installation/connections, testing & commissioning of following Aux. LV AC cables laid on Underground
hardware & all necessary consumable (i.e. Cable Tags, Ties, Clamps, Trefoil clamps, Ferrule, Shrouds, cable tray sections and
plates, sealing of all unused spare entries, steel supports, Civil Works(i.e. chipping of floor, breaking, making & sealing of wall,
get that approved by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and dire
and precommissioning of cables shall be done as per Specifications and Inspection and test plan.
Main Power cables 3P+N+G multi-core copper cables 0.6/1 kV
A.1.3.1 XLPE. Section 4 mm2, , including complete routings. m 500
LV Cables For Field UPS supply from IS.
1P+N multi-core copper cables 0.6/1 kV XLPE. Section 2,5 mm2,
including complete routings.
A.1.3.2 For Perimeter Security Communication Boxes from Field UPS m 7700
panel.
2% of contingency included.
SUPPLY INSTALLATION TOTAL PRICE OF
SUPPLY &
Unit price Total price Unit price Total price INSTALLATION
39 143 421,74 MAD
38 452 754,66 MAD
3 364 564,91 MAD
MV cables laid on Underground trenches & through ductbank/conduits/trays, including supply of all necessary hardware
ctions and supports, etc.) required to complete the installation / laying, drilling of gland plates, sealing of all unused spare
wall, Cutouts, etc.). Contractor shall prepare final BOM and cable drum schedule and get that approved by
cifications and directions of Client/Engineer-In-Charge & putting into commercial operation. Testing and
st plan.

82,19 MAD 747 460,83 MAD 4,50 MAD 40 923,00 MAD 788 383,83 MAD

107,65 MAD 2 453 125,88 MAD 5,40 MAD 123 055,20 MAD 2 576 181,08 MAD

894 797,41 MAD


MV termination kits, including supply of all necessary consumables and hardware (i.e. cable lugs, PVC tapes, ferrules,
upports including anti corrosion paint, mionr civil works (i.e. chipping of floor, breaking, making & sealing of wall, Cutouts,
fixing of galnd plate, drilling, sealing for unused hole/spare hole. Contractor shall prepare final BOM and get that
drawings, specifications and directions of Client/Engineer-In-Charge & putting into commercial operation. Testing and
st plan.
ned staff, in full compliance with manufacturer instructions.

11 759,39 MAD 270 465,90 MAD 8 125,00 MAD 186 875,00 MAD 457 340,90 MAD

12 460,01 MAD 124 600,13 MAD 8 750,00 MAD 87 500,00 MAD 212 100,13 MAD

13 160,64 MAD 131 606,39 MAD 9 375,00 MAD 93 750,00 MAD 225 356,39 MAD

tations' Auxiliary power cable, Gates Auxiliary power cables, Tracker NCU power cable) 263 190,41 MAD
Aux. LV AC cables laid on Underground trenches & through ductbank/conduits/trays, including supply of all necessary
Ferrule, Shrouds, cable tray sections and supports, etc.) required to complete the installation / laying, drilling of gland
loor, breaking, making & sealing of wall, Cutouts, etc.). Contractor shall prepare final BOM and cable drum schedule and
proved drawings, specifications and directions of Client/Engineer-In-Charge & putting into commercial operation. Testing
d test plan.

50,47 MAD 25 233,61 MAD 12,50 MAD 6 250,00 MAD 31 483,61 MAD

13,52 MAD 104 111,30 MAD 4,38 MAD 33 687,50 MAD 137 798,80 MAD
Not calculated yet. Estimated.

Not calculated yet. Estimated.


1P+N multi-core copper cables 0.6/1 kV XLPE. Section 2.5 mm2,
including complete routings.
A.1.3.3 m 187
For Weather Stations from Field UPS panel.
2% of contingency included.
1P+N multi-core copper cables 0.6/1 kV XLPE. Section 2.5 mm2,
including complete routings.
A.1.3.4 m 541
For Tracker NCUs from Field UPS panel.
2% of contingency included.
1P+N multi-core copper cables 0.6/1 kV XLPE. Section 2.5 mm2,
including complete routings.
A.1.3.5 m 1303
For VDS from Field UPS panel.
2% of contingency included.
Main Power cable [3P+N+PE, 5G6mm²] from Substation "TGBT 380-
220V" (located in LV&Aux.Room) to "380-220V Non UPS Panel",
A.1.3.6 Located in North Main Access Area, including complete routings. m 70
For North Main access area (Guard's house+Gate) from
Substation.
Main Power cable [1P+N+PE, 3G6mm²] from Substation "MAIN UPS
PANEL 220V AC" (located in LV&Aux.Room) to "220V UPS Panel",
A.1.3.7 Located in North Main Access Area, including complete routings. m 70
For North Main access area (Guard's house+Gate) from
Substation.
Main Power cable [3P+N+PE, 5G6mm²] from inverter station to "380-
220V Non UPS Panel", Located in South Main Access Area,
A.1.3.8 including complete routings. m 70
For South Main access area (Guard's house+Gate) from Inverter
Station.
Main Power cable [1P+N+PE, 3G6mm²] from inverter station to
"220V UPS Panel", Located in South Main Access Area, including
A.1.3.9 complete routings. m 70
For South Main access area (Guard's house+Gate) from Inverter
Station.
Distribution cables from "380-220V Non UPS Panel" to Lighting,
socket outlets, HVAC, ancillary, etc. located in Main Access Areas
A.1.3.10 (North & South), including complete routings and terminations. LOT 2
380-220V Distribution cables within North & South Main access
areas (Guard's houses+Gates)
Distribution cables from "220V UPS Panel" to CCTV/VDS, Fire Alarm
Panels and other Package P05 users located in Main Access Areas
A.1.3.11 (North & South), including complete routings and terminations. LOT 2
220V UPS Distribution cables within North & South Main access
areas (Guard's houses+Gates)
A.1.4 AUXILIARY LV AC CABLE TERMINATIONS
Supply & delivery to site, installation/connections, testing & commissioning of following LV terminations for power cables, contr
hardware (i.e. cable lugs, PVC tapes, ferrules, Nut Bolts, anchor fastener, shrouds, terminal blocks, etc), supply and installation
e. chipping of floor, breaking, making & sealing of wall, Cutouts, etc.) for complete installation/termination & commissioning. Sc
hole/spare hole. Contractor shall prepare final BOM and get that approved by Client/Engineer-In-Charge. Installation/Laying sh
Client/Engineer-In-Charge & putting into commercial operation. Testing and precommissioning of cables shall be done as per S
Complete terminations and Connectors for 3P+N+G multi-core
A.1.4.1 copper cable 0.6/1 kV XLPE. Section 4 mm2 U 120
For Field UPS supply from IS.
Complete terminations and Connectors for 1P+N multi-core copper
cable 0.6/1 kV XLPE. Section 2,5 mm2.
A.1.4.2 U 234
For Perimeter Security Communication Boxes from Field UPS
panel.
Complete terminations and Connectors for 1P+N multi-core copper
A.1.4.3 cable 0.6/1 kV XLPE. Section 2.5 mm2. U 30
For Weather Stations from Field UPS panel.
Complete terminations and Connectors for 1P+N multi-core copper
A.1.4.4 cable 0.6/1 kV XLPE. Section 2.5 mm2. U 120
For Tracker NCUs from Field UPS panel.
13,52 MAD 2 528,42 MAD 4,38 MAD 818,13 MAD 3 346,54 MAD

13,52 MAD 7 314,83 MAD 4,38 MAD 2 366,88 MAD 9 681,71 MAD

13,52 MAD 17 617,80 MAD 4,38 MAD 5 700,63 MAD 23 318,42 MAD

76,22 MAD 5 335,61 MAD 4,38 MAD 306,25 MAD 5 641,86 MAD

30,75 MAD 2 152,79 MAD 4,38 MAD 306,25 MAD 2 459,04 MAD

76,22 MAD 5 335,61 MAD 4,38 MAD 306,25 MAD 5 641,86 MAD

30,75 MAD 2 152,79 MAD 4,38 MAD 306,25 MAD 2 459,04 MAD

10 453,32 MAD 20 906,64 MAD 1 875,00 MAD 3 750,00 MAD 24 656,64 MAD

6 476,44 MAD 12 952,89 MAD 1 875,00 MAD 3 750,00 MAD 16 702,89 MAD

27 077,23 MAD
LV terminations for power cables, control & instrumentation cables, including supply of all necessary consumables and
minal blocks, etc), supply and installation of all required steel supports including anti corrosion paint, mionr civil works (i.
allation/termination & commissioning. Scope covers removal, re-fixing of galnd plate, drilling, sealing for unused
ngineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of
ssioning of cables shall be done as per Specifications and Inspection and test plan.

34,28 MAD 4 113,00 MAD 18,75 MAD 2 250,00 MAD 6 363,00 MAD

27,65 MAD 6 469,38 MAD 18,75 MAD 4 387,50 MAD 10 856,88 MAD

27,65 MAD 829,41 MAD 18,75 MAD 562,50 MAD 1 391,91 MAD

27,65 MAD 3 317,63 MAD 18,75 MAD 2 250,00 MAD 5 567,63 MAD
Not calculated yet. Estimated.

Not calculated yet. Estimated.

Not calculated yet. Estimated. New Item


Complete terminations and Connectors for 1P+N multi-core copper
A.1.4.5 cable 0.6/1 kV XLPE. Section 2.5 mm2. U 54
For VDS from Field UPS panel.
Complete terminations and Connectors for 3P+N+G multi-core
copper cable 0.6/1 kV XLPE. Section 6 mm2.
A.1.4.6 U 4
For North & South Main access areas (Guard's house+Gate)
from Substation/Inverter Station.
Complete terminations and Connectors for 1P+N+G multi-core
copper cable 0.6/1 kV XLPE. Section 6 mm2.
A.1.4.7 U 4
For North & South Main access areas (Guard's house+Gate)
from Substation/Inverter Station.
A.1.5 LV DC CABLES
Supply & delivery to site, Installation/connections, testing & commissioning of following LV DC cables laid on Underground tren
hardware & all necessary consumable (i.e. Cable Tags, Clamps, Ferrule, Shrouds, cable tray sections and supports, etc.) requ
unused spare entries, steel supports, Civil Works(i.e. chipping of floor, breaking, making & sealing of wall, Cutouts, etc.). Contr
by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of Client/En
precommissioning of cables shall be done as per Specifications and Inspection and test plan.
LV DC Cable ST-SCB: Single-core copper cable 1.5kV. Section: 6
mm2. Insulation: crosslinked polyethylene (XLPE) type A, 90ºC,
installed in air or conduits. Nominal voltage: 1500VDC, maximum
A.1.5.1 m 110626
permitted operating dc voltage 1800VDC. Unarmored, not screened,
flame retardant sheat. UV resistant PV string cables.
2% of contingency included.
SCB to IS cable: Single-core aluminium cable 1.5kV. Section: 185
mm2. Insulation: crosslinked polyethylene (XLPE) type A, 90ºC,
A.1.5.2 unarmoured. Nominal voltage: 1500VDC, maximum permitted m 60885
operating DC voltage 1800VDC. Flame retardant sheat.
2% of contingency included.
SCB to IS cable: Single-core aluminium cable 1.5kV. Section: 240
mm2. Insulation: crosslinked polyethylene (XLPE) type A, 90ºC,
A.1.5.3 unarmoured. Nominal voltage: 1500VDC, maximum permitted m 26292
operating DC voltage 1800VDC. Flame retardant Sheat.
2% of contingency included.
SCB to IS cable: Single-core aluminium cable 1.5kV. Section: 300
mm2. Insulation: crosslinked polyethylene (XLPE) type A, 90ºC,
A.1.5.4 unarmoured. Nominal voltage: 1500VDC, maximum permitted m 33412
operating DC voltage 1800VDC. Flame retardant Sheat.
2% of contingency included.
A.1.6 LV DC CABLE TERMINATIONS
Supply & delivery to site, installation/connections, testing & commissioning of following LV terminations for power cables, contr
hardware (i.e. cable lugs, PVC tapes, ferrules, Nut Bolts, anchor fastener, shrouds, terminal blocks, etc), supply and installation
e. chipping of floor, breaking, making & sealing of wall, Cutouts, etc.) for complete installation/termination & commissioning. Sc
hole/spare hole. Contractor shall prepare final BOM and get that approved by Client/Engineer-In-Charge. Installation/Laying sh
Client/Engineer-In-Charge & putting into commercial operation. Testing and precommissioning of cables shall be done as per S
String Connectors:
A.1.6.1 QC4 connectors. 6 mm2. U 14558
With contingency according to MTO.
SCB to IS cable: Complete termination and Bimetallic Connector.
Conductors size: Single Core 185 mm2. Insulation: crosslinked
A.1.6.2 polyethylene (XLPE) type A, 90ºC, unarmoured. Insulation voltage: U 1662
3.6 kV AC. Maximum width of the palm of 43mm. With contingency
according to MTO.
SCB to IS cable: Complete termination and Bimetallic Connector.
Conductors size: Single Core 240 mm2. Insulation: crosslinked
A.1.6.3 polyethylene (XLPE) type A, 90ºC, unarmoured. Insulation voltage: U 566
3.6 kV AC. Maximum width of the palm of 43mm. With contingency
according to MTO
SCB to IS cable: Complete termination and Bimetallic Connector.
Conductors size: Single Core 300 mm2. Insulation: crosslinked
A.1.6.4 polyethylene (XLPE) type A, 90ºC, unarmoured. Insulation voltage: U 418
3.6 kV AC. Maximum width of the palm of 43mm. With contingency
according to MTO.
A.1.7 FO AND DATA COMMUNICATION CABLES & TERMINATIONS
27,65 MAD 1 492,93 MAD 18,75 MAD 1 012,50 MAD 2 505,43 MAD

6,44 MAD 25,75 MAD 18,75 MAD 75,00 MAD 100,75 MAD

54,16 MAD 216,64 MAD 18,75 MAD 75,00 MAD 291,64 MAD

12 870 689,01 MAD


LV DC cables laid on Underground trenches & through ductbank/conduits/trays, including supply of all necessary
ble tray sections and supports, etc.) required to complete the installation / laying, drilling of gland plates, sealing of all
ng & sealing of wall, Cutouts, etc.). Contractor shall prepare final BOM and cable drum schedule and get that approved
specifications and directions of Client/Engineer-In-Charge & putting into commercial operation. Testing and
st plan.

9,59 MAD 1 060 906,00 MAD 2,70 MAD 298 690,20 MAD 1 359 596,20 MAD

86,72 MAD 5 279 831,09 MAD 5,63 MAD 342 478,13 MAD 5 622 309,21 MAD

88,20 MAD 2 318 911,95 MAD 6,43 MAD 169 020,00 MAD 2 487 931,95 MAD

95,36 MAD 3 186 060,22 MAD 6,43 MAD 214 791,43 MAD 3 400 851,65 MAD

765 299,15 MAD


LV terminations for power cables, control & instrumentation cables, including supply of all necessary consumables and
minal blocks, etc), supply and installation of all required steel supports including anti corrosion paint, mionr civil works (i.
allation/termination & commissioning. Scope covers removal, re-fixing of galnd plate, drilling, sealing for unused
ngineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of
ssioning of cables shall be done as per Specifications and Inspection and test plan.

13,71 MAD 199 590,37 MAD 7,50 MAD 109 185,00 MAD 308 775,37 MAD

88,53 MAD 147 137,84 MAD 61,00 MAD 101 382,00 MAD 248 519,84 MAD

103,66 MAD 58 669,85 MAD 70,00 MAD 39 620,00 MAD 98 289,85 MAD

177,47 MAD 74 184,09 MAD 85,00 MAD 35 530,00 MAD 109 714,09 MAD

409 692,86 MAD


Supply & delivery to site, Installation/connections, Welding/terminations, testing & commissioning of following Fiber optic and D
including supply of connectors and termination kits (From both sides), FO drawers, patch cords, all required steel supports, and
Trefoil clamps, Ferrule, Shrouds, conduits, cable tray sections and supports, etc.) required to complete the installation / laying,
Works(i.e. chipping of floor, breaking, making & sealing of wall, Cutouts, etc.). Contractor shall prepare final BOM and cable dr
Installation/Laying shall be as per approved drawings, specifications and directions of Client/Engineer-In-Charge & putting into
as per Specifications and Inspection and test plan.
Armored Single Mode Fibre Optic Loose Tube - OS2 Cable (12
cores), direct buried.
A.1.7.1 m 7300
To be installed in MV trenches to establish communication
through Inverter Stations.
Data cable RS-485. Shielded twisted pair (min 24AWG). Suitable for
A.1.7.2 directly buried. m 14000
For daisy chain connection between Combiner boxes and IS.
Data Ethernet Cable S/FTP Cat 6A/7. Suitable for directly buried.
A.1.7.3 For direct connections of NCUs and Weather Stations to m 920
Inverter Stations.
A.1.8 CONDUITS
Supply and Installation of the following conduits with all accessories for cable protection on walls, road crossings, structures, b
chipping or breaking of floor / walls and making good the same. Installation charges shall include cutting, threading, welding/ jo
fixing hardware, bushes, couplers, elbows, bends, etc. are in the scope of the Contractor. Sealing with fireproof/ waterproof com
String Conduits:
High Density Polyethylene (HDPE) conduit 63mm of exterior
A.1.8.1 m 35410
diameter.
2% of contingency included.
Road Conduits:
High Density Polyethylene (HDPE) conduit 160mm of exterior
A.1.8.2 m 2742
diameter.
2% of contingency included.
Inverter Station Conduits / Input Conduits:
High Density Polyethylene (HDPE) conduit 160mm of exterior
A.1.8.3 m 1436
diameter.
2% of contingency included.
Inverter Station Conduits / Output Conduits:
High Density Polyethylene (HDPE) conduit 160mm of exterior
A.1.8.4 m 185
diameter.
2% of contingency included.
Weather Station Conduits:
A.1.8.5 High Density Polyethylene (HDPE) conduit 63mm of exterior m 720
diameter.
A.1.9 CABLE TRENCHES
Cable trenches and excavations in all types of soil, backfilling the excavated area after cable laying, consolidation after backfill
masonry walls, making good and finishing the same for cable entries. Warning grids and all necessary consumables/hardware
the Contractor. (as per drawings, shall be inclusive of excavation, sand bedding, compaction in layers, concrete tiles protection
LV Trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
A.1.9.1 loading and transport to landfill. It includes also extension on m 7271
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
LV Road Trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
A.1.9.2 loading and transport to landfill. It includes also extension on m 1037
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
missioning of following Fiber optic and Data cables laid on Underground trenches & through ductbank/conduits/trays,
ch cords, all required steel supports, and all necessary hardware and consumable (i.e. Cable Tags, Ties, Clamps,
ired to complete the installation / laying, drilling of gland plates, sealing of all unused spare entries, steel supports, Civil
tor shall prepare final BOM and cable drum schedule and get that approved by Client/Engineer-In-Charge.
Client/Engineer-In-Charge & putting into commercial operation. Testing and precommissioning of cables shall be done

16,25 MAD 118 625,00 MAD 5,14 MAD 37 542,86 MAD 156 167,86 MAD

12,50 MAD 175 000,00 MAD 4,50 MAD 63 000,00 MAD 238 000,00 MAD

8,75 MAD 8 050,00 MAD 8,13 MAD 7 475,00 MAD 15 525,00 MAD

1 936 755,29 MAD


n on walls, road crossings, structures, buried or through floors / walls including installation in floor slab before casting,
hall include cutting, threading, welding/ joints, bending of pipes. All consumables such as clamps, along with associated
or. Sealing with fireproof/ waterproof compound wherever required shall be carried out by the Contractor.

24,65 MAD 872 734,33 MAD 6,25 MAD 221 312,50 MAD 1 094 046,83 MAD

160,59 MAD 440 331,23 MAD 25,00 MAD 68 550,00 MAD 508 881,23 MAD

160,97 MAD 231 146,80 MAD 31,25 MAD 44 875,00 MAD 276 021,80 MAD

160,97 MAD 29 778,66 MAD 31,25 MAD 5 781,25 MAD 35 559,91 MAD

24,65 MAD 17 745,52 MAD 6,25 MAD 4 500,00 MAD 22 245,52 MAD

12 869 667,63 MAD


cable laying, consolidation after backfilling, including chipping / drilling of concrete floor / beam, and Breaking of brick
nd all necessary consumables/hardware such as clamps, tags, route markers, hardware, sealing, etc. are in the scope of
action in layers, concrete tiles protection and backfilling)

340,92 MAD 2 478 813,43 MAD 25,00 MAD 181 775,00 MAD 2 660 588,43 MAD

807,31 MAD 837 176,44 MAD 50,00 MAD 51 850,00 MAD 889 026,44 MAD
Not calculated yet. Estimated.

Not calculated yet. Estimated.

Not calculated yet. Estimated.

Not calculated yet. Estimated.

Not calculated yet. Estimated. New Item


MV Trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
A.1.9.3 loading and transport to landfill. It includes also extension on m 2992
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
MV + LV AC trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
A.1.9.4 loading and transport to landfill. It includes also extension on m 6549
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
Aux + FO + Earthing Trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
A.1.9.5 loading and transport to landfill. It includes also extension on m 8102
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
MV Road Trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
A.1.9.6 loading and transport to landfill. It includes also extension on m 168
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
MV Crossing Trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
A.1.9.7 loading and transport to landfill. It includes also extension on m 237
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
Type A - MV Trenches
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
loading and transport to landfill. It includes also extension on
A.1.9.8 m 50
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
Dimension (LxW): 1134x1100mm
Type B - MV + LV DC CB + LV DC String Trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
loading and transport to landfill. It includes also extension on
dumping site or similar area, if requested. It includes warning,
A.1.9.9 m 50
beaconing and protection of excavation, if required for health and
safety standards.
LV DC CB cables in one layer up to 4 circuits.
Dimension (LxW): 1158x746mm

Type C - MV + LV DC CB + LV DC String Trenches:


Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
loading and transport to landfill. It includes also extension on
A.1.9.10 dumping site or similar area, if requested. It includes warning, m 50
beaconing and protection of excavation, if required for health and
safety standards.
LV DC CB cables in two layers up to 16 circuits.
Dimension (LxW): 1377x1498mm
691,31 MAD 2 068 411,05 MAD 43,75 MAD 130 900,00 MAD 2 199 311,05 MAD

729,06 MAD 4 774 620,80 MAD 43,75 MAD 286 518,75 MAD 5 061 139,55 MAD

158,61 MAD 1 285 067,35 MAD 21,25 MAD 172 167,50 MAD 1 457 234,85 MAD

683,63 MAD 114 849,04 MAD 43,75 MAD 7 350,00 MAD 122 199,04 MAD

377,34 MAD 89 429,43 MAD 50,00 MAD 11 850,00 MAD 101 279,43 MAD

757,96 MAD 37 897,98 MAD 62,50 MAD 3 125,00 MAD 41 022,98 MAD

525,03 MAD 26 251,53 MAD 50,00 MAD 2 500,00 MAD 28 751,53 MAD

1 479,10 MAD 73 955,01 MAD 250,00 MAD 12 500,00 MAD 86 455,01 MAD
Not calculated yet. New Item

Not calculated yet. New Item

Not calculated yet. New Item


Type D - LV DC CB + LV DC String Trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
loading and transport to landfill. It includes also extension on
A.1.9.11 dumping site or similar area, if requested. It includes warning, m 50
beaconing and protection of excavation, if required for health and
safety standards.
LV DC CB cables in one layer up to 4 circuits.
Dimension (LxW): 738x675mm
Type E - LV DC CB + LV DC String Trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
loading and transport to landfill. It includes also extension on
A.1.9.12 dumping site or similar area, if requested. It includes warning, m 50
beaconing and protection of excavation, if required for health and
safety standards.
LV DC CB cables in two layers up to 16 circuits.
Dimension (LxW): 963x1373mm
Type F - LV DC CB Trenches:
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
loading and transport to landfill. It includes also extension on
A.1.9.13 dumping site or similar area, if requested. It includes warning, m 50
beaconing and protection of excavation, if required for health and
safety standards.
LV DC CB cables in two layers up to 16 circuits.
Dimension (LxW): 738x1373mm
Type G - MV ROAD Trenches
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
loading and transport to landfill. It includes also extension on
A.1.9.14 dumping site or similar area, if requested. It includes warning, m 50
beaconing and protection of excavation, if required for health and
safety standards.
LV DC CB cables in two layers up to 16 circuits.
Dimension (LxW): 738x1373mm
Type H - LV DC CB ROAD Trenches
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
loading and transport to landfill. It includes also extension on
A.1.9.15 m 50
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
Dimension (LxW): 1020x690mm
Type I - LV DC String ROAD Trenches
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
loading and transport to landfill. It includes also extension on
A.1.9.16 m 50
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
Dimension (LxW): 513x500mm
Type J - Aux + FO + Earthing Trenches
Trench excavation in loose soils using mechanical means. With
removal of land from the edges. It includes material carried off,
loading and transport to landfill. It includes also extension on
A.1.9.17 m 50
dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
Dimension (LxW): 600x400mm
328,82 MAD 16 441,07 MAD 37,50 MAD 1 875,00 MAD 18 316,07 MAD

832,69 MAD 41 634,59 MAD 75,00 MAD 3 750,00 MAD 45 384,59 MAD

553,85 MAD 27 692,32 MAD 50,00 MAD 2 500,00 MAD 30 192,32 MAD

804,39 MAD 40 219,49 MAD 75,00 MAD 3 750,00 MAD 43 969,49 MAD

653,60 MAD 32 679,99 MAD 62,50 MAD 3 125,00 MAD 35 804,99 MAD

200,17 MAD 10 008,47 MAD 31,25 MAD 1 562,50 MAD 11 570,97 MAD

209,45 MAD 10 472,44 MAD 31,25 MAD 1 562,50 MAD 12 034,94 MAD
Not calculated yet. New Item

Not calculated yet. New Item

Not calculated yet. New Item

Not calculated yet. New Item

Not calculated yet. New Item

Not calculated yet. New Item

Not calculated yet. New Item


Type L - TRENCH + DICTH + ROAD
Trench excavation in loose soils using mechanical means under
ditch. With removal of land from the edges. It includes material
carried off, loading and transport to landfill. It includes also extension
A.1.9.18 m 50
on dumping site or similar area, if requested. It includes warning,
beaconing and protection of excavation, if required for health and
safety standards.
Dimension (LxW): 738x675mm
A.1.10 CABLE TIES
Supply and installation of Cable ties PV specific (UV & moisture resistant and weather rated) and stainless steel
Cable zip ties PV specific (UV & moisture resistant and weather
rated) and stainless steel (rounded edges, no risk to damage of
A.1.10.1 U 261987
cable).
2% of contingency included
A.1.11 MV OVERHEAD LINES
OH Lines at Ouled Fares site connecting South to North sector to be designed by the General Contractor. Considerations: OHL
circuit / Voltage level 33kV / Length per line: 100 m approx./ Bare conductor size on each circuit: 181.6 mm2 Almelec / Suitable
single mode fibers (on each line) and associated junction boxes and connections on both sides / MV cable terminations and co

Overhead line, simple circuit, MV line 7, including suitable


A.1.11.1 m 100
towers/poles complete with foundation, civil works, earthing, etc.

Overhead line, double circuit, MV lines 8+9, including suitable


A.1.11.2 m 100
towers/poles complete with foundation, civil works, earthing, etc.

OPGW 24 single mode fibers for SCADA (100 m for each line) and
A.1.11.3 associated junction boxes and connections on both sides / clamps m 200
and all necessary accessories.
A.2 CABLING FOR SERVER/CONTROL/IT/TELECOM ROOMS AND O&M WAREHOUSE
Supply & delivery to site, Installation/connections, terminations, testing & commissioning of following Halogen Free, Fire retard
ductbank/conduits/trays, false ceiling/false floor, including supply of all necessary hardware & all necessary consumable (i.e. te
Conduits, cable tray sections and supports, etc.) required to complete the installation / laying, drilling of gland plates, sealing of
breaking, making & sealing of wall, Cutouts, etc.). Contractor shall prepare final BOM and cable drum schedule and get that ap
approved drawings, specifications and directions of Client/Engineer-In-Charge & putting into commercial operation. Testing an
Inspection and test plan.
A.2.1 AUXILIARY LV AC CABLES & TERMINATIONS FOR SERVER/CONTROL/IT/TELECOM ROOMS
Main Power cable [3P+N+PE, 5G4mm²] from Substation "TGBT
380-220V" (located in LV&Aux.Room) to "380-220V Non UPS Panel"
(Located in Server Room), including complete routings and
A2.1.1 m 40
terminations.
For Server Room, PPC/SCADA, VDS, IT & Telecom from
Substation.
Main Power cable [1P+N+PE, 3G4mm²] from Substation "MAIN UPS
PANEL 220V AC" (located in LV&Aux.Room) to "220V UPS Panel"
(Located in Server Room), including complete routings and
A2.1.2 m 80
terminations.
For Server/Control Room, PPC/SCADA, VDS, IT/Telecom from
Substation.
Distribution cables from "380-220V Non UPS Panel" to SCADA,
PPC and CCTV panels, and other Package P05 users located in
Server/Control room and IT/Telecom, including complete routings
A2.1.3 LOT 1
and terminations.
380-220V Distribution cables within For Server/Control Room,
PPC/SCADA, VDS, IT/Telecom
Distribution cables from "220V UPS Panel" to SCADA, PPC and
CCTV panels, and other Package P05 users located in
Server/Control roomsand IT/Telecom, including complete routings
A2.1.4 LOT 1
and terminations.
220V UPS Distribution cables within Server/Control Room,
PPC/SCADA, VDS, IT/Telecom
A.2.2 AUXILIARY LV AC CABLES & TERMINATIONS FOR O&M WAREHOUSE
463,97 MAD 23 198,45 MAD 43,75 MAD 2 187,50 MAD 25 385,95 MAD

225 742,87 MAD


rated) and stainless steel

0,61 MAD 160 246,12 MAD 0,25 MAD 65 496,75 MAD 225 742,87 MAD

4 825 277,90 MAD


General Contractor. Considerations: OHLs route as per site Layout / Two different lines L1: double circuit, L2: Single
ach circuit: 181.6 mm2 Almelec / Suitable towers/poles complete with foundation, civil works, earthing, etc./ OPGW 24
oth sides / MV cable terminations and connections on both sides / Clamps and all necessary accessories.

13 520,95 MAD 1 352 094,82 MAD 4 375,00 MAD 437 500,00 MAD 1 789 594,82 MAD

20 224,70 MAD 2 022 470,30 MAD 5 625,00 MAD 562 500,00 MAD 2 584 970,30 MAD

1 628,56 MAD 325 712,77 MAD 625,00 MAD 125 000,00 MAD 450 712,77 MAD

O&M WAREHOUSE 690 667,08 MAD


ng of following Halogen Free, Fire retardant cables LV cables laid on Gutters, underground trenches & through
ware & all necessary consumable (i.e. terminations, Cable lugs, Tags, Ties, Clamps, Trefoil clamps, Ferrule, Shrouds,
laying, drilling of gland plates, sealing of all unused spare entries, steel supports, Civil Works(i.e. chipping of floor,
and cable drum schedule and get that approved by Client/Engineer-In-Charge. Installation/Laying shall be as per
ng into commercial operation. Testing and precommissioning of cables shall be done as per Specifications and

OL/IT/TELECOM ROOMS 352 227,26 MAD

50,33 MAD 2 013,39 MAD 12,50 MAD 500,00 MAD 2 513,39 MAD

21,25 MAD 1 699,91 MAD 8,75 MAD 700,00 MAD 2 399,91 MAD

154 337,61 MAD 154 337,61 MAD 31 250,00 MAD 31 250,00 MAD 185 587,61 MAD

134 226,35 MAD 134 226,35 MAD 27 500,00 MAD 27 500,00 MAD 161 726,35 MAD

338 439,82 MAD


Not calculated yet. New Item
Main Power cable [3P+N+PE, 5G6mm²] from Substation "TGBT
380-220V" (located in LV&Aux.Room) to "380-220V Non UPS Panel"
(Located in O&M Warehouse), including complete routings and
A.2.2.1 m 190
terminations.
For Server Room, PPC/SCADA, VDS, IT & Telecom from
Substation.
Main Power cable [1P+N+PE, 3G6mm²] from Substation "MAIN UPS
PANEL 220V AC" (located in LV&Aux.Room) to "220V UPS Panel"
A.2.2.2 (Located in O&M Warehouse), including complete routings and m 190
terminations.
For O&M Warehouse from Substation.
Distribution cables from "380-220V Non UPS Panel" to Lighting,
socket outlets, HVAC, ancillary, etc. Located in O&M Warehouse,
A.2.2.3 LOT 1
including complete routings and terminations.
380-220V Distribution cables within O&M Warehouse
Distribution cables from "220V UPS Panel" to CCTV, VDS, Fire
Alarm Panels and other Package P05 users located in O&M
A.2.2.4 Warehouse, including complete routings and terminations. LOT 1
220V UPS Distribution cables within Server/Control Room,
PPC/SCADA, VDS, IT/Telecom
10.B EARTHING, LIGHTING AND SOCKET OULTES
B.1 EARTHING FOR PV FIELDS
Supply & delivery to site, Installation/connections, welding/terminations, testing & commissioning of complete Earthing and ligh
& all necessary consumable required to complete the installation/laying, welding, Civil Works. Contractor shall prepare the fina
charge. Installation/Laying shall be as per approved drawings, specifications and directions of Client/Engineers-in-Charge & p
system shall be done as per Specifications and Inspection and test plan.
Bare stranded single core copper cable distributed in LV and MV
B.1.1 trenches. Section 50mm². m 11391
2% of contingency included.
Bare stranded single core copper cable distributed at perimeter and
MV trenches of the plant. Section 95mm², including complete
B.1.2 m 23326
routings and connections/terminations.
2% of contingency included.
Bare stranded single core copper cable connecting the trackers
between them and with the main earthing grid. Section 16mm²,
B.1.3 m 16209
including complete routings and connections/terminations.
2% of contingency included.
Earthing rods. Diameter 19mm. Length 2m, including complete
B.1.4 connections/terminations. U 89
With contingency according to MTO.
B.2 EARTHING, LIGHTING AND SOCKET OULTES FOR O&M WAREHOUSE AND MAIN ACCESS AREA
B.2.1 EARTHING FOR O&M WAREHOUSE AND MAIN ACCESS AREA
Supply & delivery to site, Installation/connections, welding/terminations, testing & commissioning of complete Earthing system
Earth bus, with test links, earthing cables. Including civil works, clamping & necessary hardware and consumable (i.e. bitumino
required consumable and hardware for installation. All installation, testing & pre commissioning will be as per approved drawin
commercial operation. The earthing loop shall be connected to the site main ground grid and to substation ground grid.
Complete Earthing system for O&M Warehouse including Earth
B.2.1.1 strip/Earth pit / Earth bus, with test link, earthing cables, isolators, LOT 1
supports, test links, earth pits etc.
Complete Earthing system for North & South Main Access Areas
(Guard's houses + Gates) including Earth strip/Earth pit / Earth bus,
B.2.1.2 LOT 2
with test link, earthing cables, isolators, supports, test links, earth pits
etc.
B.2.2 LIGHTING SYSTEM (NORMAL + EMERGENCY + EXIT LIGHT)
Supply & delivery to site, Installation/connections, testing & commissioning of lighting system [Normal + Emergency + Exit light
controlgear, integral driver/power supply unit, complete with wire guard, and all other accessories etc., Lighting junction boxes,
necessary mounting bracket / looping box / Glands / black enamel metalic conduit as applicable, supply & installation of steel
floor, breaking, making & sealing of wall, Cutout etc.), civil foundation as per required mounting type, & other consumables like
will be as per approved drawings, standards and directions of Client/Engineers-in-Charge & putting into commercial operation.
B.2.2.1 Indoor Lighting system for O&M Warehouse, LED type
50,33 MAD 9 563,59 MAD 12,50 MAD 2 375,00 MAD 11 938,59 MAD

21,25 MAD 4 037,29 MAD 8,75 MAD 1 662,50 MAD 5 699,79 MAD

134 453,22 MAD 134 453,22 MAD 31 250,00 MAD 31 250,00 MAD 165 703,22 MAD

127 598,22 MAD 127 598,22 MAD 27 500,00 MAD 27 500,00 MAD 155 098,22 MAD

5 724 862,19 MAD


5 370 489,27 MAD
missioning of complete Earthing and lightning protection system for PV-fields, including supply of all necessary hardware
Works. Contractor shall prepare the final BOM and earthing schedule and get that approved by Client/Engineer-in
ctions of Client/Engineers-in-Charge & putting into commercial operation. Testing and precommissioning of earthing

85,23 MAD 970 830,99 MAD 4,50 MAD 51 259,50 MAD 1 022 090,49 MAD

155,13 MAD 3 618 622,41 MAD 5,14 MAD 119 962,29 MAD 3 738 584,70 MAD

25,93 MAD 420 287,90 MAD 4,05 MAD 65 646,45 MAD 485 934,35 MAD

1 204,41 MAD 107 192,23 MAD 187,50 MAD 16 687,50 MAD 123 879,73 MAD

HOUSE AND MAIN ACCESS AREA 354 372,92 MAD


254 990,75 MAD
missioning of complete Earthing system for O&M Warehouses and Main Access Areas including Earth strip/Earth pit /
hardware and consumable (i.e. bituminous paint, insulators etc.), steel supports, welding and bolted connections and all
ssioning will be as per approved drawings, standards and directions of Client/Engineers-in-Charge & putting into
id and to substation ground grid.

122 484,45 MAD 122 484,45 MAD 24 375,00 MAD 24 375,00 MAD 146 859,45 MAD

42 190,65 MAD 84 381,30 MAD 11 875,00 MAD 23 750,00 MAD 108 131,30 MAD

88 644,60 MAD
system [Normal + Emergency + Exit light self powered with battery backup] with lighting fixtures and lamps including
ccessories etc., Lighting junction boxes, as per the suitable mounting type including supply and installation of all
applicable, supply & installation of steel supports including anti corossion painting, mionr civil works (i.e. chipping of
mounting type, & other consumables like anchor fasteners/studs, footing. All installation, testing & pre commissioning
rge & putting into commercial operation.
15 907,51 MAD
Not calculated yet. Estimated.

Not calculated yet. Estimated.

Not calculated yet. Estimated.

Not calculated yet. Estimated.


Luminaire 1x36W LED 220V
B.2.2.1.1 U 20

B.2.2.2 Outdoor Lighting system for O&M Warehouse (Projectors mounted on buiding walls/structures)
LED projector (Equivalent to 70W 220V)
B.2.2.2.1 U 8

Single switch (interrupteur simple allumage)


B.2.2.2.2 U 5

Exit light (BAES)


B.2.2.2.3 U 2

B.2.2.3 Indoor Lighting system for Main access Area (Guard's Room), LED type
Réglette LED 22W 220V (Equivalent to 36W fluorescent)
B.2.2.3.1 U 6

Spot LED 6W 220V


B.2.2.3.2 U 4

B.2.2.4 Outdoor Lighting system for Main access Area (Projectors mounted on Guard's room and Main entrance wa
LED projector 38W 220V
B.2.2.4.1 U 8

Applique LED 15W 220V


B.2.2.4.2 U 4

Single switch (interrupteur simple allumage)


B.2.2.4.3 U 8

Exit light (BAES)


B.2.2.4.4 U 2

B.2.3 POWER AND SOCKET OUTLETS


Supply & delivery to site, Installation/connections, testing & commissioning of of Indoor/commercial/industrial sockets including
works (i.e. chipping of floor, breaking, making & sealing of wall, cutout etc.) & other consumables like anchor fasteners/studs,
type. All installation, testing & pre commissioning will be as per approved drawings, standards and directions of Client/Enginee
Outlet sockets for O&M Warehouse (3P+N+PE 16A)
B.2.3.1 U 2

Outlet sockets for O&M Warehouse (1P+N 16A)


B.2.3.2 U 2

Outlet sockets for Main access Area (1P+N 16A)


B.2.3.3 U 6

10.C SOLAR/ELECTRICAL SYSTEMS & PANELS


C.1 SYSTEMS & PANELS FOR PV FIELDS
C.1.1 SCADA/PPC SYSTEMS AND WEATHER STATIONS
Supply & delivery to site, Installation/connections, programming/configuration, testing & commissioning of following equipments
necessary hardware and consumable, required to complete the installation. Contractor shall prepare final BOM and schedules
as per approved drawings, specifications and directions of Client/Engineer-In-Charge & putting into commercial operation. Tes
requirements, and Inspection and test plan.
732,88 MAD 14 657,51 MAD 62,50 MAD 1 250,00 MAD 15 907,51 MAD

n buiding walls/structures) 28 090,01 MAD

2 041,38 MAD 16 331,01 MAD 875,00 MAD 7 000,00 MAD 23 331,01 MAD

454,49 MAD 2 272,47 MAD 62,50 MAD 312,50 MAD 2 584,97 MAD

999,51 MAD 1 999,03 MAD 87,50 MAD 175,00 MAD 2 174,03 MAD

7 423,50 MAD

732,88 MAD 4 397,25 MAD 62,50 MAD 375,00 MAD 4 772,25 MAD

600,31 MAD 2 401,25 MAD 62,50 MAD 250,00 MAD 2 651,25 MAD

n Guard's room and Main entrance walls/structures) 37 223,57 MAD

3 321,63 MAD 26 573,02 MAD 125,00 MAD 1 000,00 MAD 27 573,02 MAD

747,64 MAD 2 990,58 MAD 87,50 MAD 350,00 MAD 3 340,58 MAD

454,49 MAD 3 635,95 MAD 62,50 MAD 500,00 MAD 4 135,95 MAD

999,51 MAD 1 999,03 MAD 87,50 MAD 175,00 MAD 2 174,03 MAD

10 737,57 MAD
r/commercial/industrial sockets including all necessary mounting brackets, junction boxes, cable glands, conduits, civil
nsumables like anchor fasteners/studs, footing, wire guards, and all other accessories etc., as per the suitable mounting
andards and directions of Client/Engineers-in-Charge & putting into commercial operation.

1 609,66 MAD 3 219,31 MAD 312,50 MAD 625,00 MAD 3 844,31 MAD

799,16 MAD 1 598,31 MAD 62,50 MAD 125,00 MAD 1 723,31 MAD

799,16 MAD 4 794,94 MAD 62,50 MAD 375,00 MAD 5 169,94 MAD

20 634 945,66 MAD


19 976 109,63 MAD
7 044 364,87 MAD
& commissioning of following equipments and systems, including all required furniture, steel supports, civil Works, and all
shall prepare final BOM and schedules and get that approved by Client/Engineer-In-Charge. Installation/Laying shall be
& putting into commercial operation. Testing and precommissioning shall be done as per Specifications, TSO/Grid code
SCADA System
PV SCADA System: Rack, switches, patch panels, servers,
C.1.1.1 workstations, printers, network components, patch cords, software, LOT 1
licences, etc., fully supplied, tested, installed and commissioned
according to its technical specification.
PPC System
PV PPC System: Rack, switches, patch panels, PLC, workstation,
C.1.1.2 network components, patch cords, software, licences, etc., fully LOT 1
supplied, tested, installed and commissioned according to its
technical specification.
Weather Station
Weather Station (including foundation and foundation design): fully
C.1.1.3 LOT 5
supplied, tested, installed and commissioned according to its
technical specification.
C.1.2 UPS SYSTEMS IN PV FIELDS (supplying Weather stations, NCUs and CCTV systems)
Supply & delivery to site, Installation/connections, programming/configuration,including reporting and integration of Status, alar
commissioning of following equipments and systems, including all required furniture, steel supports, foundations, civil Works, a
installation. Contractor shall prepare final BOM and schedules and get that approved by Client/Engineer-In-Charge. Installation
Client/Engineer-In-Charge & putting into commercial operation. Testing and precommissioning shall be done as per Specificati
Field UPS systems:
4 kVA Outdoor UPS (IP65) with minimum duration of 1 hour,
C.1.2.1 U 20
including protections, canopy, connections, wiring, supports and
installation on a concrete slab.
Field UPS Transformer:
Three to single phase converter transformer. 4kVA 400/230V,
C.1.2.2 U 20
including protections, enclosure/canopy, connections, wiring,
supports and installation on a concrete slab.
Field UPS Distribution Panels:
IP65 Distribution board for supplying Weather stations, NCUs and
CCTV systems, including canopy, connection to UPS, protections,
wiring, supports and installation on a concrete slab.
C.1.2.2 U 20
The board will include general automatic switchgear and distribution
circuit-breakers / residual current devices for each element. It will
include as well enclosure, surge protection devices, cable glands,
terminals and connectors as needed
C.1.3 STRING COMBINER BOXES
Supply & delivery to site, Installation/connections, programming/configuration, testing & commissioning of following Combiner b
and all necessary hardware and consumable, required to complete the installation. Contractor shall prepare final BOM and sch
shall be as per approved drawings, specifications and directions of Client/Engineer-In-Charge & putting into commercial opera
Inspection and test plan.
Combiner box type I:
Combiner Boxes of sixteen (16) inputs/fuses, with one (1) string per
fuse, two (2) cable gland or QC4 / MC4 connector per input (1P+1N).
gPV fuse-link according to IEC 60269-6, minimum size 25 A,
1500Vdc. Disconnector rating: ≥350 A. With 6mm² inputs section
C.1.3.1 (copper) and output up to 2x1x300mm2/ph (aluminium). Glass Fiber U 456
Reinforced Polyester enclosure. Surge protection device, type I+II.
IP54 or above. Reference standard IEC Codes.
Including complete string cables terminations [two (2) cable gland or
QC4 / MC4 connector per input (1P+1N)], connections, wiring,
supports and installation on a concrete slab.
C.2 SYSTEMS & PANELS FOR SERVER/CONTROL ROOMS, O&M WAREHOUSES, MAIN ACCESS ARE
C.2.1 SUBSTATION/ MV & CONTROL BUILDING
Design, Supply, Installation, Testing & Commissionong of LV Panels (UPS and non-UPS distribution), as per equipment arrang
including all wiring materials and necessary hardware (i.e. PVC tape, ferrule, anchor fastener lug, terminals, glands, etc.), supp
baseframe (as applicable), including anti-corrosion paint, civil works (i.e. breaking, making and sealing of wall, chipping of floor
labour, materials and all work will be as per approved drawings, specifications and directions of Engineers-in-Charge & putting
The indoor panels shall be IP41 minimum, and outdoor panels IP65 minimum.
"380-220V Non UPS Panel" for Server Room [3P+N] with one
C.2.1.1 incomer, feeders for SCADA, PPC and CCTV Panels ancillary LOT 1
services, etc. (including 20% equipped spare feeders).
2 030 032,88 MAD 2 030 032,88 MAD 687 500,00 MAD 687 500,00 MAD 2 717 532,88 MAD

1 749 782,56 MAD 1 749 782,56 MAD 437 500,00 MAD 437 500,00 MAD 2 187 282,56 MAD

384 159,89 MAD 1 920 799,43 MAD 43 750,00 MAD 218 750,00 MAD 2 139 549,43 MAD

CCTV systems) 5 375 677,73 MAD


g reporting and integration of Status, alarms and faults into SCADA (through Inverter station SCU/SW), testing &
teel supports, foundations, civil Works, and all necessary hardware and consumable, required to complete the
by Client/Engineer-In-Charge. Installation/Laying shall be as per approved drawings, specifications and directions of
ssioning shall be done as per Specifications, and Inspection and test plan.

74 658,46 MAD 1 493 169,24 MAD 7 875,00 MAD 157 500,00 MAD 1 650 669,24 MAD

73 325,36 MAD 1 466 507,21 MAD 6 875,00 MAD 137 500,00 MAD 1 604 007,21 MAD

87 300,06 MAD 1 746 001,27 MAD 18 750,00 MAD 375 000,00 MAD 2 121 001,27 MAD

7 556 067,04 MAD


& commissioning of following Combiner boxes, including all required furniture, steel supports, foundations, civil Works,
ntractor shall prepare final BOM and schedules and get that approved by Client/Engineer-In-Charge. Installation/Laying
-Charge & putting into commercial operation. Testing and precommissioning shall be done as per Specifications, and

15 320,32 MAD 6 986 067,04 MAD 1 250,00 MAD 570 000,00 MAD 7 556 067,04 MAD

AREHOUSES, MAIN ACCESS AREAS 658 836,02 MAD


127 260,08 MAD
PS distribution), as per equipment arrangement drawings, SLDs, scope of work and all annexures attached with inquiry,
astener lug, terminals, glands, etc.), supply and installation of all required steel supports for wall/floor mounting,
king and sealing of wall, chipping of floor etc.), touch paint for panels. All installation, testing & pre-commissioning,
ections of Engineers-in-Charge & putting into commercial operation.

60 371,61 MAD 60 371,61 MAD 11 875,00 MAD 11 875,00 MAD 72 246,61 MAD
"220V UPS Panel" for Server Room [1P+N] with two incomers
C.2.1.2 (redundant), feeders for SCADA, PPC and CCTV Panels (including LOT 1
20% equipped spare feeders).
C.2.2 O&M WAREHOUSES
Design, Supply, Installation, Testing & Commissionong of LV Panels (UPS and non-UPS distribution), as per equipment arrang
including all wiring materials and necessary hardware (i.e. PVC tape, ferrule, anchor fastener lug, terminals, glands, etc.), supp
baseframe (as applicable), including anti-corrosion paint, civil works (i.e. breaking, making and sealing of wall, chipping of floor
labour, materials and all work will be as per approved drawings, specifications and directions of Engineers-in-Charge & putting
The indoor panels shall be IP55 minimum, and outdoor panels IP65 minimum.
"380-220V Non UPS Panel" for O&M Warhouse [3P+N] with one
C.2.2.1 incomer, feeders for Lighting, socket outlets, HVAC, ancillary, etc. LOT 1
(including 20% equipped spare feeders).
"220V UPS Panel" for Server Room [1P+N] with one incomer,
C.2.2.2 feeders for CCTV, VDS, Fire Alarm Panels, etc. (including 20% LOT 1
equipped spare feeders)
C.2.3 MAIN ACCESSES (NORTH & SOUTH)
Design, Supply, Installation, Testing & Commissionong of LV Panels (UPS and non-UPS distribution), as per equipment arrang
including all wiring materials and necessary hardware (i.e. PVC tape, ferrule, anchor fastener lug, terminals, glands, etc.), supp
baseframe (as applicable), including anti-corrosion paint, civil works (i.e. breaking, making and sealing of wall, chipping of floor
labour, materials and all work will be as per approved drawings, specifications and directions of Engineers-in-Charge & putting
The indoor panels shall be IP55 minimum, and outdoor panels IP65 minimum.
"380-220V Non UPS Panel" for North & South Main Accesses
C.2.3.1 [3P+N] with one incomer, feeders for Lighting, socket outlets, HVAC, LOT 2
ancillary, etc. (including 20% equipped spare feeders).
"220V UPS Panel" for North & South Main Accesses [1P+N] with one
C.2.3.2 incomer, feeders for CCTV, VDS, Fire Alarm Panels, etc. (including LOT 2
20% equipped spare feeders).
Main gate control panel (Industrial local control station mounted in
C.2.3.3 LOT 2
Guard's Rooms) for North & South Main Accesses
10.D ENGINEERING
Engineering documents, BOMs, Calculations (as applicable), Notes,
D.1 sizing etc, Vendor documents, Shop drawings preparation and LOT 1
submission, As-Builts and O&M preparation and submission
Training and instruction to Client representatives and operators -As
D.2 LOT 1
per Annexe J -

PRIX TOTAL HT (A+B+C+D)


PRIX TOTAL TTC
46 888,47 MAD 46 888,47 MAD 8 125,00 MAD 8 125,00 MAD 55 013,47 MAD

140 516,33 MAD


PS distribution), as per equipment arrangement drawings, SLDs, scope of work and all annexures attached with inquiry,
astener lug, terminals, glands, etc.), supply and installation of all required steel supports for wall/floor mounting,
king and sealing of wall, chipping of floor etc.), touch paint for panels. All installation, testing & pre-commissioning,
ections of Engineers-in-Charge & putting into commercial operation.

73 627,86 MAD 73 627,86 MAD 11 875,00 MAD 11 875,00 MAD 85 502,86 MAD

46 888,47 MAD 46 888,47 MAD 8 125,00 MAD 8 125,00 MAD 55 013,47 MAD

391 059,61 MAD


PS distribution), as per equipment arrangement drawings, SLDs, scope of work and all annexures attached with inquiry,
astener lug, terminals, glands, etc.), supply and installation of all required steel supports for wall/floor mounting,
king and sealing of wall, chipping of floor etc.), touch paint for panels. All installation, testing & pre-commissioning,
ections of Engineers-in-Charge & putting into commercial operation.

73 627,86 MAD 147 255,73 MAD 11 875,00 MAD 23 750,00 MAD 171 005,73 MAD

46 888,47 MAD 93 776,94 MAD 8 125,00 MAD 16 250,00 MAD 110 026,94 MAD

46 888,47 MAD 93 776,94 MAD 8 125,00 MAD 16 250,00 MAD 110 026,94 MAD
1 113 525,67 MAD

0,00 MAD 0,00 MAD 463 969,03 MAD 463 969,03 MAD 463 969,03 MAD

0,00 MAD 0,00 MAD 649 556,64 MAD 649 556,64 MAD 649 556,64 MAD

L HT (A+B+C+D) 66 616 755,25


OTAL TTC 79 940 106,30
PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR
CIVIL BILL OF QUANTITY (CIVIL OULED
FARES)
Id. DESCRIPTION Unit

10.A TRAVAUX DIVERS


A1 Guérite de gardiennage Lumpsum
A2 Débrouissaillage et Décapage m²
A3 Travaux de démolition m3
A4 Travaux Geoscan m²
10.B TERRASSEMENT
Terrassement en masse déblais ou en tranchée en tout terrain y
B1 m3
compris rocheux, avec évacuation des déblais à la décharge
B2 Plus-value au prix n°B1 pour terrassement en terrain rocheux m3
Remblais avec terres des déblais selectionnées et calibrées, avec
B3 m3
compactage à 95% OPM
B4 Remblais en matériaux d'apport m3
10.C VOIRIE ET DRAINAGE
C1 Couche de forme type F2 avec un indice CBR > 10 m3
C2 Matériau pour Couche de roulement MCR m3
C3 Couche de fondation GNF1 m3
C4 Couche de base GNA m3
C5 Revêtement superfciel en bicouche m²
C6 Couche d'imprégnation y compris sablage m²
C7 Couche d'accrochage m²
C8 Enrobé bitumineux EB T
C9 Matériaux sélectionnés MS pour accotement m3
C10 Béton de propreté de Classe C12/15 m3
C11 Béton armé de Classe C30/37 m3
C12 Béton de Classe C20/25 m3
C13 Aciers à haute adhérence kg
C14 BUSE en CAO de classe 135A de DIAMETRE 600 mm
C15 BUSE en CAO de classe 135A de DIAMETRE 800 mm ml
C16 BUSE en CAO de classe 135A de DIAMETRE 1000 mm ml
C17 BUSE en CAO de classe 135A de DIAMETRE 1200 mm ml
C18 Fossés trapèzoidal non-revêtus ml
C19 Lit de pose m3
SUPPLY INSTALLATION
Quantity
Unit price Total price Unit price Total price

- 1- 101 238,04 MAD 101 238,04 MAD 0,00 MAD 0,00 MAD
- 250- 18,89 MAD 4 722,54 MAD 0,00 MAD 0,00 MAD
- 200- 539,53 MAD 107 905,94 MAD 0,00 MAD 0,00 MAD
- 100- 338,03 MAD 33 803,46 MAD 0,00 MAD 0,00 MAD

66500 74,24 MAD 4 936 630,46 MAD 0,00 MAD 0,00 MAD

20000 432,15 MAD 8 643 080,19 MAD 0,00 MAD 0,00 MAD

6000 47,72 MAD 286 335,17 MAD 0,00 MAD 0,00 MAD

2000 94,12 MAD 188 238,86 MAD 0,00 MAD 0,00 MAD

11500 269,10 MAD 3 094 673,42 MAD 0,00 MAD 0,00 MAD
7600 94,12 MAD 715 307,68 MAD 0,00 MAD 0,00 MAD
560 298,27 MAD 167 028,85 MAD 0,00 MAD 0,00 MAD
340 324,78 MAD 110 424,63 MAD 0,00 MAD 0,00 MAD
1570 54,35 MAD 85 330,53 MAD 0,00 MAD 0,00 MAD
153 41,09 MAD 6 287,44 MAD 0,00 MAD 0,00 MAD
153 229,33 MAD 35 087,99 MAD 0,00 MAD 0,00 MAD
15 2 704,28 MAD 40 564,15 MAD 0,00 MAD 0,00 MAD
76 161,73 MAD 12 291,20 MAD 0,00 MAD 0,00 MAD
3000 1 352,14 MAD 4 056 414,93 MAD 0,00 MAD 0,00 MAD
8 2 293,33 MAD 18 346,66 MAD 0,00 MAD 0,00 MAD
1900 1 683,54 MAD 3 198 735,04 MAD 0,00 MAD 0,00 MAD
41020 17,56 MAD 720 497,50 MAD 0,00 MAD 0,00 MAD
20 1 212,95 MAD 24 258,95 MAD 0,00 MAD 0,00 MAD
140 1 829,36 MAD 256 110,90 MAD 0,00 MAD 0,00 MAD
40 2 512,06 MAD 100 482,44 MAD 0,00 MAD 0,00 MAD
20 4 732,48 MAD 94 649,68 MAD 0,00 MAD 0,00 MAD
200 470,60 MAD 94 119,43 MAD 0,00 MAD 0,00 MAD
190 298,27 MAD 56 670,50 MAD 0,00 MAD 0,00 MAD
TOTAL PRICE OF
SUPPLY &
INSTALLATION
247 669,98 MAD
101 238,04 MAD
4 722,54 MAD
107 905,94 MAD
33 803,46 MAD
14 054 284,69 MAD

4 936 630,46 MAD

8 643 080,19 MAD

286 335,17 MAD

188 238,86 MAD


13 455 677,15 MAD
3 094 673,42 MAD
715 307,68 MAD
167 028,85 MAD
110 424,63 MAD
85 330,53 MAD
6 287,44 MAD
35 087,99 MAD
40 564,15 MAD
12 291,20 MAD
4 056 414,93 MAD
18 346,66 MAD
3 198 735,04 MAD
720 497,50 MAD
24 258,95 MAD
256 110,90 MAD
100 482,44 MAD
94 649,68 MAD
94 119,43 MAD
56 670,50 MAD
C20 RIP RAP pour passage en ford m3
C21 Geotextile m²
C22 Gabions U
C23 Maçonnerie de moellons m3
C24 Enrochements m3
C25 Grillage m²
C26 Garde corps ml
10.D INVERTERS FOUNDATION
D1 Excavation m3
D2 Bottom excavation compaction m²
D3 Béton de propreté m3
D4 Formwork m²
D5 Reinforcement steel kg
D6 Béton de fondation m3
10.E TRACKERS FOUNDATION
Execution of Piles Civil Works for tracking mounting systems. Civil Works shall be as per Manufacturer instructions
Piles per Tracker is 19 (i.e. a total of 33896 Piles)
E1 Pre-Drill and soil filling 0.12m diameter m
E2 Pre-Drill and soil filling 0.15m diameter m
E3 Pre-Drill 0.30 diameter m
E4 Concrete m3
10.F TANKS DE STOCKAGE DE L'EAU DE NETTOYAGE

Tank en acier galvanisé de volume égal ou supérieur à 125 m3, y


F1 Lumpsum
compris sa fondation et tous les accessoires

PRIX TOTAL HT (A+B+C+D+E+F

PRIX TOTAL TTC


220 943,85 MAD 207 646,02 MAD 0,00 MAD 0,00 MAD
400 107,38 MAD 42 950,28 MAD 0,00 MAD 0,00 MAD
40 543,51 MAD 21 740,26 MAD 0,00 MAD 0,00 MAD
20 782,12 MAD 15 642,38 MAD 0,00 MAD 0,00 MAD
50 633,65 MAD 31 682,46 MAD 0,00 MAD 0,00 MAD
15 674,74 MAD 10 121,15 MAD 0,00 MAD 0,00 MAD
50 4 772,25 MAD 238 612,64 MAD 0,00 MAD 0,00 MAD

300 404,32 MAD 121 294,76 MAD 0,00 MAD 0,00 MAD
200 8,09 MAD 1 617,26 MAD 0,00 MAD 0,00 MAD
20 1 352,14 MAD 27 042,77 MAD 0,00 MAD 0,00 MAD
447 201,50 MAD 90 068,32 MAD 0,00 MAD 0,00 MAD
12770 17,56 MAD 224 299,20 MAD 0,00 MAD 0,00 MAD
93 1 683,54 MAD 156 569,66 MAD 0,00 MAD 0,00 MAD

er Manufacturer instructions, approved drawings, specifications and directions of Client/Engineer-In-Charge. Number of

531,25 MAD 0,00 MAD 0,00 MAD 0,00 MAD


618,75 MAD 0,00 MAD 0,00 MAD 0,00 MAD
52200 877,56 MAD 45 808 855,24 MAD 0,00 MAD 0,00 MAD
3815 1 683,54 MAD 6 422 723,26 MAD 0,00 MAD 0,00 MAD

1 2 518 689,01 MAD 2 518 689,01 MAD 0,00 MAD 0,00 MAD

AL HT (A+B+C+D+E+F)

IX TOTAL TTC
207 646,02 MAD
42 950,28 MAD
21 740,26 MAD
15 642,38 MAD
31 682,46 MAD
10 121,15 MAD
238 612,64 MAD
620 891,97 MAD
121 294,76 MAD
1 617,26 MAD
27 042,77 MAD
90 068,32 MAD
224 299,20 MAD
156 569,66 MAD
52 231 578,51 MAD
gineer-In-Charge. Number of

0,00 MAD
0,00 MAD
45 808 855,24 MAD
6 422 723,26 MAD
2 518 689,01 MAD

2 518 689,01 MAD

83 128 791,30

99 754 549,56
PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR

VDS BILL OF QUANTITY (VDS OULED FARES)

Id. DESCRIPTION Unit

Study, supply, tests in manufacturer workshops, installation, assembly, connection,


softawre listed below, in accordance with all the specifications, lists, drawings, anne

11.A Communication LAN


Security Distribution switches :
A.1 * 24 x SFP ports fully equipped with 20 Gbics 1GbaseLX and 4 Gbics 1Gbase SX U
* 2 x SFP+ ports fully equipped with 2 Gbics 10GbaseSR
IT Distribution switches :
* 24 ports 1GbE SFP equipped with 12 FO ports modules & 12 Gbics modules 1000Base
A.2 LX/LH each U
* 4 x 10GbE SFP+ ports fully equipped with 2 Gbics 10G SM LR & 2 Gbics 10G SM SR

A.3 Indoor access switche 24 ports with SFP modules U

A.4 Industrial switch 8 Ports With SFP modules U

A.5 Industrial switch 4 Ports With SFP modules U

A.6 Routers with all related licences U

A.7 Firewalls with all related licences U

11.B PAGA & Intecom system


PAGA & Intercom Central Exchange Unit, with redundant CPU, Redundant Amplifiers and
B.1 U
Redundant Power
PAGA System & Intercom management software with licences, and integration with the
B.2 U
existing PAGA system
B.3 PAGA & Intercom mobile application U

B.4 Outdoor Field Call Station IP U

B.5 Acoustic hood for outdoor Intercoms + Free standing mounting post U

B.6 Desktop intercom station (Master Call Station) U

B.7 Industrial Horn Speaker U

B.8 Sirens with all their relative masts U

B.9 Beacon U

B.10 Speakers Junction Box U


SUPPLY INSTALLATION
Quantity
Unit price Total price Unit price Total price

ssembly, connection, programming, testing and commissioning of all VDS systems' equipme
, lists, drawings, annexures, and any other document included into this bid.

1 504 513,20 MAD 504 513,20 MAD 39 375,00 MAD 39 375,00 MAD

2 430 200,95 MAD 860 401,89 MAD 129 062,50 MAD 258 125,00 MAD

5 46 661,59 MAD 233 307,97 MAD 4 375,00 MAD 21 875,00 MAD

1 29 737,59 MAD 29 737,59 MAD 10 812,50 MAD 10 812,50 MAD

49 22 937,72 MAD 1 123 948,42 MAD 5 650,00 MAD 276 850,00 MAD

2 24 823,02 MAD 49 646,03 MAD 2 750,00 MAD 5 500,00 MAD

2 356 875,85 MAD 713 751,70 MAD 15 625,00 MAD 31 250,00 MAD

1 116 557,28 MAD 116 557,28 MAD 31 250,00 MAD 31 250,00 MAD

1 75 595,44 MAD 75 595,44 MAD 31 250,00 MAD 31 250,00 MAD

1 112 950,92 MAD 112 950,92 MAD 18 750,00 MAD 18 750,00 MAD

10 17 308,76 MAD 173 087,61 MAD 1 250,00 MAD 12 500,00 MAD

10 17 293,64 MAD 172 936,36 MAD 1 000,00 MAD 10 000,00 MAD

2 3 351,88 MAD 6 703,75 MAD 625,00 MAD 1 250,00 MAD

2 4 688,85 MAD 9 377,69 MAD 812,50 MAD 1 625,00 MAD

36 8 680,85 MAD 312 510,59 MAD 1 062,50 MAD 38 250,00 MAD

9 8 455,49 MAD 76 099,44 MAD 1 062,50 MAD 9 562,50 MAD

10 1 289,44 MAD 12 894,43 MAD 125,00 MAD 1 250,00 MAD


TOTAL PRICE OF
SUPPLY &
INSTALLATION

l VDS systems' equipment or


his bid.

4 159 094,29 MAD

543 888,20 MAD

1 118 526,89 MAD

255 182,97 MAD

40 550,09 MAD

1 400 798,42 MAD

55 146,03 MAD

745 001,70 MAD

1 224 401,01 MAD

147 807,28 MAD

106 845,44 MAD

131 700,92 MAD

185 587,61 MAD

182 936,36 MAD

7 953,75 MAD

11 002,69 MAD

350 760,59 MAD

85 661,94 MAD

14 144,43 MAD
11.C CCTV
Outdoor 5 MP fixed surveillance camera with line crossing analysis, with all licences & IR
C.1 U
projectors
C.2 Outdoor 5MP fixed surveillance camera U

C.3 Outdoor mobile PTZ 8MP surveillance camera (500m Night vision/ 1000m Daylight) U

C.4 LPR camera with all related licences U

C.5 Masts 6m U
Management & recording server and storage Supplied with monitoring software and
C.6 U
necessary licenses.
VMS with all necessary licences and modules( for video surveillance analysis, wall screen,
C.7 Ens
LPR, Access Control)
C.10 Thermal video analysis solution Ens

11.D Pre cabling

D.1 server cabinet 42U 19" 1200 width with modules, cable management and accessoires U

D.2 Rack cabinet 12 U with modules, cable management and accessoires U

D.3 Waterproof outdoor cabinet Rail DIN with modules & accessoires U

D.4 Twisted pair cable (S/FTP Cat 6A with Fire retardant ) ML

D.5 IT Socket U

D.6 Patch cord 1m/ 3m/ 5m RJ45 S/FTP Cat 6A ENS

D.7 Patch Panel Copper( 24 Ports 6A SFTP) U

D.8 Outdoor Fiber Optic Cables OS1 (12 brins) ML

D.9 Indoor FO patch panel 24 SC/APC SM U

D.10 Optical fiber patch cord SC APC/LC UPC/ optic garter Single mode U

Industrial patch panel fiber optic Din Rail mouting 8 ports (Din Rail mounting 8 ports for
D.11 U
outdoor deployment Type of ports : SC APC)

RJ45 Plugs to connect cameras, intercoms, access point, Access Control, Video Wall and
D.12 U
other IP equipment
86 23 279,44 MAD 2 002 032,26 MAD 2 500,00 MAD 215 000,00 MAD

3 32 746,43 MAD 98 239,30 MAD 3 125,00 MAD 9 375,00 MAD

7 102 534,13 MAD 717 738,94 MAD 5 625,00 MAD 39 375,00 MAD

2 45 318,80 MAD 90 637,60 MAD 5 625,00 MAD 11 250,00 MAD

52 11 403,95 MAD 593 005,18 MAD 2 250,00 MAD 117 000,00 MAD

1 106 541,52 MAD 106 541,52 MAD 18 750,00 MAD 18 750,00 MAD

1 999 458,82 MAD 999 458,82 MAD 62 500,00 MAD 62 500,00 MAD

1 0,00 MAD 0,00 MAD 0,00 MAD 0,00 MAD

1 13 015,60 MAD 13 015,60 MAD 1 500,00 MAD 1 500,00 MAD

2 3 389,69 MAD 6 779,38 MAD 1 250,00 MAD 2 500,00 MAD

50 16 683,76 MAD 834 188,06 MAD 1 875,00 MAD 93 750,00 MAD

1950 13,63 MAD 26 587,05 MAD 6,25 MAD 12 187,50 MAD

8 166,64 MAD 1 333,10 MAD 125,00 MAD 1 000,00 MAD

1 64 730,52 MAD 64 730,52 MAD 16 875,00 MAD 16 875,00 MAD

5 2 000,00 MAD 10 000,00 MAD 62,50 MAD 312,50 MAD

11700 34,31 MAD 401 475,55 MAD 6,25 MAD 73 125,00 MAD

5 3 366,58 MAD 16 832,89 MAD 375,00 MAD 1 875,00 MAD

87 299,20 MAD 26 030,42 MAD 125,00 MAD 10 875,00 MAD

50 4 354,05 MAD 217 702,52 MAD 625,00 MAD 31 250,00 MAD

230 106,98 MAD 24 606,44 MAD 125,00 MAD 28 750,00 MAD


5 080 903,62 MAD

2 217 032,26 MAD

107 614,30 MAD

757 113,94 MAD

101 887,60 MAD

710 005,18 MAD

125 291,52 MAD

1 061 958,82 MAD

0,00 MAD

2 455 644,69 MAD

14 515,60 MAD

9 279,38 MAD

927 938,06 MAD

38 774,55 MAD

2 333,10 MAD

81 605,52 MAD

10 312,50 MAD

474 600,55 MAD

18 707,89 MAD

36 905,42 MAD

248 952,52 MAD

53 356,44 MAD
D.13 Multipair cable between central exchange unit and outdoor cabinet ML

D.14 Audio cable between sirens and outdoor cabinets ML

D.15 Goulottes et cheminement de cable ENS

D.16 Audio cable between sirens and outdoor cabinets ML

D.17 Goulottes et cheminement de cable ENS

11.E Access Control

E.1 Controller U

E.2 Card Reader U

Control access system for sliding access gate, including motors, controller, card reader
E.3 ENS
"range 10 m"

E.4 Smart card booster 2G U

E.5 100 printed badges pack, MIFARE/ DESFIRE EV2 U

E.6 Badge printer U

E.7 full height turnstil U

E.8 Access control Software with licenses and integration with VMS ENS

E.9 server for access control U

PRIX TOTAL HT (A+B+C+D+E

PRIX TOTAL TTC


9400 33,52 MAD 315 076,47 MAD 6,25 MAD 58 750,00 MAD

402 33,52 MAD 13 474,55 MAD 6,25 MAD 2 512,50 MAD

1 60 031,29 MAD 60 031,29 MAD 6 250,00 MAD 6 250,00 MAD

402 33,52 MAD 13 474,55 MAD 6,25 MAD 2 512,50 MAD

1 60 031,29 MAD 60 031,29 MAD 6 250,00 MAD 6 250,00 MAD

2 12 867,91 MAD 25 735,83 MAD 1 250,00 MAD 2 500,00 MAD

2 4 677,50 MAD 9 355,01 MAD 625,00 MAD 1 250,00 MAD

2 60 858,35 MAD 121 716,70 MAD 3 750,00 MAD 7 500,00 MAD

30 24 845,70 MAD 745 371,13 MAD 3 125,00 MAD 93 750,00 MAD

1 16 096,57 MAD 16 096,57 MAD 3 125,00 MAD 3 125,00 MAD

1 25 158,42 MAD 25 158,42 MAD 625,00 MAD 625,00 MAD

2 106 686,75 MAD 213 373,51 MAD 7 500,00 MAD 15 000,00 MAD

1 33 291,90 MAD 33 291,90 MAD 2 500,00 MAD 2 500,00 MAD

1 47 762,62 MAD 47 762,62 MAD 6 250,00 MAD 6 250,00 MAD

TAL HT (A+B+C+D+E)

RIX TOTAL TTC


373 826,47 MAD

15 987,05 MAD

66 281,29 MAD

15 987,05 MAD

66 281,29 MAD

1 370 361,69 MAD

28 235,83 MAD

10 605,01 MAD

129 216,70 MAD

839 121,13 MAD

19 221,57 MAD

25 783,42 MAD

228 373,51 MAD

35 791,90 MAD

54 012,62 MAD

14 290 405,31

17 148 486,37
PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR

SID BILL OF QUANTITY (SID OULED FARES)

Id. DESCRIPTION

12.A Système de détection incendie et de report des alarmes et défauts

Fourniture, pose, programmation, paramétrage et raccordement des


centrales de détection incendie adressable, y compris alimentation
A1 électrique de secours, batteries, outils et logiciels de programmation et de
paramétrage avec licences, Modules et toutes sujétions nécessaires a une
installation complète en ordre de marche.
Fourniture et pose de Détecteurs (Linéaire de fumée/Multicritères/Optique
A2 de fumée...) avec socles et tous les accessoires de pose et de
raccordement nécessaire pour une installation en ordre de marche.
Fourniture et pose de Déclencheur Manuel d'alarme avec capots de
A3
protection et tous les accessoires de pose et de raccordement,
Fourniture et pose de Déclencheur Manuel d'alarme pour une utilisation à
A4 l'extérieur avec capots de protection et tout les accessoires de pose et de
raccordement,
Fourniture et pose de Sirènes d'alarme avec flash avec module de
A5 commande et tous les accessoires de pose et de raccordement, tous les
accessoires nécessaires pour une installation en ordre de marche.
Fourniture et pose de Sirènes d'alarme avec flash, pour usage externe
A6 avec module de commande et tous les accessoires de pose et de
raccordement,
Fourniture et pose de câblages, circuits de fin de ligne, chemins de câble,
tube métallique, flexible armée, support, et toutes sujétions et accessoires
A7
nécessaires à la pose et au raccordement d'une installation complète en
ordre de marche.

12.B Système de protection à eau pour Warehouse


Connexion au réseau incendie existant (à partir du tie-in) : Fourniture et
pose de tuyauterie en PEHD SDR9 Approuvé FM assemblé par poly-
fusion/en acier carbonne sans soudure SH40 avec bande de protection
(pour la partie enterrée), y compris fouille, terrassement, déblais, remblais,
B1
toutes pièces de raccordement, ancrages, butées, brides, coudes, vannes,
tés, dérivations, raccords, réductions, regards, supports, essais et toutes
fournitures et sujétions réalisés selon les normes en vigueur et
spécifications techniques.
Fourniture et pose des RIA DN33/30m avec armoire, vannes, clapet anti-
retour, réducteur de pression, Tuyauteris, coudes, tés, dérivations,
B3 raccords, réductions, Regards, supports, les accessoires de pose et de
raccordement et toutes sujétions nécessaires à une installation complète
en ordre de marche

Rinçage et essais hydrostatiques avec PV délivré par un organisme


B4
(bureau de contrôle) agréé par l'Etat
SUPPLY INSTALLATION
Unit Quantity
Unit price Total price Unit price

et défauts

Ens 1 279 326,74 MAD 279 326,74 MAD 15 625,00 MAD

Ens 1 263 063,70 MAD 263 063,70 MAD 10 625,00 MAD

Ens 1 13 015,60 MAD 13 015,60 MAD 1 500,00 MAD

Ens 1 14 567,30 MAD 14 567,30 MAD 1 950,00 MAD

Ens 1 8 730,01 MAD 8 730,01 MAD 1 875,00 MAD

Ens 1 17 161,33 MAD 17 161,33 MAD 2 187,50 MAD

Ens 1 61 612,59 MAD 61 612,59 MAD 15 625,00 MAD

Ens 1 106 806,32 MAD 106 806,32 MAD 12 500,00 MAD

Ens 1 26 890,64 MAD 26 890,64 MAD 6 250,00 MAD

Ens 1 33 405,34 MAD 33 405,34 MAD 4 375,00 MAD


INSTALLATION TOTAL PRICE OF
Total price SUPPLY & INSTALLATION

706 864,77 MAD

15 625,00 MAD 294 951,74 MAD

10 625,00 MAD 273 688,70 MAD

1 500,00 MAD 14 515,60 MAD

1 950,00 MAD 16 517,30 MAD

1 875,00 MAD 10 605,01 MAD

2 187,50 MAD 19 348,83 MAD

15 625,00 MAD 77 237,59 MAD

198 843,87 MAD

12 500,00 MAD 119 306,32 MAD

6 250,00 MAD 33 140,64 MAD

4 375,00 MAD 37 780,34 MAD


Fourniture et pose des plaques signalétiques photoluminescentes de
dimensions adéquates pour tous les composants fixes des installations de
B5
protection à eau incendie conformément aux documents fournis
(Spécifications techniques, Réquisition…etc)

12.C Extincteurs Pour Warehouse

Fourniture et pose d'extincteurs à Poudre ABC 9 Kg Approuvé NF y


C1
compris accessoires de montage, supports, coffret en plastique…etc

Fourniture et pose d'extincteurs CO2 5 KG Approuvé NF y compris


C2
accessoires de montage, supports, coffret en plastique…etc

Fourniture et pose d'extincteurs mobiles ABC 50 kg Approuvé NF avec


C3
housse de protection

Fourniture et pose des plaques signalétiques photoluminescentes de


C4 dimensions adéquates pour tous les extincteurs conformément aux
documents fournis (Spécifications techniques, Réquisition…etc)

12.D Extincteurs pour poste de garde

Fourniture et pose d'extincteurs à Poudre ABC 9 Kg Approuvé NF y


D1
compris accessoires de montage, supports, coffret en plastique…etc

Fourniture et pose d'extincteurs CO2 5 KG Approuvé NF y compris


D2
accessoires de montage, supports, coffret en plastique…etc

Fourniture et pose des plaques signalétiques photoluminescentes de


D3 dimensions adéquates pour tous les extincteurs conformément aux
documents fournis (Spécifications techniques, Réquisition…etc)

12.E Extincteurs pour Inverter stations

Fourniture et pose d'extincteurs à roues CO2 2x10 Kg, avec housse de


E1
protection
Ens 1 6 741,57 MAD 6 741,57 MAD 1 875,00 MAD

Ens 1 53 403,16 MAD 53 403,16 MAD 6 250,00 MAD

Ens 1 12 915,07 MAD 12 915,07 MAD 3 125,00 MAD

Ens 1 127 825,10 MAD 127 825,10 MAD 31 250,00 MAD

Ens 1 45 222,53 MAD 45 222,53 MAD 2 500,00 MAD

Ens 1 12 500,00 MAD 12 500,00 MAD 2 744,70 MAD

Ens 1 6 431,07 MAD 6 431,07 MAD 1 125,00 MAD

Ens 1 12 500,00 MAD 12 500,00 MAD 1 419,07 MAD

Ens 1 50 000,00 MAD 50 000,00 MAD 9 653,16 MAD


1 875,00 MAD 8 616,57 MAD

282 490,86 MAD

6 250,00 MAD 59 653,16 MAD

3 125,00 MAD 16 040,07 MAD

31 250,00 MAD 159 075,10 MAD

2 500,00 MAD 47 722,53 MAD

36 719,83 MAD

2 744,70 MAD 15 244,70 MAD

1 125,00 MAD 7 556,07 MAD

1 419,07 MAD 13 919,07 MAD

152 181,84 MAD

9 653,16 MAD 59 653,16 MAD


Fourniture et pose d'extincteurs CO2 5 KG Approuvé NF y compris
E3
accessoires de montage, supports, coffret en plastique…etc

Fourniture et pose d'extincteurs à Poudre ABC 9 Kg Approuvé NF y


E4
compris accessoires de montage, supports, coffret en plastique…etc

Fourniture et pose des plaques signalétiques photoluminescentes de


E5 dimensions adéquates pour tous les extincteurs conformément aux
documents fournis (Spécifications techniques, Réquisition…etc)

12.F Signalisation, Evacuation et Intervention

Fourniture et pose des plans de Signalisation, Evacuation et d'Intervention


F1
conformément au Spécification

12.G PRESTATION DIVERSES

Ingénierie détail et d'exécution comprenant l'établissement de tous les


G1
plans, Isos, notes de calculs, etc…..

G2 Fourniture des pièces de rechange conformément à l'annexe D


Dossiers constructeurs As-Built (y compris tous les documents, plans,
G3 schémas, notes de calculs, etc.) de tous les équipements et les ouvrages
fournis/réalisés

PRIX TOTAL HT (A+B+C+

PRIX TOTAL TT
Ens 1 12 915,07 MAD 12 915,07 MAD 3 125,00 MAD

Ens 1 22 500,00 MAD 22 500,00 MAD 6 266,08 MAD

Ens 1 42 500,00 MAD 42 500,00 MAD 5 222,53 MAD

Ens 1 0,00 MAD 0,00 MAD 2 087 984,71 MAD

Ens 1 0,00 MAD 0,00 MAD 304 893,93 MAD

Ens 1 0,00 MAD 0,00 MAD 0,00 MAD

Ens 1 0,00 MAD 0,00 MAD 304 893,93 MAD

RIX TOTAL HT (A+B+C+D+E+F+G)

PRIX TOTAL TTC


3 125,00 MAD 16 040,07 MAD

6 266,08 MAD 28 766,08 MAD

5 222,53 MAD 47 722,53 MAD

2 087 984,71 MAD

2 087 984,71 MAD 2 087 984,71 MAD

609 787,87 MAD

304 893,93 MAD 304 893,93 MAD

0,00 MAD 0,00 MAD

304 893,93 MAD 304 893,93 MAD

4 074 873,74

4 889 848,49
Id.

13.A

A1

A1.1

13.B

B1

B1.1

B2

B2.1

B3

B3.1

B4

B4.1

13.C

C1

C3

C4

PRIX TOTAL

PRIX TOT
PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR

HVAC BILL OF QUANTITY (HVAC OULED FARES)

DESCRIPTION

Engineering, details and achievement

Engineering, details and achievement


Engineering of details and execution including the establishment of all plans, calculation notes, technical
specification,...etc.

Supply of equipment (including PDR for commissioning, start-up and warranty period) and assembly servic
as well as construction services (including tests, factory and on-site acceptance tests)

Non-return dampers
smoke vents with, including curbs and control devices, anti-vibration studs and sleeves supports and all accessorie
for a complete installation. effective area = 1.21 m2.
External grid galvanized steel
External grid galvanized steel (special treatment anticorision), for fixation in wall or external door with filter G4 and
accessories for a complete installation (Dimension 900*600)
Sealing
Sealing all walls, slabs and reservations for electrical equipment, with the same fire resistance rating as the
construction element
Electricity
Cable, cable duct, armed hose, support, all Electrical installation requirements and accessories for a complete
installation

Diverse

As-Built builders' records (including all documents, plans, diagrams, calculation notes, etc.) of all equipment and wo
supplied / produced
Inspection, testing and commissioning of the complete HVAC Systems, including all labour and all required testing
eauipment, testing equipment shall be calibrated. Testing shall be as per, specifications of this tender and direction
Engineers-in-Charge & putting into commercial operation.

Supply of Electrical Spare Parts - As per Annexe D -

PRIX TOTAL HT (A+

PRIX TOTAL TT
SUPPLY INSTALLATION
Unit Quantity
Unit price Total price Unit price Total price

Lumpsum - 1- 0,00 MAD 0,00 MAD 331 406,45 MAD 331 406,45 MAD

U - 4- 30 000,00 MAD 120 000,00 MAD 9 768,77 MAD 39 075,10 MAD

U - 8- 32 500,00 MAD 260 000,00 MAD 7 268,77 MAD 58 150,19 MAD

Lumpsum - 1- 30 000,00 MAD 30 000,00 MAD 14 408,46 MAD 14 408,46 MAD

Lumpsum - 1- 50 000,00 MAD 50 000,00 MAD 12 967,23 MAD 12 967,23 MAD

Lumpsum - 1- 0,00 MAD 0,00 MAD 198 843,87 MAD 198 843,87 MAD

Lumpsum - 1- 0,00 MAD 0,00 MAD 159 075,10 MAD 159 075,10 MAD

Lumpsum - 1- 0,00 MAD 0,00 MAD 0,00 MAD 0,00 MAD

T (A+B+C)

L TTC
TOTAL PRICE OF
SUPPLY & INSTALLATION

331 406,45 MAD

331 406,45 MAD

331 406,45 MAD

584 600,98 MAD

159 075,10 MAD

159 075,10 MAD

318 150,19 MAD

318 150,19 MAD

44 408,46 MAD

44 408,46 MAD

62 967,23 MAD

62 967,23 MAD

357 918,96 MAD

198 843,87 MAD

159 075,10 MAD

0,00 MAD

1 273 926,39

1 528 711,67
PROJECT: MINES SOLAR PV
PACKAGE P05 - GENERAL CONTRACTOR
CHARPENTE METALLIQU BILL OF
QUANTITY (O&M WAREHOUSE DEFICIT
SAFI)
Id. DESCRIPTION Unit

14.A CHARPENTE METALLIQUE


A1 Charpente métallique kg
A2 Couverture et bardage en toles NERVESCO m2
A3 Couverture et bardage en panneaux translucides m2
A4 Descentes d'eau pluviale(diametre 160mm ) ML
A5 Cheneaux ML
A6 Portail coulissant 3m x 3.5m U
14.B BETON ET BETON ARME EN FONDATION
B1 Béton de propreté m3
B2 Béton pour semelles, radiers et massifs de fondations m3
B3 Armatures en aciers HA FeE500S pour béton armé kg
B4 Dallage m3

PRIX TOTAL HT (A+B)

PRIX TOTAL TTC


SUPPLY INSTALLATION
Quantity
Unit price Total price Unit price Total price

- 15 961- 37,50 MAD 598 537,50 MAD 2,27 MAD 36 211,90 MAD
- 582- 25,00 MAD 14 550,00 MAD 1,51 MAD 880,28 MAD
- 81- 312,50 MAD 25 312,50 MAD 18,91 MAD 1 531,42 MAD
- 16- 300,00 MAD 4 800,00 MAD 18,15 MAD 290,40 MAD
- 54- 312,50 MAD 16 875,00 MAD 18,91 MAD 1 020,95 MAD
- 2- 43 750,00 MAD 87 500,00 MAD 2 646,90 MAD 5 293,81 MAD

- 3- 1 250,00 MAD 3 750,00 MAD 75,63 MAD 226,88 MAD


- 58- 1 562,50 MAD 90 625,00 MAD 94,53 MAD 5 482,87 MAD
- 2 064- 17,50 MAD 36 120,00 MAD 1,06 MAD 2 185,28 MAD
- 66- 1 937,50 MAD 127 875,00 MAD 117,22 MAD 7 736,52 MAD

TOTAL HT (A+B)

X TOTAL TTC
TOTAL PRICE OF
SUPPLY &
INSTALLATION
792 803,76 MAD
634 749,40 MAD
15 430,28 MAD
26 843,92 MAD
5 090,40 MAD
17 895,95 MAD
92 793,81 MAD
274 001,55 MAD
3 976,88 MAD
96 107,87 MAD
38 305,28 MAD
135 611,52 MAD

1 066 805,31

1 280 166,38
ANNEXE B - BILL OF QUANTITIES
15. GENERAL WORKS AND SERVICES
SECTIO UNI
DESCRIPTION
N T
15 GENERAL WORKS AND SERVICES
Temporary Site Facilities and services, Site facilities, Site offices for Contractor /
15,1 Temporary services (Electricity supply, Temporary lighting, Water, Sewage, Temporary LOT
stores, etc.)
Site supervision and coordination, mobilisation, demobilisation and Construction
15,2 management, Insurance coverage, Safety regulations, Site meetings & reporting, LOT
Clearing/Cleaning during and upon completion
Testing and Commissioning (including Performance testing) of the complete Installation,
including all labour and all required testing eauipment, testing equipment shall be
15,3 LOT
calibrated. Testing shall be as per Specifications, TSO/Grid code requirements, and
directions of Client/Engineer-in-Charge & putting into commercial operation.
Supply of Spare Parts -As per Annexe D - and disposal in the O&M Warehouses and
15,5 LOT
Substation Storage Rooms, with all necessary Shelving and Supports
Supply of Weather Forecast System. The Contractor shall supply, integrate with the
SCADA and bear the costs associated with the WFS for the duration of the contract. The
forecasting system shall provide, but not be limited to, the following capabilities:
• Performing global Numerical Weather Prediction (NWP) model.
• Nowcasting up to next 6 hours and forecasts up to 10 days at least.
15,6 • PV power output predictions based on your own plant configuration. LOT
• It shall be scalable and flexible platform.
• Support for tracker systems. Algorithms to calculate plane-of-array solar irradiance and
PV power output for the selected tracker systems.
• Renewable production and consumption forecasts to guarantee a better performance
and energy control of PV installation.

PRIX TOTAL HT
PRIX TOTAL TTC
Quantit SUPPLY INSTALLATION
y Unit price Total price Unit price Total price

1 11 173 199,27 MAD 11 173 199,27 MAD 0,00 MAD 0,00 MAD

1 26 157 633,13 MAD 26 157 633,13 MAD 0,00 MAD 0,00 MAD

1 2 750 000,00 MAD 2 750 000,00 MAD 1 250 000,00 MAD 1 250 000,00 MAD

1 3 625 000,00 MAD 3 625 000,00 MAD 0,00 MAD 0,00 MAD

1 562 500,00 MAD 562 500,00 MAD 150 000,00 MAD 150 000,00 MAD

TOTAL HT
TOTAL TTC
TOTAL PRICE OF
SUPPLY &
INSTALLATION

11 173 199,27 MAD

26 157 633,13 MAD

4 000 000,00 MAD

3 625 000,00 MAD

712 500,00 MAD

45 668 332,40 MAD

You might also like