1. Introduction .......................................................................................................................................... 1
1.1 Scope...................................................................................................................... 1
1.2 Purpose .................................................................................................................. 1
1.3 Project Description and Location........................................................................... 1
2. Project Construction Traffic Routes ...................................................................................................... 1
2.1 General................................................................................................................... 1
2.2 Turbine Component Supply Routes ....................................................................... 2
2.2.1 Delivery of Components for Turbines 1, 2 and 5 ................................................... 2
2.2.2 Delivery of Components for Turbines 6, 4 and 9 ................................................... 2
2.2.3 Delivery of Components for Turbines 7, 10 and 11 ............................................... 3
2.2.4 Delivery of Components for Turbine 12 ................................................................ 3
2.2.5 Delivery of Components for Turbines 18, 20 and 21. ............................................ 3
2.2.6 Delivery of Components for Turbine 16 ................................................................ 3
2.2.7 Delivery of Components for Turbine 23 ................................................................ 3
2.2.8 Delivery of Components for Turbines 48 and 52 ................................................... 3
2.2.9 Delivery of Components for Turbines 46, 56 and 57 ............................................. 4
2.2.10 Delivery of Components for Turbines 44 and 47 ................................................... 4
2.2.11 Delivery of Components for Turbines 54 ............................................................... 4
2.2.12 Delivery of Components for Turbines 32, 35, 41, 43, and 38 ................................ 4
2.2.13 Delivery of Components for Turbine 58 ................................................................ 5
2.2.14 Delivery of Components for Turbine 25 ................................................................ 5
2.2.15 Delivery of Components for Turbine 27 ................................................................ 5
2.2.16 Delivery of Components for Turbines 29 and 28 ................................................... 6
2.3 Turbine Components Supply Routes Summary ..................................................... 6
2.4 Aggregate Supply Routes ....................................................................................... 6
2.5 Wind Farm Entrances............................................................................................. 7
3. Traffic Management.............................................................................................................................. 7
3.1 Entrance Construction ........................................................................................... 7
3.2 Roadway Upgrades ................................................................................................ 8
List of Tables
Table 1: Estimated Number of Deliveries ……………………………………………………………………………………………..8
Appendices
Appendix A: Renewable Energy Approval
Appendix B: Construction Traffic Plan
Appendix C: Intersection Improvement Drawings
Appendix D: Affected Road Sign Locations
Appendix E: Ontario Traffic Manual Book 7, Typical Layouts for Temporary Work Zone Locations
1. Introduction
1.1 Scope
Tulloch Engineering have been retained by the Nation Rise Wind Farm Limited Partnership to complete a
Traffic Management Plan (TMP) to fulfill the requirements of the Renewable Energy Approval (REA) No.
0871-AV3TFM dated May 4, 2018.
The REA states that as a condition of approval the company shall prepare a Traffic Management Plan and
provide it to the Township of North Stormont and the United Counties of Stormont, Dundas and
Glengarry. A copy of the REA is included in Appendix A.
1.2 Purpose
The TMP is developed in coordination with the local municipalities to ensure that public access to the
project area is maintained throughout all phases of the project construction. The TMP provides
procedures and mitigation measures to ensure continuous and safe access through the project area. The
TMP will be used during construction to describe potential impacts caused by project related traffic and
will provide methods and mitigation measures to reduce these impacts.
Intersection improvements are not required for the County Rd 32 and Concession 10-11 Rd intersection,
however the intersection bypass road will be constructed. The intersection bypass road is detailed on
drawing P5, presented in Appendix C.
Routing from the intersection of County Rd 43 and County Rd 31 to the proposed new turbine entrances
for turbines 48 and 52 located on the south side of County Rd 43 as follows:
• at the intersection of County Rd 43 and County Rd 31 continue easterly on County Rd 43 to the
new respective entrances on the south side.
2.2.12 Delivery of Components for Turbines 32, 35, 41, 43, and 38
Routing from the intersection of County Rd 43 and County Rd 31 to the proposed new turbine entrances
for turbines 32, 35 and 38 located on the north side of Concession 4-5 Rd, as well as to the proposed new
turbine entrance for turbine 41 and 43 on the south side of Concession 4-5 Rd as follows:
In addition to the delivery of turbine components there are extensive delivery requirements for
equipment and materials for access road construction, turbine site preparation and turbine base
construction. Turbine components constructed on site will utilize materials, reinforcing steel, concrete
and other components and will typically follow the route outlined for turbine components in Section 2.2.
3. Traffic Management
As required by condition N1 of the REA this Traffic Management Plan is to be submitted to the Township
of North Stormont and the United Counties of Stormont, Dundas and Glengarry. The following section of
the report will outline steps to be taken to address traffic management issues during construction of
proposed entrances and roadway modifications/upgrades.
dates were not available at the time of writing this plan. Planned substantial completion of the project is
scheduled for October 22, 2019.
4. Summary
This Traffic Management Plan has outlined the requirements for delivery of turbine components and
construction materials to the Nation Rise Wind Project, as well as the cursory identification of the
requirements for construction of the thirty-six (36) proposed entrances. This plan is to be submitted to
the Township of North Stormont and the United Counties of Stormont, Dundas and Glengarry.
Further approvals for the Nation Rise Wind Project are required including entrance permits, road user’s
agreements and permits for the hauling of oversized components. These approvals will be arranged for
separately from this Traffic Management Plan by Nation Rise Wind Farm Limited Partnership and the
turbine supplier. We trust that this Traffic Management Plan has fulfilled the requirements of the
Renewable Energy Approval No. 0871-AV3TFM dated May 4, 2018.
A A
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\NRS-01_100% Civil Submission 10.27.18 JGT 2.dwg - Feb 11, 2019 - 3:36pm
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:12am
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:13am
F F
G G
A A
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 1:26pm
F F
G G
A A
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 1:26pm
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:13am
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:14am
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:14am
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:20am
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:21am
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:22am
F F
G G
A A
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 1:40pm
F F
G G
A A
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 1:43pm
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:22am
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:23am
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 11:23am
F F
G G
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
100% SUBMISSION
NOT FOR CONSTRUCTION
OCTOBER 26, 2018
B B
C C
D D
E E
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRWF_Intersections W-Autoturn on.dwg - Jan 18, 2019 - 1:24pm
F F
G G
< ;
< ;
>
$ $
&
& & +
, , ,
$ $ $
- - -
% $
&
&
' &
)
)
* #
4 -
&
0
2 1
"
0
&
$
4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
B B
C C
D D
E E
F F
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRS-01.dwg - Jan 18, 2019 - 9:25am
G G
1 2 3 4 5 6 7 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CAUTION
UTILITIES SHOWN ON THIS PLAN ARE
APPROXIMATE. UTILITIES ARE TO BE
LOCATED PRIOR TO CONSTRUCTION.
A A
B B
C C
D D
E E
F F
P:\2018\18-2021 Nation Rise Wind Farm\Drawings\NRS-01.dwg - Jan 18, 2019 - 9:27am
G G
1 2 3 4 5 6 7 10 11 12 13 14 15 16
Nation Rise Wind Project
Traffic Management Plan
5 Two-Lane Mobile Operations Two-Lane Mobile Operations
Multi-Lane Undivided Non-freeway Very Short Duration
5 Multi-Lane
5 Undivided Non-freeway Very Short Duration
JANUARY 2014
Divided Non-freeway Short Duration
5 Divided Non-freeway Short Duration
·
Freeway
5 Long Duration
5 Freeway
5 Long Duration
30m minimum
Rb-90B
30m minimum Rb-90B
TC-1
5*
Contract
BOOK 7
5* TC-1 Contractor’s
Identification
Sign Sign
Contract 60m TC-81 or MCIS-MTO TC-75
Identification Contractor’s
Sign TC-1A TC-74 Municipal
Sign
(rural or freeway)
TC-81 or MCIS-MTO TC-75 60m
TC-74 Municipal
TC-1A
SECTION 8
(rural highway)
TC-1B
(freeway)
* See Table B. NOTES * For Non-Freeways, see Table B. For Freeways, see Table C. NOTES
i) The same signing is required in the opposite direction. i) Where signs cannot be accommodated in the median, provide additional signs on the
right shoulder or oversize as practicable.
201
ii) Speed Fines Doubled signs are recommended, but not required. ii) Speed Fines Doubled signs are recommended, but not required.
· TEMPORARY CONDITIONS
iii) As shown, the limits of the Designated Construction Zone do not need to include TC-1, TC-1A, TC-1B, iii) As shown, the limits of the Designated Construction Zone do not need to include TC-1, TC-1A, TC-1B,
TC-5, TC-5A, TC-5B and information signs. TC-5, TC-5A, TC-5B and information signs.
Figure TL-5 Shoulder Work Figure TL-6 Shoulder Work
Mobile Operations
5 Two-Lane 5 Mobile Operations 5 Two-Lane
Very Short Duration
5 Multi-Lane 5 Undivided Non-freeway 5 Very Short Duration 5 Multi-Lane 5 Undivided Non-freeway
JANUARY 2014
5 Divided Non-freeway Short Duration
5 Divided Non-freeway
5 Short Duration
·
Freeway Long Duration Freeway
5 Long Duration
With work vehicle - Mobile or VSD
WORK
VEHICLE 1b*
with OR
WORK
AREA
1b*
3*
5*
TC-2B or TC-2A
1b*
TC-1
(Long Duration)
BOOK 7
WORK
AREA
1b*
3*
SECTION 8
* See Table A. NOTES * For Short Duration, see Table A. For Long Duration, see Table B. NOTES
i) Work on the left shoulder mirror image for multi-lane divided road. i) Work on the left shoulder mirror image for multi-lane divided road.
ii) Termination taper optional.
203
ii) Termination taper optional.
· TEMPORARY CONDITIONS
iii) Work area may or may not contain a work vehicle. See General Notes to Typical Layouts #4.
iv) A work vehicle with a TC-12 may replace cones for Short Duration work.
Figure TL-7 Lane Encroachment Figure TL-8 Lane Encroachment
5 Two-Lane
5 Mobile Operations
5 Two-Lane Mobile Operations
204
5 Multi-Lane 5 Undivided Non-freeway
5 Very Short Duration Multi-Lane Undivided Non-freeway Very Short Duration
5 Divided Non-freeway Short Duration Divided Non-freeway
5 Short Duration
Freeway Long Duration Freeway
5 Long Duration
(Long Duration)
TC-1
With work vehicle - Mobile or VSD
SECTION 8
TEMPORARY CONDITIONS
·
5*
TC-2B or TC-2A
BOOK 7
3m WORK
min. VEHICLE 5*
with OR
Beacon plus 1b*
TC-12
4WF
TC-12
WORK
3m (NPRS 70km/h or greater)
min.
AREA
TC-11
5*
1b*
TC-2B or TC-2A
WORK
AREA 5*
3m
min.
·
ii) Center line cones are optional and are to be used if lane keeping is an issue.
* See Table A. NOTES iii) On unpaved roads with low volume (<3000 vehicles per day):
i) Termination taper optional. - Where remaining roadway width is at least 6m, and ALW is less than 3m, use Rb-91, a distance 5*
upstream of start of taper, and move the TC-1 and TC-2B an additional distance 5* upstream.
ii) Encroachment in the left lane, mirror image for multi-lane divided road.
iv) Work area may or may not contain a work vehicle. See General Notes to Typical Layouts #4.
v) A work vehicle with a TC-12 may replace cones for Short Duration work where NPRS is under 70km/h.
JANUARY 2014
Figure TL-9 Partial Lane Shift Figure TL-10 Partial Lane Shift: Wide Platform
5 Two-Lane Mobile Operations
5 Two-Lane Mobile Operations
Multi-Lane Undivided Non-freeway Very Short Duration Multi-Lane Undivided Non-freeway Very Short Duration
JANUARY 2014
Divided Non-freeway
5 Short Duration Divided Non-freeway
5 Short Duration
·
Freeway
5 Long Duration Freeway
5 Long Duration
(Long Duration)
(Long Duration) TC-1
TC-1
5*
5*
TC-2B or TC-2A
TC-2B or TC-2A
5*
5*
½ (1a*)
1a*
1a*
1a*
½ (1a*)
½ (1a*)
3m 3m
min. min.
WORK
AREA WORK VEHICLE OR 3m 3m WORK
with Beacon TC-12 min. min. AREA WORK VEHICLE OR
plus 4WF TC-12
with Beacon
plus 4WF
3* ½ (1a*)
3* ½ (1a*)
1a*
1a*
TC-4
5* 1a*
5* TC-4
BOOK 7
TC-2B or TC-2A
5* TC-2B or TC-2A
5*
SECTION 8
TC-1
(Long Duration) TC-1
(Long Duration)
* For Short Duration, see Table A. For Long Duration, see Table B. NOTES * For Short Duration, see Table A. For Long Duration, see Table B. NOTES
i) Remaining roadway must be at least 6m with a lane width of at least 3m in each direction.
i) Remaining roadway must be at least 6m with a lane width of at least 3m in each direction.
ii) Traffic should not be shifted onto a surface texture different from the main roadway without
205
a posted speed reduction. ii) Traffic should not be shifted onto a surface texture different from the main roadway without
· TEMPORARY CONDITIONS
JANUARY 2014
Divided Non-freeway
5 Short Duration Divided Non-freeway
5 Short Duration
·
Freeway
5 Long Duration Freeway Long Duration
(Short Duration)
TC-2B or TC-2A
(Long Duration)
TC-1
5*
or greater)
(Short Duration 70km/h
5*
Rb-31
(Short and Long Duration)
TC-2B or TC-2A
5*
5*
TC-21
Table
½ (1a*) See TCP
½(1a)*
TC-22 3*
WORK
AREA
TC-4
WORK
AREA
3* 1a*
Rb-91
1a*
TC-22
5* See TCP
Wb-1A Table
(NPRS over 70 km/h)
5*
TC-21
5*
5*
TC-2B or TC-2A
(Short and Long Duration)
BOOK 7
5*
Rb-31
5* (Short Duration 70km/h
or greater)
TC-1
(Long Duration)
TC-2B or TC-2A
TC-1A (Short Duration)
SECTION 8
(Long Duration Rural)
* See Table A. NOTES
* For Very Short and Short Duration, see Table A. For Long Duration, see Table B. NOTES i) For low-volume roads (< 3000 vehicles per day) and visibility more than 150m beyond
i) Use only on roads with low traffic volume (< 3000 vehicles per day). the end taper, the TCP and TC-21 may be eliminated for the direction that is not closed.
ii) To be used for short length work areas (< 150m). ii) For Very Short duration, work on low-volume roads with a normal posted speed less
iii) May also be used on roads with no centreline. than 70km/h, the cones are not required.
209
iv) Use only where there is unobstructed visibility of oncoming traffic in both directions.
· TEMPORARY CONDITIONS
iii) On high speed (70 km/h or greater) or where lane keeping/compliance is an issue,
v) Work area may or may not contain a work vehicle. See General Notes to Typical Layouts #4. If work
consider using TL-20B.
vehicle has a TC-12, it must be in bar mode.