INSTALLATION MANUAL
Engineering by ARCTECH TRACKERS
MA-ECIDI-maroc-34MW
This document is property of Arctech. It is strictly forbidden to reproduce this document, it whole or in a part, and provide to others without the previous written consent by Arctech
Table of Contents
1 FOREWORD ................................................................................................................................................. 3
1.1 ABOUT ARCTECH ............................................................................................................................................... 3
1.2 ABOUT THIS MANUAL ....................................................................................................................................... 3
1.3 SAFETY RECOMMENDATIONS AND SYMBOLS USED .........................................................................................5
1.4 AFTER SALES SERVICE ........................................................................................................................................ 5
2 GENERAL SOLAR TRACKER DESCRIPTION ....................................................................................................... 6
2.1 DAYTIME TRACKING .......................................................................................................................................... 6
2.2 BACKTRACKING ..................................................................................................................................................7
2.3 TRACKER DATASHEET ........................................................................................................................................ 8
3 GENERAL ARRANGEMENT .............................................................................................................................9
4 LIST OF MAIN COMPONENTS ...................................................................................................................... 10
5 DEFINITION OF HARDWARE ........................................................................................................................ 15
6 FOUNDATION PROCEDURE ......................................................................................................................... 17
6.1 LAYOUT OF FOUNDATIONS ............................................................................................................................. 17
6.2 TERRAIN REQUIREMENTS ................................................................................................................................17
6.3 TOLERANCES FOR RAMMING POST .................................................................................................................18
6.4 TOLERANCES FOR INSTALLATING POSTS .........................................................................................................18
7 DEGREES OF FREEDOM AND TOLERANCES FOR INSTALLING SLEW DRIVES AND BEARINGS ............................20
8 STRUCTURE INSTALLATION PROCEDURE ......................................................................................................21
8.1 STEP 1: INSTALLATION AND LEVELING OF DRIVE SEATS AND ¨POST SEATS ................................................... 22
8.2 STEP 2: INSTALLATION AND ALIGNMENT OF “SLEW DRIVES” ........................................................................ 24
8.3 STEP 3: INSTALLATION OF PURLINS .................................................................................................................27
8.4 STEP 4: INSTALLATION OF TORQUE TUBES AND PREASSEMBLED PURLINS ................................................... 28
8.4.1 TORQUE TUBES AND BEARING SEAT ............................................................................................................................28
8.4.2 TORQUE TUBES AND PURLINS ......................................................................................................................................28
8.4.3 TORQUE TUBES AND DRIVE POST ................................................................................................................................ 29
8.4.4 BEARING SEAT AND POST SEAT ................................................................................................................................32
8.4.5 TORQUE TUBES AND TORQUE TUBE CONNECTION .....................................................................................................35
www.arctechsolar.com
2
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
1 FOREWORD
1.1ABOUT ARCTECH
Arctech (SSE-STAR: 688408) is a leading manufacturer and supplier of intelligent solar trackers, fixed-tilt
structures and BIPV systems for utility-scale and commercial solar PV projects worldwide. As of the end of
2020, the company had supplied over 32GW of tracking and racking systems to nearly 1,100 PV plants in
40 countries, thanks to its extensive marketing networks including its offices in China, Japan, India, the
U.S., Spain, Australia, UAE, Mexico, Chile, Brazil, Vietnam and Argentina. With innovation and a customer-
first philosophy in its DNA, Arctech is committed to offering industry-leading solar trackers and best-in-class
services to boost energy yield for solar power plants and maximize returns for investors. For more
information, please visit www.arctechsolar.com.
Ensure that the installation is completed by a solar professional, and all tasks are supervised by
technical staff assigned for this purpose.
Comply with all applicable local or national building codes, including any that may supersede
this manual.
Ensure all installation equipment is appropriate for the installation, environment, and site’s
conditions.
Use only “SkySmart II” original parts or parts supplied or recommended by Arctech Solar.
Replacements with parts from other sources may void any applicable warranty.
Validate foundation parameters prior to installation, as a local geotechnical report may be
required to assess soil conditions. We recommend consulting with a local engineer familiar with
local regulations and build site requirements, including soil conditions, terrain and load criteria. All
parameters may impact foundation requirements. Lengths of foundation posts here are illustrative
only.
Comply with all applicable fire codes including, but not limited to, keeping walkways clear and
avoiding obstacles.
Ensure provided information is accurate. Issues resulting from inaccurate information are the
installer’s responsibility.
Confirm with the module manufacturer that Ground Mount Tracker is compatible with the
selected module.
Ensure safe installation of all electrical aspects of the PV system. All electrical installation and
procedures should be conducted by a licensed and bonded electrician or solar contractor. All work
must comply with national, state and local installation procedures, product and safety standards.
See installation O&M manual for details about the periodic and preventive maintenance labors on
the trackers.
To facilitate the comprehension of this manual, some symbols and messages are included:
www.arctechsolar.com
3
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
NOTICE: Indicates a situation which, if not observed, will or could result in malfunction or damage.
ADVICE: indicates a suggestion to carry out an action in a useful way, or indicates additional information
of interest
Arctech Solar’s trackers are customized on project basis. Figures, tables, quantities, in this manual may vary.
For specific project information refer to the “Project Specific Annex” at the end of the document.
COPYRIGHT STATEMENT: All the contents of this manual, including the graphics contained herein, are
intended for the use of the recipient to whom the document and all associated information are directed.
Arctech Solar Holding Co., Ltd. owns the copyright of this document, which is supplied in confidence. It
must not be used for any purpose other than that for which it is supplied and must not be reproduced, in
whole or in part stored in a retrieval system or transmitted in any form or by any means without prior
permission in writing from Arctech Solar Holding Co., Ltd. ARCTECH SOLAR® is a trademarked tracker
and module mounting structure of Arctech Solar Holding Co. A patent covering the ARCTECH SOLAR®
has been granted.
DISCLAIMER: Information and data contained in this manual is exclusively for the purpose of assisting in
the operation and maintenance of Arctech Solar Holding Co., Ltd.’s ARCTECH SOLAR®. No warranty is
given nor can liability be accepted for use of this information for any other purpose. Arctech Solar Holding
Co., Ltd. has a policy of continuous product development and reserves the right to amend specifications
and parameters without notice.
The parts and spare parts supplied by Arctech Solar have been specially designed by Arctech Solar for its
trackers, non-original parts and spare parts and / or not validated by Arctech Solar will be considered
invalid, however Arctech Solar may certify these elements and their safety.
www.arctechsolar.com
4
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
www.arctechsolar.com
5
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
The new tracker concept SkySmart II is defined as an Independent Row 2P tracker, which includes a
Synchronous Multi-point Driving System (3, 4 or 5 fixed points) which significantly increases torsional
stiffness.
This single-axis solar tracker consists of horizontal steel beams, aka torque tubes, (aligned in the North /
South direction) supported on a series of structural posts, which are fixed on the terrain. The torque tubes
support mounting rails and PV modules (along the East / West direction), these horizontal steel beams turn
(±60º) by mechanical rotating drive to orient the PV modules to their optimal position with respect to solar
radiation.
The solar tracker tracks the Sun’s position throughout the day and returns to stow during night-time or
when the stow strategy against the high winds gets triggered.
2.1DAYTIME TRACKING
This tracking technology uses geographic latitude, longitude, and time as the main parameters, and
astronomical algorithms (a general formula for the sun's position and horizontal coordinates) to calculate
the sun's altitude α and azimuth γ.
The tracker is a structure with a mechanism and electric motor, which is connected to a control box with the
tracking algorithm. This controller receives information about the specific tilt angle through an inclinometer.
www.arctechsolar.com
6
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
2.2BACKTRACKING
During sunrise and sunset, the first row of trackers cast shadows on consecutive PV arrays due to Sun’s
low altitude. Increasing row spacing can effectively reduce power losses caused by shadow occlusion, but
it will increase investment costs such as land, cables, and construction.
Backtracking technology is a reverse-direction tracking routine. Its application in PV tracking systems can
avoid shadow occlusion between PV arrays ensuring the optimization of power generation of PV systems,
and reducing the land area.
In simple terms, the backtracking routine uses the control system to calculate whether there is a shadow
between the PV arrays in the morning and afternoon according to the module pitch, the array size and the
azimuth and altitude of the sun. If there is shadow, the tracker will turn in the opposite direction to avoid it
and until the shadow is no longer there.
The operation of the tracker throughout the day is: as the Sun's altitude increases after sunrise, the tracker
gradually rotates from the flat or starting position to the maximum angle until the time when there is no
shading between PV arrays. Then it goes into regular tracking, which is turning towards the sun. In the
afternoon, there will be shadow occlusion between PV arrays and the tracker will be in the backtracking
mode again, from the maximum tracking angle position gradually turning to flat position to ensure that there
is no shadow occlusion in the PV array throughout the day.
PV arrays in the morning or evening without backtracking PV arrays in the morning or evening with backtracking
www.arctechsolar.com
7
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
2.3TRACKER DATASHEET
www.arctechsolar.com
8
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
3 GENERAL ARRANGEMENT
General Post Drive Post General Post General Post Drive Post General Post General Post Drive Post General Post
The above illustrations do not show the exact tracker dimensions for a specific project. To obtain such,
please refer to the detailed drawings in the Annex A.1
www.arctechsolar.com
9
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
300002214
300018942 300018943
300002216 300018944
300004390
Weight[kg] 80 Weight[kg] 69.9 Weight[kg] 69.9
300000953
300023774 300022705
300003759 300023049
300001020
Weight[kg] 0.1 Weight[kg] 10 Weight[kg] 0.31
300008350
300000455 300007944
300004331 300023052
300001004
Weight[kg] 1.9 Weight[kg] 0.5 Weight[kg] 0.25
(*) a/p = Weight varies per project. Please see the specific value in Annex BOM.
www.arctechsolar.com
10
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
300023795
300001077 300012410 300023803
300000975
Weight[kg] a/p(*) Weight[kg] 0.02 Weight[kg] 0.15
(*) a/p = Weight varies per project. Please see the specific value in Annex BOM.
Refer to the Annex A.4. to consult the List of Electronic and Communication parts.
www.arctechsolar.com
11
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Pos.
Post Seat Pos.
② Post Seat
②
Code Code
TZ9057385 TZ9057385
Pos.
Post Seat Weight[kg] 9.44
② Weight[kg] 9.44
Code Pos.
General Post Pos.
⑧ General Post
⑧
TZ9057385 Code Code
Weight[kg] 9.44 Details see Details see
Pos. Annex BOM Annex BOM
General Post Weight[kg] a/p(*)
⑧ Weight[kg] a/p(*)
Code Pos.
Pos.
Bearing Seat Bearing Seat
Details see ⑯
⑯
Annex BOM Code Code
Weight[kg] a/p(*)
300000455 300000455
Pos.
Bearing Seat Weight[kg] 1.9
⑯ Weight[kg] 1.9
Code Pos.
Plastic Bearing Pos.
⑰ Plastic Bearing
⑰
300000455 Code Code
Weight[kg] 1.9
300004331 300004331
Pos.
Plastic Bearing Weight[kg] 0.5
⑰ Weight[kg] 0.5
Pos.
Code Grounding Cable Pos.
23 Grounding Cable
23
300004331 Code
Code
Weight[kg] 0.5
300012410
Pos.
300012410
Grounding Cable Weight[kg] 0.02
23 Weight[kg] 0.02
Code
300012410
Weight[kg] 0.02
South
North
Pos.
Pos. Pos. Pos. Grounding Cable
Pos. Pos. Drive Post Grounding Cable Drive Post 23
Drive Post Grounding Cable ① 23 ①
① 23 Code
Code Code Code
Code Code
Details see Details see 300012410
Details see 300012410
300012410 Annex BOM Annex BOM
Annex BOM Weight[kg] 0.02
Weight[kg] 0.02
Weight[kg] a/p(*) Weight[kg] a/p(*)
Weight[kg] a/p(*) Weight[kg] 0.02
Pos. Pos.
Pos. 7in Slew Drive Seat 7in Slew Drive Seat
7in Slew Drive Seat ③ ③
③
Code Code
Code
300005753 300005753
300005753
Weight[kg] 7.79 Weight[kg] 7.79
Weight[kg] 7.79
Pos. Pos.
Pos. 7in Slew Drive 7in Slave Drive A
7in Slave Drive A ④ ⑤
⑤
Code Code
Code
300002214 300002216
300002216
Weight[kg] 80 Weight[kg] 69.9
Weight[kg] 69.9
Pos. Pos.
Pos. Gasket20-40 Gasket20-40
Gasket20-40 ⑦ ⑦
⑦
Code Code
Code
300000939 300000939
300000939
Weight[kg] 0.04 Weight[kg] 0.04
Weight[kg] 0.04
Pos. Slew Drive Pos. Slew Drive
Pos. Slew Drive
⑩ Reinforcing Plate ⑩ Reinforcing Plate
⑩ Reinforcing Plate
Code Code
Code
300000953 300000953
300000953
Weight[kg] 0.1 Weight[kg] 0.1
Weight[kg] 0.1
Pos. Pos.
Pos. Gasket20-60 Gasket20-60
Gasket20-60 24 24
24
Code Code
Code
300000975 300000975
300000975
Weight[kg] 0.15 Weight[kg] 0.15
Weight[kg] 0.15
www.arctechsolar.com
12
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Pos.
Tube Cover
28
Code
300003234
Weight[kg] 0.21
300001172
Weight[kg] 13
South
North
Purlin Assembly
Pos.
Tube Cover
28
Code
300003234
Weight[kg] 0.21
www.arctechsolar.com
13
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
300001004
Weight[kg] 0.25
300004325
Weight[kg] 0.06
South
North
300001004
Weight[kg] 0.25
300004325
Weight[kg] 0.06
www.arctechsolar.com
14
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
5 DEFINITION OF HARDWARE
TIGHTENING TIGHTENING
SCREW SIZE JOIN DESCRIPTION (From – To) TORQUE TORQUE
[Nm] [ft-lb]
M4 WIFI Antenna bracket to Antenna 1.5 1
www.arctechsolar.com
15
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
www.arctechsolar.com
16
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
6 FOUNDATION PROCEDURE
6.1LAYOUT OF FOUNDATIONS
General Post Drive Post General Post General Post Drive Post General Post General Post Drive Post General Post
All above dimensions identified as “a”, “b”, “c”, & “x” (according to project) are project specific.
Please See Annex A.
Foundation depths and distances to ram, please see the specific foundation drawings in Annex
A.1. This installation manual takes the top of the posts as reference.
30±30 mm 30±30 mm
Take drive post as a reference post, always take the tolerance between the same reference post.
6.2TERRAIN REQUIREMENTS
www.arctechsolar.com
17
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
The figure shows the height scenarios for Post ramming (it depicts the same posts in three different
scenarios, not different posts)
a α
θ β
www.arctechsolar.com
18
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
www.arctechsolar.com
19
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
www.arctechsolar.com
20
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
STEP 1: INSTALLATION AND LEVELING OF DRIVE SEATS AND THE POST SEAT
www.arctechsolar.com
21
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
4
5
www.arctechsolar.com
22
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
7 5
6 4
3
Assembly of Post Seat onto General Post
173±15 mm
www.arctechsolar.com
23
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
2
Drive Seats
Assembly of Slew Drive onto Drive Seat
www.arctechsolar.com
24
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
1
1
5
5
4
4
3
3
2
2
Assembly of the Slave Drive A (South) onto Drive Seat Assembly of the Slave Drive A (North) onto Drive Seat
Tightening the first four nuts after the alignment of slew drive.
www.arctechsolar.com
25
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Once the "Slew Drives" have been mounted onto the posts, it is absolutely necessary to align and level
them, as described below:
1st ALIGNMENT STEP:
1 2
Slave Drive A (North)as Motor and Slew Drive as Slave Drive A(South)
Initial Reference regulated Point (Target) as secondary reference
III. Mount the “Main Slew Drive with Motor” in the center post so its center is aligned with the
previous slew drives.
If the alignment #2 is not possible, the Slew Drive to the North must be readjusted until the
same line goes through the center all slew drives.
www.arctechsolar.com
26
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
2
4
5
6
Qty.
Tightening Torque
Pos. Ref. Description per
[Nm] / [ft-lbs]
figure
1 See Annex Purlin 1
2 300023795 Clamp Fixed Member2 1
3 -- Bolt M12x200 ,8.8 2
4 -- Flat Washer 12 2 80 / 59 (*)
5 -- Spring Washer 12 2
6 -- Nut M12 2
Do not tighten
completely in this Step
There are two types of purlin without brace designs. The difference is the length of bottom strengthen plate. Exact purlin design will
be selected basing on project load. Below shows one purlin with long strengthen plate.
www.arctechsolar.com
27
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
(*) Please refer to the detailed drawings in the Annexes to know the exact torque tube thicknesses.
www.arctechsolar.com
28
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Do not fix the Purlin assy. to the Torque tube yet, they must be moved freely as they will be positioned
in place later. See Step #5.
For the quantities of purlins to be pre-assembled, please refer to the detailed drawings in the Annexes
Notice
-All the M16 bolt (part 3 in the table below) connecting slew Drive T.T. to slew Drive must have screw
thread sealant painted before inserting into the hole.
Pour some thread sealant into a small container (the thread sealant is anaerobic and will not solidify in non-
closed spaces). Try to keep the thread as clean as possible and then immerse the bolt into the sealant as 4
teeth are covered with sealant. Now you can install the bolt. Refer to below:
www.arctechsolar.com
29
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
3
2
www.arctechsolar.com
30
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
(*) Please refer to the detailed drawings in the Annexes to know the exact torque tube thicknesses.
www.arctechsolar.com
31
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Post Seat
Socket
Qty. Tightening
Wrench
Pos. Ref. Description per Torque
sizes DIN /
figure [Nm] / [ft-lbs]
ANSI
1 -- Bolt M12x40, 8.8 4
2 -- Spring Washer 12 4
80 / 59 19 / 18
3 -- Big Flat Washer 12 4
4 -- Flange Nut M12 4
www.arctechsolar.com
32
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Socket
Qty. Tightening
Wrench
Pos. Ref. Description per Torque
sizes DIN /
figure [Nm] / [ft-lbs]
ANSI
1 300008369 Grounding cable hoop 1
2 -- Bolt M8 x 25 1
3 -- Flat Washer 8 2 15 / 11 -
4 -- Spring Washer 8 1
5 -- Nut M8 1
6 300012410 Grounding Cable 1
These grounding cables will be installed in each posts (as shown in below figure)
Bearing Seat
Transmission Shaft
Fixed Plate
Post Seat
Assembly of Bearing Seat onto Post Seat with Transmission Shaft Fixed Plate
Socket
Qty. Tightening
Wrench
Pos. Ref. Description per Torque
sizes DIN /
figure [Nm] / [ft-lbs]
ANSI
1 -- Bolt M12x40, 8.8 4
2 -- Spring Washer 12 4
80 / 59 19 / 18
3 -- Big Flat Washer 12 4
4 -- Flange Nut M12 4
www.arctechsolar.com
33
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
The Bearing seat should be not fastened when it is installed, since it will adapt itself when the
Torque Tube is totally aligned. Therefore, no tolerances are needed.
(*) Please refer to the detailed drawings in the Annexes to know the exact Torque Tube thicknesses.
www.arctechsolar.com
34
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
1 4 8 4 2 6
5 1 3 7
www.arctechsolar.com
35
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Qty. per
Pos. Ref. Descripción
figure
1 300007909 Tube Cover 1
In this Step is defined the adjusting and lock of the Purlins along the Torque Tubes (both sides). The
dimensions “x” varies by project. Please refer to the detailed drawings in the Annex A.1.
www.arctechsolar.com
36
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Transmission Shaft
Fixed Plate
Please install the transmission shaft fixed plate in the same face.
www.arctechsolar.com
37
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Hereafter, it is recommended to follow the following sequence for the Central section of “Transmission
shaft” installation:
Step 6.1: Put the “Transmission Shaft Plastic Bearing” into the “Transmission Shaft fixed plate” first, and
then insert the “Transmission Shaft” into it.
(*) Please refer to the detailed drawings in the Annex A.1 to know the exact length of each Transmission
Shaft to be installed.
Step 6.2: Keep the above parts horizontally fixed on the General post “a” (Do not tighten in this step).
www.arctechsolar.com
38
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Step 6.3: Sliding the “Transmission Shaft” on its axis direction to the opposite General Post “b”.
Step 6.4: Pre-assembly Transmission Shaft Plastic Bearing in the same way and then move the
Transmission Shaft through its center.
Step 6.5: Ensure the Transmission Shaft Fixed Plate is installed tightly and keep the transmission
Shaft on the same line.
www.arctechsolar.com
39
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Transmission Shaft#3
Fixed Plate #1 Fixed Plate #1
&
Step 6.6: Once Central section of “Transmission shaft” has been installed, install the transmission shaft
to the slew drive as below:
1
2
4
3
Nuts above are preassembled and it must be taken off before starting this step.
www.arctechsolar.com
40
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
(*) Please refer to the detailed drawings in the Annex A.1 to know the exact length of each Transmission
Shaft to be installed.
Do not tighten until Transmission shaft assy. is completely set and leveling.
3 2
1
7
8
6
1
4
www.arctechsolar.com
41
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Tightening
Qty. Socket
Po Torque
Ref. Description per Wrench sizes
s. [Nm] / [ft-
figure DIN / ANSI
lbs]
1 See Annex Transmisión Shaft 1 - -
2 300023051 Transmission Shaft Connection 1
3 -- Bolt M8x70, 8.8 2
4 -- Big Flat washer 8 4
5 -- Spring Washer 8 6 15/11
6 -- Nut M8 6
7 -- Bolt M8x25 ,8.8 4
8 Flat washer 8 8
www.arctechsolar.com
42
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Electrical current:
Module Washer Bolt Purlin Torque tube
2) The PV module and purlin are fixed with Bolt and flat washer.
www.arctechsolar.com
43
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
5 2
2 4
3
www.arctechsolar.com
44
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
The AI control box is mounted on the torque tube side with the emergency button facing south.
This grounding cable connects the control box with the torque tube. The cable is fixed to the torque tube
with a self-tapping screw which cannot damage the torque tube.
5
7
6
2 8
North
South
4
1
3
Control Box and fixing plates
Socket
Qty. Tightening
Po Wrench
Ref. Description per Torque
s. sizes
figure [Nm] / [ft-lbs]
DIN / ANSI
1 300022705 AI Control Box 1 - -
2 300023049 Control box hoop 2
3 300012450 Control Box Grounding Cable 1
4 300002028 Self-tapping screw 1
5 -- Bolt M8x30 4
6 -- Flat Washer 8 8
10/7
7 -- Spring Washer 8 4
8 -- Nut M8 4
The distance from the end of Torque Tube to Control box hoop is 620mm (Refer to below figure).
www.arctechsolar.com
45
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
ANNEXES
LIST OF ANNEXES
www.arctechsolar.com
46
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
www.arctechsolar.com
47
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
www.arctechsolar.com
48
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Then, the tracker can be rotated to -45 degrees to install the remaining PV modules.
WARNING!
For trackers that mount more than 120 PV Modules, the team at site should contact with
Arctech Engineering in order to provide them alternative installation procedure.
WARNING!
-Modules should be place in stow position (horizontal, i.e. 0 deg.) after panel installation is
complete or interrupted due to shift change.
www.arctechsolar.com
49
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
When connecting power ensure the DC switch is in OFF position, and the emergency
stop is pushed in.
DC switch
There is no LED
and Sensor, only Connects to motor Emergency Stop Button
two terminals.
www.arctechsolar.com
50
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
MC4-connector
Follow guidance below to tie the motor cable. If already tied up, skip this step.
Lay the motor cable along the motor shell and make sure the cable loop radius is larger than 50mm.
Tie the cable with cable ties and cut the excess plastic tie.
www.arctechsolar.com
51
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Tie the motor cable with cable ties, make sure the cable loop radius is larger than 50mm.
The reserved cable of antenna cannot be too long, it should be tied together with motor
cable and control box cables on the purlin bracing.
The reserved cable of antenna cannot be too long, it should be tied together with motor
cable and control box cables on the torque tube.
www.arctechsolar.com
52
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
www.arctechsolar.com
53
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Foundation type for the wind sensor post should be followed as the one considered for the
project (direct ramming/predrill/concrete encased posts), but with the embedment of 1300mm.
Wind sensor
Communication
antenna holder
Mid pole
Communication Box
Wind sensor seat
1200mm±20
Wind Sensor Seat Connector
A.
www.arctechsolar.com
54
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
www.arctechsolar.com
55
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Grounding is required on the wind sensor post above the ground. The post needs to be self-
grounded with the project grounding net. (Marked “A” in above figure.)
The grounding materials such as grounding cable or grounding flat iron can be used. Fixed with
self-tapping screw, welding or other installing methods according to the specific project.
Tightening
Qty. Socket
Torque
Pos. Ref. Description per Wrench sizes
[Nm] / [ft-
figure DIN / ANSI
lbs]
a -- Bolt M6x30 3
b -- Flat Washer 6 6
8/6
c -- Spring Washer 6 3
d -- Nut M6 3
www.arctechsolar.com
56
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Communication Antenna
Holder hoop A
Qty.
Tightening Socket
per
Pos. Ref. Description Torque Wrench sizes
figur
[Nm] / [ft-lbs] DIN / ANSI
e
a -- Bolt M10x50 4
b -- Flat Washer 10 8
40 /30
c -- Spring Washer 10 4
d -- Nut M10 4
Communication Antenna
A 300000574 1
Holder
Communication Antenna
B 300000947
Holder hoop A
www.arctechsolar.com
57
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
Tightening
Qty. Socket
Torque
Pos. Ref. Description per Wrench sizes
[Nm] / [ft-
figure DIN / ANSI
lbs]
A 300023805 Wind Sensor Mid Pole 1
a -- Bolt M10x50 4
b -- Flat Washer 10 8 40 / 30
c -- Spring Washer 10 4
d -- Nut M10 4
Tightening
Qty. Socket
Torque
Pos. Ref. Description per Wrench sizes
[Nm] / [ft-
figure DIN / ANSI
lbs]
A 300023054 Communication Box Hoop 2
B 300023053 Communication Box Mounting Plate 2
40 / 30
a -- Bolt M10x50 4
b -- Flat Washer 10 8
www.arctechsolar.com
58
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
c -- Spring Washer 10 4
d -- Nut M10 4
Tightening
Qty. Socket
Torque
Pos. Ref. Description per Wrench sizes
[Nm] / [ft-
figure DIN / ANSI
lbs]
A 300022702 Communication Box 1
a -- Bolt M8x25 2
b -- Flat Washer 8 4 15 / 11
c -- Spring Washer 8 2
d -- Nut M8 2
A
c
www.arctechsolar.com
59
SKYSMART II-MA-ECIDI-maroc-34MW ▌INSTALLATION MANUAL
d
A
c
www.arctechsolar.com
60