4.6.5. HSE Committee Meeting ........................... 30 4.6.5. HSE Committee Meeting ........................... 30
4.6.6. HSE Campaign Dan Safety Sign ............... 31 4.6.6. HSE Campaign And Safety Sign ................ 31
4.6.7. Penghargaan HSE .................................... 31 4.6.7. HSE Rewards............................................. 31
4.6.8. Safety Patrol .............................................. 31 4.6.8. Safety Patrol............................................... 31
4.7. Sistem Manajemen Keselamatan Kerja 4.7. Contractor Safety Management
(CSMS)Kontraktor ....................................... 32 System (CSMS)………………………………………….32
4.8. Peraturan Perundangan .............................. 33 4.8. Rules And Regulations ................................ 32
4.9. MCU (Medical Check Up) ............................ 34 4.9. MCU (Medical Check Up) ............................ 34
4.10. Pengendalian Dokumen ............................. 34 4.10. Documents Control ..................................... 34
3
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
4
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
1. PENDAHULUAN 1. INTRODUCTION
1.1. Latar Belakang 1.1. Background
PT. Aldzama Dalam Melaksanakan Kegiatan Proyek PT. Aldzama In Implement Development Project
Berpotensi Dapat Menimbulkan Dampak Negatif Activity Can Potentially Cause A Negative Impact On
Terhadap Aspek HSE (Health, Safety And HSE Aspects (Health, Safety And Environment).
Environment).
This Procedure As A General Reference To Carried
Prosedur Ini Sebagai Acuan Umum Untuk Out In All Plant Maintenance service untinl Project
Dilaksanakan Di Semua Kegiatan Prawatan pabrik Activities Starting From The EPC (Engineering,
hingga Proyek Mulai Dari Tahap EPC (Engineering, Procurement, Construction Until Commissioning)
Procurement, Construction Sampai Commissioning) Primarily Related To HSE Aspects In The
Terutama Yang Berhubungan Dengan Aspek HSE Implementation Of The Construction
Dalam Pelaksanaan Pembangunan
This Procedure Was Made As A Guideline In
Prosedur Ini Dibuat Sebagai Pedoman Yang Sesuai Accordance With The Aldzama Commitments
Dengan Komitmen PT Aldzama Untuk Dilaksanakan Undertaken By For All Workers Refractory
Oleh Semua Pekerja Proyek Refractory Maintenance Maintenance Services Project at PTFI – Manyar
Services di PTFI - Manyar Smelter Project. Smelter Project.
.
Aldzama Memprioritaskan Aspek HSE Dalam Aldzama Prioritize HSE Aspects In The Project and
Kegiatan Proyek maupun Perawatan Pabrik se- or Plant Maintenance Serice activities as stated
bagaimana tertera jelas dalam Kebijakan HSE. clearly In the HSE Policy. HSE rules should be
kaidah-kaidah HSE harus terintegrasi dalam setiap integrated in all activities to prevent and reduce the
kegiatan untuk mencegah dan mengurangi insiden incidence (equipment failure, work accidents, fires,
(kegagalan peralatan, kecelakaan kerja, kebakaran, explosions, occupational diseases, environmental
ledakan, penyakit akibat kerja, pencemaran pollution and disruption of other operations) as well
lingkungan dan gangguan operasi lainnya) serta as minimizing the risk of operation in order to
meminimalisasi terjadinya risiko operasi guna improve the reliability, efficiency and productivity.
meningkatkan keandalan, efisiensi dan produktivitas.
5
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Berkala Seperti Yang Dibutuhkan Dalam Proyek, Update The HSE Program As Required In The
Diantaranya Yaitu : Construction, Among Which :
a. Menyediakan Sebuah Rencana Kerja Untuk a. Provide A Work Plan For HSE Management
Manajemen HSE Dan Untuk Mengidentifikasi And To Identify Actions That Need To Be Taken
Tindakan-Tindakan Yang Perlu Diambil Untuk To Fulfill The Policies, Contracts And
Memenuhi Kebijakan, Kontrak Dan Regulasi Applicable Regulations.
Yang Berlaku.
b. Identify Responsibilities And Accountability
b. Mengidentifikasi Tanggung Jawab Dan Related To HSE In Every Stage Of Project
Akuntabilitas Yang Berhubungan Dengan HSE Activities Including Risk Analysis.
Disetiap Tahapan Kegiatan Proyek Termasuk
Analisa Risiko. c. Identify And Comply With HSE Regulations,
c. Mengidentifikasi Dan Mematuhi Peraturan HSE, Standards, Procedures And Reference To
Standar, Prosedur Dan Acuan Untuk Dijalankan Carried Out for Refrcatory Maintenance
pada Proyek Refractory Maintenance Services Services Project at PTFI - Manyar Smelter
di PTFI - Manyar Smelter Project. Project.
d. Menyediakan Sebuah Sistem Kerja Untuk d. Provide A Working System For Monitoring,
Pengawasan, Peningkatan Dan Pelaksanaan Enhancement And Implementation Of HSE.
HSE.
6
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
7
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
SIO/SIM (Surat Izin Operator/Surat Izin Letter Of Workers Required To Operate The Lifting
Mengemudi) Equipment And/Or Certain Conveyance Equipment
In Aldazama Environment Project and Issued By
Surat Yang Diperlukan Pekerja Untuk
The Competent Authority.
Mengoperasikan Peralatan Alat Angkat Dan/Atau
Alat Angkut Tertentu Dilingkungan Proyek Aldzama
yang Dikeluarkan Oleh Instansi Yang Berwenang.
Subcontractor
Subkontraktor
Partners Who Provide Services For Aldzama To The
Mitra Kerja Yang Menyediakan Layanan Jasa
Construction Aldzama Project
Kepada Aldzama Untuk Pembangunan/proyek
Aldzama
Pencemaran Pollution
Masuk Atau Dimasukkannya Mahluk Hidup, Zat, Login Or Inclusion Of Living Things, Matter, Energy,
Energi Dan/Atau Komponen Lain Ke Dalam Air, And/Or Other Components In The Water, Air And
Udara Dan Tanah. Pencemaran Juga Bisa Berarti Soil. Pollution Can Also Mean A Change Order
Berubahnya Tatanan (Komposisi) Air, Udara Dan (Composition) Of Water, Air And Soil By Natural
Tanah Oleh Kegiatan Manusia Dari Alam Dan Human Activities And The Project Activity, Beyond
Aktivitas Proyek, Diluar Daya Dukung Lingkungan The Carrying Capacity Of The Environment So That
Sehingga Kualitas Air/Udara/Tanah Menjadi The Quality Of The Water/Air/Soil Is Reduced And
Berkurang & Tidak Sesuai Peruntukannya. Not In Accordance With The Designation.
Aspek Lingkungan Hidup
Unsur Kegiatan Atau Produk Atau Jasa Organisasi Environmental Aspect
Yang Dapat Berinteraksi Dengan Lingkungan Hidup. Element Of Activities Or The Products Or Services
That Could Interact With The Environment.
8
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
9
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
c. Undang-Undang No. 32 Tahun 2009 Tentang d. Government Regulation No. 50 Year 2012 On
Perlindungan Dan Pengelolaan Lingkungan Implementation Of Safety Management System
Hidup. And Occupational Health
d. Peraturan Pemerintah No. 50 Tahun 2012 e. Government Regulation No.35 Of 2021 On
Tentang Penerapan Sistem Manajemen Fixed Term Employment Contract,
Keselamatan Dan Kesehatan Kerja. Outsourcing, Working Time And Rest Time And
Termination
e. Peraturan Pemerinta No. 35 Tahun 2021
Tentang Perjanjian Kerja Waktu Tertentu, Alih f. Manpower Of Mintery Regulation No 1 Of 80
Daya, Waktu Kerja Dan Waktu Istirahat, Dan Concerning The Construction Building
Pemutusan Hubungan Kerja
f. Peraturan Menteri Tenaga Kerja Dan
Transmigrasi Nomor: Per 01/Men/1980 Tentang g. Manpower Of Mintery Regulation No 8 Of 2010
Keselamatan Dan Kesehatan Kerja Pada Concerning The Personal Protective
Konstruksi Bangunan. Equipment (PPE)
g. Peraturan Menaker Nomor
PER.08/MEN/VII/2010 Tentang Alat Pelindung h. Manpower Of Mintery Regulation No 4 Of 1987
Diri Concerning The Safety Committee
h. Peraturan Menteri Tenaga Kerja Nomor Per- i. Government Regulations & Local Government.
04/Men/1987 Tahun 1987 – Panitia Pembina
Keselamatan Dan Kesehatan Kerja Serta Tata
Cara Penunjukan Ahli Keselamatan Kerja
i. Peraturan Pemerintah & Daerah Setempat.
2.1. Kunjungan Senior Manajemen (Leadership 2.1. Senior Visits Management (Leadership
Visits) Visits)
Kunjungan Senior Manajemen Dilakukan Sebagai Visit Of The Senior Management Is Done As
Tolok Ukur Kemampuan Pimpinan Aldzama Dalam A Benchmark Chairman Of Aldzama Ability To
Mempengaruhi Pekerja Dengan Menunjukkan Influence Workers By Show A Positive HSE
Perilaku HSE Yang Positif Dalam Upaya Mencapai Behaviors In Order To Achieve HSE Objectives.
10
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Sasaran HSE. Kunjungan Senior Manajemen Akan Senior Management Visits Will Be Conducted By
Dilakukan Oleh Para Pimpinan Dari Aldzama. The Chairman Of The Aldzama.
Kunjungan Senior Manajemen Ke Lokasi Proyek Senior Management Visit To The Project Site
Bertujuan Untuk Mendorong Sikap Perilaku Positif Aims To Encourage Positive Behavior Of HSE
Penerapan Aspek HSE Pada Setiap Pekerja Dengan Aspec Application To Each Worker By Showing
Menunjukkan Keterlibatan Kepemimpinan Dan Leadership Involvement And HSE Commitment In
Komitmen HSE Secara Praktis. Kunjungan Senior Practice. Senior Management Visits Conducted At
Manajemen Dilakukan Minimal 2 X Dalam Setahun Least Every 2 X In Years Or Due To Any Others
Atau Karena Hal Lain. Agenda.
e. Sebagai Tolak Ukur Dalam Melakukan Tindakan e. As A Benchmark For Taking Corrective Action
Perbaikan Terhadap Temuan Aspek HSE. On The Findings Of The HSE Aspects.
11
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Kesehatan Kerja Merupakan Persyaratan Bisnis Particular, Health And Safety Performance Is An
Yang Utama Dan Penting. Essential And Important Business Requirement.
Pernyataan Kebijakan Keselamatan Dan Kesehatan Policy Statements Of Aldzama Occupational Health
Kerja PT Aldzama (Lampiran 2) Dari Rencana HSE And Safety And Environment (Appendix 2) Of This
Ini, Mencerminkan Nilai-Nilai Dan Keyakinan Dari HSE Plan, Reflects The Values And Beliefs Of The
Manajemen Senior Aldzama Untuk Dilaksanakan Aldzama Senior Management To Implement By All
Oleh Seluruh Pekerja Aldzama Dan Aldzama Workers And Subcontractor. This Policy
Subkontraktornya. Pernyataan Kebijakan Ini Jelas Statement Clearly Defines The Commitment Of
Mendefinisikan Komitmen Aldzama Untuk Aldzama To Increase Of Safety And Health
Meningkatkan Keselamatan Dan Kesehatan Kerja. Performance. Occupational Health And Safety
Kebijakan Keselamatan Dan Kesehatan Kerja Policy Communicated To All Project Workers,
Disampaikan Kepada Semua Pekerja Proyek, Stakeholders, And Other Interested Parties
Pemangku Kepentingan, Dan Pihak Lain Yang Internally And Externally, through Briefings,
Berkepentingan Secara Internal Maupun Eksternal, Socialization, Documentation Of The HSE
Melalui Briefing, Sosialisasi, Dokumentasi Sistem Management System, Bulletin Boards, The
Manajemen HSE, Papan Pengumuman, Proses Introduction Of Process And The Training, And Will
Pengenalan Dan Pelatihan, Dan Akan Berusaha Strive To Be The Identity For Aldzama
Untuk Menjadi Identitas Bagi Aldzama.
Manajemen Senior Secara Nyata Akan Menunjukkan Senior Management Will Clearly Demonstrate Their
Komitmen Mereka Dengan Merinci Kegiatan Dan Commitment By Detailing The Activities And Level
Tingkat Keterlibatan Selama Kunjungan Manajemen Of Involvement During A Visit To The Job Site
Aldzama Ke Lokasi Kerja Proyek Dan Secara Aktif Management Aldzama Project And Actively
Berpartisipasi Dalam Pengenalan Proyek. Participated In The Introduction Of The Project.
3.1.3. Pernyataan Kebijakan Alkohol & NAPZA 3.1.3. Alcohol And Drug Policy Statement
Pernyataan Kebijakan Larangan Alkohol Dan Napza Policy Statements Of Prohobition Aclcohol And Drug
PT Aldzama (Lampiran 3) Dari Rencana HSE Ini. (Appendix 4) Of This HSE Plan, During This Project
Pernyataan Kebijakan Keselamatan Dan Kesehatan Activity, Aldzama Is Committed To Provide A
Kerja PT Aldzama (Lampiran 4) Selama Kegiatan Conducive Working Environment And Free From
Proyek Berlangsung, Aldzama Berkomitmen Untuk The Circulation And Use Of Alcohol And Drugs For
Menyediakan Lingkungan Kerja Yang Kondusif Dan All Parties Including Aldzama Workers,
Bebas Dari Peredaran Dan Pemakaian Alkohol Dan Subcontractors, Partners, Guests And The
NAPZA Untuk Semua Pihak Termasuk Pekerja Surrounding Community
Aldzama Subkontraktor, Mitra, Tamu Dan
Masyarakat Sekitar.
Pernyataan Kebijakan Alkohol Dan NAPZA Aldzama Alcohol And Drug Policy Statements Of Aldzama
(Lampiran 3) Dari Rencana HSE Ini, Mencerminkan (Appendix 3) Of This HSE Plan, Reflects The Values
Nilai-Nilai Dan Keyakinan Dari Manajemen Senior And Beliefs Of The Aldzama Senior Management.
Aldzama. Kebijakan Alkohol Dan NAPZA Alcohol And Drug Policy Is Communicated To All
Disampaikan Kepada Semua Pekerja Proyek, Project Workers, Stakeholders, And Other
Pemangku Kepentingan, Dan Pihak Lain Yang Interested Parties Internally And Externally, Through
Berkepentingan Secara Internal Maupun Eksternal, Briefings, Socialization, Documentation Of The HSE
Melalui Briefing, Sosialisasi, Dokumentasi Sistem Management System, Bulletin Boards, And The
Manajemen HSE, Papan Pengumuman, Proses Introduction Of The Training Process, And Will
Pengenalan Dan Pelatihan, Dan Akan Berusaha Strive To Be The Identity For Aldzama.
Untuk Menjadi Identitas Bagi Aldzama.
3.2. Strategi Untuk Kebijakan, Pernyataan 3.2. Strategies For Policy, HSE Policy Statement
Kebijakan HSE
Untuk Memastikan Bahwa Beberapa Kebijakan HSE To Ensure That Some HSE Policies Above Can Be
Di Atas Dapat Diketahui, Dimengerti Dan Known, Understood And Implemented By All
Dilaksanakan Oleh Seluruh Pekerja, Maka Beberapa Workers, Then The Following Steps Will Be Carried
Langkah Berikut Akan Dilakukan Oleh Aldzama Out By Aldzama :
13
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
a. Aldzama Menyiapkan Salinan Dari Kebijakan- a. Aldzama Provide Copies Of HSE Policies At
Kebijakan HSE di lokasi kerja Yang Selalu The Project Work Site That Is Always Available
Tersedia Dan Mudah Di Akses Oleh Pekerja And Easily Accessible By Site Workers When
Dilapangan Ketika Dibutuhkan. Needed.
b. Kebijakan-Kebijakan HSE Dikomunikasikan b. HSE Policies Communicated To Aldzama
Kepada Pekerja Aldzama Subkontraktor, Tamu Workers, Subcontractors, Guests And Others
Dan Orang Lain Melalui Sosialisasi Ataupun Through Socialization Or Induction.
Induksi. c. HSE Policies Displayed At Strategic Locations
c. Kebijakan-Kebijakan HSE Ditampilkan Di Lokasi And Can Be Viewed By All Workers Each Day,
Strategis Dan Dapat Dilihat Oleh Semua Pekerja For Example, Installed In The Meeting Room,
Setiap Harinya, Contohnya Dipasang Di Ruang Corridor, Front Office And Others.
Rapat, Koridor, Kantor Depan Dan Lain-Lain. d. Awareness Of HSE Policies Will Be Assessed
d. Kesadaran Mengenai Kebijakan-Kebijakan HSE Subject During The Audit Process.
Ini Akan Menjadi Subyek Yang Dinilai Selama e. And Other Steps Such As The Discussion In
Proses Audit. The Safety Talk, Toolbox Meeting And Safety.
e. Dan Langkah-Langkah Lainnya Seperti Diskusi Meeting.
Dalam Safety Talk, Toolbox Meeting Dan Safety
Meeting.
b. Melakukan Inspeksi HSE Dan Safety Patrol. b. Perform HSE Inspection And Safety Patrol.
c. Melaksanakan Risk Assessment Terhadap c. Carry Out A Risk Assessment To High Risk
Pekerjaan Yang Mempunyai Risiko Tinggi. Work.
d. Melakukan MWT HSE Dan Kunjungan d. Conduct HSE MWT And Management Visits.
Manajemen.
e. Give Sanction Related With Violation Of HSE
e. Memberikan Sanksi Terkait Pelanggaran Aspec.
Terhadap Aspek HSE.
f. Conduct Periodic Audits.
f. Melakukan Audit Secara Berkala.
Pelaksanaan dari kebijakan hse aldzama merupakan Implementation of the hse aldzama policy is the
tanggung jawab Aldzama seluruh pekerja aldzama responsibility of the aldzama all aldzama workers
14
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
dan subkontraktor, tamu dan pihak lain yang and subcontractors, guests and other interested
berkepentingan yang terlibat di dalam proyek. parties involved in the project. Aldzama will be
Aldzama akan bertanggung jawab untuk mematuhi responsible to comply with this policy and to develop
kebijakan ini dan untuk mengembangkan pendekatan a pro-active approach to the application of hse
pro-aktif terhadap penerapan aspek hse tanpa aspec of in the absence of the number of accidents.
adanya kejadian kecelakaan.
b. Memastikan Bahwa Program HSE Termasuk b. Ensure That HSE Programs Including HSE
Persyaratan Aspek HSE, Sudah Aspec Requirements, Has Been Communicated
Dikomunikasikan Dan Disosialisasikan, Diamati And Socialized, Observed And Implemented By
Dan Dilaksanakan Oleh Seluruh Pekerja Proyek All Workers On Refractory Maintenance Services
Refractory Maintenance Services di PTFI - Project at PTFI – Manyar Smelter Project.
Manyar Smelter Project. c. Ensure The Implementation Of All HSE
c. Memastikan Pelaksanaan Seluruh Program Programs Implemented In Each Phase Of The
HSE Dilaksanakan Disetiap Tahapan Site Site Project Aldzama .
Proyek Aldzama.
d. Memastikan Perilaku Dan Perbuatan Yang d. Ensuring That Risk Behaviors And Actions
Berisiko Terhadap Aspek HSE Dari Pekerja Against The HSE Aspects Of The Aldzama
Aldzama Dan Subkontraktor Dapat Dihindari Workers And Subcontractor Can Be Avoided And
Dan Ditekan Seminimal Mungkin. Reduced To A Minimum.
e. Memastikan Program-Program Manajemen e. Ensure Risk Management Programs Are
Risiko Efektif Dilaksanakan Pada Proyek Ini. Effectively Implemented In This Project.
f. Memastikan Semua Pekerja Proyek Memiliki f. Ensure All Project Workers Have The Same
Pemahaman Yang Sama Dan Jelas Tentang Understanding And Clear About The Purpose
Tujuan Dan Tanggung Jawab Dari Rencana And Responsibilities Of The HSE Plan Project.
HSE Proyek. g. Comply With, Care And Intervence Directly
g. Mematuhi, Peduli Dan Melakukan Intervensi Related Of HSE Aspects.
Langsung Terkait Aspek HSE.
h. Membuat Rencana Anggaran Untuk Seluruh i. Monitor HSE Performance And Make Strategic
Program HSE. Moves To Improve It.
i. Memonitor HSE Performance Dan Membuat j. Establish And Implement Management Review.
Langkah Strategis Untuk Meningkatkannya. k. Comply With, Care And Directly Interventions
j. Mengadakan Dan Melaksanakan Management Related To HSE Aspects
Review. l. Implement And Monitor The Implementation Of
k. Mematuhi, Peduli Dan Intervensi Langsung HSE Programs.
Terkait Aspek HSE. m. Ensure HSE Training Given To Workers In
l. Melaksanakan Dan Memantau Penerapan Accordance With The Requirements Of The
Program HSE. HSE And Socialize Throughout The Procedure
m. Menjamin Pelatihan HSE Diberikan Untuk To All ALDZAMA Employees And
Pekerja Sesuai Dengan Persyaratan Dan Subcontractors.
Mensosialisasikan Seluruh Prosedur HSE n. Monitor Compliance With The Applicable
Kepada Seluruh Pekerja ALDZAMA Dan Regulations And HSE Performance Of The
Subkontraktor. Project.
n. Memantau Kepatuhan Terhadap Regulasi Yang o. Promote HSE Efforts And Prevention
Berlaku Dan Kinerja HSE Proyek. Programs.
o. Mempromosikan Upaya-Upaya Program HSE p. Provide Adequate Access For Workers To Get
Dan Pencegahannya. The Latest Information About HSE.
p. Menyediakan Akses Yang Memadai Bagi Para q. Ensure Inspection And Audit Programs Run
Pekerja Untuk Mendapatkan Informasi Yang Properly.
Terbaru Tentang HSE r. Ensure The Findings Of Inspections And Audits
q. Menjamin Program Inspeksi Dan Audit Berjalan Can Be Completed By The Relevant Parties In
Dengan Baik. A Timely.
r. Menjamin Temuan Inspeksi Dan Audit Dapat s. Ensure Regular And Continuous Reporting Of
Diselesaikan Oleh Pihak-Pihak Terkait Tepat HSE.
Waktu. t. Provide Rewards And Punishments To
s. Menjamin Pelaporan HSE Secara Berkala Dan Workers Who Do Not Apply In Accordance With
Berkesinambungan. The HSE Aspects.
t. Memberikan Reward And Punishment Kepada u. Responsible For Project Activities In Each
Pekerja Yang Tidak Menerapkan Aspek HSE Phase Of The Implementation Of HSE Aspects.
Sesuai Ketentuan. v. Ensure And Implement Accidents Investigating
u. Bertanggung Jawab Disetiap Tahapan Kegiatan At The Work Site Of The Project.
Proyek Terhadap Penerapan Aspek HSE.
v. Memastikan Dan Melakukan Investigasi
Kecelakaan di Lokasi Kerja.
18
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
f. Melakukan Pengaturan Jam Kerja Paramedic f. Performs Paramedic Working Hours (Stand-By
(Stand By Duty, Dsb). Duty, Etc).
g. Melakukan Random Check/Test Drugs Dan g. Perform Random Check/Test Drugs And
Alkohol Kepada Seluruh Pekerja. Alcohol To All Workers.
h. Memastikan Pelaksanaan MCU Telah Dilakukan h. Ensure The Implementation Of The MCU Has
Untuk Seluruh Pekerja. Been Done For All Workers.
i. Memastikan Dan Melakukan Pengecekan Pada i. Ensuring And Checking The Ambulance
Kendaraan Ambulance Siap Pakai Dalam Vehicle Ready For Use In An Emergency.
Keadaan Darurat.
j. Coordinate With Third Parties To Conduct
j. Melakukan Koordinasi Dengan Pihak Ketiga Training Of First Aids To The Emergency
Untuk Mengadakan Pelatihan First Aids Kepada Team.
Team Emergency.
k. Melakukan Sosialisasi Medivac Kepada Seluruh k. o Disseminate Medivac To The Workers At The
Pekerja Proyek Refractory Maintenance Work Site Of The Project.
Services di Manyar Smelter Project.
20
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
i. Mematuhi, Peduli Dan Intervensi Langsung i. Comply With, Care and Directly Interventions
Terkait Aspek HSE. Related To HSE Aspect.
b. Melaksanakan Dan Mengelola Dokumen b. Implement And Manage Air Quality Control
Pengendalian Kualitas Udara Dengan Baik. Documents By Well.
c. Menyediakan Dokumen Pengendalian Kualitas c. Provide Document Control Of Air Quality In The
Udara Di Lokasi Kerja. Workplace.
d. Memastikan Seluruh Pekerja Telah Mengetahui d. Ensure All Workers Have To Know And
Dan Mengerti Bahaya-Bahaya Yang Ditemukan Understand The Hazard That Are Found In
Disetiap Identifikasi Pengendalian Kualitas Each Air Quality Control Identification.
Udara.
e. Menyediakan Akses Informasi Pengendalian e. Providing Access To Any Air Quality Control
Kualitas Udara Setiap Dibutuhkan. Information Every Needed.
21
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
a. Mengevaluasi Cara Kerja, Proses Dan a. Evaluate Ways Of Working, Processes And
Lingkungan Kerja Yang Aman. Safe Work Environment.
b. Menentukan Tindakan Koreksi Dengan Alternatif b. Determine Corrective Action With The Best
Terbaik. Alternative.
c. Mengembangkan Sistem HSE Untuk c. Develop HSE Systems To Control Hazards.
Mengendalikan Bahaya. d. Evaluate The Causes Of Accidents And
d. Mengevaluasi Penyebab Timbulnya Kecelakaan Occupational Diseases.
& Penyakit Akibat Kerja.
e. Mengembangkan Penyuluhan Dan Penelitian e. Develop Counseling And Research In The Field
Dibidang Keselamatan Kerja, Hygiene, Of Safety, Hygiene, Occupational Health And
Kesehatan Kerja Dan Ergonomi. Ergonomics.
f. Memeriksa Kelengkapan Peralatan f. Checking The Completeness Of Safety
Keselamatan Kerja. Equipment.
g. Mengembangkan Program Pelayanan g. Develop A Program Of Health Care Workers.
Kesehatan Pekerja.
h. Melakukan Kontrol Terhadap Hasil Tindakan h. To Control The Corrective Action Results From
Perbaikan Dari Temuan-Temuan Aspek HSE. The Findings Of HSE Aspects.
i. Mengembangkan Laboratorium HSE. i. Develop HSE Laboratory.
j. Menyelenggarakan Administrasi Keselamatan
Kerja, Hygiene Dan Kesehatan Pekerja. j. Carrying Out Administrative Of Safety Work,
k. Membantu PMT Menyusun Kebijakan Hygiene And Health Of Workers.
Manajemen Dan Pedoman Kerja. k. Assist PMT Formulate Management Policies
l. Melakukan Monitoring Terhadap Kebijakan HSE And Work Guidelines.
Proyek Terhadap Penerapannya Di Lokasi l. Monitoring Of The Implementation Of The HSE
Proyek. Policy Project At The Project Site.
Struktur Organisasi P2K3 Proyek Dapat Dilihat Di P2K3 Organizational Structure Of The Project Can
Bawah Ini: Be Seen Below:
22
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
4.3.2. Tanggungjawab Dan Wewenang P2K3 4.3.2. Responsibility And Authority Of P2K3
Bagian Berikut Ini Menjelaskan Rincian Tanggung The Following Section Describes The Details Of The
Jawab Dari Masing-Masing Anggota Yang Berkaitan Responsibilities Of Each Member Of P2K3 Related
Dengan P2K3 Untuk Posisi Kunci Dalam Proyek. To Key Positions In The Project.
D. Anggota C. Members
1) Mengikuti Pertemuan HSE Dan Terlibat Dalam 1) Following The HSE Meetings And Engage In
Diskusi Mengenai HSE Selama Pertemuan HSE Discussions About The HSE During The HSE
Meeting.
2) Melaksanakan Tugas-Tugas Yang Ditetapkan 2) Carry Out The Tasks Set By The HSE
Oleh Komite HSE. Committee.
23
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Berikut Jadwal Kerja Di Area Kerja Proyek Aldzama: a. Work Day : Monday S/D Friday.
b. Working Hours : 07.30 Am -17.00 Pm.
a. Hari Kerja : Hari Senin S/D Jumat.
c. The Shift System Is Set According To The
b. Jam Kerja : 07.30 Pagi -17.00 .
Needs And Activities Of The Project Activity.
c. Sistem Shift Diatur Sesuai Kebutuhan Kegiatan
Dan Aktivitas Proyek.
Tugas Dan Tanggung Jawab Tenaga Kerja Duties And Responsibilities Of Manpower Including:
Diantaranya:
a. Manpower Shall Be Subject To And Comply
a. Tenaga Kerja Wajib Tunduk Dan Patuh Pada With The Instructions Or Orders And
Instruksi-Instruksi Atau Perintah Serta Regulations Either Orally Or In Writing With
Peraturan-Peraturan Baik Secara Lisan Maupun Related To The Company's Activities.
Tertulis Yang Sehubungan Dengan Kegiatan-
Kegiatan Perusahaan. b. Labor Required To Keep Secret To Anyone
b. Tenaga Kerja Wajib Merahasiakan Kepada About The Particulars Obtained During The
Siapapun Mengenai Keterangan-Keterangan Employment Relationship Of The Company In
Yang Didapat Selama Hubungan Kerja Any Form In Connection With The Company.
Mengenai Perusahaan Dalam Bentuk Apapun
Yang Ada Hubungan Dengan Perusahaan.
c. Tenaga Kerja Harus Mentaati Setiap Peraturan c. Workers Should Be Obeying All The Rules And
Dan Tata Tertib Kerja Yang Berlaku. Applicable Work Rules. Violation Of The Rules
Pelanggaran Atas Peraturan Maupun Tata And The Order May Result In Granting
Tertib Tersebut Dapat Berakibat Diberikannya Sanction.
Sanksi.
24
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
25
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Di Akhir Tiap Induksi, Peserta Akan Diberikan Buku At The End Of Each Induction, Participants Will Be
Saku Panduan HSE (HSE Pocket) Yang Berisikan Hal- Given A HSE Guide Handbook (HSE Pocket) That
Hal Sebagai Berikut : Contain Any Of The Following :
1. Peraturan Dan Tata Tertib Keselamatan Kerja Di 1. Safety Rules And Regulations At The Work Site
Lokasi Kerja Proyek. Of The Project.
2. Persyaratan Perlengkapan Perlindungan Diri Dan 2. Requirements Of Self-Protection Equipment
APD. And PPE.
3. Perlindungan Dan Kepekaan Lingkungan Hidup 3. Protection And Environmental Sensitivity Of
Proyek. The Project.
4. Penyediaan Kesehatan Kerja Dan Sanitasi. 4. Provision Of Occupational Health And
5. Jam Kerja. Sanitation.
6. Peraturan Dan Tata Tertib Barak. 5. Working Hours.
7. Tanda Bahaya Dan Tempat Berkumpul (Muster 6. Rules And Regulations Of Barracks.
Point). 7. Danger Signs And Places Of Assembly (Muster
8. Klasifikasi Area Berbahaya. Point).
9. Standar HSE Dan Pengendaliannya. 8. Classification Of Hazardous Areas.
9. HSE Standards And Control.
Rekaman Formal Dari Semua Kehadiran Induksi HSE Formal Recording Of All HSE Induction Presence
Harus Dijaga, Disimpan, Dan Dikontrol Oleh Must Be Maintained, Stored, And Controlled By
Perwakilan HSE. Representatives Of The HSE.
4.5.2. Short Service Employees (SSE) 4.5.2. Short Service Employees (SSE)
SSE Adalah Semua Pekerja (Kantor Dan Lapangan) SSE Is All Workers (Office And Site) Who Have
Yang Telah Bekerja Kurang Dari 3 Bulan Pada Lokasi Worked For Less Than 3 Months On The Job Site
Kerja Aldzama Meliputi: Of Aldzama Inluding:
a. Pekerja Baru. a. New Workers.
b. Pekerja Yang Berpengalaman. b. Experienced Workers.
c. Pekerja Yang Ditransfer Dari Proyek Lain. c. Workers Who Transferred From Another
d. Tamu (PT. Aldzamadan Lain-Lain). Project.
d. Guest (PT. Aldzama Etc).
SSE Harus Mengikuti HSE Induksi Atau Melakukan
Site Visit Dan Harus Mematuhi Semua Peraturan Dan SSE Must Follow HSE Induction Or Conduct A Site
Perundang-Undangan HSE Seperti Yang Visit And Must Comply With All HSE Rules And
Dipersyaratkan Dalam HSE Induksi. Regulations As Required In HSE Induction.
Persyaratan Minimum Untuk Program SSE Meliputi The Minimum Requirements For The SSE Program
Hal-Hal Berikut Ini : Include The Following :
1. Pelatihan Yang Memadai. 1. Adequate Training.
2. Pekerja SSE Harus Mengunakan Atribut Proyek 2. SSE Workers Must Use The Project Attributes
Yang Mudah Terlihat (Helm Warna Hijau Dan Are Easily Visible (Green Helmet And Vest).
Rompi). 3. Number Of SSE In Each Member Of The Work
3. Jumlah SSE Dalam Tiap Anggota Kerja Harus Should Be Limited.
Dibatasi. 4. SSE Should Not Be Working In Any Activities
4. SSE Tidak Boleh Bekerja Di Setiap Aktifitas- That Are High Risk.
Aktifitas Yang Berisiko Tinggi.
26
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
27
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
4.6.6. HSE Campaign Dan Safety Sign 4.6.6. HSE Campaign And Safety Sign
Untuk Mengkampanyekan Program HSE, ALDZAMA To Campaign The HSE Program, ALDZAMA
Menyediakan Adanya Spanduk, Stiker, Rambu-Rambu Prepare Banners, Stickers, Safety Signs Installed on
Keselamatan Terpasang pada Proyek Refractory Refractory Maintenance Services Project at PTFI -
Maintenance Services di PTFI - Manyar Smelter Manyar Smelter Project
Project.
Karakteristik Dari Proyek, Selama Konstruksi, The Project, During Construction, Commissioning
Komisioning Sampai Berakhirnya Proyek. Umumnya, Until The End Of Proyek. Generally, This Award
Program Penghargaan Ini Dibagi Menjadi Sebagai Program Is Divided Into The Following :
Berikut :
a. Penghargaan Pekerja Terbaik a. Award Of Best Workers
Pekerja Yang Memberikan Contoh Yang Baik Workers Who Provide A Good Example Or
Atau Menunjukkan Tindakan Yang Positif Indicate A Positive Action On The Rules And
Mengenai Peraturan Dan Persyaratan Requirements Of The Safety, Health And
Keselamatan, Kesehatan Dan Keamanan, Atau Security, Or Workers Who Avoid A Crash With
Pekerja Yang Mencegah Sebuah Kecelakaan Precaution, Save Lives In An Emergency, To
Dengan Tindakan Pencegahan, Menyelamatkan Prevent The Spread Of An Accident Or Fire
Nyawa Pada Keadaan Darurat, Mencegah And Others.
Meluasnya Sebuah Kecelakaan Atau Kebakaran
Dan Lain-Lain.
b. Award Of Best Group/Function
b. Penghargaan Grup/Fungsi Terbaik
The Group/Function That Contributes To
Grup/Fungsi Yang Berkontribusi Meningkatkan Improving Safety Performance, Or Safety
Kinerja Keselamatan, Atau Peralatan Equipment Or Incentive Ideas. Group /
Keselamatan Atau Ide-Ide Insentif. Grup / Fungsi Functions That Get The Job Done Without Any
Yang Menyelesaikan Pekerjaan Tanpa Adanya Accident/Incident, Including A Near-Miss.
Kecelakaan/Kejadian, Termasuk Near-Miss.
c. Other Awards Programs Such As:
c. Program Penghargan Lainnya Diantaranya Yaitu:
1) Award For The Achievement Of Safe
1) Penghargaan Pencapaian Jam Kerja Selamat
Selama Kegiatan Proyek Dilangsungkan, Manhours During The Project Activity Held,
Diberikan Setiap 500.000 Jam Kerja Selamat. Given Every 500,000 Hours Worked Safely.
2) Penghargaan Pelapor Kartu Observasi K3 2) Award For Most Safety Observation Card
Terbanyak Setiap Bulan. Reporter Every Month.
3) Penghargaan Observasi K3 Yang Berkualitas. 3) Award For Quality Safety Observation Card.
4) Penghargaan Driver Yang Terbaik. 4) Award For Best Driver.
5) Penghargaan House Keeping Terbaik. 5) Best Housekeeping Award
6) Penghargaan Subkontraktor Terbaik. 6) Best Subcontractor Award
7) Penghargaan HSE Lainnya. 7) Other HSE Award.
29
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Lebih Rinci Dapat Dilihat Dalam Inspection & Can Be Found In The Inspection And Monitoring
Monitoring Procedure. Procedure.
4.7. Sistem Manajemen Keselamatan Kerja 4.7. Contractor Safety Management System
Kontraktor (CSMS)
Manajemen Hse Aldzama Berkomitmen Akan Hse Management Of Aldzama Is Committed To
Mengelola Hse Subkontraktor, Agar Manajemen Managing Hse Subcontractor, In Order To
Subkontraktor Memiliki Organisasi Hse, Mengetahui Subcontractor Management Have The Hse
Tanggung Jawabnya Dalam Mempromosikan Standar Organization, Knowing Their Responsibility In
Hse Yang Tinggi Dan Mengimplementasikan Aspek Promoting A High Hse Standard And Implement Hse
Hse Disetiap Tahapan Pekerjaan, Menyediakan Aspects Of Each Stage Of The Work, Provide
Sumberdaya Yang Memadai, Berkomitmen Untuk Adequate Resources, Is Committed To Develop And
Mengembangkan Dan Memelihara Sistem Sesuai Maintain The System According To The Procedure,
Prosedur, Rencana Kerja Serta Program Hse As Well As The Work Plan And Hse Program So
Sehingga Misi Dan Tujuan Dari Kebijakan Hse That The Mission And Purpose Of The Hse Policy Is
Tercapai. Reached.
Seluruh Pekerja Subkontraktor Akan Di Berikan All Employees Of Subcontractors Will Be Given A
Arahan Untuk Selalu Mengimplementasikan Secara Referral To Always Consistently Implement And
Konsisten Dan Mengembangkan Pendekatan Pro-Aktif Develop A Pro-Active Approach Related To HSE
Terkait Aspek HSE Agar Tercapai Zero Accident.
Aspects In Order To Achieve Zero Accident.
Semua Pekerjaan Yang Diperkerjakan Kepada
Subkontraktor Harus Melewati Proses Penilaian All Work Carried Out By The Subcontractor Shall
Bahwa Subkontraktor Harus Mempunyai Kemampuan Pass The Assessment Process That The
Untuk Melakukan Pekerjaan Secara Aman Yang Subcontractor Shall Have The Ability To Do The Job
Disyaratkan Saat Pra Kualifikasi Di Aldzama Dibawah Safely Required When Pre-Qualification In Aldzama
Pengawasan Manejemen Aldzama. Salah Satu Under Aldzama Management Supervision. One Of
Persyaratannya Yaitu Membuat Rencana Hse Plan The Requirements Is To Make A Plan Of
Subkontraktor. Subcontractors Hse Plan.
Semua Subkontraktor Yang Bekerja Dibawah All Subcontractors Are Required To Work Under
Pengawasan Aldzama Wajib Dan Tunduk Mengikuti Aldzama Supervision And Subject Follow Smhse
Smhse Aldzama Aldzama And Project Regulations
Proses Csms Berisi Evaluasi Dokumen Serta Kinerja CSMS Process Contains Evaluation Of Document
Sistem Manajemen Hse Subkontraktor Sebelum And Performance Of Subcontractor Hse
Ditunjuk Sebagai Rekanan Aldzama Dimana Management System Before Being Appointed As
Subkontraktor Harus : Aldzama Project Partner, In Which The
Subcontractor Shall :
30
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Persyaratan Perundangan Dan Standar Aspek Hse Regulatory Requirements And Other Hse Aspects
Yang Berlaku Lainnya Dapat Dilihat Dalam Lampiran 6 Standards That Applicable Can Be Seen In
(Undang-Undang & Peraturan Hse). Appendix 6 (Laws And Hse Regulations).
Aldzama Dan Subkontraktor Akan Mematuhi Peraturan
Perundangan Republik Indonesia, Dan Standar, Baik Aldzama And Subcontractor Will Adhere To
Standar Nasional/Internasional Yang Berhubungan Republik Of Indonesia Rules And Regulation And
Dengan Aspek Hse Yang Akan Di Pantau, Dikaji, Standards, Include National/International Standart
Dipelihara Serta Implementasinya Pada Kegiatan Related To Hse Aspects That Will Be Monitored,
Proyek, Dibawah Control Project Manajer Dan Fungsi Reviewed, Maintained And Its Implementation In
Hse Koordinator Untuk Memastikan Bahwa Informasi Project Activity, Under Control Of The Project
Tersebut Masih Berlaku. Manager And Hse Coordinator Function To Ensure
That The Information Is Still Valid.
31
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
4.9. MCU (Medical Check Up) 4.9. MCU (Medical Check Up)
Seluruh Pekerja ALDZAMA Dan Subkontraktor Yang All ALDZAMA Workers And Subcontractors Who
Bekerja pada Proyek Refractory Maintenance Services Worked on Refractory Maintenance Services
di PTFI - Manyar Smelter Project Harus Melakukan Project at PTFI - Manyar Smelter Project Must
MCU Dan Mendapatkan Laporan Rekam Medis Dalam Perform The MCU And Get Reports Of Medical
Keadaan Sehat (Fit To Work) Oleh Dokter. MCU Ini Records In A Healthy State (Fit To Work) By Doctor.
Dilakukan Secara Berkala Minimal 1 Tahun Sekali, MCU Is Done Regularly At Least Once 1 Year, And
Dan Untuk Subkontraktor Mengacu Pada CSMS For Subcontractors Refer To CSMS Specially For
Khususnya Untuk Subkontraktor Yang Melakukan Subcontractor That Do High Risk Of Job Must Do
Pekerjaan Dengan Resiko Tinggi Wajib Melakukan MCU.
MCU.
For Office Workers, MCU Implementation Is Done At
Untuk Pekerja Kantor, Pelaksanaan MCU Dilakukan The Time Of Pre Employment.
Pada Saat Pre Employement.
32
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
11) Laporan Kinerja HSE, Diantaranya: 11) HSE Performance Report, Including:
Semua Dokumen Dan Data Terkait Dengan Proyek All Documents And Data Related To The Project Will
Akan Dikendalikan Dan Dipelihara Secara Sistematis. Be Controlled And Maintained Systematically. HSE
Dokumentasi HSE Dan Sistem Manajemen Ditinjau Documentation And Management Systems Are
Dan Disetujui Untuk Diimplementasikan Oleh Pekerja Reviewed And Approved For Implemented By The
Yang Berwenang Sebelum Dikeluarkan. ALDZAMA Competent Worker Before Discharge. ALDZAMA
Akan Memastikan Dokumen-Dokumen Tersedia Ketika Will Ensure That The Documents Are Available
Dibutuhkan Dan Dengan Revisi Terkini. Perubahan When Needed And With The Current Revision.
Dokumentasi Akan Ditinjau, Disetujui Oleh HSE Client. Changes In The Documentation Will Be Reviewed,
Approved By HSE Client.
Lingkungan Sehingga Kejadian Yang Tidak Diinginkan Environment So That Undesirable Events Can Be
Dapat Diminimalisasi. Minimized.
Proses Manajemen Risiko Teridiri Dari Kegiatan; The Process Of Risk Management Consists Of
Identifikasi Bahaya, Risk Assessment, Evaluasi Activities; Hazard Identification, Risk Assessment,
Pengurangan/Penghilangan Risiko, Implementasi Evaluation Of The Reduction/Elimination Of Risk,
Pengurangan/Penghilangan Risiko Dan Monitoring Implementation Of Reduction/Elimination Of Risk
Implementasi Pengurangan/Penghilangan Risik. And Monitoring The Implementation Of The
Reduction/Elimination Of Risk.
5.1. Penanganan, Pengendalian Bahaya Dan 5.1. Handling, Control Of Hazards And Impacts
Dampak
Penanganan Bahaya Dan Dampak Termasuk Handling Hazards And Impacts Including Risk
Penilaian Resiko Wajib Dilakukan Selama Proyek Assessment Shall Be Carried Out During The
Berlangsung, Mulai Dari Tahap Engineering, Project, Starting From The Engineering,
Construction Sampai Selesai Commisioning. Construction Commissioning To Completion.
Sasaran Penanganan Dan Pengendailan Bahaya Dan Target Hazard Handling And Controlling And Impact
Dampak Meliputi : Include :
a. Menyediakan Pedoman Untuk Mengidentifikasi a. Provide Guidelines To Identify Hazards on
Bahaya-Bahaya pada Proyek Refractory Refractory Maintenance Services Project at
Maintenance Services di PTFI - Manyar Smelter PTFI - Manyar Smelter Project.
Project. b. Ensure Potential Hazards Of The Work
b. Memastikan Potensial Bahaya Dari Proses Kerja, Process, Environment, Materials And
Lingkungan, Material Dan Peralatan Equipment Are Identified Before on Refractory
Teridentifikasi Sebelum Berada pada Proyek Maintenance Services Project at PTFI - Manyar
Refractory Maintenance Services di Manyar Smelter Project.
Smelter Project. c. Identify Jobs Or Tasks Required In The Risk
c. Mengidentifikasi Pekerjaan Atau Tugas Yang Assessment.
Dibutuhkan Dalam Penilaian Risiko. d. Conducting Mitigation In The Event Of
d. Melakukan Mitigasi Jika Terjadi Kejadian Yang Unwanted Events.
Tidak Kita Inginkan. e. To Control Against The Dangers Found.
e. Melakukan Pengendalian Terhadap Bahaya Yang
Ditemukan.
5.2. Metode Penanganan Bahaya Dan Dampak 5.2. Methods For Hazards Handling And
Impacts
Identifikasi Bahaya Merupakan Tahap Awal Dari
Proses Manajemen Risiko Dimana Langkah Penting Hazard Identification Is An Early Stage Of The Risk
Pertama Dalam Pengendalian Risiko. Secara Praktis, Management Process In Which The First Essential
Bahaya Dapat Di Identifikasi Melalui Pengamatan Step In Risk Control. In Practical Terms, The Danger
Dan Pengetahuan Sebelumnya. Dalam Kasus Lain, Can Be Identified Through Observation And Prior
Informasi Bahaya Dapat Diberikan Oleh Knowledge. In Other Cases, The Hazard Information
Industri/Pabrik Atau Diperoleh Dari Kecelakaan Atau Can Be Given By The Industrial/Factory Or Obtained
Insiden Yang Mungkin Atau Tidak Dapat From An Accident Or Incident That May Or May Not
Menghasilkan Kerusakan Atau Cedera, Disamping Result In Damage Or Injury, In Addition, The Danger
Itu, Informasi Bahaya Dapat Dikumpulkan Dari Information Can Be Gathered From Several
Beberapa Regulasi Yang Relevan Dan Complain Relevant Regulations And Worker Complaints. All
Pekerja. Seluruh Pekerja Disetiap Tingkatkan Harus Employees At Every Stage Should Actively
Berpartisipasi Aktif, Dalam Mengidentifikasi Bahaya Participate In Identifying Hazards And Are Expected
Dan Diharapkan Dapat Memberikan Kontribusi Untuk To Give Contribution To All Stages Of The Process
Seluruh Tahapan Proses Kegiatan Di Proyek Activities In Aldzama Projects.
Aldzama
34
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Identifikasi Bahaya Akan Digunakan Secara Terus- Hazard Identification Will Be Used Continuously
Menerus Sepanjang Proyek, Pekerja Akan Didorong Throughout A Project, Workers Will Be Encouraged
Untuk Terlibat Dalam Program Seperti: To Engage In Programs Such As:
a. Ijin Kerja Aman Dan JSA a. Work Permit And JSA
b. Kartu Pengamatan Keselamatan Kerja b. Safety Observation Cards
c. Perilaku Dasar Keselamatan Kerja c. Behavioral Basis Safety (BBS)
d. Identifikasi Bahaya, Penilaian Risiko, Dan d. Hazard Identification, Risk Assessment And
Penentuan Tingkat Pengendalian Determination Of Rate Control (HIRARC)
Proses Identifikasi Bahaya Diilustrasikan Pada Hazard Identification Process Is Illustrated In The
Siklus Di Bawah Ini: Following Cycle:
Kali Peristiwa Terjadi, Berapa Banyak Orang Akan What It’s The Potential, The Level Of Exposure And
Terlibat, Apa Potensinya, Tingkat Keterpajanan Dan The Possibility Of Exposure.
Kemungkinan Terjadinya Pajanan.
5.4. Key Risk Condition (KRC) 5.4. Key Risk Condition (Krc)
ALDZAMA Telah Mengidentifikasi Dan Menganalisis Aldzama Has Been Identified And Analysis Of
Insiden Major/Tinggi Dari Sebagian Besar Major/High Incident From Most Of The Accident And
Kecelakaan Dan Telah Terangkum Dalam 10 Has Been Summarized In 10 Categories, Which Are
Kategori, Yang Ditampilkan Dalam Berbagai Displayed In A Variety Of The Following Pictograms
Piktogram Berikut : :
10 Kondisi Risiko Bahaya Utama Saat Tahap 10 The Main Risk Hazard Condition
Konstruksi Proyek Aldzama : Whenconstruction Stage Of Aldzama Including :
1. Safety Equipment 1. Safety Equipment.
Kondisi Bahaya Yang Disebabkan Oleh Tata Cara Hazardous Conditions Caused By The
Pengunaan APD Yang Tidak Benar Dalam Procedure Of Improper Use Of PPE In The
Pemilihan, Pemasokan, Pengunaan, Selection, Supply, Use, Replacement,
Penggantian, Pemeliharaan, Pelatihan Dan Maintenance, Training And Storage.
Penyimpanan.
2. Confined Space
2. Confined Space.
Suatu Ruangan Yang Tidak Dimaksudkan
A Room That Is Not Intended As A Permanent
Sebagai Tempat Kerja Tetap/Reguler Yang
Workplace/Regular That Have Entrance Or Exit
Mempunyai Jalan Masuk Atau Keluar Yang
That Limited, Limiting The Space For The Work
Terbatas, Membatasi Ruang Gerak Dalam
And Have Hazards Such As :
Bekerja Dan Mempunyai Bahaya Seperti :
a) Have The Atmospheric Pressure And
a) Mempunyai Tekanan Atmosfir Dan
Have Atmospheric Air And/Or Hazardous
Mempunyai Udara Atmosfir Dan/Atau Udara
Air Which Could Potentially Cause An
Berbahaya Yang Berpotensi Menyebabkan
Accident.
Kecelakaan.
b) Contains Material (Solid Or Liquid) That
b) Berisi Bahan (Padat Atau Cair) Yang Memiliki
Has The Potential To The Incoming
Potensi Pada Pekerja Yang Masuk.
Workers.
c) Memiliki Bentuk Bagian Dalam Sehingga
c) Has The Inside Shape So The Workers
Pekerja Yang Masuk Dapat Terperangkap
Who Enter Can Be Trapped Or Breathless
Atau Sesak Napas Oleh Dinding Yang
By A Wall That Collapsed Into, Or A Floor
Runtuh Kedalam , Atau Suatu Lantai Yang
Which Slopes Downhill And
Tapered/Conical.
37
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
38
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
39
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
APD Mandatory Yang Digunakan Di Proyek Mandatory PPE Used In Refrctory Maintenance
Refractory Maintenance Services Termasuk Area Services Project Facilities Including Flowline Dan
Flowline Dan Trunkline Yaitu : Trunkline Area That Is :
a. Safety Helmet a. Safety Helmet
b. Safety Shoes b. Safety Shoes
c. Safety Glasses c. Safety Glasses
d. Pakaian Kerja Lengan Panjang/Cover All d. Work Clothes Long Sleeve/Cover All
Yang Berlaku Untuk Menghilangkan Atau Or Reduce The Risks That Can Be Applied At A Low
Mengurangi Resiko Yang Dapat Diterapkan Pada Level.
Tingkat Rendah.
Aldzama And Subcontractors Shall Take All Actions
Aldzama Dan Subkontraktor Harus Mengambil Reasonably Acceptable To Ensure That The
Semua Tindakan Yang Dapat Diterima Secara Wajar Workplace Is Safe For Every Person Who Is In Their
Untuk Memastikan Bahwa Tempat Kerja Aman Untuk Place By :
Setiap Orang Yang Berada Di Tempat Mereka
Dengan :
a. Menghilangkan Atau Mengurangi Resiko Yang a. Eliminate Or Reduce Risks Arising From
Timbul Karena Mesin, Peralatan Atau Zat-Zat Machinery, Equipment Or Hazardous
Berbahaya, Serendah Dan Sepraktis Mungkin Substances, And As Low And As Practical As
(As Low As Reasonably Practicable). Possible (As Low As Reasonably Practicable).
b. Memberikan Informasi Mesin, Peralatan Atau b. Provide Machinery Information, Equipment Or
Zat Berbahaya Kepada Aldzama Yang Hazardous Substances To Aldzama Which
Mungkin Memerlukan Informasi Untuk Maybe Need Information To Perform A Risk
Melakukan Penilaian Resiko Di Tempat Kerja Assessment Of Their Workplace.
Mereka.
c. Membuat JSA Untuk Semua Kegiatan Yang c. Make JSA For All Activities That May Pose A
Dapat Menimbulkan Bahaya Spesifik Dan Specific Hazards And The Hazards Must Be
Bahaya Tersebut Harus Dikelola Atau Managed Or Controlled To Reduce The
Dikendalikan Untuk Mengurangi Potensi Potential For Incidents.
Insiden.
d. Planning For The Future To Ensure Future
d. Merencanakan Kedepannya Untuk Activities And Prepare JSA Needs And Ensure
Memastikan Kegiatan Mendatang Dan Execution By Identifying The Associated Thing
Mempersiapkan Kebutuhan JSA Dan With HSE And Implement Appropriate
Memastikan Eksekusinya Dengan Cara Corrective Action.
Mengidentifikasi Hal Yang Berkaitan Dengan
HSE Dan Menerapkan Tindakan Perbaikan
Yang Sesuai. e. Ensure JSA Approved By Aldzama And Client
e. Memastikan JSA Di Setujui Oleh Aldzama Dan Prior To The Execution Of Work.
Client Sebelum Eksekusi Kerja.
Aldzama Will Provide Procedures Related To The
Aldzama Akan Menyediakan Prosedur Yang Terkait Manufacture And Maintenance Of The Full JSA. A
Untuk Pembuatan Dan Pemeliharaan JSA Secara More Detailed Explanation Can Be Found In The
Lengkap. Penjelasan Lebih Rinci Dapat Dilihat Job Safety Analysis Procedure.
Dalam Job Safety Analysis Procedure.
41
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Yang Terangkum Dalam Rencana Sistem Summerized In The Security System Plan As
Pengamanan Sebagai Berikut : Follows :
a. Metode Jalur Masuk Dan Keluar
Mengatur Jalan Masuk Dan Keluar Ke Lokasi a. Entry And Exit Strip Method
Kerja Proyek Dengan Memakai Jalur Khusus Regulate The Entrance And Exit To The Site Of
Dan Di Jaga Oleh Sekuriti. The Project Work Using Special Lanes And
Guarded By Security.
b. Pengamanan
Aldzama Erencanakan Perlindungan b. Security
Terhadap Keamanan Orang, Perlengkapan Aldzama Plan Protection For The Security Of
Dan Lingkungan Aldzama Pada Lokasi Rute People, Property And Environment Owned By
Yang Akan Digunakan Dengan Mengunakan Aldzama At The Location Route To Be Used
Pagar Pengaman Serta Pembuatan Internal With A Safety Fence And Making Use Of
Gate Sementara. Temporary Internal Gate.
Aldzama Akan Menyediakan Prosedur Yang Aldzama Will Provide Procedures Related To
Terkait Sistem Keamanan Di Proyek Untuk Security System In Project To Do The
Melakukan Pelaksanaan Pengamanan Implementation Of The Security Of Property
Terhadap Properti Proyek Yang Sedang Projects That Are Being Constructed. A More
Dibangun. Penjelasan Lebih Rinci Dapat Detailed Explanation Can Be Found In The
Dilihat Dalam Security Plan Procedure. Security Plan Procedure.
42
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
6.1.12. Storm & Hazardous Conditions 6.1.12. Storm & Hazardous Conditions
Protection Protection
Aldzama Akan Menyiapkan Pedoman Perlindungan Aldzama Will Prepare Guidelines For Protection
Terhadap Badai Dan Kondisi Berbahaya Yang Against Storms And Hazardous Conditions That
Dapat Dilihat Secara Rinci Di Strom & Hazardous Can Be Found In Detail In Strom & Hazardous
Conditions Protection Procedure. Conditions Protection Procedure.
43
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Jika APD Sudah Tidak Lagi Memenuhi Tingkat Longer Fulfill The Protection Level Must Be
Perlindungan Maka Harus Diperbaiki Atau Di Ganti. Repaired Or Replaced.
Penjelasan Lebih Rinci Dapat Dilihat Di Safety More Detail Procedure Can Be Found In Safety
Equipment Procedure. Equipment Procedure.
44
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
45
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
46
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Dalam Kondisi Darurat, Aldzama Akan Menetapkan In Emergency Conditions, Aldzama Will Assign
Setiap Alur Komunikasi, Prosedur Evakuasi Dimana Each Communication Flow, Evacuation Procedure
Setiap Jenis Kejadian Dan Penanganan Keadaan In Which Each Type Of Events And Handling Of
Darurat Seperti : Emergencies Such Asn :
a. Gangguan Masyarakat Termasuk a. Disturbance Of Society, Including
Demonstrasi. Demonstrations.
b. Cuaca Buruk. b. Bad Weather.
c. Tumpahan Zat Berbahaya Dan Beracun. c. Spills Of Hazardous And Toxic Substances.
d. Banjir Dan Longsor. d. Flood And Landslide.
e. Gempa Bumi. e. Earthquakes.
f. Ancaman Bom. f. The Threat Of A Bomb.
g. Dan Kondisi Darurat Lainnya. g. And Other Emergencies.
Maka Tanggungjawab Dan Kewajiban Pihak-Pihak The Responsibility And Obligation Of The Parties
Yang Terlibat (Project Manager, Construction Involved (Project Manager, Construction Manager,
Manager, HSE Manager Dan Tim Tanggap Darurat) HSE Manager And Emergency Response Team) In
Dalam Proyek Aldzama Untuk Dapat Melakukan The Aldzama Project, To Be Able To Control The
Pengendalian Keadaan Darurat Yaitu Dengan State Of Emergency Is To Minimize And Anticipate
Meminimalisasi Dan Mengantisipasi Kejadian Emergency Events.
Keadaan Darurat.
The Process Control Of An Emergency Required A
Proses Pengendalian Keadaan Darurat Diperlukan System To Handle, Control And Cope With
Suatu Sistem Untuk Menangani, Mengendalikan Emergency Conditions In Projects, By Identifying
Dan Menanggulangi Kondisi Keadaan Darurat Di Potential Hazards, Making And Disseminating
Proyek, Yaitu Dengan Melakukan Identifikasi Emergency Response Procedures, Test Procedures
Potensi Bahaya, Membuat Dan Mensosialisasikan And Emergency Response Through Simulation
Prosedur Tanggap Darurat, Menguji Prosedur Exercises And Review Those Procedures
Tanggap Darurat Melalui Latihan Dan Simulasi Periodically. Some Things To Consider In
Serta Mengkaji Ulang Prosedur Tersebut Secara Developing An Emergency Response System Is As
Berkala. Beberapa Hal Yang Harus Diperhatikan Follows:
Dalam Menyusun Sistem Tanggap Darurat Yaitu
Sebagai Berikut:
a. Prosedur Tanggap Darurat Disusun Untuk a. Emergency Response Procedures Are
Menghadapai Setiap Kejadian Darurat Yang Prepared To Deal With Any Emergency Events
Menimbulkan Dampak Negative/Kerugian Bagi That Cause A Negative Impact/Harm To
Pekerja, Lingkungan Ataupun Asset Workers, The Environment Or Assets.
Perusahaan. b. Each Emergency Is Evaluated By A Committee
b. Setiap Keadaan Darurat Ditelaah Oleh Sebuah Consisting Of The Heads Of Related Functions
Komite Yang Terdiri Dari Para Pimpinan And HSE Functions In The Workplace. Doing
Fungsi Terkait Dan Fungsi HSE Di Lokasi Readiness To Do Exercises Or Emergencies
Kerja. Melakukan Kesiagaan Dengan Simulations Periodically Every 2 X In Years
Dilakukannya Latihan Atau Simulasi Keadaan Under The Coordination Of HSE Functions.
Darurat Secara Periodik 2 X Setahun Dibawah
Koordinasi Fungsi HSE.
Further Explanation Can Be Found In Emergency
Penjelasan Lebih Lanjut Dapat Dilihat Pada Response Plan.
Emergency Response Plan
47
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Aldzama Akan Meninjau Semua Rencana Aldzama Will Review All Of The Equipment Plans
Peralatan Untuk Kecukupan Kebutuhan Pekerjaan For The Adequacy Requirements Of Project Work
Proyek Untuk Melakukan Analisa Dan Dipilih Agar To Perform The Analysis And Selected So That No
Tidak Ada Peralatan Yang Tidak Sesuai Dengan Equipment That Does Not Comply With The
Rekomendasi Standar Dan Peraturan Standards Of Recommendations And Legislation.
Perundangan.
Inspeksi Peralatan Dan Pemeliharaan Peralatan Equipment Inspection And Maintenance Of
Bertujuan Untuk Menjamin Kelayakan Operasi Equipment Intended To Ensure The Feasibility Of
Melalui Analisa Teknis Berdasarkan Peraturan The Operation Through Technical Analysis Based
Perundangan Dan Standar Nasional Atau On The Rule Of Law And National Or International
Internasional Yang Berlaku. Hasil Rekomendasi Standards That Is Applicable. The
Inspeksi Peralatan Digunakan Sebagai Dasar Recommendations Of Inpection Result Are Used As
Salah Satu Tindakan Perbaikan Sebelum Peralatan A Basic One Remedial Action Before The
Tersebut Disetujui Dan Digunakan Di Proyek Equipment Is Approved And Used In The
Aldzama Construction Of The Aldzama Project.
Inspeksi Peralatan Dilakukan Sejak Tahap
Perencanaan Agar Peralatan Dapat Beroperasi
Equipment Inspection Is Done At The Design Stage
Sesuai Rencana Dan Aspek Hse.
So That The Equipment Can Operate According To
Inspeksi Peralatan Secara Terencana The Plan And Hse Aspects.
Dilaksanakan Untuk Mengetahui Sejak Dini
Inspection Of Equipment In A Planned Implemented
Kemungkinan Adanya Kondisi Tidak Aman,
To Determine Early On The Possibility Of Unsafe
Tindakan Tidak Aman Maupun Tata Cara Atau
Conditions, Unsafe Acts Or Ordinances Or Unsafe
Prosedur Tidak Aman Sehingga Tindakan
Procedures So That Corrective Action Can Be
Perbaikan Dapat Dilakukan Sebelum Terjadinya
Performed Prior To The Occurrence Of An Accident,
Sebuah Kejadian Kecelakaan, Kerusakan
Damage To Equipment/Facilities And Other
Peralatan/Fasilitas Dan Dampak Negatif Hse
Negative Hse Impacts.
Lainnya.
48
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
ALDZAMA Akan Menyediakan Prosedur Yang ALDZAMA Will Provide Inspection Procedures
Terkait Untuk Inspeksi Peralatan Konstruksi, Related To Construction Equipment, Operation And
Operasi Dan Perawatan. Program Ini Konsisten Maintenance. This Program Will Be Carried Out
Akan Dilakukan Dengan Rekomendasi Dari Hasil Consistently With The Recommendation Of The
Temuan Inspeksi. Inspeksi Visual Harian, Bulanan, Findings Of The Inspection. Visual Inspection Daily,
Quarterly Dan Tahunan Akan Dilakukan Secara Monthly, Quarterly And Yearly Be Done Regularly.
Teratur. Penjelasan Lebih Rinci Dapat Dilihat Pada A More Detailed Explanation Can Be Found In The
Safety Equipment Procedure. Safety Equipment Procedure.
49
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Keperluan Inspeksi Dan Tindakan Medis Lanjutan Aldzama Officer Must Provide First Aid (First Aider)
Jika Dibutuhkan. In Accordance With The Ratio Of Workers In The
Project. In Conditions Where There Is Occupational
ALDZAMA Harus Menyediakan Petugas
Accidents And Are Not Able To Be Handled By First
Pertolongan Pertama (First Aider) Sesuai Dengan
Aid Personnel And Facilities, The Local Clinic
Rasio Pekerja Dalam Proyek Tersebut. Pada
Aldzama Will Facilitate Referral To Hospital Workers
Kondisi Dimana Terjadi Kecelakaan Kerja Dan
Higher.
Tidak Mampu Ditangani Oleh Petugas Pertolongan
Pertama Dan Fasilitas Klinik Setempat Maka
Aldzama Akan Memfasilitasi Pekerja Ke Rumah
Aldzama Health Services Provides A Minimum:
Sakit Rujukan Yang Lebih Tinggi.
a. Emergency Response, Stabilization And
Pelayanan Kesehatan Aldzama Minimum
Handling Capabilities In Trauma Cases.
Menyediakan:
b. Setting Up Procedures For The Handling Of
a. Tanggap Darurat, Kemampuan Stabilisasi Dan Patient Medical Evacuation Or Referral To
Penanganan Pada Kasus Trauma. Hospitals Located In Major Cities In Indonesia.
b. Menyiapkan Tata Cara Penanganan Pasien
Untuk Evakuasi Medis Atau Rujukan Ke
Rumah Sakit Yang Berada Di Kota Besar Di
A More Detail Explanation Can Be Found In Medivac
Indonesia.
Procedure.
Penjelasan Lebih Rinci Dapat Dilihat Di Medivac
Procedure.
Insiden Yang Lebih Komprehensif Untuk Incident Investigation For Development Projects
Diimplementasikan Di Proyek, Yang Berisi Implemented, Which Contains About :
Mengenai :
1) The Scope, Type, Time, Place And Description
1) Ruang Lingkup, Jenis, Waktu, Tempat Dan Of The Incident.
Uraian Insiden. 2) Reporting And Receiving An Incident Report.
2) Pelaporan Dan Penerima Laporan Insiden. 3) Methods Of Investigation.
3) Metode Investigasi. 4) Methods Of Improvement And
4) Metode Perbaikan Dan Rekomendasi. Recommendations.
5) Penyusunan Laporan Dan Sistem 5) Preparation Of Reports And Documentation
Dokumentasi System
Sistem Pelaporan Dan Investigasi Insiden Incident Reporting And Investigation System
Memberikan Manfaat Untuk: Provides Benefits For:
1) Memastikan Bahwa Semua Insiden Telah 1) Ensure That All Incidents Have Been Reported
Dilaporkan Dan Diselidiki. And Investigated.
2) Mengidentifikasi Dan Menentukan Pemilihan 2) Identifying And Determine Selecting Incident
Metode Investigasi Insiden. Investigation Methods.
3) Mengindentifikasi Sistem Pengendalian Dan 3) Identify Control And Countermeasures
Penanggulangan Insiden Sebagai Acuan Systems Of Incident As A Reference For
Untuk Penanganan Tindakan Perbaikan Serta Incident Response Handling And Remedial
Pembelajaran Dimasa Mendatang Atas Action And Learning In The Future For The
Insiden Yang Terjadi. Incident That Occurred.
51
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
6.1.31 Insiden Notifikasi Dan Klasifikasi 6.1.31. Notification And Classification Of Incident
Tim Investigasi Ini Ditunjuk Oleh Manajemen The Investigation Team Appointed By The Project
Proyek. Tim Penyelidikan Harus Terdiri Dari Management. Investigation Team Should Consist Of
Beberapa Orang Termasuk HSE Yang Sudah A Few People Including The Trained HSE And Has
Terlatih Dan Pernah Mengikuti Pelatihan Investigasi Attended Investigation Training As An Investigator.
Sebagai Penyidik.
In The Implementation Of The Investigation,
Dalam Pelaksanaan Investigasi, ALDZAMA Akan ALDZAMA Will Communicate Openly And Approach
Melakukan Komunikasi Terbuka Dan Melakukan Without Blaming Principle. All Incidents Must Be
Pendekatan Tanpa Prinsip Menyalahkan. Semua Reported To The HSE Department Within 24 Hours.
Insiden Harus Dilaporkan Kepada HSE
Departemen Dalam 24 Jam.
Subject In Under Is The Classification Of Incidents
Subyek Dibawah Merupakan Klasifikasi Insiden That Must Be Reported And Recorded, Such As :
Yang Harus Dilaporkan Dan Di Rekam, Diantaranya
:
a. High/Major
a. Tinggi /Major
b. High Potential/High Potential
b. Potensial Tinggi/High Potential
c. Endangering Other
c. Membahayakan Orang
d. Fatality
d. Fatality
e. Lost Work Time Due To Injury (LTI)
e. Hilang Waktu Kerja Akibat Cedera (LTI)
f. Case Work Is Limited (RWC)
f. Kasus Kerja Yang Dibatasi (RWC)
g. The Incidence Of Treatment In Hospital (MTI)
g. Insiden Pengobatan Di Rumah Sakit (MTI)
h. Environment
h. Lingkungan
i. Minor Reporting
i. Pelaporan Minor
j. Not Reported As Minor
j. Tidak Terlapor Karena Minor
k. Damage To Property/Asset
k. Kerusakan Properti/Asset
l. Near Miss
l. Near Miss
52
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
7.2. Pengawasan, Evaluasi Dan Kontrol 7.2. Monitoring, Evaluation And Control
Aldzama Akan Menetapkan, Menerapkan, Aldzama Will Establish, Implement, Maintain Hse
Memelihara Prosedur Hse Dan Melakukan Procedures And Monitoring Through Periodic
Pengawasan Melalui Inspeksi Secara Berkala Inspections To Evaluate Compliance With The
Untuk Mengevaluasi Kepatuhannya Terhadap Laws, Regulations, Rules And Applicable Hse
Peraturan Perundangan, Regulasi, Peraturan Dan Standards, Including Regulations Of Hse Client,
Standar Hse Yang Berlaku, Termasuk Peraturan Record Of The Results Of Periodic Evaluations
Hse Client, Catatan Hasil Evaluasi Disimpan Stored For 3 Years And Controlled For Future
Secara Berkala Selama 3 Tahun Dan Terkontrol Purposes.
Untuk Keperluan Di Masa Mendatang.
Untuk Menangani Ketidaksesuaian Yang Aktual To Deal With Actual And Potential Nonconformity,
Dan Potensial, Aldzama Akan Melakukan Aldzama Will Conduct An Investigation And
Penyelidikan Dan Menetapkan Penyebab Serta Establish The Cause And Evaluate The Need For
Mengevaluasi Kebutuhan Untuk Tindakan Preventive And Corrective Actions, Then Record
Pencegahan Dan Perbaikan, Selanjutnya Mencatat The Results And Reviewing Its Effectiveness.
Hasilnya Dan Meninjau Efektifitasnya.
53
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Project Management Team Aldzama Akan Aldzama Project Management Team Will Use The
Menggunakan Lagging & Leading Indicator Lagging & Leading Indicator As An Instrument To
Sebagai Instrumen Untuk Mengukur Dan Measure And Monitor The Implementation Of Hse
Memantau Pelaksanaan Kinerja Hse. Manager Performance. Project Manager Responsible For The
Proyek Bertanggung Jawab Pada Implementasi Implementation Of Hse Performance Periodicly In
Kinerja Hse Secara Berkala Didalam Lokasi Kerja Work Location Of Construction Projects So That
Proyek Sehingga Tujuan Proyek Tercapai Dan Project Objectives Are Achieved And Scheduled
Terjadwal Sesuai Target Terutama Target Hse. According To Target Mainly The Hse Targets.
54
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
b. Kategori/Kriteria Dan Lingkup Kegiatan Audit b. Category/Criteria And Scope Of Audit Activities
Perlu Mendapatkan Perhatian, Termasuk Need To Get Attention, Including
Tanggung Jawab Pelaksanaan Audit. Responsibilities Of Audit Implementation.
c. Methodology And Audit Communication
c. Metodologi Dan Sistem Komunikasi Audit. Systems.
d. External Audit And Audit From Client Is
d. Audit External Dan Audit Dari Client Conduct Once A Year.
Dilaksanakan Setahun Sekali. e. Corective Action Results Of Internal And
e. Corective Action Hasil Audit Internal Dan External Audit.
Eksternal. f. Sosialization Of Internal And External Audit
f. Sosialisasi Hasil Audit Internal Dan Results.
Eksternal.
Internal Audit: Audit Akan Dipimpin Oleh Lead Internal Audit: The Audit Will Be Led By A Lead
Auditor Yang Memiliki Kompetensi Yang Memadai Auditor Who Has Sufficient Competence And Has
Serta Memiliki Sertifikat Lead Auditor. Lead Auditor Lead Auditor Certificate. Lead Auditor Will Be
Akan Dibantu Oleh Beberapa Auditor Lain Yang Assisted By Some Of The Other Auditors Who Have
Telah Memiliki Sertifikasi Sebagai Internal Auditor. Been Certified As An Internal Auditor.
Audit External: Audit Akan Dilakukan Oleh External Audit: Audit Will Be Conducted By An
Konsultan Independen Dan Atau Pihak Client Independent Consultant And Or From Client Or
Ataupun Instansi Lainnya. Other Agencies.
The Scope: Audit Included The Following Things
Ruang Lingkup: Audit Meliputi Hal-Hal Sebagai Below, But Are Not Limited To :
Berikut Dibawah Tetapi Tidak Terbatas Pada :
a. HSE Management System
a. Sistem Manajemen HSE b. Work Permit, JSA, PPE, MSDS, LOTO,
b. Ijin Kerja Aman, JSA, APD, MSDS, LOTO, Housekeeping)
Housekeeping) c. Workers And Infrastructure
c. Pekerja Dan Infrastruktur d. Subcontractor Management (CSMS)
d. Manajemen Subkontraktor (CSMS) e. Occupational Health And Industrial Hygiene
e. Kesehatan Kerja Dan Higiene Industri f. Safety Observation Card
f. Kartu Pengamatan K3 g. Training
g. Pelatihan h. Environment
h. Lingkungan i. Corrective Action And Preventive
i. Tindakan Perbaikan Dan Pencegahan j. Continuous Improvement
j. Perbaikan Berkelanjutan
Kurang Dari 15 Hari Kerja. Jawaban Terhadap Than 15 Working Days. The Answer To The Audit
Temuan Audit Harus Mencantumkan Akar Findings Must Include The Root Causes And
Permasalahan Dan Tindakan Perbaikan Yang Corrective Actions Taken.
Dilakukan.
56
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
LAMPIRAN-1 / ATTACHMENT-1
57
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
58
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
59
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
60
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
D. Fire Extinguisher.
E. Canteen Free From Rodent / Insects
F. Food Handlers Hygiene.
61
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
Aldzama Team
Sub Contractor
62
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
LAMPIRAN-2 / ATTACHMENT-2
(KEBIJAKAN KESELAMATAN DAN KESEHATAN KERJA)
SAFETY AND HEALTH POLICY
63
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
64
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
LAMPIRAN-3 / ATTACHMENT-3
(KEBIJAKAN LINGKUNGAN)
ENVIRONMENT POLICY
65
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
66
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
LAMPIRAN-4 / ATTACHMENT-4
(KEBIJAKAN LARANGAN ALKOHOL DAN NAPZA)
DRUG AND ALCOHOL CONSUMPTION POLICY
67
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
68
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
LAMPIRAN-5/ ATTACHMENT-5
(UNDANG-UNDANG DAN PERATURAN HSE)
69
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
70
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
LAMPIRAN-6 / ATTACHMENT-6
(STOP AUTHORITY FORM)
71
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Rekomendasi/Recommendation: _________________________________________________
______________________________________________________________________________
______________________________________________________________________________
72
AZM-HSE-PCR-HSP-001/2/23
PT. ALDZAMA
LAMPIRAN-7 / ATTACHMENT-7
(PROGRAM KESELAMATAN DAN KESEHATAN KERJA)
SAFETY AND HEALTH PROGRAM)
73
AZM-HSE-PCR-HSP-001/2/23
SAFETY & HEALTH PROGRAM
Daily Weekly Monthly
No. Description Of Activities Remarks
Mon Tue Wed Thur Fri Sat I II III IV Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
01 Safety Observation Card Daily
02 PTW & JSA Quality Audits Monyhly
03 Tool Box Meeting Monyhly
04 HSE Committee Meeting Monyhly
05 HSE Monthly Patrol Monyhly
06 Management Site Visit Monyhly
07 Full Body Harness Inspection Monyhly
08 Fire Protection Inspection Monyhly
09 Waste Segregation Inspection Monyhly
10 Scaffolding Inspection Base on request
11 Electrical Tools & Equipment Monyhly
12 Cylinder Gasses Monyhly
13 Sanitary & Hygienis Inspection Monyhly
14 Light Vehicle Inspection Monyhly
15 Fist Aid Kit Inspection Monyhly
Site Awareness HSE Training
- Working At Height (WAH) See Schedul e
- Scaffolding Safety See Schedul e