You are on page 1of 7

SOLAR INSTALLATIONS INDIA

Annual Utility Scale Solar Installations (MWAc) State wise cumulative installations as of March 2022 (GWAC)

Chhattisgarh Bihar
0.3 GW, 0.2 GW 0.1 GW, 0.2 GW
50,000 Other States
10,147 46,133 0.9 GW, 0.1 GW
Odisha
Others, 15.1% 0.5 GW
40,000
3,559
Capacity (MW)

5,846 Punjab
30,000 5,076 1 GW, 0.2 GW Across India
Rajasthan
State, 46.6% (ISTS)
11.5 GW
9,251
18.7
14.1 GW
20,000
Uttar Pradesh
5,460 2.0 GW, 0.9 GW
10,000 6,794 Co
Central, 38.3% m
Telangana

m
GW
3.9 GW, 0.1 GW
0

iss
Until FY2017 FY2019 FY2020 FY2021 FY2022 Until

eline - 43.6
FY2018

ion
FY2016 Mar 2022

ed - 45.8 G
Maharashtra Total: 89 GW
2.4 GW, 2.2 GW

Pip
Across India
Annual Installations (MWAC)

W
(ISTS)
17.7 GW 1,110
Madhya Pradesh
2.5 GW, 2.3 GW
Utility Scale (10,147) Rooftop (2,206)
4,966

Commissioned

1,500
3,616

1,565

706
FY2022 Tamil Nadu
Karnataka
4.3 GW, 0.5 GW
7.7 GW Commissioned
Utility Scale (16,500) Rooftop (3,500) 1.4 GW
Pipeline
Projection Gujarat
11,070

2,380
3,930

1500

1,120

Andhra Pradesh 4.7 GW


FY2023
4.1 GW, 0.8 GW 2.9 GW

Utility scale Rooftop/Onsite


Central State Others OPEX CAPEX

Note: Note:
- Rooftop solar includes all installations on open ground spaces, roof, parking lot or any other area within the premises. - State wise installation trends are for utility scale solar projects above 1 MW only. State wise rooftop solar projects are not available
- Rooftop/ Onsite solar market size is calculated basis module and inverter shipment data for India market in Apr 2021-Mar 2022 period - Projects are split between Central /State based on tendering authority that allots projects. ‘Others’ include third party/open access projects.
- Pipeline includes projects allotted to developers under various central/ state tenders but not yet commissioned.
- All installtion capacity numbers mentioned in this report are AC capacity numbers unless otherwise mentioned.

OnlineDashboard
2,600+
solar projects
10,000+
wind projects
450+
RE tenders
350+
RE sector policies/ regulations

Contact for online demo, subscription enquiries


STATE PROFILES
Installation Trends (MWAC) State-district wise installations (MWAC) Installation Trends (MWAC) State-district wise installations (MWAC)

R ajasthan
12000 6,037 11,537
Others, 6%
11,537
T elangana
4000
2,068 103 17 132
310 3,989
Others, 15%
3,989
Capacity (MW)

10000 Mehbubnagar, 25%

Capacity (MW)
State, 21% Jodhpur, 42% 3000
8000 Medak, 16%

557 Nizamabad, 11%


6000 1,826 2000 State, 66%
Jaisalmer, 28% Nalgonda, 9%
1,359 Rangareddy, 4%
4000 796 Central, 73%
1000
2000 1,759 562 Bikaner, 22% Others, 35%
Central, 19%
0 Others, 8% 0

K arnataka
8000 1,364 149 264 7,674 7,674 M adhya Pradesh
2500 354 75 2 2,375 2,374
Capacity (MW)

Others, 26% 631 Others, 25%

Capacity (MW)
Tumkur,35% 2000
6000 686 Rewa, 32%
4,205
Chitradurga, 8% 1500
Bidar, 4% 423 Mandsaur, 14%
4000 Bellary, 4% State, 50% Shivpuri, 8%
State, 51% 1000 890 Neemuch, 7%
Koppal, 3%
Ujjain, 6%
2000 Others, 46%
1,006 500 Others, 34%
Central, 23% Central, 25%
0 0

G ujarat
5000

4000
1,912 4,775
Others, 12%
4,775
Patan, 21%
M aharashtra
2500

2000 388
460 2,374 2,374
Solapur, 15%

Capacity (MW)
Others, 41%
Capacity (MW)

Surendranagar,14% Dhule, 13%


645 204 Jalgaon, 10%
3000 Banaskantha, 14% 1500 159 Satara, 8%
222 722
575 Kutch, 9% State, 23% Osmanabad, 4%
2000 State, 78% 1000
1,256 165
1000 Others, 42% 500 411 Others, 50%
Central, 36%
Central, 10%
0 0

T amil Nadu
5000
364 4,333 4,333 U ttar Pradesh
2500
Capacity (MW)

495 2,043 2,043


4000 1,242 181 Others, 17% 2000

Capacity (MW)
Ramanathapuram, 34% Others, 12% Kanpur, 16%
570 Allahabad, 11%
3000 Virudhanagar, 10% 1500
690 Jalaun, 8%
State, 64% Tirunelveli, 7%
100 State, 70% Mahoba, 7%
2000 1,674 182 Tuticorin, 5% 1000 218 Chitrakoot, 6%
285
Others, 44% 500 375
1000 Others, 52%
Central, 19% Central, 18%
0 0

A ndhra Pradesh
5000

4000
326 133 4,143
Others, 6%
4,143
P unjab Capacity (MW)
2000
Capacity (MW)

513 1500
788 State, 27% Ananthapuramu, 52%
3000 970
324 1000 108 11 2 0 0 970
2,059 849 Others, 2% Mansa, 41%
2000 Bhatinda, 26%
Central, 68% Kurnool, 30% Fazilka, 14%
500 State, 96%
1000 Kadapa, 8% Sri Muktasar Sahib, 9%
Chittoor, 3% Sangrur, 3%
0 Others, 7% 0 Central, 2% Others, 7%
Until
FY 2017

FY2018

FY 2019

FY 2020

FY 2021

FY 2022
Until
Mar’2022

Until
FY 2017

FY2018

FY 2019

FY 2020

FY 2021

FY 2022
Until
Mar’2022
INVERTERS MODULES
Leading inverter suppliers in India in FY2022

Pre

Gold

Others, 3.0%
mie

Navitas, 0.3%
5,000

Jakson, 0.4%
Rayzon, 1.1%
r En

i Sola
Saat
Sungrow

3%

Em

erg
.
23

vik,
Ta

r, 1.4%
Re
t i,

mv

ies,
4,000 a
ng

ne
Po

1.4%
Lo

ee
w

wS

1.4%
Sineng

Central Inverters String Inverters er

, 1.4
ys
So

, 1.

%
Shipped Capacity (MW)

la
Huawei

Vik r,

8%
3,000 ra 2.
m 2%
so
FIMER

lar
,2
.7%

2,000
Solis

Kehua

Statcon Energiaa
Waare
Goodwe
e, 4.6%

Growatt
Total

Waaree
1,000

Havells

Hitachi
Module Shipment in

EVVO
Adani, 5.2
% FY2022
0

21,086 MWDC
Central Inverters String Inverters
6%
n , 5.
R ise
Others, 5.2%
rters (100% = 11,19
g Inve 3M
Hitachi, 0.9%
trin W
) Jin
TMEIC, 3.5% S Havells
ko

2%
1.4%
,2

6.
EVVO
Others 2.3
%

e,
1.3% 9.1%

in
.9%

sh
i, 6
.7%

Kehua
Sin

FIMER
an

Zn
Ad
0.6%
, 12

3.8%
eng
ua

Statcon
Waaree Energiaa
Keh

2.2% 0.5%
, 38.4%

Sineng,
Hitachi
4.3% Sungrow

Trina, 14.8%
0.4%
27.9%
8,683 MWAC Goodwe,
7.5%
Growatt, Domestic
9%

5.7%
Chinese/ International
ER, 1
M
FI

Solis Huawei Note:


12.9% 22.3% JA Solar, Suntech, Jinergy, Renesola and Canadian Solar have not shared their data, hence not included. Suppliers are ranked
basis their shipment/ supplies in India market from Apr 2021-Mar 2022 period. Include all module supplies to utility scale,
onsite, offgrid as well as solar pumping segment.

Sungrow, 20%

Note: Note:
Inverter suppliers are ranked basis their shipment in India from Apr Others include data of SolarEdge, Sofarsolar, Delta etc. The analysis
2021-Mar 2022 period. Data in this analysis is the shipment/ sales data of includes overlapping data of OEMs who would have supplied inverters to
players in India market and not basis project commissioning other players as well. Actual split of inverters sold by OEMs under own
brand or other players' brand is not available.
DISCOM PPA UTILITY SCALE EPC
Juniper Green (2.3%)
Engie (2.4%)
Others
GSECL (2.9%) (6.0%) Self EPC, 61.6%

Fortum (3.0%)
ReNew Power Others, 7.5%
(15.5%)
Acme (3.0%)
Swelectes, 0.2%
Avaada
Enrich Energy, 0.3%
Hero Future(3.0%)
(15.3%) Tata Power, 10%
Addwatt, 0.4%
InSolare Energy, 0.4%
Eden 8,421 MWAC
(3.6%)
GIPCL, 0.7%
Ayana Azure 10,146 MWAC Sterling and
Renewables (8.9%) Wilson, 6%
(3.6%) Vikram Solar, 0.8%

NTPC
Limited Mahindra
(6.1%) Susten Siemens Gamesa, 1%
Tata (8.8%) Mahindra Susten, 3.4%
Power Adani BHEL, 1.2%
(7.7%) (8.1%)
B-Electric, 2.5%
Rays Power Infra, 1.7%
Prozeal Infra, 2.2%
Note: Note:
DISCOM PPA projects are utility scale projects allotted by central and state agency tenders, where end power offtake is by Siemens Gamesa, B-Electric, Sunsure and GIPCL have not confirmed their numbers.
State DISCOMs. Market share of the leading players are based on AC commissioned capacity in FY2022

OPEN ACCESS ROOFTOP/ ONSITE


Others, 6.4% 350
Sunsource, 0.8%

Tata Power Solar


Oriano Clean Energy, 1.9%
Sakthi Murugan Group, 1.6% 300
Hinduja Group, 1.9%
Mothi Spinners, 2.1% Avaada, 22.3%

Radiance Renewables, 2.4% 250

Fourth Partner Energy


DC Capacity (MW)

Amplus, 2.5%
OPEX CAPEX

Panasonic Life Solution India


Tata Power Solar, 3.3% 200

Cleanmax, 3.3%
1,886 MW

Evolve Energy Group


150

Mahindra Solarize
Amplus
Vibrant Enegry, 3.5%

AMP Energy India


ReNew Power, 17.2%

Sunkind Energy

GSERenewables

InSolare Energy
Cleantech Solar, 7.2% 100

Vikram Solar
Prozeal Infra
MEC Power
Havells

Lume Solar
Roofsol

HFM Solar
Waaree
Hartek

Swelectes

Emmvee
Addwatt
Navitas
50

U Solar

Solar91
Grace
AMP Energy India, 9.7%

Asun
Fourth Partner
Energy, 13.9%
0
Note: Note:
Though CleanMax total open access capacity across wind and solar plants (hybrid) is ~176 MW. We have only considered Rooftop/Onsite projects include all installations on open ground spaces, roof, parking lot or any other area
solar capacity for this analysis. within the premises. SolarSquare, Sunedison, Sunsource and Orb Energy have not shared their data, hence
not included.
LEADERBOARD FY2022

Discom PPA Corporate


DiscomPPA
PPA Corporate
DiscomPPA
PPA Inverters
Discom PPA Module Discom
suppliersPPA Discom PPA
EPC Contractors
Discom PPA commissioned
Commissioned Inverter shipments India shipment EPC Contractors
Commissioned projects commissioned
Commissionedprojects
Open Accessprojects Rooftop/projects
projects
onsite Commissioned
India supplies projects Commissioned
Module projects
shipments Commissioned
(Utility Scale) projects
projects (Central+String) (Utility Scale)
Rank Adani
Adani Adani Adani Adani

1 ReNew Power Avaada Tata Power Solar Sungrow Longi Tata Power Solar
2 Avaada ReNew Power Fourth Partner Energy Sineng Jinko Sterling & Wilson

3 Azure Fourth Partner Energy Amplus Huawei Trina Mahindra Susten

4 Mahindra Susten AMP Energy India Havells FIMER Znshine B-Electric

5 Adani Cleantech Solar Mahindra Solarize Solis Risen Prozeal Infra

6 Tata Power Vibrant Energy Hartek Kehua Adani Rays Power Infra

7 NTPC Limited Cleanmax Roofsol Goodwe Waaree BHEL

8 Ayana Renewables Tata Power Solar Panasonic Life Solution India Growatt Vikram Solar Siemens Gamesa

9 Eden Amplus Evolve Energy Group Waaree Tata Power Solar Vikram Solar

10 Hero Future Radiance Renewables Waaree Havells RenewSys GIPCL

Note:
- DISCOM PPA projects are utility scale projects allotted by central and state agency tenders, where end power offtake is by State Distribution Utilities. Players are ranked basis AC commissioned capacity in FY2022
- Inverter and Module suppliers are ranked basis their India shipment numbers in FY2022
- EPC contractors (Utility scale) are ranked basis their commissioned AC capacity in FY2022
 

Copyright (c) JMK Research & Analytics 2022