ANNUAL
INDIA SOLAR
REPORT CARD
CY2023
SOLAR INSTALLATIONS INDIA
State wise cumulative Utility Scale installations as of December 2023 (GWAC)
Annual Utility Scale Solar Installations (MWAC)
Odisha kerala
0.5 GW 0.3 GW,
80,000 0.01 GW Other States
Chhattisgarh 1.2 GW, 1.8 GW
70,000
6,495 60,933 0.8 GW, 0.2 GW
60,000
Capacity (MW)
11,758
Others, 22.3% Punjab
50,000
7,886 1 GW, 0.4 GW Rajasthan
40,000 3,472 17.4 GW
7,030 State, 40.3% 23.1 GW
30,000 6,629 Uttar Pradesh
20,000 17,663 2.4 GW, 0.4 GW
10,000 Central, 37.4% Co
m
Telangana
0 3.8 GW, 0.1
m
GW
iss
Until 2018 2019 2020 2021 2022 2023 Until GW
.7.0G1W
ione
2017 Dec 2023
-5614
d-6
Madhya Pradesh Total: 124.9
107.8 GW
inee-
56
2.8 GW, 2.2 GW
0.19G
Across India
Annual Installations (MWAC)
liln
(ISTS)
GW
e
iPpip
W
P 16.8 GW
Tamil Nadu
Utility Scale (6,495) Rooftop (3,002) 5.9 GW, 0.2 GW
2,456
Commissioned
1,788
3,510
2,022
1,197
5,016
1,559
2,811
CY2023 546
673
Rooftop (4,200)
Gujarat
Utility Scale (15,938)
Maharashtra 6.9 GW
Projection 8.7 GW
6,685
7,364
2,090
5,486
3,318
882
750
724
CY2024 Andhra
Pradesh
Karnataka 4.4 GW
Utility scale Rooftop/Onsite 8.9 GW, 0.5 GW 7 GW
Central State Others OPEX CAPEX Commissioned
Pipeline
Note: Note:
- Rooftop solar includes all installations on open ground spaces, roof, parking lot or any other area within the premises. - State wise installation trends are for utility scale solar projects above 1 MW only. State wise rooftop solar projects are not available
- Projects are split between Central /State based on tendering authority that allots projects. ‘Others’ include third party/open access/captive projects.
- Pipeline includes projects allotted to developers under various central/ state tenders but not yet commissioned.
- All installation capacity numbers mentioned in this report are AC capacity numbers unless otherwise mentioned.
STATE PROFILES
Installation Trends (MWAC) State-district wise installations (MWAC) Installation Trends (MWAC) State-district wise installations (MWAC)
Andhra Pradesh
Others, 6% Others, 9%
18,000 2,238 17,430 5,000
Others, 7% Chittoor, 4%
5,977 391 132 28 4,416
Rajasthan
State, 19%
Capacity (MW)
Capacity (MW)
15,000 Bikaner, 27% 4,000 593 Others, 9%
Kadapa, 10%
437
12,000 635 State, 25%
3,710 3,000
Jaisalmer, 35% Ananthapuramu,
9,000 2,200
49%
1,152 Central, 75% 2,000
6,000 1,263 Central, 66%
3,000 2,296 794 17,430
1,000
4,416
Jodhpur, 32% Kurnool, 28%
0 0
Telangana
Capacity (MW)
Capacity (MW)
534 3,123
8,000 1,936 88 Others, 43%
Others, 36% 3,000
6,000 2,879
2,000 State, 66%
4,000 State, 44%
2,468 Medak, 17%
Chitradurga, 9% 1,000
2,000 8,893 Rangareddy, 5% 3,846
Central, 20% Bellary, 6% Central, 20%
0 Koppal, 4% 0 Nalgonda, 9%
Bidar, 4% Nizamabad, 12%
Raichur, 4%
Madhya Pradesh
1,310 6,861 Others, 55% Patan, 15%
7,000 3000 361 2,773
Others, 33% Others, 31%
Capacity (MW)
6,000 1,600 86 43
Capacity (MW)
5,000
1,231
2000
4,000 328
1,298 State, 44%
3,000 594 State, 67%
524 1000
2,000 1,410 193 Banaskantha, 10%
Ujjain, 5% Khandwa, 13%
1,000 6,861 Central, 32% 2,773
Neemuch, 6%
0 Central, 3% Kutch, 6% 0 1,110
Shivpuri, 6% Mandsaur, 12%
Kanpur, 14%
Uttar Pradesh
752 5,921
6,000 Ramanathapuram, 3000
Tamil Nadu
Capacity (MW)
173 2,386
Capacity (MW)
5,000 337
318 Others, 18% Jalaun, 13%
4,000 1,672 188 2000 775
State, 46% Others, 53%
3,000 Others, 49%
211
Tirunelveli, 8% 123 State, 67%
113
2,000 1,805 1000 330
Prayagraj, 11%
535
1,000 Central, 20% 5,921 Tuticorin, 8% 2,386
Central, 15% Chitrakoot, 7%
0 Virudhanagar, 7% 0
Mahoba, 6%
Capacity (MW)
774 Jalgaon, 5%
500 State, 96%
2,000 388 State, 36%
550 152 Satara, 4%
250
1,000 765
Osmanabad, 4%
Central, 19% Fazilka, 15%
0 4,590 0 Central, 2%
970
Until
2017
2018
2019
2020
2021
2022
2023
Until
Dec’2023
Until
2017
2018
2019
2020
2021
2022
2023
Until
Dec’2023
Bhatinda, 26%
Central Inverters
INVERTERS
Others, 1.6%
Hitachi, 0.8%
TMEIC, 0.9%
%
1.3
,2
ER
FIM
Leading central and string inverter suppliers in India in CY2023
Sun
grow, 49.2%
Sungrow 13,315 MWAC
Sineng
FIMER
Si n
en
26
g,
. 3%
Growatt
Goodwe
Note:
Inverter suppliers are ranked basis their shipment in India from Jan - Dec 2023 period.
SOFAR Data in this analysis is the shipment/ sales data of players in India market and not basis
project commissioning.
Polycab
Statcon Energiaa
Central (MW)
Waaree String (MW)
SOFAR, 7.3% Sineng, 11.3%
Livguard
Goodwe, 8.5% Growatt, 9.0%
0 2000 4000 6000 8000 10000
Note:
Shipped Capacity (MW) The analysis includes overlapping data of OEMs who would have supplied inverters to
other players as well. Actual split of inverters sold by OEMs under own brand or other
players' brand is not available.
MODULES
Others, 3.5%
Ins
Citizen, 0.4%
Novasys
wer T ce, 0.6 %
Cred Solar, , 1.1%%
Pah
ola
Pixon, 0.4%
1%
3.
tio
al Icon , 1.1
2
Vi
en
ech, 0 %
3500 80
r,
nE
kr
la
So
, 0.5%
am vit
ne ar, 1 .2%
o
nk
.5%
So as,
N
rgy .1%
1.0
J
Ji
a
Em aks
l
70
3000
63.3 63.3 m on
v ,
1
60.9 Ax ee 1.4
ite , 1.5 %
Re c, %
2500 Tat w %
aP , 1.
ow 6%
er,
1.9%
50 (Chin Astroner
t Gro g
2000 up), 1 y
.9%
Gautam So
lar, 2.0%
Total
40
Module Shipment in
1500 CY2023
RenewSys, 2.8%
30 25,707 MWDC
.9%
1000 on, 2 Lon
Rayz gi, 15
20 .5%
15.0
%
, 3.2
vik
500 Saat
7.9 10
3.6 3.2%
2.0 2.8 e,
1.0 1.1 n
0.1 0.2 s hi %
0 0 Zn 3.3
s,
Waaree
Adani
Vikram Solar
RenewSys
Saatvik
Goldi Solar
Sunbond Energy
Jakson
Premier Energies
Rayzon
Navitas
Novasys
ie
rg
.4%
e
Tri
n
rE
r, 3
na
ie
, 3.4
ola
,8
em
Waaree, 7.0%
Pr
.5%
iS
ani
ld
Go
Ad
Domestic
Chinese/ International
Note:
JA Solar, Suntech and Canadian Solar have not shared their data, hence not included. Suppliers are ranked basis their
shipment/ supplies in India market from Jan-Dec 2023 period. Include all module supplies to utility scale, onsite, offgrid
as well as solar pumping segment.
UTILITY SCALE SOLAR
Project Developers EPC Players
Adani, 11.5%
Others, 15.0%
Azure, 3.0%
Vikram Solar, 5.8%
SJVN, 1.2% Shell (Sprng Energy), 2.6%
Sunsure, 1.5% Continuum Wind, 2.6%
Cleanmax, 1.6%
Sterling & Wilson, 7.1% Waaree, 19.1%
Radiance, 1.8% NTPC Limited, 2.6%
Cleantech Solar, 1.9%
GSECL, 2.3% Rising Sun, 2.5%
Aditya Birla, 2.5%
Note:
Sterling & Wilson, Tata Power, Everrenew and Oriano Solar have not confirmed their data.
LEADERBOARD CY2023
Note:
DISCOM PPA projects are utility scale projects allotted by central and state agency tenders, where end power offtake is by State Distribution Utilities. Players are ranked basis AC commissioned
capacity in CY2023
- Corporate PPA projects are private PPA projects where power offtaker is a private player. Onsite PPA are rooftop/ onsite projects setup under OPEX model. Offsite PPA are open access private
solar parks projects. Players are ranked basis DC commissioned capacity in CY2023
- Inverter and Module suppliers are ranked basis their India shipment numbers in CY2023
Capacity addition, Developers, Module suppliers,
Tariff trends, Inverter suppliers, Turbine
Leading players suppliers
market share etc. Installation trends, Projects,
E
Research & Analytics
T SHAR
tender participation, key
equipment suppliers
ROO RKET
S
ILE
RE
MA
MARK E
FTO
OF
(300+ policies all central and state
PR
P
E
summary, actual pdf documents)
AT
ST IE
S
C
LI
PO
Landed cost, Cross-subsidy
surcharge, State-wise player-wise
corporate PPA market size etc.
ANNUAL
ES S
E N ACC
O P
KET
MAR
SUBSCRIPTION
2500+ solar and 10,000+ wind projects
with details of Developer, Plant
capacity, location, power off-taker,
PROJ
ECTS equipment supplier names etc.
TE
ND
ER
S
(350+ tenders with status of all
ongoing tenders, amendments and
auctions across the solar,wind, rooftop,
PLANS
hybrid and storage tenders in India)
PV NU
MA
DS
FA
production trends, BOM cost analysis, Deliverables Platinum Gold Silver Associate
CT
CE T
NG
PRI
contact@jmkresearch.com
Phone: +91-7428306655
EVENTS PASSES Delegate Passes for Conferences 6 passes 3 passes 2 passes 1 pass
E: contact@jmkresearch.com
M: +91-7428306655
A: Unit-12, 5th Floor, Enkay Towers, Udyog Vihar, Phase V, Gurgaon, Haryana-122016