Professional Documents
Culture Documents
68 @ KATIPUNAN ST M. L. QUEZON
CALUMPANG ANGONO
BINANGONAN RIZAL TIN 000-101-528-000-VAT
Billing Statement No.: 3213085729545
Meter No.: 116EAC030628
Route Seq.: 3210 15 0001 Print Seq.: 152069 Page 1 of 2
Residential 17,230
=
Actual Consumption Bill Computation Summary
Your rate this month 546 kWh Remaining Balance from previous bill 0.00
� 12.08 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 6,593.78
Please see the back page of your bill for more details about your Generation 3,490.52
meter reading and consumption. Transmission 307.13
System Loss 301.12
Distribution (Meralco) 1,619.52
Subsidies 33.68
Your monthly consumption 28.6ºC Government Taxes
Universal Charges
696.52
145.29
Ave. temp this month 0.5 FiT-All (Renewable) 0.00
kWh deg lower than prev.
192 125 207 269 335 356 394 488 480 485 494 505
Payment Instruction
jcbZ2RXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZ57XZlXZ accredited payment partner before the due date.
cbcSZZSbzbP
SViLlOC9iXX
SSCR:HFtj2Z
1849324024 � 6,593.78
Zs:ZX9LtoCP
ucSZugpRoUR Bfw:fUZVwIJfEFEZJeqZbwCFUw
Payment made after 22 Aug 2023 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005
16211
Bill Reference No.: 23085445966 Local Application No.: 822110790 Billing Period: 23 Jul 2023 to 22 Aug 2023 Print Seq. 152069 Page 2 of 2
BINANGONAN , RIZAL Your rate this month (price per kWh) is computed as Total Energy Amount
divided by the Actual Consumption (in kWh)
Note: The average temperature for the month represents the reading from
Metering Information the PAG-ASA weather station in Quezon City, Metro Manila.
Previous Current
Meter Number Reading Reading Multi Registered
116EAC030628 17230 17776 1 546 kWh
Rate Components Base Price Amount
Generation 52.94% 3,490.52
Generation Charge (PhP/kWh) 546 kWh 6.3929 3,490.52
Power Act Reduction 0.00
Transmission 4.66% 307.13
Transmission Charge(PhP/kWh) 546 kWh 0.5625 307.13
System Loss 4.57% 301.12
System Loss Charge (PhP/kWh) 546 kWh 0.5515 301.12
Distribution (Meralco) 24.56% 1,619.52
Distribution Charge (PhP/kWh) 546 kWh 2.0941 1,143.38
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 546 kWh 0.3350 182.91
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 546 kWh 0.4979 271.85
Subsidies 0.51% 33.68
Lifeline Rate Subsidy (PhP/kWh 546 kWh 0.0616 33.63
Senior Citizen Subsidy 546 kWh 0.0001 0.05
Government Taxes 10.56% 696.52
Current RPT (PhP/kWh) 546 kWh 0.0063 3.44
Local Franchise Tax 5755.41 0.5000% 28.78
VALUE ADDED TAX
Generation Charge 3490.52 11.2400% 392.33
Power Act Reduction 0.00
Transmission Charge 307.13 11.6400% 35.75
System Loss Charge 301.12 11.2800% 33.97
Distribution Charge 1619.52 12.0000% 194.34
Subsidies and Others 65.90 12.0000% 7.91
Universal Charges 2.20% 145.29
Missionary Elec for NPC-SPUG 546 kWh 0.2216 120.99
Missionary Elec for REDCI 546 kWh 0.0017 0.93
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00
NPC Stranded Debts 546 kWh 0.0428 23.37
DU Stranded Contract Costs 0.00