You are on page 1of 2

ISRAEL MARK ANTHONY BARCENAS ANGONO BUSINESS CENTER

68 @ KATIPUNAN ST M. L. QUEZON
CALUMPANG ANGONO
BINANGONAN RIZAL TIN 000-101-528-000-VAT
Billing Statement No.: 3213085729545
Meter No.: 116EAC030628
Route Seq.: 3210 15 0001 Print Seq.: 152069 Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 1849324024 03 Sep 2023
23 Jul 2023 to 22 Aug 2023 22 Aug 2023
Date of Meter Reading Electric Meter Number
22 Aug 2023 116EAC030628 Please Pay
Date of Next Meter Reading Current Reading
22 Sep 2023
Customer Type -
17,776
Previous Reading
� 6,593. 78

Residential 17,230
=
Actual Consumption Bill Computation Summary
Your rate this month 546 kWh Remaining Balance from previous bill 0.00
� 12.08 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 6,593.78
Please see the back page of your bill for more details about your Generation 3,490.52
meter reading and consumption. Transmission 307.13
System Loss 301.12
Distribution (Meralco) 1,619.52
Subsidies 33.68
Your monthly consumption 28.6ºC Government Taxes
Universal Charges
696.52
145.29
Ave. temp this month 0.5 FiT-All (Renewable) 0.00
kWh deg lower than prev.

Total Amount Due � 6,593.78

kWh 490 422 428 486 497 527 505 546 - - - -

192 125 207 269 335 356 394 488 480 485 494 505

Your consumption explained Your typical consumption


This bill is 8% higher (+41kWh) vs 489 kWh 17.6 kWh � 213
previous billing period
Ave. monthly Ave. daily Ave. daily
This bill is 12% higher (+58kWh) vs consumption consumption cost this bill
same period last year (last 12 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
546 kWh 0.3889 tCO * 2 18 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ2RXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZ57XZlXZ accredited payment partner before the due date.
cbcSZZSbzbP
SViLlOC9iXX
SSCR:HFtj2Z
1849324024 � 6,593.78
Zs:ZX9LtoCP
ucSZugpRoUR Bfw:fUZVwIJfEFEZJeqZbwCFUw
Payment made after 22 Aug 2023 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 23085445966 Local Application No.: 822110790 Billing Period: 23 Jul 2023 to 22 Aug 2023 Print Seq. 152069 Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
23 Jun-22 Jul 2023 14 Aug 2023 Bayad Partner � 6,247.28 Equalization Taxes & Royalties 0.00
23 May-22 Jun 2023 12 Jul 2023 Bayad Partner � 6,898.53
FiT-All (Renewable) 0.00% 0.00
23 Apr-22 May 2023 04 Jun 2023 Bayad Partner � 6,299.31
23 Mar-22 Apr 2023 09 May 2023 Bayad Partner � 6,074.75 FiT-All (Renewable) 0.00
22 Feb-22 Mar 2023 05 Apr 2023 Bayad Partner � 5,403.16
22 Feb-22 Mar 2023 22 Mar 2023 Meralco Headquarters � 0.02
Energy Bill Amount
Base VAT
What remains unpaid VAT Sales
VAT Zero Rated
Non-VAT
5,784.19
0.00
145.29
664.30

No unpaid bill, thank you!


Total Energy Amount 6,593.78
How your bill was computed Charges for this billing period � 6,593.78
Service ID Number: 458592830101
Contract Holder: ISRAEL MARK ANTHONY BARCENAS
Additional Bill Information
Service Address: 68 @ KATIPUNAN ST , CALUMPANG, CALUMPANG, Voltage Level Class : Secondary

BINANGONAN , RIZAL Your rate this month (price per kWh) is computed as Total Energy Amount
divided by the Actual Consumption (in kWh)
Note: The average temperature for the month represents the reading from
Metering Information the PAG-ASA weather station in Quezon City, Metro Manila.
Previous Current
Meter Number Reading Reading Multi Registered
116EAC030628 17230 17776 1 546 kWh
Rate Components Base Price Amount
Generation 52.94% 3,490.52
Generation Charge (PhP/kWh) 546 kWh 6.3929 3,490.52
Power Act Reduction 0.00
Transmission 4.66% 307.13
Transmission Charge(PhP/kWh) 546 kWh 0.5625 307.13
System Loss 4.57% 301.12
System Loss Charge (PhP/kWh) 546 kWh 0.5515 301.12
Distribution (Meralco) 24.56% 1,619.52
Distribution Charge (PhP/kWh) 546 kWh 2.0941 1,143.38
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 546 kWh 0.3350 182.91
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 546 kWh 0.4979 271.85
Subsidies 0.51% 33.68
Lifeline Rate Subsidy (PhP/kWh 546 kWh 0.0616 33.63
Senior Citizen Subsidy 546 kWh 0.0001 0.05
Government Taxes 10.56% 696.52
Current RPT (PhP/kWh) 546 kWh 0.0063 3.44
Local Franchise Tax 5755.41 0.5000% 28.78
VALUE ADDED TAX
Generation Charge 3490.52 11.2400% 392.33
Power Act Reduction 0.00
Transmission Charge 307.13 11.6400% 35.75
System Loss Charge 301.12 11.2800% 33.97
Distribution Charge 1619.52 12.0000% 194.34
Subsidies and Others 65.90 12.0000% 7.91
Universal Charges 2.20% 145.29
Missionary Elec for NPC-SPUG 546 kWh 0.2216 120.99
Missionary Elec for REDCI 546 kWh 0.0017 0.93
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00
NPC Stranded Debts 546 kWh 0.0428 23.37
DU Stranded Contract Costs 0.00

Reminders when paying Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bill's due date and remit the
All payments made via banks, e-wallets, and other authorized payment partners will be applied to payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
your oldest unpaid bill/s under your Meralco account. Please pay on or before the due date to avoid these accredited ADA partners.
any inconvenience.
Asia United Bank Rizal Commercial Banking Corporation (RCBC)
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of Banco de Oro (BDO) Robinsons Bank
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Chinabank Security Bank
Philippine National Bank Union Bank of the Philippines
Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5397 to 98
consumer@erc.gov.ph (Office hours, Mon-Fri except holidays)

You might also like