You are on page 1of 2

ISABELO ALON ALON BACOOR BUSINESS CENTER

0023 B KUDARAT ST GEN. EMILIO AGUINALDO


BAHAYANG PAG-ASA PH 6 MOLINO V BACOOR
BACOOR 4102 CAVITE TIN 000-101-528-000-VAT

B 4 L 11 Billing Statement No.: 4133093356501


Meter No.: 109BA140806
Route Seq.: 4130 09 0004 Print Seq.: 237503 Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 1431829795 27 Sep 2023
16 Aug 2023 to 15 Sep 2023 15 Sep 2023
Date of Meter Reading Electric Meter Number
15 Sep 2023 109BA140806 Please Pay
Date of Next Meter Reading Current Reading
15 Oct 2023
Customer Type -
91,623
Previous Reading
� 9,155. 92

Residential 90,895
=
Actual Consumption Bill Computation Summary
Your rate this month 728 kWh Remaining Balance from previous bill 0.00
� 12.58 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 9,155.92
Please see the back page of your bill for more details about your Generation 4,968.75
meter reading and consumption. Transmission 403.60
System Loss 441.97
Distribution (Meralco) 2,152.23
Subsidies 47.90
Your monthly consumption 28.9ºC Government Taxes
Universal Charges
965.14
176.33
Ave. temp this month 0.3 FiT-All (Renewable) 0.00
kWh deg higher than prev.

Total Amount Due � 9,155.92

kWh 579 537 534 704 705 723 652 634 728 - - -

716 739 767 845 900 713 708 693 618 640 659 662

Your consumption explained Your typical consumption


This bill is 15% higher (+94kWh) vs 646 kWh 23.5 kWh � 295
previous billing period
Ave. monthly Ave. daily Ave. daily
This bill is 18% higher (+110kWh) vs consumption consumption cost this bill
same period last year (last 12 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
728 kWh 0.5185 tCO * 2 24 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
cqE9dl32PpZ
C3SbnIC8F4X
1431829795 � 9,155.92
Zs:Z62HBfER
ucSZOFHTlQP Bfw:eqKIEYFdwFEu;E;JbeYZUw
Payment made after 15 Sep 2023 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 23093426264 Local Application No.: 827645295 Billing Period: 16 Aug 2023 to 15 Sep 2023 Print Seq. 237503 Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
16 Jul-15 Aug 2023 24 Aug 2023 Meralco Online � 7,652.64 NPC Stranded Debts 728 kWh 0.0428 31.16
16 Jun-15 Jul 2023 24 Jul 2023 Meralco Online � 8,059.01 DU Stranded Contract Costs 0.00
16 May-15 Jun 2023 23 Jun 2023 Meralco Online � 9,462.56 Equalization Taxes & Royalties 0.00
16 Apr-15 May 2023 25 May 2023 Meralco Online � 8,931.07 FiT-All (Renewable) 0.00% 0.00
16 Mar-15 Apr 2023 22 Apr 2023 Meralco Online � 8,794.26
15 Feb-15 Mar 2023 23 Mar 2023 Meralco Online � 6,735.39 FiT-All (Renewable) 0.00
Energy Bill Amount
What remains unpaid VAT Sales
Base
8,059.14
VAT
912.65
No unpaid bill, thank you! VAT Zero Rated 0.00
Non-VAT 184.13

How your bill was computed Total Energy Amount 9,155.92


Service ID Number: 403265040102 Charges for this billing period � 9,155.92
Contract Holder: ALON ALON, ISABELO
Service Address: 0023 B KUDARAT BAHAYANG PAG-ASA PH 6 Additional Bill Information
MOLINO V BACOOR CAVITE 4102 Voltage Level Class : Secondary

Metering Information Previous Service ID Number (SIN) : 208756202

Previous Current Your rate this month (price per kWh) is computed as Total Energy Amount
Meter Number Reading Reading Multi Registered divided by the Actual Consumption (in kWh)
Note: The average temperature for the month represents the reading from
109BA140806 90895 91623 1 728 kWh the PAG-ASA weather station in Quezon City, Metro Manila.

Rate Components Base Price Amount


Generation 54.27% 4,968.75
Generation Charge (PhP/kWh) 728 kWh 6.8252 4,968.75
Power Act Reduction 0.00
Transmission 4.41% 403.60
Transmission Charge(PhP/kWh) 728 kWh 0.5544 403.60
System Loss 4.83% 441.97
System Loss Charge (PhP/kWh) 728 kWh 0.6071 441.97
Distribution (Meralco) 23.51% 2,152.23
Distribution Charge (PhP/kWh) 728 kWh 2.0941 1,524.50
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 728 kWh 0.3350 243.88
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 728 kWh 0.4979 362.47
Subsidies 0.52% 47.90
Lifeline Rate Subsidy (PhP/kWh 728 kWh 0.0657 47.83
Senior Citizen Subsidy 728 kWh 0.0001 0.07
Government Taxes 10.54% 965.14
Current RPT (PhP/kWh) 728 kWh 0.0063 4.59
Local Franchise Tax 8019.04 0.5000% 40.10
ENERGY TAX
FIRST 78.00 0.1000 7.80
VALUE ADDED TAX
Generation Charge 4968.75 11.0200% 547.56
Power Act Reduction 0.00
Transmission Charge 403.60 11.5900% 46.78
System Loss Charge 441.97 11.0700% 48.93
Distribution Charge 2152.23 12.0000% 258.27
Subsidies and Others 92.59 12.0000% 11.11
Universal Charges 1.93% 176.33
Missionary Elec for NPC-SPUG 728 kWh 0.1977 143.93
Missionary Elec for REDCI 728 kWh 0.0017 1.24
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00

Reminders when paying Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bill's due date and remit the
All payments made via banks, e-wallets, and other authorized payment partners will be applied to payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
your oldest unpaid bill/s under your Meralco account. Please pay on or before the due date to avoid these accredited ADA partners.
any inconvenience.
Asia United Bank Rizal Commercial Banking Corporation (RCBC)
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of Banco de Oro (BDO) Robinsons Bank
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Chinabank Security Bank
Philippine National Bank Union Bank of the Philippines
Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5397 to 98
consumer@erc.gov.ph (Office hours, Mon-Fri except holidays)

You might also like