Professional Documents
Culture Documents
Residential 7,387
=
Actual Consumption Bill Computation Summary
Your rate this month 106 kWh Remaining Balance from previous bill 0.00
� 12.05 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 1,277.60
Please see the back page of your bill for more details about your Generation 752.81
meter reading and consumption. Transmission 74.92
System Loss 67.41
Distribution (Meralco) 213.58
Subsidies 0.13
Your monthly consumption 26.4ºC Government Taxes
Universal Charges
136.45
28.44
Ave. temp this month 1.1 FiT-All (Renewable) 3.86
kWh deg lower than prev.
kWh 95 106 - - - - - - - - - -
66 13 83 101 111 95 92 92 83 82 86 81
Payment Instruction
jcbZ2RXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZ57XZlXZ accredited payment partner before the due date.
cbcSZZSbzbP
VHv8jEG1iXX
cS3bJjGBn0Z
1826774318 � 1,277.60
Zs:ZhuM6nAP
ucSZxOpSy5R Bfw:fUZbwIZYKDwZJfbuBwYJUw
Payment made after 24 Feb 2024 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005
16211
Bill Reference No.: 240210369914 Local Application No.: 871903532 Billing Period: 25 Jan 2024 to 24 Feb 2024 Print Seq. 51266 Page 2 of 2
HEN T DE LEON, VALENZU Your rate this month (price per kWh) is computed as Total Energy Amount
divided by the Actual Consumption (in kWh)
Note: The average temperature for the month represents the reading from
Metering Information the PAG-ASA weather station in Quezon City, Metro Manila.
Previous Current
Meter Number Multi Registered
Reading Reading Additional Account Information
115BAG230325 7387 7493 1 106 kWh
Payments or credits in excess of your previous billing were either
applied to your current charges or shall be applied to your future
Rate Components Base Price Amount bills.
Generation 58.92% 752.81
Generation Charge (PhP/kWh) 106 kWh 7.1020 752.81
Power Act Reduction 0.00
Transmission 5.86% 74.92
Transmission Charge(PhP/kWh) 106 kWh 0.7068 74.92
System Loss 5.28% 67.41
System Loss Charge (PhP/kWh) 106 kWh 0.6359 67.41
Distribution (Meralco) 16.72% 213.58
Distribution Charge (PhP/kWh) 106 kWh 0.9803 103.91
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 106 kWh 0.3350 35.51
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 106 kWh 0.4979 52.78
Subsidies 0.01% 0.13
Lifeline Rate Subsidy (PhP/kWh 106 kWh 0.0011 0.12
Senior Citizen Subsidy 106 kWh 0.0001 0.01
Government Taxes 10.68% 136.45
Current RPT (PhP/kWh) 106 kWh 0.0055 0.58
Local Franchise Tax 1109.43 0.7500% 8.32
VALUE ADDED TAX
Generation Charge 752.81 11.3200% 85.22
Power Act Reduction 0.00
Transmission Charge 74.92 10.7000% 8.02
System Loss Charge 67.41 11.2700% 7.60
Distribution Charge 213.58 12.0000% 25.63
Subsidies and Others 9.03 12.0000% 1.08
Universal Charges 2.23% 28.44
Missionary Elec for NPC-SPUG 106 kWh 0.2238 23.72
Missionary Elec for REDCI 106 kWh 0.0017 0.18
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00
NPC Stranded Debts 106 kWh 0.0428 4.54
DU Stranded Contract Costs 0.00