Professional Documents
Culture Documents
Closing Rfi
Closing Rfi
CVL-1066 1401856801
2022 Support Foundations S-301,S-302, at NJBP as per highlighted attached drawing.
25 January Compaction Testing Inspection of subgrade (Select fill material) for Stair pad
CVL-1067 1401856787
2022 Foundations (SPF) at NJBP as per highlighted attached drawing.
26 January Compaction Testing Inspection of Backfill 4th Layer (Select fill material) for Pipe
CVL-1070 1401860461
2022 Support Foundations S-301,S-302,at NJBP as per attached highlighted drawing.
Grade and Site Preparation Inspection for installlation of Pipe Support Foundation SL-
27 January
CVL-1072 1401864898 314 Platform Foundation,s PLTF-301 & PLTF-302( 02 No,s) AND Stair pad
2022
Foundations (SPF) qty 03 No,s @ station KM 340+000 NJBP
Pre-cast Concrete Erection and Alignment Inspection for installlation of Pipe Support
27 January Foundation SL-314 , Platform Foundation,s PLTF-301 & PLTF-302( 02 No,s) AND
CVL-1074 1401865065
2022 Stair pad Foundations (SPF) qty 03 No,s @ station KM 340+000 NJBP as per
highlighted attached drawing.
Compaction Testing Inspection of Backfill 1st Layer (Select fill material) for Plateform
27 January
CVL-1075 1401865117 Foundations PF1(09 nos.), PF2(03 nos.) AND SP1 (02 nos.) as per highlighted
2022
attached drawing at Scrapper Launcher
27 January Compaction Testing Inspection of Backfill 5th Layer (Select fill material) for Pipe
CVL-1076 1401865176
2022 Support Foundations S-301,S-302,at NJBP as per attached highlighted drawing.
27 January Compaction Testing Inspection of Backfill 1st Layer (Select fill material) for Pipe
CVL-1077 1401865170
2022 Support Foundations SL-314 at NJBP as per highlighted attached drawing.
27 January Compaction Testing Inspection of Backfill 3rd Layer (Select fill material) for Pipe
CVL-1078 1401865266
2022 Support Foundations S-303, S-304 at NJBP as per highlighted attached drawing.