INSTRUCTIONS: This Self-Check Instrument will give the trainer necessary
data or information which is essential in planning training sessions. Please check the appropriate box of your answer to the questions below. CAN I…? YE NO S CORE COMPETENCIES 1. Install electrical metallic/non-metallic (PVC conduit) 1.1. Interpret correct drawings based on job requirements 1.2. Determine correct quantities of conduit, fittings and accessories as per job requirements 1.3. Select tools and equipment as per job requirements 1.4. Assemble conduit and ensure that fittings are fully inserted and tightened as per job requirements 1.5 Bent conduit with bends not exceeding 90° as per job requirements 1.6 Install conduit couplings and elbows as per job requirements 1.7 Thread conduit in line with job requirements 1.8 Follow safety procedures in line with standard operating procedures (SOPs)
2. Install wire ways and cable tray
2.1 Interpret correct drawings to determine job requirements 2.2 Select correct quantities of materials as per job requirements 2.3 Select tools and equipment as per job requirements 2.4 Install wire ways and cable trays as per job requirements.
Date Developed: Document No.
Form 1.1 Self- June 2021 Assessment Date Revised: Issued by: Checklist on CWNHS ELECTRICAL Page INSTALLATION AND Developed by: 1 of 3 MAINTAINANCE NC Jayson D. Dela Torre Revision #00 II CAN I…? YE NO S 2.5 Follow safety procedures in line with SOPs 3 Install auxiliary terminal cabinet and distribution panel 3.1 Interpret correct drawings to determine job ̸ requirements 3.2 Select correct quantities of materials as per job ̸ requirements 3.3 Select tools and equipment as per job ̸ requirements 3.4 Install auxiliary terminal cabinet as per job ̸ requirements 3.5 Install auxiliary main distribution frame as per ̸ job requirements 4 Prepare for cable pulling and installation
and personal protective equipment (PPE) in line with job requirements.
4.2 Identify cable pulling & installation ̸
requirements and constraints from plan and site inspection as per job requirements.
4.3 Set up cable lay out & installation equipment in ̸
accordance with manufacturer's and job requirements.
4.4 Make site safe and secure for cable installation. ̸
4.5 Select suitable protective clothing and use ̸
required safety devices 4.6 Assess support structure as safe for normal ̸ working conditions. 5 Perform wiring and cabling lay out 5.1 Follow safety procedures based on safety ̸ regulations Identified and selected PPE in line with safety requirements 5.2 Identify and obtain tools, equipment, pulling ̸ compound and safety requirements for the lay
Date Developed: Document No.
Form 1.1 Self- June 2021 Assessment Date Revised: Issued by: Checklist on CWNHS ELECTRICAL Page INSTALLATION AND Developed by: 2 of 3 MAINTAINANCE NC Jayson D. Dela Torre Revision #00 II CAN I…? YE NO S out and installation. 5.3 Properly install and tension pulling materials to ̸ required specifications 5.4 Permanently secured cable to support structure ̸ in accordance with standard installation procedures 5.5 Observe bending radius and loops tolerance for ̸ cable materials at all times 5.6 Follow schedule of wire cutting lists based on ̸ estimates, quantity and sizes to avoid wastage. 5.7 Seek further instructions if unplanned events ̸ or conditions occur 5.8 Do checking of quality of work in accordance ̸ with instructions and requirements. 6 Notify completion of work 6.1 Make final checks to ensure that work ̸ conforms with instructions and job requirements 6.2 Notify supervisor upon completion of work ̸ 6.3 Clean, check and return where appropriate, ̸ tools, equipment and any surplus resources and materials to storage in accordance with established procedures 6.4 Clean up and make work area safe according ̸ to OHSA regulations
Form 1.1 Self- June 2021 Assessment Date Revised: Issued by: Checklist on CWNHS ELECTRICAL Page INSTALLATION AND Developed by: 3 of 3 MAINTAINANCE NC Jayson D. Dela Torre Revision #00 II