Form 1.

3 Identifying Training Gaps


Summary of Current Competencies versus Required Competencies
Required Units of Current Training
Competency/Learning Competencies Gaps/Requirements
Outcomes based on CBC
1. Perform roughing-in, wiring and cabling works for single-phase
distribution, power, lighting and auxiliary systems
1.1. Install electrical Install electrical
metallic /non- metallic metallic /non-
(PVC conduit) metallic (PVC conduit)
1.2. Install wire ways and Install wire ways and
cable tray cable tray
1.3 Install auxiliary Install auxiliary
terminal cabinet and terminal cabinet and
distribution panel distribution panel
1.4 Prepare for cable pulling Prepare for cable
and installation pulling and
installation
1.5. Perform wiring and Perform wiring and
cabling lay out cabling lay out
1.6. Notify completion of work Notify completion of
work
2. Install electrical protective devices for distribution, power, lighting,
auxiliary, lightning protection and grounding systems
2.1 Plan and prepare work Plan and prepare
work

2.1 2.2. Install electrical Install electrical


protective devices protective devices

2.3. Install lighting fixture Install lighting fixture


and auxiliary outlet and auxiliary outlet
2.2 2.4. Notify completion of Notify completion of
work work

3. Install wiring devices of floor and wall mounted outlets, lighting


fixtures/switches and auxiliary outlets
3.1 Select wiring devices Select wiring devices
3.2. Install wiring devices Install wiring devices
3.3. Install lighting Install lighting
fixtures/switches fixtures/switches
3.4. Notify completion of Notify completion of
work work

Date Developed: Document No.


Form 1.3 May 2019 VPC-EIMNC2-CBLM01
Identifying Date Revised: Issued by:
Training Gaps on Page
Electrical Developed by: 1 of 3
Installation and Jayson D. Dela Torre Revision #00
Maintenance