Exam Production Execution and Logistics SS2021 Final
Exam Production Execution and Logistics SS2021 Final
Matriculation
number:
Please note:
Please fill in all pages with your matriculation number in the header!
Allowed auxiliary means: writing and drawing utensils (pen, felt pen,
ball-pen), scientific calculators (non-programmable and non-graphic); for editing
only use the handed out pages of this exam – if necessary, use the back
of the page.
The editing time is 90 minutes.
Rating:
Exam question
1 2 3 4 5 6 -- -- -- --
30 10 10 10 14 16 -- -- -- -- 90
Mark
-- -- -- --
1b) Please name the eight steps of the design guideline of the value
stream method in the correct order. 9 Points
1a.)
1.
2.
3.
4.
1b.)
1.
2.
3.
4.
5.
6.
7.
8.
1c.)
Question Yes No
What is a customer paying for – Processing?
1d.)
1d-1.)
1d-2.)
1d-3.)
1e.)
(Note that since the payoff is cost, the maximax criteria becomes minimin and
maximin becomes minimax.)
3c) Improve the layout in such a way that nonadjacent loads are
completely eliminated.
Finally draw the new grid according to your findings. 6 Points
5d) There are three different types of basic supply chain network ful-
fillment options. Please assign the three options in the figure be-
low:
“cross dock”,
“direct delivery”, and
“distribution center”. 3 Points
5a.)
5b.)
5c-1)
5c-2)
5d)
6a) In this case you have to explain the major fields of the Pareto
principle. Please sketch the Pareto principle, assign the axis of
the diagram and give a typical range of the items were located in
the three categories (value and amount).
For your answer, please use the figure below. 3 Points
Subtask 6c-1):
Please describe the advantages and disadvantages of the 2 Points
“single sourcing strategy”. Please highlight one advantage
and one disadvantage of this strategy.
Subtask 6c-2):
Please describe the advantages and disadvantages of the 2 Points
“JIT sourcing strategy”. Please highlight one advantage and
one disadvantage of this strategy.
For your answer, please use the figure below. 2,5 Points
P/D - RDV -
Production to Delivery Relative Demand
Product segment Ratio Volatility
A 1,5 low
B 3,5 high
C 0,5 high
6a)
6b)
6c-1)
6c-2)
6d-1)
6d-2)