AE INSPECTION REQUEST
‘ConTRAcTOR: CONSULTANT: PROJECT:
AL TURKIENTERPRISES LLC NJPENGINEERING CONSTRUCTION OF BARQ PROJECT
CONSULTANCY [AT RAFO AIRBASE THUMRAIT
‘To: MSNJP ENGINEERING CONSULTANCY Request No: ATIE-499-TH-HO-ELL-S4 Rev: 00
From: ALTURKI ENTERPRISES LLC Discipline : ELECTRICAL
‘Name: SHREELANI HK Report No:
Position: ELECTRICAL ENGINEER Date of request: 24:9-2018
Location: HO BUILDING
Drwvg/Spec Ref: ATE-499-THU-HQB-E-003, ATE-499-AB-THU-HQB-F-206
‘You are here by requested to inspect our work as listed below on 24/9/2018 at 3.00 pm
onwards.
Work tobe inspected: «
1) Pre Testing & Commissioning of SMDB & LCP in HQ Building a attached highlighted drawing
herewith
reSlea std dee
(CONSULTANT RESPONSE
COMMENTS:
Davros C7) etn ejesed (_] — fembmt
FAL Natio WS be @ [Rain Spode. Ob
K Thy Sgoted AP Atyrormn of soritg Rosanna of prdave Coen
2
2 TO Prone Lead sddte Cherié in gion Lup Cat taba
1 1G Kblabnt focal
lcctieal Engineer | SIFUGTUEUENsineor QAIQC Engineer
Mechanical Engineer
ee
y owe
i
aoc aINSPECTION CHECKLIST
FATE psec on72%3/se- nc R01 a0 ARGASESTHOMRAT
yaa
Stra —[GuENT mnustey oF DEFENCE
[CONSULTANT: NIP JCONTRACTOR : AL TURKI
‘WK DESCRIPTION: a Testing Conmisarng Check ist for Sob Nain Divibton Panel SMOBOL
Se DESCRIPTION Yes | NO [N/A] __REMARIS
'ra-Teatng & Commissioning heck Tt for Sob Main
Distribution Pane
[crcuts CCE switches termina ave provided wih
lle and durable enifction abe
2 |Novisse damage to impale stey
3. [an update schematic lagram for pane spayed
[Al accesses pars screened with sang pate
learned metal
5_[earthing system effectively connected,
6. |atexposed conductive parts effectively earthed.
[i protective deca ae Tarioned propery and
forrecty set.
8 |p proper of station provided for every cut.
9 [Sutabe cable terminations provided.
[raakar des based on approved Toad
2? | ule/scheratic ciagram,
I ISECICISTSTCICT SIS
11 |eabie conductors of correct phase connected
Tp PomroReaTA Test or connec abies To Be
encoses
maa: “TWh SR Ap TO Ge aR =
Grvulatin Tervetare Vell ts CDecthay | confront, Wireteag
4
Shek Rar ed AB TSREEL qin he bs Meat
ducted by jwitnessed by ‘Approves by
ain contractor [constant lent
1 Th Enterprises lon moves
fone Voge
» wi cs es
ae J. 712A ge loate__ TATOA IE —_oateINSPECTION CHECKLIST.
[CLIENT : MINISTRY OF DEFENCE
JPRovECT: MOD/2013/034-1 BARQ PROJECT AT RAFO AIRBASES THUMRAIT
[CONSULTANT: NIP
JEONTRACTOR : AL TURK!
i Main Dirbuion ane SHDB OE
[sno DESCRIPTION ves | no [w/a] REMARKS
(re Testne & Commissioning Check tor Sub Maia
bist
[Crcuts CCE switches termina are provided with
eigbe an durable identfiation lable.
2 |No vite damage to impair safety.
3 [An update Schematic diagram for panel deployed
[A ocesse We pars sreened with isting pave
lr earthec meta
5 [Farthing sstem EMtectvely connected
6. |Alexposed conductive pats effectively earthed.
[at arotacive delice are Tuntioned propery and
eoreciy et.
8 [Aproperct lation provided for every cult.
29. |soiable be terminations provided
reat sie based on approved oad
20 | snedule/sinematic agra
11 [able conductors ofcorect phase connected
IApbrovedW teat or connected WV cbs to Be
2 Jencioses
[ora suterad Ae Aree Ge
TSSSINS SISTSISISIS
5, ay Ra SR
Univicllin entrance Vale Ip credeag Leantinaly Ye atlas]
Xa Dees Pehimy Je de tong
conducted by lwienessd by ‘Approved by
Main contractor consultant lent
Turk Enterpies lowe ‘Moves
Name See ECA CIT [Name ie
Le big A
sien
xe Cea bas aT
ate
—INSPECTION CHECKLIST.
PROJECT: MOD/2013/034-1 BARO PROJECT AT RAFO AIRBASES THUMRAIT
retry)
Miroua [euenT: ministry OF DEFENCE
[CONSULTANT: NIP [CONTRACTOR : AL TURKI
‘WOR DESCRIPTION: ra Ten 8 Cemmisoa hea for Sub Men Dskbuon Panel SOE
Sho DESCRIPTION yes | No [w/a] __ REWARKS
era Testing & Commisioning Check Tt Yor Sub Mala
Disribution pane
[crcts ce switches famine are provided with
lle and curable dentieation able,
2 [Wo isle damage to impair seer.
3. [Anup-date Schematic dagram fr panel displayed,
"A aceasbe Wve parts sereeneo with STAT Dae
SISIS]S
5 earthing system erectively connect,
Ss
6 |Alexposed conductive parts effectively earthed
Tairpratectve devces ae Tantioned propery and
locrecty set.
1 [Aproper of solaton provid fr every cet.