You are on page 1of 13
AE INSPECTION REQUEST ‘ConTRAcTOR: CONSULTANT: PROJECT: AL TURKIENTERPRISES LLC NJPENGINEERING CONSTRUCTION OF BARQ PROJECT CONSULTANCY [AT RAFO AIRBASE THUMRAIT ‘To: MSNJP ENGINEERING CONSULTANCY Request No: ATIE-499-TH-HO-ELL-S4 Rev: 00 From: ALTURKI ENTERPRISES LLC Discipline : ELECTRICAL ‘Name: SHREELANI HK Report No: Position: ELECTRICAL ENGINEER Date of request: 24:9-2018 Location: HO BUILDING Drwvg/Spec Ref: ATE-499-THU-HQB-E-003, ATE-499-AB-THU-HQB-F-206 ‘You are here by requested to inspect our work as listed below on 24/9/2018 at 3.00 pm onwards. Work tobe inspected: « 1) Pre Testing & Commissioning of SMDB & LCP in HQ Building a attached highlighted drawing herewith reSlea std dee (CONSULTANT RESPONSE COMMENTS: Davros C7) etn ejesed (_] — fembmt FAL Natio WS be @ [Rain Spode. Ob K Thy Sgoted AP Atyrormn of soritg Rosanna of prdave Coen 2 2 TO Prone Lead sddte Cherié in gion Lup Cat taba 1 1G Kblabnt focal lcctieal Engineer | SIFUGTUEUENsineor QAIQC Engineer Mechanical Engineer ee y owe i aoc a INSPECTION CHECKLIST FATE psec on72%3/se- nc R01 a0 ARGASESTHOMRAT yaa Stra —[GuENT mnustey oF DEFENCE [CONSULTANT: NIP JCONTRACTOR : AL TURKI ‘WK DESCRIPTION: a Testing Conmisarng Check ist for Sob Nain Divibton Panel SMOBOL Se DESCRIPTION Yes | NO [N/A] __REMARIS 'ra-Teatng & Commissioning heck Tt for Sob Main Distribution Pane [crcuts CCE switches termina ave provided wih lle and durable enifction abe 2 |Novisse damage to impale stey 3. [an update schematic lagram for pane spayed [Al accesses pars screened with sang pate learned metal 5_[earthing system effectively connected, 6. |atexposed conductive parts effectively earthed. [i protective deca ae Tarioned propery and forrecty set. 8 |p proper of station provided for every cut. 9 [Sutabe cable terminations provided. [raakar des based on approved Toad 2? | ule/scheratic ciagram, I ISECICISTSTCICT SIS 11 |eabie conductors of correct phase connected Tp PomroReaTA Test or connec abies To Be encoses maa: “TWh SR Ap TO Ge aR = Grvulatin Tervetare Vell ts CDecthay | confront, Wireteag 4 Shek Rar ed AB TSREEL qin he bs Meat ducted by jwitnessed by ‘Approves by ain contractor [constant lent 1 Th Enterprises lon moves fone Voge » wi cs es ae J. 712A ge loate__ TATOA IE —_oate INSPECTION CHECKLIST. [CLIENT : MINISTRY OF DEFENCE JPRovECT: MOD/2013/034-1 BARQ PROJECT AT RAFO AIRBASES THUMRAIT [CONSULTANT: NIP JEONTRACTOR : AL TURK! i Main Dirbuion ane SHDB OE [sno DESCRIPTION ves | no [w/a] REMARKS (re Testne & Commissioning Check tor Sub Maia bist [Crcuts CCE switches termina are provided with eigbe an durable identfiation lable. 2 |No vite damage to impair safety. 3 [An update Schematic diagram for panel deployed [A ocesse We pars sreened with isting pave lr earthec meta 5 [Farthing sstem EMtectvely connected 6. |Alexposed conductive pats effectively earthed. [at arotacive delice are Tuntioned propery and eoreciy et. 8 [Aproperct lation provided for every cult. 29. |soiable be terminations provided reat sie based on approved oad 20 | snedule/sinematic agra 11 [able conductors ofcorect phase connected IApbrovedW teat or connected WV cbs to Be 2 Jencioses [ora suterad Ae Aree Ge TSSSINS SISTSISISIS 5, ay Ra SR Univicllin entrance Vale Ip credeag Leantinaly Ye atlas] Xa Dees Pehimy Je de tong conducted by lwienessd by ‘Approved by Main contractor consultant lent Turk Enterpies lowe ‘Moves Name See ECA CIT [Name ie Le big A sien xe Cea bas aT ate — INSPECTION CHECKLIST. PROJECT: MOD/2013/034-1 BARO PROJECT AT RAFO AIRBASES THUMRAIT retry) Miroua [euenT: ministry OF DEFENCE [CONSULTANT: NIP [CONTRACTOR : AL TURKI ‘WOR DESCRIPTION: ra Ten 8 Cemmisoa hea for Sub Men Dskbuon Panel SOE Sho DESCRIPTION yes | No [w/a] __ REWARKS era Testing & Commisioning Check Tt Yor Sub Mala Disribution pane [crcts ce switches famine are provided with lle and curable dentieation able, 2 [Wo isle damage to impair seer. 3. [Anup-date Schematic dagram fr panel displayed, "A aceasbe Wve parts sereeneo with STAT Dae SISIS]S 5 earthing system erectively connect, Ss 6 |Alexposed conductive parts effectively earthed Tairpratectve devces ae Tantioned propery and locrecty set. 1 [Aproper of solaton provid fr every cet.

You might also like