Professional Documents
Culture Documents
Em-2006-Mep-Eom-Mt-Sd-Plb-104-1 (Rev-1)
Em-2006-Mep-Eom-Mt-Sd-Plb-104-1 (Rev-1)
8248 9752 9000 9000 9000 9000 9000 9000 9000 10400 7600
A6 TROLLEY PATH
TROLLEY PATH
A5
2 3 4 5 6 7 8 9 10 11 12 13 14 15 A4 TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
DRAIN
A3 TROLLEY PATH
B4 A2 TROLLEY PATH
BR-02
L002
EXISTING ATRIUM
L016
BR-03
L003
OMAN TEL
L030
ELE
L031
DH DRIVER
DRAIN
323
TROLLEY PATH TOI.
A1 000
1:11
TROLLEY PATH
BOILER ROOM
UP
BR-04
99
L004
HD OFFICE
IKEA DRY STORE BR-06 HOME DELIVERY S.LIFT-03 (5 TON) 600b
278 L006 600b 590f
TROLLEY PATH
B2 S.LIFT-01 (2 TON)
SANITATION
F.T
PASSAGE
RECEIVING F.T
262 UP
481
281
F.T
BR-05
CHILLER/WALK IN
F.T
C C
E
ENTRANCE
OIL ROOM
GENTS TOI.1443 490
GARBAGE ROOM
480 WATER TANK
REF.
270
261
FREEZER
E
1445 L014
B3 272
260b
AIRLOCK REC/SECURITY/
TROLLEY PATH
L008
SERVER ROOM CCTV
IT ROOM 420
422
11a
SLOPE - 1:10
WALL
GREASE
TRAP
ROOM
1:15
B4
TROLLEY PATH
1:10
RAMP UP TO GROUND
EXIT-03
RAMP UP TO GROUND 1:10
B5 LOBBY
L010
GENERATOR
1000KVA
IKEA
S.LIFT-06 (5 TON)
590i
DRAIN
SEC. RM 1 (MALL)
B6 L010
+44.300 FFL
UP 4800
SUBSTATION
L025
UP
1:11
+44.000 FFL
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
L023
L024
B8
STAIR
790a
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
TROLLEY PATH
B10 STORE
L027
B5
B11
DRAIN
250 KVA
WALL
N GENERATOR
DRAI MALL
B12
1:61
B13 DRAIN
AIN
DR
B14 DRAIN
DRAIN
KEY PLAN
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS ARE IN METER
UNLESS OTHERWISE SPECIFIED
2. ALL IL (INVERTED LEVEL) ARE FROM INSIDE BLDG FFL.
B6 LEGEND
SP SOIL PIPE
WP WASTE PIPE
UP K_WP KITCHEN WASTE PIPE
F_WP FISH WASTE PIPE
VP VENT PIPE
CDR CONDENSATE DRAIN
RWP RAIN WATER PIPE
MH MANHOLE
UP GT GULLY TRAP
FG FLOOR GULLY
FCO FLOOR CLEAN-OUT
AD AREA DRAIN
T/A TO ABOVE
B7 T/B TO BELOW
F/A FROM ABOVE
F/B FROM BELOW
EL ELEVATION (BOTTOM OF PIPE ) OF PIPE FROM F.F.L
COMMENTS
COORDINATE WITH HVAC & CIVIL DRAWINGS. LOCATION OF HVAC EQUIPMENTS
SHALL BE AS PER APPROVED HVAC DRAWINGS
IL & FINAL ROUTING OF THE PIPES SHALL BE AS PER APPROVED COORDINATION
SEC. ROOM
(MALL) DRAWINGS
L023 THIS DRAWING APPROVAL IS ONLY FOR PREPARATION OF THE COORDINATION
DRAWINGS. THE CONTRACTOR SHALL RESUBMIT THIS DRAWING IF REQUIRED BASED
ON THE APPROVED COORDINATION DRAWINGS OR ANY KIND OF MAJOR CHANGES IN
THE ARCH LAYOUTS
B8
SHOP DRAWING / SUBMITTAL
REVIEW STATUS
CODE A – APPROVED
CODE D – REJECTED
NOTE – THE SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITY AND GENERAL CONFORMANCE TO CONTRACT
DOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND CORRELATING DIMENSIONS AT JOB
B9 SITE FOR TOLERANCE. CLEARANCE, QUANTITIES, FABRICATION PROCESSES AND TECHNIQUES OF CONSTRUCTION
COORDINATION OF HIS WORK WITH OTHER TRADES AND FULL COMPLIANCE WITH CONTRACT DOCUMENTS. APPROVAL
DOES NOT RELIEVE THE CONTRACTOR OF ANY OF HIS OBLIGATIONS AND RESPONSIBILITIES UNDER HIS CONTRACT.
TRANSMITTAL/LETTER REFERENCE:
SHOP DRAWING
3030
3030
FROM GROUND FLOOR
005 352-(&7
FG-1
940
PROPOSED MALL EXTENSION AT OMAN
Ø40 CDR AVENUES MALL
CONNECTED TO FG-1
&/,(17
352-(&70$1*(5
B11
&2168/7$17
IN
DRA 0$,1&2175$&725
B12
ELECTRO MECHANICS
68%&2175$&725
'5$:,1*7,7/(
MAJOR TENANT
LOWER GROUND FLOOR PART-01
ENLARGED CONDENSATE DRAIN LAYOUT
B13 IN
DRA Drawn by : SS Date
Sign : Sign :