The document describes the supporting structure requirements for a solar water heating system. A structure up to 1 meter high does not require removal works. A structure higher than 1 meter but less than 2 meters high needs to be at least 1.5 meters from the roof edge or have a protective barrier if installed on a roof. Electrical cables and apparatus must be discharged before demolition of any supporting structure.
The document describes the supporting structure requirements for a solar water heating system. A structure up to 1 meter high does not require removal works. A structure higher than 1 meter but less than 2 meters high needs to be at least 1.5 meters from the roof edge or have a protective barrier if installed on a roof. Electrical cables and apparatus must be discharged before demolition of any supporting structure.
The document describes the supporting structure requirements for a solar water heating system. A structure up to 1 meter high does not require removal works. A structure higher than 1 meter but less than 2 meters high needs to be at least 1.5 meters from the roof edge or have a protective barrier if installed on a roof. Electrical cables and apparatus must be discharged before demolition of any supporting structure.
22 Supporting Structure for Solar Water Heating System
MW Items 1.5 2.2 3.2
Simple Removal ... Comparison of Descriptions on a cantilevered slab on-grade / on a slab; with a span of > 1 m. (if cantilevered slab, other than a span ≤ 1 m); & cantilevered slab; Not MW item 3.2. Height of structure > 1 m & ≤ 2 m; & If on roof – (i) > 1.5 m from edge of roof; or (ii) with protective barrier ≥ 1.1 m high at the roof edge. Other Building (Demolition Works) Regulations 5 – Not having the electric cables considerations or the apparatus remained electrically charge.