You are on page 1of 298

Service

Workshop Manual
Passat 2006 ➤
Passat 2011 ➤
Passat Variant 2011 ➤
Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA
111, turbocharger, supercharger)
Engine ID
CDG
A
Edition 11.2015

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

Service Department. Technical Information


Service
List of Workshop Manual Repair Groups

Repair Group
00 - Technical data
10 - Removing and installing engine
AG. Volkswagen AG d
13 - Crankshaft group olksw
agen oes
not
y V gu
b
15 - Cylinder head, valve gear rise
d ara
nte
tho eo
17 - Lubrication ss au ra
c

ce
le

19 - Cooling
un

pt
an
d
itte

21 - Turbocharging/supercharging

y li
rm

ab
pe

ility
24 - Mixture preparation - injection
ot

wit
, is n

26 - Exhaust system

h re
hole

spec
28 - Ignition system
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

Technical information should always be available to the foremen and mechanics, because their
careful and constant adherence to the instructions is essential to ensure vehicle road-worthiness and
safety. In addition, the normal basic safety precautions for working on motor vehicles must, as a
matter of course, be observed.

All rights reserved.


No reproduction without prior agreement from publisher.

Copyright © 2015 Volkswagen AG, Wolfsburg D3E801A6C32


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Contents

00 - Technical data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1 Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.1 Engine number, engine data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2 Safety instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.1 Safety precautions when working on fuel supply system . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.2 Safety precautions when working on natural gas system . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2.3 Safety precautions during road tests in which testing and measuring equipment is used . . 6
2.4 Safety precautions when working on cooling system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.5 Safety precautions when working on ignition system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3 Repair instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.1 Rules for cleanliness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.2 Foreign objects in engine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.3 Contact corrosion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.4 Routing and securing lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.5 Installing coolers, condensers and radiators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

10 - Removing and installing engine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11


1 Removing and installing engine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.1 Removing engine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .n .AG . .. V.o.lk.sw
. a. g.e.n.A. . . . . . . . . . . . . . . 11
ge Gd
1.2 Installing engine . . . . . . . . . . . . . . . . . . . . . . . . .V.ol.ks.w.a. . . . . . . . . . . . . . . . o. e.s.no. t. . . . . . . . . 20
b y gu
a
2 Assembly mountings . . . . . . . . . . . . . . . . .ris.e.d . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ra. n.te. . . . 25
o eo
2.1 Assembly overview - assembly mountings au . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .r .a .
th
25
ss c

ce
le

13 - Crankshaft group . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
un

pt
an
d
itte

1 Cylinder block (pulley end) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

y li
erm

ab
1.1 Assembly overview - poly V-belt drive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

ility
ot p

1.2 Assembly overview - cylinder block (pulley end) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

wit
is n

h re
1.3 Removing and installing poly V-belt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
ole,

spec
1.4 Removing and installing ancillary bracket . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
urposes, in part or in wh

t to the co
1.5 Removing and installing pulley . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
1.6 Renewing crankshaft oil seal - belt pulley end . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
2 Cylinder block, gearbox end . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40

rrectne
2.1 Assembly overview - cylinder block, gearbox end . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
2.2 Renewing crankshaft sealing flange - flywheel end . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

ss o
3 Crankshaft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
cial p

f inform
3.1 Assembly overview - crankshaft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
mer

3.2 Crankshaft dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50


atio
om

3.3 Renewing needle bearing in crankshaft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50


n
c

i
or

n thi
e

4 Pistons and conrods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52


t

sd
iva

4.1 Assembly overview - pistons and conrods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52


pr

cum
r
fo

4.2 Checking piston and cylinder bore . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53


en
ng

t.
yi Co
4.3 Removing and installing oil spray jets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . t. Cop py
rig 55
4.4 Separating new conrod . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
gh ht
pyri by
Vo
co lksw
by
cted
15 - Cylinder head, valve gear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
agen
Prote AG.

1 Cylinder head . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
1.1 Assembly overview - cylinder head . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
1.2 Removing and installing cylinder head . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
1.3 Removing and installing camshaft housing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
1.4 Checking compression . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
2 Cover for timing chain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
2.1 Removing and installing valve timing housing (timing case) . . . . . . . . . . . . . . . . . . . . . . . . 74

Contents i
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3 Chain drive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
3.1 Checking valve timing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
3.2 Adjusting valve timing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
3.3 Checking timing chain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99
3.4 Removing and installing timing chain and chain drive for oil pump . . . . . . . . . . . . . . . . . . 106
4 Valve gear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117
4.1 Assembly overview - valve gear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117
4.2 Measuring axial play of camshaft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119
4.3 Removing and installing valve stem seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119
5 Inlet and exhaust valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 122
5.1 Checking valve guides . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 122
5.2 Reworking valve seats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 122

17 - Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124
1 Sump, oil pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a.g.en. A. G. ..V.o.lk.sw. a. g.e.n .A.G.d.o . . . . . . . . 124
sw es
1.1 Assembly overview – sump/oil pump . . . . . . . . . . . b.y.V.ol.k . . . . . . . . . . . . . . . . . . . . .no. t.g.ua. . . 124
d r
1.2 Engine oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . o.ri.se. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a. n.tee126
h
1.3 Removing and installing sump . . . . . . . . . .s a.u.t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127 or
ac
s
1.4 Removing and installing oil pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 130

ce
le
un

pt
2 Oil filter, oil pressure switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133

an
d
itte

y li
2.1 Checking oil pressure and oil pressure switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133
rm

ab
pe

ility
ot

19 - Cooling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135

wit
, is n

h re
hole

1 Cooling system, coolant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135

spec
1.1 Coolant hose schematic diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135
es, in part or in w

t to the co
1.2 Draining and filling coolant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 137
1.3 Checking cooling system for leaks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141

rrectness of i
2 Coolant pump, regulation of cooling system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144
2.1 Assembly overview - thermostat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144
l purpos

2.2 Removing and installing coolant pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145


2.3 Removing and installing coolant pump pulley . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 151

nform
ercia

2.4 Removing and installing coolant circulation pump V50 . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155


m

a
3 Radiator/radiator fan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 158
com

tion in
3.1 Assembly overview – radiator/radiator fan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 158
r
te o

thi
3.2 Removing and installing cowl together with radiator fan V7 and radiator fan 2 V177 . . . . 159
s
iva

do
r

3.3 Removing and installing radiator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 160


rp

cum
fo

en
ng

t.
yi
21 - Turbocharging/supercharging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162
Co
Cop py
t. rig
gh
1 Turbocharger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162
ht
pyri by
Vo
co
1.1 Assembly overview - turbocharger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162
by lksw
cted agen
Prote AG.
1.2 Removing and installing turbocharger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166
1.3 Checking vacuum unit for turbocharger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 170
1.4 Adjusting vacuum unit for turbocharger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172
1.5 Renewing vacuum unit for turbocharger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 177
2 Charge air system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 180
2.1 Assembly overview - charge air system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 180
2.2 Assembly overview - charge-air hose connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181
2.3 Checking charge air system for leaks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182
2.4 Removing and installing charge air cooler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 186
3 Supercharger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 192
3.1 Assembly overview - supercharger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 192
3.2 Removing and installing supercharger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 194
3.3 Removing and installing drive unit seal for supercharger . . . . . . . . . . . . . . . . . . . . . . . . . . 201

24 - Mixture preparation - injection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 205

ii Contents
AG. Volkswagen AG d
agen oes
olksw not
V
Passat 2006 ➤ , Passat 2011 ➤ , ePassat db
y Variant 2011 ➤ , Touran 2003 gu ➤
ara
is nte
4-cylinder direct-injection engine (1.4 l, natural gas, EAthor111, turbocharger, supercharger) - Edition eo
u ra
ss a 11.2015 c

ce
e
nl

pt
du

an
1 Injection system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 205

itte

y li
erm

ab
1.1 General notes on injection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 205

ility
ot p
2 Injectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 206

wit
, is n

h re
2.1 Assembly overview - fuel rail with injectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 206

hole

spec
2.2 Releasing high pressure in fuel system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207

es, in part or in w
2.3 Removing and installing injectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 208

t to the co
2.4 Renewing seal on injector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 211
3 Checking natural gas supply system for leaks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214

rrectness of i
3.1 Different pressure sections of natural gas supply system . . . . . . . . . . . . . . . . . . . . . . . . . . 214

l purpos
3.2 Determining pressure in gas system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 217
3.3 Determining operating mode of natural gas vehicles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 217

nf
ercia
3.4 Activating/deactivating natural gas mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 218

orm
3.5 Checking gas system for leaks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 219
m

atio
4 m
Gas injectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
o 225

n in
or c
4.1 Removing and installing gas rail with gas injectors N366 , N367 , N368 , N369 . . . . . . . . 225

thi
te

sd
iva
5 Gas pressure regulator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 228

o
r
rp

cu
o

m
5.1 Assembly overview - gas pressure regulator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 228
f

en
ng t.
yi
5.2 Removing and installing gas pressure regulator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 233
Co
Cop py
t. rig
5.3 Removing and installing tank pressure sensor G400 . . . . . . . . . . . . . . . . . . . . . . . . . . . . opyri
gh by
Vo
ht
238
6 Air filter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242
c by lksw
cted agen
Prote AG.
6.1 Assembly overview - air filter housing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242
6.2 Removing and installing air filter housing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 243
7 Intake manifold . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244
7.1 Assembly overview - intake manifold . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244
7.2 Removing and installing upper part of intake manifold . . . . . . . . . . . . . . . . . . . . . . . . . . . . 251
7.3 Removing and installing lower part of intake manifold . . . . . . . . . . . . . . . . . . . . . . . . . . . . 256
7.4 Removing and installing regulating flap control unit J808 and throttle valve module J338
........................................................................ 258
7.5 Cleaning throttle valve module J338 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 260
8 High-pressure pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 262
8.1 Assembly overview - high-pressure pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 262
8.2 Removing and installing high-pressure pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 263
9 Senders and sensors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 268
9.1 Checking fuel pressure sender G247 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 268
10 Engine control unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 272
10.1 Removing and installing engine control unit J623 (Passat ▶10.2010) . . . . . . . . . . . . . . . . 272
10.2 Removing and installing engine control unit J623 with protective housing (Passat ►
10.2010) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 273
10.3 Removing and installing engine control unit J623 (Passat 11.2010▶) . . . . . . . . . . . . . . . . 274
10.4 Removing and installing engine control unit J623 with protective housing (Passat
11.2010▶) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 276
10.5 Removing and installing engine control unit J623 (Touran) . . . . . . . . . . . . . . . . . . . . . . . . 278
10.6 Removing and installing engine control unit J623 with protective housing (Touran) . . . . . . 279

26 - Exhaust system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 283


1 Emission control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 283
1.1 Assembly overview – emission control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 283
2 Exhaust pipes, silencers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 285
2.1 Assembly overview - silencers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 285
2.2 Removing and installing front exhaust pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 286

28 - Ignition system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 287


1 Ignition system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 287
1.1 General notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 287

Contents iii
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1.2 Assembly overview - ignition system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 287


1.3 Test data, spark plugs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 289
1.4 Removing and installing ignition coils with output stage . . . . . . . . . . . . . . . . . . . . . . . . . . 289
1.5 Removing and installing engine speed sender G28 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 291

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

iv Contents
AG. Volkswagen AG d
agen oes
olksw not
yV gu
Passat 2006 is➤ e , Passat 2011 ➤ , Passat Variant 2011
d b ara ➤ , Touran 2003 ➤
nte
r
4-cylinder direct-injection engineu(1.4
tho l, natural gas, EA 111, turbocharger, supercharger)
eo
ra - Edition
a
ss c 11.2015

ce
e
nl

pt
du

an
itte
00 – Technical data

y li
erm

ab
ility
ot p

wit
, is n

h re
1 Identification

hole

spec
es, in part or in w
(20; Edition 11.2015)

t to the co
⇒ “1.1 Engine number, engine data”, page 1

1.1 Engine number, engine data

rrectness of i
l purpos

– Detach hose from activated charcoal filter at hose clip


-arrow-.

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.
Engine code and engine number can be found on the sticker
-arrow- on the control housing.
Starting with the letter “C”, new four digit engine codes have been
introduced. The first 3 digits denote the mechanical design of the
engine and are stamped on the engine as before. The fourth digit
denotes the performance and torque rating of the engine and de‐
pends on the engine control unit - J623- . The four digit engine
code can be found on the identification plate, the vehicle data
sticker and on the engine control unit.

Note

Vehicles for some countries do not have an identification plate.


Fittings locations for vehicle data sticker and identification plate
⇒ Maintenance ; Booklet .

Engine code CDGA


Manufactured
Passat 01.09►
Touran 06.09►
Emission standards EU 5
Capacity cm3 1390
Output kW at rpm 110/5,500 (natural gas/petrol)
Torque Nm at rpm 220/1,500-4,500 (natural gas/petrol)
Bore Diameter, mm 76.5
Stroke mm 75.6
Compression ratio 10
RON Petrol 95 unleaded
Natural gas Up to 1401)
Injection, ignition Motronic MED 17
Firing order 1-3-4-2
Type of mixture formation Homogeneous

1. Identification 1
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Engine code CDGA


Turbocharging/supercharging Turbocharger and mechanical supercharger

• 1)In gas mode, the engine output and the torque depend on
the quality of the natural gas used. The methane content for L
gas (low calorific gas: methane content 79.8% - 87.0%) and H
gas (high calorific gas: methane content 87.1% - 98.0%) may
vary in different regions.

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

2 Rep. gr.00 - Technical data


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
en AG. V
olkswagen AG 11.2015
ag does
ksw not
y Vol gu
b ara
ed
2 Safety instructions thoris nte
eo
s au ra
c
⇒ “2.1 Safety precautions when working on fuel
s
supply system”,

ce
e
nl
page 3

pt
du

an
itte

y li
⇒ “2.2 Safety precautions when working on natural gas system”,

erm

ab
page 4

ility
ot p

wit
, is n
⇒ “2.3 Safety precautions during road tests in which testing and

h re
measuring equipment is used”, page 6

hole

spec
es, in part or in w
⇒ “2.4 Safety precautions when working on cooling system”, page

t to the co
7
⇒ “2.5 Safety precautions when working on ignition system”, page

rrectness of i
8
l purpos

2.1 Safety precautions when working on


fuel supply system

nform
ercia

Please note the following when working on fuel supply system:


m

at
om

ion
c

in t
r

WARNING
o

his
ate

do
riv

Risk of injury due to highly pressurised fuel.


p

cum
for

en
ng

♦ The fuel system is pressurised! The fuel pressure in the


t.
yi Co
op
high-pressure section of the injection system must be re‐
C py
t. rig
gh
duced to a residual pressure prior to opening the system;
ht
pyri by
Vo
for the correct procedure see
o
by c lksw
cted agen
⇒ “2.2 Releasing high pressure in fuel system”, Prote AG.
page 207 .
♦ To release the residual pressure of approx. 7 bar, the con‐
nection must be separated »immediately« after releasing
the high pressure. To do this, wrap a clean cloth around
the connection.
♦ Wear protective gloves.
♦ Wear eye protection.
Risk of fire due to escaping fuel.
♦ The fuel pump will be activated by the driver door contact
switch when the driver door is opened. Therefore the pow‐
er supply to the fuel pump must be interrupted if the battery
power has NOT been disconnected yet.
♦ Pull off fuse for fuel pump control unit - J538- ⇒ Current
flow diagrams, Electrical fault finding and Fitting locations.

Caution

Risk of damage to the electronic components when discon‐


necting the battery.
♦ Observe notes on procedure for disconnecting the battery.

Only disconnect battery with ignition switched off ⇒ Electrical


system; Rep. gr. 27 ; Battery; Disconnecting and reconnecting
battery .

2. Safety instructions 3
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Even small amounts of contamination/soiling can lead to defects.


For this reason, please observe the following rules for cleanliness
when working on the fuel supply system and injection system:
♦ Carefully clean connection points and the surrounding area
with engine cleaner or brake cleaner and dry thoroughly before
opening.
♦ Any open lines, pipes, hoses and connections must be sealed
immediately with a suitable cap or plug.
♦ Place removed parts on a clean surface and cover. Use only
lint-free cloths.
♦ Install clean components only. Do not remove replacement
parts from packing until immediately before installing. Do not
use parts that have not been stored in their packing (e.g. in
tool boxes etc.).
♦ When the system is open: Do not work with compressed air.
Do not move vehicle unless absolutely necessary.
♦ Protect detached electrical connections against dirt and mois‐
ture and only connect when they are dry.

2.2 Safety precautions when working on


natural gas system
• Before renewing tank shut-off valve or natural gas tank:
• Instruct the customer to leave as little natural gas in the tank
as possible.
• This is to avoid unnecessary costs for the customer as well as
the pollution of the environment.

WARNING

Release pressure in the system before working on the natural


gas system. swa
gen AG
. Volkswagen AG
does
k not
Vol gu
Connect ⇒ Vehicle diagnostic testerd b and perform Guided Func‐
y ara
ise nte
tion “Releasing pressure in tthe
ho natural gas high-pressure line”.
r eo
au ra
Observe test prerequisites
ss ⇒ page 214 . c
ce
le
un

pt

A leakage test of the system must always be performed after


an
d
itte

components have been removed ⇒ Maintenance ; Booklet


y li
erm

ab

35.1 ; Description of work; Performing visual inspection of gas


ility
ot p

tanks for corrosion and leakage test .


wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

4 Rep. gr.00 - Technical data


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

DANGER!

• The mechanic may be the source for electrostatic dis‐


charge. Therefore, it is mandatory to wear protective cloth‐
ing.
• Before performing any work on the natural gas system,
make sure to take the necessary measures to avoid elec‐
trostatic discharge/to ensure that any existing static
charge has been discharged.
• The vehicle or removed natural gas tanks will note be‐
come electrostatically charged.
Protective gloves containing cotton must be worn to avoid in‐
juries and static charging.
Volkswagen safety shoes must be worn to avoid static charg‐
ing.
Volkswagen workwear (of cotton blend fabric) must be worn,
this workwear contains a residual moisture which also prevents
static charging.

DANGER!

Before evacuating natural gas tanks, make sure to comply with


the following rules in order to avoid hazards: en AG. V
olkswagen AG
ag does
lksw not
♦ Natural gas tanks must not be evacuated in confined
yV
o gu
db ara
spaces. o
ir se nte
h eo
ut
♦ Before evacuation, establish a safetysszone
a of 10 m x 10 m. ra
c

ce
le

♦ The safety zone must be permanently supervised during


un

pt
an
d

the evacuation.
itte

y li
rm

ab
♦ There must be no open flame or source of ignition in the
pe

ility
safety zone.
ot

wit
, is n

h re
♦ Do not touch tank shut-off valves during the evacuation:
hole

spec
danger of freezing injuries.
es, in part or in w

• If evacuation of the natural gas tanks is not possible, close t to the co


the tank shut-off valves.
• Do not perform any further repair work.
rrectness of i

• Contact your importer for further procedure regarding the


l purpos

natural gas tanks that are still filled with fuel.


nform
mercia

a
com

WARNING
ion in
r
te o

thi

• Observe the country-specific regulations as well as spec‐


s
iva

do

ifications provided by the importer regarding the safety


r
rp

cum
fo

measures described in this manual.


en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Safety instructions 5
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Caution

Prior to doing any repair work, especially in the engine com‐


partment, pay attention to the following due to the cramped
conditions:
♦ Route high-pressure lines in their original positions.
♦ Ensure lines have sufficient clearance to moving or hot
components.
♦ Never attempt to reshape high-pressure lines of natural
gas system.

AG. Volkswagen AG d
agen oes
lksw not
Note by Vo gu
ara
d
rise nte
o eo
♦ On no account a must the union nut be tightened further than r ac
uth
specified, otherwise
ss
the special connection will be damaged

ce
e

and the pressure line must be renewed.


nl

pt
du

an
itte

♦ A leakage test of the system must always be performed after

y li
erm

ab
components have been removed ⇒ Maintenance ; Booklet

ility
ot p

35.1 ; Description of work; Performing visual inspection of gas

wit
, is n

tanks for corrosion and leakage test .


h re
hole

♦ Disconnect battery earth strap before carrying out work on spec


es, in part or in w

t to the co
natural gas system.
♦ Only components of the same type and with the same type
approval may be exchanged on the high-pressure system.
rrectness of i

2.3 Safety precautions during road tests in


l purpos

which testing and measuring equipment


nform
ercia

is used
m

at
om

Please note the following if the use of test and measuring equip‐
ion
c

ment is required during a road test:


in t
or

his
ate

do
riv

WARNING
p

cum
for

en
ng

t.
yi Co
Risk of accidents due to distraction and inadequate securing t. Cop py
of test and measuring equipment.
rig
gh ht
pyri by
Vo
co
Additional danger as a result of front passenger airbag deploy‐
by lksw
cted agen
Prote
ment in the event of an accident.
AG.

♦ Always strap test and measuring equipment in place on


rear seat and have a 2nd person operate them.
♦ Operation of test and measuring instruments while driving
results in distraction
♦ Greater injury hazard as a result of unsecured test and
measuring equipment must be eliminated.

6 Rep. gr.00 - Technical data


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2.4 Safety precautions when working on


cooling system

WARNING

Steam may escape when expansion tank is opened.


♦ Wear eye protection and protective clothing to avoid eye
injuries and scalding.
♦ Cover cap with cloth and open carefully.

Caution

When doing any repair work, especially in the engine compart‐


ment, pay attention to the following due to the cramped condi‐
tions:
♦ Route all the various lines (e.g. for fuel, hydraulics, acti‐
vated charcoal filter system, coolant and refrigerant, brake
fluid and vacuum) and electrical wiring in their original po‐
sitions.
♦ To avoid damage to lines, ensure sufficient clearance from AG. Volkswagen AG d
all moving or hot components. lksw
agen oes
no o t gu
yV
db ara
ir se nte
ho eo
aut ra
ss c
Note

ce
e
nl

pt
du

an
itte

y li
♦ When the engine is warm, the cooling system is under pres‐
erm

ab
sure. If necessary, release pressure before beginning repair

ility
ot p

work.

wit
, is n

h re
♦ Secure all hose connections with hose clips, allocation ⇒
hole

spec
Electronic Parts Catalogue “ETKA” .
es, in part or in w

t to the co
♦ Hose clip pliers - VAS 6499- are recommended to install
spring-type clips.
♦ Renew gaskets and seals.

rrectness of i
♦ When installing coolant hoses, route stress-free so that they
l purpos

do not come into contact with other components (observe


markings on coolant connection and hose). nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Safety instructions 7
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2.5 Safety precautions when working on ig‐


nition system

WARNING

To prevent injuries to persons and/or damage to the injection


and ignition system, the following must be observed:
Do not touch or disconnect ignition cables when the engine is
running or being turned at starter speed.
Switch off ignition before connecting or disconnecting injection
and ignition system wiring as well as test instrument cables.
AG. Volkswagen A gen G do
swa es
Fuel pump is activated by switching
by
Vol
k
on ignition and via driver
not
gu
door contact switch. If therisbattery
ed power has not been discon‐ arante
nected, the connector uof
tho the fuel delivery unit must be discon‐ eo
ra
nected or the fuel spump
sa fuse must be removed for safety c
reasons before opening the fuel system.

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

8 Rep. gr.00 - Technical data


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3 Repair instructions
⇒ “3.1 Rules for cleanliness”, page 9
⇒ “3.2 Foreign objects in engine”, page 9
⇒ “3.3 Contact corrosion”, page 9
⇒ “3.4 Routing and securing lines”, page 9
⇒ “3.5 Installing coolers, condensers and radiators”, page 10

3.1 Rules for cleanliness


When working on the fuel supply and injection system or the nat‐
ural gas supply system, always observe the following “5 rules” for
cleanliness:
♦ Thoroughly clean all unions and surrounding areas before dis‐
connecting.
♦ Place removed parts on a clean surface and cover. Use only
lint-free cloths.
♦ Carefully cover opened componentswaor
geseal iforepairs
n AG. V lkswagencannot
AG do
es n
be carried out immediately. y Volks ot g
u b ara
ed
♦ Install clean componentshoonly.
ris Do not remove replacement nte
e
parts from packing until
aut
immediately before installing. Do not or
ac
ss been stored in their packing (e.g. in
use parts that have not

ce
le

tool boxes etc.).


un

pt
an
d
itte

y li
♦ When the system is open: Do not work with compressed air.
erm

ab
Do not move vehicle.

ility
ot p

wit
is n

3.2 Foreign objects in engine


h re
ole,

spec
To prevent the ingress of foreign bodies during work on the en‐
urposes, in part or in wh

gine, seal open channels of the intake and exhaust sections with t to the co
suitable plugs, for example from the engine bung set - VAS 6122- .

3.3 Contact corrosion


rrectne

Contact corrosion can occur if unsuitable connecting elements


s

(screws, bolts, nuts, washers, etc.) are used.


s o
cial p

f i

For this reason, only connecting elements with a special surface


nform

coating are fitted in the vehicle.


mer

atio
m

Moreover, certain rubber or plastic parts as well as adhesives


o

n
c

made of electrically non-conductive materials.


or

n thi
te

sd
va

If there is any doubt about the suitability of parts, a general rule


i

o
pr

is to use new parts ⇒ Electronic Parts Catalogue .


um
r
fo

en
ng

t.
yi
3.4 Routing and securing lines
Co
Cop py
t. rig
gh ht
yri by
♦ In order to ensure that lines are all installed in their original cop Vo
by lksw
position, the lines for the fuel, hydraulic and vacuum systems cted agen
Prote AG.
and for the activated charcoal filter system as well as electrical
wires must be marked appropriately before they are removed.
If necessary, take a photo or make a sketch.
♦ Because of the lack of space in the engine compartment, make
sure that there is sufficient clearance between lines and all
moving or hot components. This is to avoid damage to lines.
♦ Any clips, cable ties or other fastening devices that have been
cut through or damaged when loosening must be renewed.
♦ Insulation mats and other insulating devices must always be
re-fitted in their original positions.

3. Repair instructions 9
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3.5 Installing coolers, condensers and radi‐


ators
Even if installed correctly, the radiator, the condenser and the
charge air cooler may have small dents in their fins. This does not
mean that these components have been damaged. It is not per‐
missible to renew radiators, condensers or charge air coolers only
because of such minor dents.

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss
ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

10 Rep. gr.00 - Technical data


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

10 – Removing and installing engine


1 Removing and installing engine
Removing engine ⇒ “1.1 Removing engine”, page 11 .
Installing engine ⇒ “1.2 Installing engine”, page 20 .

1.1 Removing engine

Note

♦ Crankcases were installed with different size threaded holes.


♦ Check these holes before dismantling/assembling and install
the respective engine support.
♦ The engine support - T40075- can continue to be used if con‐
verted as described in the respective work sequence.
♦ The fitting of engine support - T40075- and engine support -
T40075A- on the crankcase is described in the respective
work sequence.

Modifying engine support - T40075-


– Scribe dimensions -a- and -b- as shown.
Dimension -a-: 24.5 mm
Dimension -b-: 49.0 mm
– Mark position with a centre punch.
– Drill a hole with a 13 mm bit. AG. Volkswagen AG d
agen oes
olksw not
yV gu
– Identify engine support with an -A- behind tool designation.
ised b ara
nte
or eo
h
aut ra
ss c
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

1. Removing and installing engine 11


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Special tools and workshop


equipment required
♦ Engine support - T40075- n AG. Volkswagen AG do
with adapters /4, /5, /6 or olkswage es n
ot g
engine support - T40075A- d by V ua
ran
(not illustrated) with adapt‐
orise
tee
ers /4, /5, /6 au
th or
a
ss c
♦ Torque wrench - V.A.G

ce
le
un

pt
1331-

an
d
itte

y li
erm

♦ Engine and gearbox jack -

ab
ility
V.A.G 1383 A-
ot p

wit
is n

♦ Engine and gearbox sup‐

h re
ole,

port - VAS 6095-

spec
urposes, in part or in wh

♦ Drip tray for workshop hoist

t to the co
- VAS 6208-

rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

12 Rep. gr.10 - Removing and installing engine


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Hose clip pliers - VAS


6340-
♦ Torque wrench - V.A.G
1332-
♦ Guide rods - T10093-
♦ Commercially available
stepladder (not illustrated)

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
DANGER! Cop py
t. rig
gh ht
pyri by
Before working on the natural gas system, always observe
co Vo
by lksw
cted agen
⇒ “2.2 Safety precautions when working on natural gas sys‐ Prote AG.
tem”, page 4 !!!

WARNING

• Make sure that the tank shut-off valve on each of the nat‐
ural gas tanks is closed.

– Empty gas system ⇒ Fuel supply system – natural gas en‐


gines; Rep. gr. 20 ; Fuel tank; Releasing pressure in high-
pressure line .

Note

Before carrying out further work, disconnect battery earth strap.


Check whether a coded radio is fitted. Obtain anti-theft coding first
if necessary.

1. Removing and installing engine 13


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Lift engine cover panel at points -1- and pull it forwards in di‐
rection of -arrow-.

– Unbolt heat shield over turbocharger -arrows-.

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen

14
Prote AG.
Rep. gr.10 - Removing and installing engine
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
AG. Volkswagen
11.2015
n AG do
wage es n
olks ot g
– Unscrew bolts -1- ed
band
y V
remove pressure pipe. ua
ran
ris tee
Item -2- can beautdisregarded.
ho
or
ac
ss
– Remove air filter

ce
e
nl
⇒ “6.2 Removing and installing air filter housing”, page 243 .

pt
du

an
itte

y li
erm

ab
WARNING

ility
ot p

wit
, is n

h re
Observe safety precautions
hole

spec
⇒ “2.4 Safety precautions when working on cooling system”,
es, in part or in w

page 7 .

t to the co
rrectness of i
Note
l purpos

Pull coolant hoses off engine with hose clip pliers - VAS 6340- .

nf
ercia

orm
– Open and close expansion tank cap to release pressure in
m

atio
m

cooling system.
o

n in
or c

– Drain coolant ⇒ “1.2 Draining and filling coolant”, page 137 .

thi
te

sd
iva

o
r
rp

cu
o

m
WARNING
f

en
ng

t.
yi Co
op py
Observe safety precautions
t. C rig
gh ht
yri
⇒ “2.1 Safety precautions when working on fuel supply sys‐ p by
co Vo
tem”, page 3 .
by lksw
cted agen
Prote AG.
Fuel supply lines are under pressure! Wear eye protection and
gloves to avoid injuries and skin contact. Before loosening
hose connections, wrap a cloth around the connection. Then
release pressure by carefully pulling hose off connection.

– Separate fuel supply line and line to activated charcoal filter.


Press release tabs to do this.
– Seal lines so that fuel system is not contaminated by dirt.

– Unscrew securing nuts/bolts -arrows- for gas pressure regu‐


lator bracket.

Caution

Ensure that high-pressure lines are not kinked.

1. Removing and installing engine 15


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Push gas pressure regulator -1- in direction of -arrow- and se‐


cure to side with wire.

– Remove securing bolts -arrows- of engine splash protection.


– Remove front left and right wheel housing liners ⇒ General
body repairs; Rep. gr. 66 ; Wheel housing liner; Removing
and installing front wheel housing liner .
G. Volkswagen
– Bring lock carrier into service position w⇒
ageGeneral
nA body repairs,
AG do
es n
olks
exterior; Rep. gr. 50 ; Body - front;
by V Lock carrier service posi‐ ot gua
d
tion . or
ise
ran
te
h eo
ut ra
The engine is removed downwards
ss
a together with the gearbox. c

ce
le

– Disconnect battery ⇒ Electrical system; Rep. gr. 27 ; Discon‐


un

pt
an
d

necting and reconnecting battery .


itte

y li
rm

ab
– Remove battery and battery carrier ⇒ Electrical system; Rep.
pe

ility
ot

gr. 27 ; Removing and installing battery .

wit
, is n

h re
– All cable ties which are opened or cut through when engine is
hole

spec
removed must be replaced in the same position when engine
es, in part or in w

is installed. t to the co
– Disconnect all electrical wiring from gearbox, alternator and
starter, and lay it to one side.
rrectness of i

– Disconnect all other electrical wiring as necessary from en‐


l purpos

gine, and lay it to one side.


– Pull vacuum and breather hoses off engine.
nform
ercia

– Pull connectors off thermal switch and radiator fan.


m

a
com

tio

– Remove plenum chamber bulkhead ⇒ General body repairs;


n in
r

Rep. gr. 50 ; Body - front; Plenum chamber bulkhead .


te o

thi
s
iva

do

– Remove engine control unit - J623-


r
rp

cum

⇒ “10 Engine control unit”, page 272 .


fo

en
ng

t.
yi Co
op py
– Open all line guide fasteners -arrows-. t. C rig
gh ht
pyri by
– Remove wiring from engine control unit.
co Vo
by lksw
cted agen
Prote AG.
– Secure lines/wiring to engine with a cable tie.
– Remove wiring for Lambda probe after catalytic converter -
G130- and for alternator from cable guides -arrows-.

16 Rep. gr.10 - Removing and installing engine


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Pull connector off Lambda probe after catalytic converter -


G130- and remove.

– Open hose clip -3- and remove charge air pipe -2-.
– Unbolt exhaust pipe from catalytic converter -arrows-.

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c

ce
le
un

pt
an
d

– Unbolt exhaust pipe together with decoupling element


itte

y li
erm

-arrows-.

ab
ility
ot p

– Unhook rear exhaust system from mountings and pull system

wit
is n

slightly to rear in direction of -arrow-.

h re
ole,

spec
– Push exhaust pipe out of mounting -1-.
urposes, in part or in wh

t to the co
– Remove exhaust pipe.

rrectness o
cial p

f inform

– Disconnect pendulum support -arrows-.


mer

atio
m

– Unbolt selector mechanism from gearbox ⇒ 6-speed manual


o

n
c

gearbox 02S; Rep. gr. 34 ; Repairing selector mechanism .


or

n thi
te

sd
a

– Remove strut -1-.


iv

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

1. Removing and installing engine 17


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Remove slave cylinder -arrows- and lay to side.ADo not


G. Volkswopen
agen AG
agen does
hydraulic system. Volksw not
g y ua
db ran
– Remove hydraulic clutch slave cylinder:
ris
e
⇒ 6-speed manual tee
ho
gearbox 02S; Rep. gr. 30 ; Repairing
au
t clutch mechanism or
ac
ss

ce
le
un

pt
an
d
Note itte

y li
erm

ab
ility
♦ Clutch pedal must not be depressed.
ot p

wit
is n

♦ To prevent damage to condenser or to refrigerant lines and

h re
ole,

hoses, ensure that lines and hoses are not stretched, kinked

spec
urposes, in part or in wh

or bent.

t to the co
– Remove poly V-belt
⇒ “1.3 Removing and installing poly V-belt”, page 30 .

rrectnes
Note

s o
cial p

f inform
The air conditioning system lines must not be opened.
mer

atio
om

– Remove retaining clamp(s) for refrigerant lines.

n
c

i
or

n thi
e

To facilitate removing and installing engine without opening re‐


t

sd
va

frigerant circuit:
i

o
pr

cum
r
fo

en
ng

– Remove air conditioner compressor ⇒ Heating, air condition‐


t.
yi Co
ing system; Rep. gr. 87 . t. Cop py
rig
gh ht
yri
• Secure air conditioner compressor to lock carrier. p by
o Vo
by c lksw
cted agen
• Ensure that lines are not kinked. Prote AG.

– Remove right drive shaft, unscrew left drive shaft at gearbox


and tie up: ⇒ Running gear, axles, steering; Rep. gr. 40 ;
Repairing drive shafts; Removing and installing drive shafts.
Work sequence with engine support - T40075-

Engine support - T40075- with adapters -/4-, -/5- and -/6- is re‐
quired to lower engine with gearbox.

– Screw adapter T40075/4 into crankcase to stop.


– Position the engine support - T40075- with adapters -/5- and
-/6- on crankcase.

18 Rep. gr.10 - Removing and installing engine


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Secure engine support - T40075- hand-tight to crankcase us‐


ing bolt -1-.

– Tighten all bolts on engine support - T40075- to 20 Nm.


Work sequence with engine support
agen
AG. Volks-wT40075A-
agen AG
do w es n
olks ot g
byV ua
ed ran
ris tee
tho or
au ac
ss

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

Engine support - T40075A- with adapters -/4-, -/5- and -/6- is re‐ t to the co
quired to lower engine with gearbox.
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

– Screw adapter T40075 A /4 into crankcase to stop.


en
ng

t.
yi Co
op py
– Position the engine support - T40075A- with adapters -/5- and t. C rig
gh ht
-/6- on crankcase. yri
p by
co Vo
by lksw
cted agen
Prote AG.

1. Removing and installing engine 19


AG. Volkswagen
Passat 2006 ➤ , Passat 2011 ➤ , PassatlkVariant swa
gen 2011 ➤ , Touran
AG do
e2003
s no ➤
Vo
4-cylinder direct-injection engine (1.4d bl, natural gas, EA 111, turbocharger,
y t gu
arasupercharger) - Edition
se nte
11.2015 thori
eo
au ra
c
ss
– Secure engine support - T40075A- hand-tight to crankcase

ce
le
un
using bolt -1-.

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
– Tighten all bolts on engine support - T40075A- to 20 Nm.
cial p

f inform
– Lift engine and gearbox lightly using engine and gearbox jack
mer

- V.A.G 1383 A- .

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

– Unbolt engine side of assembly mounting from above


-arrows-.

– Unbolt gearbox side of assembly mounting from above


-arrows-.

Note

♦ To remove securing bolts use a stepladder - VAS 5085- .


♦ When lifted out, the assembly must be carefully guided to pre‐
vent damage to the bodywork.

– Carefully lower engine and gearbox.

1.2 Installing engine


Installation is carried out in the reverse order. When installing,
note the following:

20 Rep. gr.10 - Removing and installing engine


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Caution

When doing any repair work, especially in the engine compart‐


ment, pay attention to the following due to the cramped condi‐
tions:
♦ Route all the various lines (e.g. for fuel, hydraulics, acti‐
vated charcoal filter system, coolant and refrigerant, brake
fluid and vacuum) and electrical wiring in their original po‐
sitions.
♦ To avoid damage to lines, ensure sufficient clearance from
all moving or hot components.
agen
AG. Volkswagen AG d
o
w es n
olks ot g
byV ua
d ran
ir se tee
– Check clutch uthrelease bearing for wear and renew if necessary.
o
or
a ac
ss
– Lightly lubricate clutch release bearing, release bearing guide

ce
e
nl

sleeve and splines on input shaft with grease ⇒ Electronic

pt
du

an
Parts Catalogue (ETKA) .
itte

y li
erm

ab
– Check whether dowel sleeves for centring engine/gearbox

ility
ot p

have been fitted in cylinder block, insert if necessary.

wit
, is n

h re
– Hook intermediate plate onto sealing flange and slide onto
hole

spec
dowel sleeves -arrows-.
es, in part or in w

t to the co
– When swinging engine in, ensure that there is clearance be‐
tween drive shafts.

rrectness of i
Align engine mountings as follows:
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

1. Removing and installing engine 21


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ There must be a distance -a- of at least 10 mm between engine


support and longitudinal member (right side).
♦ The side surface of the engine support -2- should be located
parallel to the support arm -1-.
♦ Ensure that edges of support arm -1- and gearbox bracket
-2- are parallel on gearbox side.
– Install pendulum support.

Note

Specified torques for assembly mountings


⇒ “2 Assembly mountings”, page 25

– Install drive shafts ⇒ Running gear, axles, steering; Rep. gr.


40 ; Repairing drive shafts; Removing and installing drive
shafts.
– Install air conditioner compressor ⇒ Heating, air conditioning
system; Rep. gr. 87 .
– Move lock carrier back from service position ⇒ Body, front;
Rep. gr. 50 ; Lock carrier; Moving to and back from service
position .
– Install poly V-belt ⇒ page 30 .
– Electrical connections and routing: ⇒ Electrical system; Rep.
gr. 97 .
– Install hydraulic clutch slave cylinder: ⇒ 6-speed manual gear‐
box 02S; Rep. gr. 30 ; Repairing clutch mechanism .
AG. Volkswagen gen AG do
swa es
– Attach selector mechanism: y V⇒ 6-speed manual gearbox 02S;
olk not
gu
Rep. gr. 34 ; Repairing edb
selector mechanism . ara
ris nt ee
tho or
au ac
– Tighten union nuts -arrow-
s to 5 Nm +70° additional specified
ce
le

angle.
un

pt
an
d
itte

– Counterhold on union with an open-end spanner


y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

22 Rep. gr.10 - Removing and installing engine


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Tighten securing bolts and nuts -arrows- on bracket for gas


pressure regulator to 8 Nm.
– Install engine splash guard ⇒ Exterior equipment; Rep. gr.
66 ; Noise insulation; Removing and installing noise installa‐
tion .
– Install front right and front left wheel housing liners ⇒ Exterior
equipment; Rep. gr. 66 ; Wheel housing liner; Removing and
installing front wheel housing liner .
– Fill with coolant wage
n AG. Volkswagen AG do
es n
s
⇒ “1.2 Draining and fillingycoolant”,
Volk page 137 . ot g
u b ara
ed nte
– Install air filter tho
ris e or
⇒ “6.2 Removings aand installing air filter housing”, page 243 .
u ac
s

ce
le

– Install battery and battery carrier ⇒ Electrical system; Rep. gr.


un

pt
27 ; Removing and installing battery .

an
d
itte

y li
rm

ab
– Install plenum chamber cover ⇒ Body, front; Rep. gr. 50 ;
pe

ility
Plenum chamber bulkhead; Removing and installing plenum
ot

wit
, is n

chamber bulkhead .

h re
hole

spec
– Install engine control unit
es, in part or in w

⇒ “10 Engine control unit”, page 272 .

t to the co
– Connect battery ⇒ Electrical system; Rep. gr. 27 ; Discon‐
necting and reconnecting battery .

rrectness of i
– Connect Vehicle diagnostic, testing and information system -
l purpos

VAS 5051B- .

nform
ercia

Note
m

a
com

tio
Natural gas system may not be operated until tested accordingly.
n in
r
te o

thi
s
iva

do
r
rp

WARNING
um
fo

en
ng

t.
yi Co
• Operating the natural gas system without having tested it Cop py
t. rig
for leaks according to specifications may result in severe gh ht
yri by
injuries or death. cop Vo
by lksw
cted agen
Prote
The necessary scope of the leakage test depends on the pres‐
AG.

sure section which has been worked on.


Note the following allocation!

Allocation:
⇒ “3.1 Different pressure sections of natural gas supply system”,
page 214
– Open fuel tank shut-off valves -N361/N362/N363/N429- (de‐
pending on vehicle model and equipment level) using hand
wheel - T50026- .
– Check gas system
⇒ “3 Checking natural gas supply system for leaks”,
page 214
– Erase learnt values and adapt engine control unit to throttle
valve module ⇒ Vehicle diagnostic tester “Guided Functions”.
– Carry out vehicle system test ⇒ Vehicle diagnostic tester “Gui‐
ded fault finding”.
– End the vehicle system test so that any entries stored in the
event memory during assembly can be deleted automatically.

1. Removing and installing engine 23


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Push engine cover panel down at points -1- in direction of


-arrow- until it engages.
Observe applicable safety precautions during road test.
– Carry out a road test.
n AG. Volkswagen AG do
– Then carry out vehicle system test again and rectify any faults
olks
wage es n
ot g
which may have occurred. d byV ua
ran
e
ris tee
Specified torques: utho or
a ac
ss
♦ Securing bolts for heat shield

ce
le
un
⇒ “1.1 Assembly overview – emission control”, page 283

pt
an
d
itte

y li
♦ Securing bolts for pressure pipe
rm

ab
pe
⇒ “2.1 Assembly overview - charge air system”, page 180

ility
ot

wit
, is n

♦ Securing bolts for air filter

h re
⇒ “6.1 Assembly overview - air filter housing”, page 242
hole

spec
es, in part or in w

♦ Securing bolts for gas pressure regulator

t to the co
⇒ “5.1 Assembly overview - gas pressure regulator”,
page 228

rrectness of i
♦ Specified torque for lambda probe
⇒ “1.1 Assembly overview – emission control”, page 283
l purpos

♦ Securing nuts for exhaust pipe


⇒ “1.1 Assembly overview – emission control”, page 283

nform
ercia

♦ Specified torques for assembly mountings


m

a
⇒ “2 Assembly mountings”, page 25
com

tion in
r
te o

Threaded connections Specified torque

thi
s
iva

do
Bolts, nuts M6 10 Nm
r
rp

cum
fo

M8 20 Nm

en
ng

t.
yi Co
op
M10 45 Nm
C py
t. rig
gh ht
yri
M12 60 Nm
p by
co Vo
by lksw
cted agen
Prote AG.

24 Rep. gr.10 - Removing and installing engine


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2 Assembly mountings
⇒ “2.1 Assembly overview - assembly mountings”, page 25

2.1 Assembly overview - assembly mount‐


ings
Specified torques
Engine assembly mountings
Bolt Specified torque Note
A 20 Nm + turn 90° Renew
further
B 40 Nm + turn 90° Renew
further
C 60 Nm + turn 90° Renew
further

Gearbox assembly mounting


Bolt Specified torque
en AG. V
Note
olkswagen AG
ag does
ksw
A by40
Vol Nm + turn 90° Renew not
gu
ara
ed further nte
oris eo
th
B au 60 Nm + turn 90° Renew ra
c
ss further
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec

Pendulum support
es, in part or in w

t to the co

Bolt Specified torque Note


A – property class 8.8 40 Nm + turn 90° Renew
rrectness of i

further
l purpos

A – property class 10.9 50 Nm + turn 90° Renew


further
nform
ercia

B 100 Nm + turn Renew


90° further
m

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Assembly mountings 25
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

13 – Crankshaft group
1 Cylinder block (pulley end)
⇒ “1.1 Assembly overview - poly V-belt drive”, page 26
⇒ “1.2 Assembly overview - cylinder block (pulley end)”,
page 28
⇒ “1.3 Removing and installing poly V-belt”, page 30
⇒ “1.4 Removing and installing ancillary bracket”, page 33
⇒ “1.5 Removing and installing pulley”, page 34
⇒ “1.6 Renewing crankshaft oil seal - belt pulley end”,
page 36

1.1 Assembly overview - poly V-belt drive

1 - Bolt
❑ To loosen and tighten
securing bolt, counter‐
hold supercharger shaft
with 16 mm spanner.
❑ Renew.
❑ 40 Nm + turn 90° further
2 - Belt pulley
❑ For supercharger.
3 - Bolt
❑ 23 Nm
AG. Volkswagen AG d
4 - Tensioning element agen oes
olksw not
V gu
❑ For supercharger poly d by ara
ise nte
V-belt hor eo
aut ra
❑ Relieve tension using ss c
16 mm spanner.
ce
le
un

pt
an
d

❑ Lock with locking pin -


itte

y li

T10060 A- .
rm

ab
pe

ility

5 - Bolt
ot

wit
, is n

h re

❑ 8 Nm
hole

spec

6 - Coolant pump with magnet‐


es, in part or in w

t to the co

ic clutch for supercharger -


N421-
❑ Removing and installing
rrectness of i

⇒ “2.2 Removing and in‐


stalling coolant pump”,
l purpos

page 145 .
❑ Removing and installing
nform
ercia

coolant pump pulley


⇒ “2.3 Removing and in‐
m

a
com

stalling coolant pump


ion in

pulley”, page 151 .


r
te o

thi
s
iva

7 - Bolt
do
r
rp

cum

❑ 23 Nm
fo

en
ng

t.
yi Co
8 - Tensioning element t. Cop py
rig
❑ For poly V-belt.
gh ht
pyri by
Vo
o
by c
❑ Relieve tension using 16 mm open-end spanner - T10241- .
lksw
cted agen
Prote AG.

26 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
❑ Lock with locking pin - T10060 A- .

Note

♦ Vehicles with a manual gearbox:


idler pulley installed instead of
tensioning element.
♦ Specified torque for securing
bolt: 40 Nm.

9 - Bolt
❑ 23 Nm
10 - Alternator
11 - Belt pulley
❑ With diamond coated washer
❑ Observe note on diamond coated washers ⇒ page 38 .
❑ Contact surfaces must be free of oil and grease.
12 - Securing bolt
❑ Always make sure to observe procedure ⇒ “1.5 Removing and installing pulley”, page 34 .
❑ Contact surface for securing bolt must be free of oil and grease.
❑ Oil threads before inserting.
❑ Secure pulley against turning with counterhold - 3415- .
❑ Turning further can be done in several stages.
❑ The turning further angle can be measured with a commercial protractor.
❑ Renew
❑ 150 Nm + turn 180° further
13 - Bolt
❑ Removing and installing with vehicle raised
❑ Renew.
❑ 40 Nm + turn 90° further
AG. Volkswagen AG d
14 - Air conditioner compressor agen oes
olksw not
byV gu
ara
d
15 - Bolt orise nte
h eo
❑ 23 Nm aut ra
ss c
ce
le

16 - Tensioning element
un

pt
an
d

❑ For poly V-belt.


itte

y li
rm

ab

❑ Relieve tension with spanner.


pe

ility
ot

❑ Lock with 4 mm Allen key.


wit
, is n

h re
hole

17 - Poly V-belt
spec
es, in part or in w

❑ Mark direction of rotation before removing.


t to the co

Caution
rrectness of i

When installing poly V-


belt, observe direction of
l purpos

rotation and make sure it


is properly seated on pul‐
nform
ercia

leys and tensioning ele‐


ments.
m

a
com

tion in
r

❑ Removing and installing poly V-belt ⇒ “1.3 Removing and installing poly V-belt”, page 30 .
te o

thi
s
iva

do

18 - Poly V-belt
r
rp

cum
fo

❑ For supercharger.
en
ng

t.
yi Co
Cop py
ht. rig
rig ht
by
27
copy Vo
by lksw
cted agen 1. Cylinder block (pulley end)
Prote AG.
n AG. Volkswagen AG do
lkswage es n
o ot g
byV u
Passat 2006 ➤ , Passat 2011 ➤ , Passat ir se
d Variant 2011 ➤ , Touran 2003 ➤arante
o
4-cylinder direct-injection engine ut(1.4 l, natural gas, EA 111, turbocharger, supercharger)
h eo
ra - Edition
sa c
11.2015 s

ce
le
un

pt
❑ Mark direction of rotation before removing.

an
d
itte

y li
erm

ab
ility
ot p
Caution

wit
is n

h re
When installing poly V-

ole,
belt, observe direction of

spec
urposes, in part or in wh
rotation and make sure it

t to the co
is properly seated on pul‐
leys and tensioning ele‐
ments.

rrectness o
cial p

f
1.2 Assembly overview - cylinder block (pulley end)

inform
mer

atio
om

1 - Cylinder head with cam‐

n
c

i
or

n
shaft housing

thi
te

sd
va

❑ Removing and installing


i

o
pr

cum
r

⇒ “1.2 Removing and in‐


fo

en
ng

stalling cylinder head”,


t.
yi Co
op
page 59 . C py
t. rig
gh ht
❑ Sealing surface must yri
p by
co Vo
not be reworked.
by lksw
cted agen
Prote AG.
❑ With integrated cam‐
shaft bearings.
❑ Remove sealant resi‐
due.
❑ When installing, insert
vertically from above so
that dowel pins fit into
holes in cylinder head
2 - Cylinder block
❑ Dismantling and assem‐
bling cylinder block
⇒ “2.1 Assembly over‐
view - cylinder block,
gearbox end”,
page 40
❑ Dismantling and assem‐
bling pistons and con‐
rods
⇒ “4 Pistons and con‐
rods”, page 52 .
3 - Bracket for ancillaries
❑ For tensioning element
and air conditioner com‐
pressor.
❑ Removing and installing
⇒ “1.4 Removing and in‐
stalling ancillary brack‐
et”, page 33 .
4 - Cover
5 - Chain sprocket
❑ For oil pump drive and timing chain.
❑ Contact surfaces must be free of oil and grease.
6 - Bolt
❑ Renew
❑ 20 Nm + turn 90° further

28 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

7 - Chain sprocket
❑ Lock chain sprocket using counterhold - T10172- .
8 - Drive chain
❑ Before removing, mark direction of rotation (installation position).
9 - Bolt
❑ 25 Nm
10 - Bolt
❑ 15 Nm
11 - Chain tensioner with tensioning plate
❑ For oil pump drive.
12 - Tensioning spring
13 - Sump
❑ Removing and installing ⇒ “1.3 Removing and installing sump”, page 127 .
❑ Clean sealing surface before fitting.
❑ Install with sealant ⇒ Electronic Parts Catalogue (ETKA) .
14 - Bolt
❑ 13 Nm
15 - Piston
❑ For drive chain tensioner.
16 - Spring
17 - Chain tensioner
18 - Bolt
❑ 9 Nm
19 - Valve timing housing
AG. Volkswagen
Removing and installing valve timing housing wage
n AG do
es n
olks
⇒ “2.1 Removing and installing valved btiming
y V housing (timing case)”, page
ot g
ua74
e ran
ris t
❑ Additionally apply sealantuthwhen
o installing ⇒ Electronic Parts Catalogue
ee
o(ETKA)
ra
.
a
❑ To facilitate guidance on
s installation, screw two “M6x80” studs into camshaft
s c
housing and cylinder block.
ce
le
un

❑ For better guidance of valve timing housing, secure sump in position with 2 bolts.
pt
an
d
itte

y li

20 - Bolt
erm

ab
ility
ot p

❑ 10 Nm
wit
is n

h re

21 - Belt pulley
ole,

spec

❑ With diamond coated washer


urposes, in part or in wh

t to the co

❑ Observe note on diamond coated washers ⇒ page 38 .


❑ Observe tightening procedure ⇒ “1.5 Removing and installing pulley”, page 34 .
❑ Contact surfaces must be free of oil and grease.
rrectne

❑ Secure pulley against turning with counterhold tool - 3415- .


s

❑ Removing and installing ⇒ “1.3 Removing and installing poly V-belt”, page 30 .
s o
cial p

f i

22 - Securing bolt
nform
mer

❑ Always make sure to observe procedure ⇒ “1.5 Removing and installing pulley”, page 34 .
atio
m

❑ Contact surface for securing bolt must be free of oil and grease.
o

n
c

i
or

❑ Oil threads before inserting.


thi
te

sd
va

❑ Secure pulley against turning with counterhold tool - 3415- .


i

o
pr

cum
r
fo

❑ The turning further angle can be measured with a commercial protractor.


en
ng

t.
yi Co
❑ Renew ht. Cop py
rig
❑ 150 Nm + turn 180° further rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

1. Cylinder block (pulley end) 29


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015 wage
n AG. Volkswagen AG do
e ks s no
Vol t gu
by ara
23 - Bearing bush ris
ed
nte
ho eo
❑ Contact surfaces must
au be free of
t oil and grease. ra
c
ss
24 - O-ring

ce
e
nl

pt
du

an
❑ Renew.
itte

y li
erm

ab
25 - Bolt

ility
ot p

wit
❑ 50 Nm
, is n

h re
hole

26 - Gasket

spec
es, in part or in w

27 - Bolt

t to the co
❑ Lock chain sprockets using counterhold - T10172- .
❑ Bolt with left-hand thread.

rrectness of i
❑ Renew.
l purpos

❑ 40 Nm + turn 90° further


28 - Bolt

nf
ercia

o
❑ Renew

rm
m

atio
m

❑ 50 Nm + turn 90° further


o

n in
or c

29 - Tensioning plate

thi
te

sd
iva

o
30 - Camshaft adjuster
r
rp

cu
o

m
f

❑ Removing and installing ⇒ “3.2 Adjusting valve timing”, page 90 .

en
ng

t.
yi Co
op
❑ Must not be dismantled. C py
t. rig
gh ht
yri by
31 - Timing chain op Vo
by c lksw
cted agen
❑ Removing and installing Prote AG.
⇒ “3.4 Removing and installing timing chain and chain drive for oil pump”, page 106 .
32 - Sprocket
❑ Removing and installing ⇒ “3.2 Adjusting valve timing”, page 90 .
❑ For exhaust camshaft.
❑ Lock chain sprockets using counterhold -T10172- .
33 - Guide rail
❑ For timing chain.
34 - Guide pins
❑ Specified torque: 20 Nm
35 - Bearing bush

1.3 Removing and installing poly V-belt


⇒ “1.3.1 Belt routing in air conditioner compressor belt drive”,
page 32
Special tools and workshop equipment required

30 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Locking pin - T10060 A-

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
♦ 16 mm open-end spanner - T10447-
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

♦ 4 mm Allen key
i
or

n thi
te

sd
a

Removing
iv

o
pr

cum
r
fo

– Unscrew securing bolts -arrows- for engine splash guard ⇒


en
ng

t.
Exterior equipment; Rep. gr. 66 ; Noise insulation; Removing
op
yi Co
and installing noise installation .
C py
ht. rig
rig ht
py by
– Remove front right wheel housing liner ⇒ General body re‐
co Vo
by lksw
pairs; Rep. gr. 66 ; Wheel housing liner; Removing and
cted agen
Prote AG.
installing front wheel housing liner .
– Mark direction of rotation of poly V-belt.

– To slacken poly V-belt, swing tensioning element in direction


of -arrow- from below using 16 mm open-end spanner.
– Lock tensioning element with a 4 mm Allen key -1-.

1. Cylinder block (pulley end) 31


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– To slacken poly V-belt, swivel tensioning element in direction


of -arrow- from above using 16 mm open-end spanner -
T10447- .
– Lock tensioning element using locking pin - T10060 A- .
AG. Volkswagen AG d
– Remove poly V-belt -2-. ksw
agen oes
not
ol
yV gu
Installing ised b ara
nte
or eo
h
aut ra
s c
Caution s

ce
e
nl

pt
du

an
Ensure, before installing poly V-belt, that all ancillaries (alter‐

itte

y li
erm
nator, air conditioner compressor) are secured tightly.

ab
ility
ot p
When installing poly V-belt, observe direction of rotation and

wit
, is n

make sure it is properly seated on pulleys and tensioning ele‐

h re
hole

ments.

spec
es, in part or in w

t to the co
– Fit poly V-belt over crankshaft pulley first. Finally, push belt
onto tensioning roller.

rrectness of i
Further assembly is basically the reverse of the dismantling se‐
l purpos

quence.
Check after completing repair:

nf
ercia

or
– Start engine and check that belt runs properly.

m
m

atio
om

n in
c

1.3.1 Belt routing in air conditioner compres‐


or

thi
te

sd
sor belt drive
iva

o
r
rp

cu
o

m
f

Belt drive with air conditioner compressor

en
ng

t.
yi Co
op py
1 - Coolant pump pulley
. C rig
ht ht
rig by
py
2 - Crankshaft pulley
co Vo
by lksw
cted agen
Prote AG.
3 - Tensioning roller
4 - Tensioning roller or idler pulley
5 - Alternator pulley
6 - Air conditioner compressor pulley
7 - Poly V-belt

Belt drive for supercharger

Note

♦ The pulley of the magnetic clutch for supercharger - N421- is


located behind the coolant pump pulley.
♦ The poly V-belt -4- runs over the pulley of the magnetic clutch
for supercharger - N421- .

1 - Supercharger pulley
2 - Tensioning roller
3 - Pulley - coolant pump with pulley - magnetic clutch for super‐
charger - N421-
4 - Poly V-belt

32 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1.4 Removing and installing ancillary brack‐


et
Special tools and workshop equipment required
♦ Torque wrench - V.A.G 1331-

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
Removing
hole

spec
– Remove securing bolts -arrows- of engine splash protection.
es, in part or in w

t to the co
– Remove poly V-belt
⇒ “1.3 Removing and installing poly V-belt”, page 30 .

rrectness of i
– Remove alternator ⇒ Electrical system; Rep. gr. 27 ; Remov‐
ing and installing alternator .
l purpos

– Remove air conditioner compressor ⇒ Heating, air condition‐


ing system; Rep. gr. 87

nform
mercia

a
com

tio
Note

n in
r
te o

thi
s
The air conditioning system lines must not be opened.
iva

do
r
rp

cum
fo

en
g

– Secure air conditioner compressor to lock carrier.


n

t.
yi Co
Cop py
– Ensure that lines are not kinked.
t. rig
gh ht
pyri by
Vo
co lksw
by
cted
– Unscrew securing bolts -1- and remove bracket.
agen
Prote AG.

Installing
– Fit ancillary bracket to cylinder block.

1. Cylinder block (pulley end) 33


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Tighten securing bolts -1- to specified torque ⇒ page 34 .


Further assembly is basically the reverse of the dismantling se‐
quence.
Specified torques:
♦ Specified torque for tensioning element
⇒ “1.1 Assembly overview - poly V-belt drive”, page 26
Component Specified torque
Securing bolts for ancillary bracket 25 Nm

1.5 Removing and installing pulley

Special tools and workshop


equipment required
♦ Torque wrench - V.A.G
1601-
♦ Counterhold - 3415-
♦ Pin - 3415/1- (not illustra‐
ted) AG. Volkswagen AG d
agen oes
ksw not
♦ Locking pin - T10340- by Vol
gu
ara
d
ise nte
♦ Torque wrench - V.A.G thor eo
1331- ss au ra
c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

34 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Dial gauge - VAS 6079-


♦ Dial gauge adapter - T10170- or dial gauge adapter - T10170
A-

Note

If the dial gauge adapter - T10170 A- is used, the ball head does
not need to be unscrewed from the dial gauge - VAS 6079- . Theswagen AG. Volkswagen AG does
ball head is fitted onto the flat side of the rod. by
Vol
k not
gu
ara
ed nte
ris
ho e
Removing au
t or
ac
ss
– Remove poly V-belt

ce
le
un

pt
⇒ “1.3 Removing and installing poly V-belt”, page 30 .

an
d
itte

y li
rm

ab
– Loosen pulley securing bolt. Hold pulley with counterholds -
pe

ility
ot

3415- and -3415/1- .

wit
, is n

h re
Installing
hole

spec
es, in part or in w

– Tighten pulley hand-tight using a new securing bolt.

t to the co
rrectness of i
l purpos

nform
mercia

a
com

ti
– Turn crankshaft in direction of engine rotation to TDC for No.
on in

1 cylinder.
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

1. Cylinder block (pulley end) 35


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Unscrew plug from crankcase.


– Screw locking pin - T10340- to stop into crankcase.
– Tighten locking pin - T10340- to 30 Nm.

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
o
Locking pin - T10340- locks crankshaft in direction of engine
auth ro‐ or
ac
tation. ss

ce
e
nl

pt
du

an
itte

y li
Note
erm

ab
ility
ot p

♦ Observe notes on diamond coated washers ⇒ page 38 .

wit
, is n

h re
hole

♦ Always use a new bolt.

spec
es, in part or in w

♦ Oil threads before inserting.

t to the co
♦ Contact surfaces must be free of oil and grease.

rrectness of i
Hold pulley with counterhold - 3415- and -3415/1- .
l purpos

Specified torque: 150 Nm + turn 180° further


⇒ “1.2 Assembly overview - cylinder block (pulley end)”,

nform
ercia

page 28
m

at
om

– Unscrew locking pin - T10340- from crankcase.

ion
c

in t
or

– Screw plug into crankcase.

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

Specified torque: 30 Nm
– Install poly V-belt
⇒ “1.3 Removing and installing poly V-belt”, page 30 .
Further assembly is basically the reverse of the dismantling se‐
quence.

1.6 Renewing crankshaft oil seal - belt pulley end

36 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Special tools and workshop


equipment required
♦ Oil seal extractor - 3203-
♦ Torque wrench - V.A.G
1332-
♦ Assembly sleeve -
T10117/2-
♦ Assembly tool - T10053-
AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
o Vo
Removing by c lksw
cted agen
Prote AG.
– Remove securing bolts -arrows- of engine splash protection.
– Remove front right wheel housing liner ⇒ General body re‐
pairs; Rep. gr. 66 ; Removing and installing wheel housing
liner; Front wheel housing liner .
– Remove poly V-belt
⇒ “1.3 Removing and installing poly V-belt”, page 30 .
Continuation for all vehicles
– Removing and installing crankshaft pulley
⇒ “1.5 Removing and installing pulley”, page 34 .

1. Cylinder block (pulley end) 37


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Now remove pulley securing bolt. Hold pulley with counterhold


-3415- and -3415/1- .
– Remove centre bolt and remove crankshaft pulley.
– Unscrew inner part of oil seal extractor - 3203- 3 turns (approx.
5 mm) from the outer part and lock in position with the knurled
screw.

– Lubricate threaded head of oil seal extractor, place it in posi‐


tion and, exerting firm pressure, screw it into oil seal as far as
possible.
– Loosen knurled screw and turn inner part against crankshaft
until the oil seal is pulled out. G. Volkswagen nA AG do
wage e
– Remove bearing bush from crankshaft Vol
ks journal and clean con‐
s no
t gu
by
tact surfaces of crankshaftrisechain sprocket and bearing bush.
d ara
nt ee
tho or
Installing s au ac
s

ce
e
nl

pt
du

an
Note
itte

y li
erm

ab
ility
ot p

♦ From model year 2009, a diamond-coated washer is installed.

wit
, is n

The washer prevent the crankshaft from being turned when


h re
the securing bolt is tightened.
hole

spec
es, in part or in w

♦ Install a diamond-coated washer -7- if a washer was not fitted t to the co


as original equipment ⇒ Electronic Parts Catalogue “ETKA”.
♦ The washer is fitted -7- between the bearing bush -5- and the
crankshaft chain sprocket.
rrectness of i

♦ Note that all contact surfaces from the securing bolt to the
l purpos

crankshaft chain sprocket must be free of oil and grease.


nf
ercia

orm

– Clean sealing surfaces carefully. They must be free of oil and


m

atio
m

grease.
o

n in
or c

1 - Securing bolt
thi
te

sd
iva

o
r

2 - Crankshaft belt pulley


rp

cu
o

m
f

en
ng

3 - Diamond coated washer (clipped onto crankshaft belt pulley)


t.
yi Co
Cop py
t.
4 - Crankshaft oil seal
rig
gh ht
pyri by
Vo
o
by c
5 - Bearing bush
lksw
cted agen
Prote AG.
6 - O-ring
7 - Diamond coated washer
– Push bearing bush onto crankshaft journal.

38 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
. Volkswagen AG
a gen AG d
– Fit sleeve -T10117/2-
Volonto bush and slide oil seal oonto
ksw
oes
n t
g
bush.
y ua
db ran
– Remove sleeve
or -T10117/2- from bush.
ise tee
th or
au ac
ss

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
– Using assembly tool - T10053- , drive in oil seal into valve tim‐

rrectness of i
ing housing as far as it will go with even blows of hammer.
l purpos

Further assembly is basically the reverse of the dismantling se‐


quence.

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

1. Cylinder block (pulley end) 39


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2 Cylinder block, gearbox end


⇒ “2.1 Assembly overview - cylinder block, gearbox end”,
page 40
⇒ “2.2 Renewing crankshaft sealing flange - flywheel end”,
page 41

2.1 Assembly overview - cylinder block,


gearbox end

Note

Repairing clutch ⇒ Repairing clutch; Rep. gr. 30 ; Removing and


installing clutch .

1 - Securing bolt
❑ Always make sure to ob‐
serve procedure
⇒ “1.5 Removing and in‐
stalling pulley”,
page 34 .
❑ Contact surface for se‐
curing bolt must be free
of oil and grease.
AG. Volkswagen AG d
❑ Oil threads before in‐ lksw
agen oes
not
serting. byV
o gu
ara
ed
❑ Secure pulley against horis nte
eo
turning with counterhold aut ra
s c
tool - 3415- . s

ce
e
nl

pt
❑ The turning further an‐
du

an
itte

gle can be measured

y li
erm

ab
with a commercial pro‐

ility
ot p

tractor.

wit
, is n

❑ Renew

h re
hole

spec
❑ 150 Nm + turn 180° fur‐
es, in part or in w

ther
2 - Belt pulley t to the co
❑ With diamond coated
rrectness of i

washer
l purpos

❑ Observe note on dia‐


mond coated washers
⇒ page 38 .
nform
ercia

❑ Contact surfaces must


m

be free of oil and grease.


at
om

ion
c

❑ Secure against turning


in t
or

with counterhold - 3415-


his
ate

when removing and in‐


do
priv

stalling
um
for

en
ng

❑ Remove poly V-belt


t.
yi Co
op
⇒ “1.3 Removing and in‐
C py
ht. rig
stalling poly V-belt”, rig ht
py by
Vo
page 30 .
co lksw
by
cted agen
Prote AG.
3 - Seal
❑ Renew.
4 - Bearing bush
❑ Contact surfaces must be free of oil and grease.

40 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

5 - O-ring
❑ Renew.
6 - Cylinder block
❑ Removing and installing ⇒ “1 Removing and installing engine”, page 11 .
7 - Bolt
❑ Renew
❑ 60 Nm + turn 90° further
8 - Flywheel/drive plate
❑ When removing and installing flywheel, lock with counterhold - T10044- .
9 - Intermediate plate
❑ Must seat on dowel sleeves.
❑ Do not damage or bend when assembling.
10 - Bolt
❑ Renew
❑ 12 Nm n AG. Volkswagen AG do
swage es n
11 - Sealing flange with sender wheel and oil seal byV
olk ot g
ua
ed ran
❑ Removing and installing engine speed sender hor - G28- (not shown)
is tee
⇒ “1.5 Removing and installing engine speed
aut sender G28 ”, page 291 . or
ac
ss
❑ Specified torque for engine speed sender - G28- : 5 Nm.

ce
le
un

pt
❑ Renew sealing flange complete with oil seal and sender wheel only.

an
d
itte

y li
❑ Renewing crankshaft sealing flange - flywheel end
erm

ab
ility
⇒ “2.2 Renewing crankshaft sealing flange - flywheel end”, page 41 .
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

2.2 Renewing crankshaft sealing flange -

t to the co
flywheel end
Special tools and workshop equipment required

rrectne
♦ 24 mm tool insert - V.A.G 1332/11-

ss o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.
♦ Depth gauge - VAS 6082-

2. Cylinder block, gearbox end 41


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Assembly tool - T10134-

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
♦ Torque wrench - V.A.G 1331-
es, in part or in w

t to the co
♦ Bolt M6x35 (qty. 3)
♦ Hexagon key

rrectness of i
Pressing sealing flange with sender wheel off crankshaft
l purpos

Note

nf
ercia

orm
m

atio
♦ For the sake of clarity, the work is performed with the engine
om

removed.

n in
or c

thi
e

♦ The procedure is identical whether the engine is installed or


t

sd
iva

removed.

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Procedure t. Cop py
rig
gh ht
– Remove flywheel or drive plate ⇒ Item 8 (page 41) . yri
p by
o Vo
by c lksw
cted
– Set engine to TDC No. 1 cylinder
agen
Prote AG.
⇒ “3.1 Checking valve timing”, page 88
– Remove sump
⇒ “1.3 Removing and installing sump”, page 127 .
– Remove engine speed sender - G28- -arrow-.

42 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Unscrew securing bolts -arrows- of sealing flange -1-.

– To press off, screw 3 M6x35 bolts -arrows- into the sealing


flange -1-.

Note

The sealing flange -1- is pressed off the crankshaft -3- together
with sender wheel -2-.

– Alternately turn the bolts a maximum of a 1/2 turn into the


sealing flange.
– Remove the sealing flange -1- together with the sender wheel
-2-.
Pressing sealing flange with sender wheel onto crankshaft

Note

♦ The sealing flange with a PTFE seal is equipped with a sealing


agen
AG. Volkswagen AG d
lip support ring -2-. This support ring serves as a fitting
olksleeve
sw o es n
ot g
yV
and must not be removed prior to installation. sed b ua
ran
i tee
or
♦ Sealing flange and sender wheel -1- must not
au be separated
th or
ac
after removal from packaging. ss
ce
e
nl

pt

♦ The sender wheel -1- is held in its installation position on the


du

an
itte

assembly device - T10134- by a locating pin ⇒ page 44 .


y li
erm

ab
ility

♦ Sealing flange and oil seal form one unit and must only be
ot p

wit

renewed together with the sender wheel.


, is n

h re
hole

♦ The assembly device - T10134- is held in its position relative


spec

to the crankshaft by a guide pin ⇒ page 44 inserted into a


es, in part or in w

t to the co

hole in the crankshaft.


rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Cylinder block, gearbox end 43


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Components of assembly tool - T10134- :


A - Clamping surface
B - Hexagon nut
C - Assembly housing
D- wage
n AG. Volkswagen AG do
es n
Locating pin yV
olks ot g
ua
b
ed ran
E - Hexagon socket head bolthoris tee
ut or
a ac
F- ss
Guide pin for petrol engines (red knob)

ce
e
nl

pt
du

an
itte

G - Guide pin for diesel engines (black knob)

y li
erm

ab
ility
H - Knurled screws (qty. 3)
ot p

wit
, is n

I - Inner part

h re
hole

spec
es, in part or in w

Mounting seal with sender wheel on assembly tool - T10134-

t to the co
– Screw on nut -B- until just before it touches the clamping sur‐
face -A- of the threaded spindle.

rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

– Clamp assembly device - T10134- in a vice -1- on clamping


f

en
ng

t.
yi
surface -A- of threaded spindle.
Co
Cop py
t. rig
gh
– Press assembly housing -C- downwards until it lies on hexa‐
ht
pyri by
gon nut -B-.
co Vo
by lksw
cted agen
Prote AG.
• Inner part of assembly tool and assembly housing must be at
same height.

– If fitted, remove securing clip -arrow- from new sealing flange.

Note

Do not take the sender wheel out of the sealing flange or rotate it
out of position.

44 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Place sealing flange -1- with front side facing down on a clean
level surface.
– Push sealing lip support ring -2- downwards in
-direction of arrow- until it lies on flat surface.

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss

ce
le
un

pt
an
d
itte

• The upper edge of the sealing lip support ring -1- and front

y li
erm

ab
edge of the sealing flange -2- must align -arrows-.

ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

– Place sealing flange -1- with front side onto the assembly tool
- T10134- so that locating pin -D- sits in the sender wheel -2- atio
om

hole -3-.
n
c

i
or

n thi
e

• The sealing flange must rest flat against the assembly tool.
t

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

– Screw knurled screws -H- onto sealing flange -1-.


– Push sealing flange -1- and sealing lip support ring -2- onto
the surface of the assembly tool - T10134- while tightening.
– This prevents the locating pin from slipping out of the sender
wheel hole.
– When installing sealing flange, ensure that sender wheel re‐
mains fixed in assembly device.
Mounting assembly tool - T10134- with sealing flange on crank‐
shaft flange
• Crankshaft flange must be free of oil and grease.
• Engine positioned at TDC No. 1 cylinder.
– Screw on nut -B- until it reaches end of threaded spindle.
– Press threaded spindle of assembly tool - T10134- in
-direction of arrow-, until nut -B- lies against assembly housing
-C-.
– Align flat side of assembly housing to sealing surface of cyl‐
inder block on sump side.

2. Cylinder block, gearbox end 45


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Secure assembly tool - T10134- on the crankshaft -2- together


with the sealing flange -1-.
– To do this, screw hexagon socket head bolts -E- into crank‐
shaft flange (approx. 5 full turns) using a hexagon key.
– Push guide pin for petrol engines (red knob) -F- into crankshaft
flange.

– Screw 2 M6x35 -3- bolts into the cylinder block -2- to guide the
sealing flange -1-.

Bolting assembly tool - T10134- onto crankshaft flange:


olkswagen AG
en AG. V
– Push assembly housing -C- by hand oinlks-direction
wag of arrow- untildoes not
sealing lip support ring -1- touches
ed
b crankshaft flange -2-.
y V gu
ara
is nte
or
– Check that the guide pin for au
thpetrol engines (red knob) -F- sits eo
ra
correctly in the hole in crankshaft.
ss This ensures that the sender c
wheel reaches its final installation position.
ce
le
un

pt
an
d
itte

y li
rm

ab

Note
pe

ility
ot

wit
, is n

h re

The guide pin for diesel engines (black knob) must not be inserted
hole

in threaded hole of crankshaft.


spec
es, in part or in w

t to the co

– Tighten the two hexagon socket head bolts of the assembly


tool hand-tight.
rrectness of i

– Screw nut -B- onto threaded spindle by hand until it lies against
assembly housing -C-.
l purpos

Pressing sender wheel onto crankshaft flange using assembly


nform
ercia

tool - T10134- :
m

– Tighten nut -B- of assembly tool - T10134- to 35 Nm.


com

tion in

• After nut has been tightened to 35 Nm, a small air gap must
r
te o

thi

still be present between cylinder block -2- and sealing flange


s
iva

do

-1-.
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

46 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Checking sender wheel installation position on crankshaft


– Screw on nut -B- until it reaches end of threaded spindle.
– Unscrew both bolts -2- from cylinder block.
– Pull guide pin for petrol engines (red knob) -F- out of crank‐
shaft flange.
– Unscrew knurled screws -H- from sealing flange -1-.
– Unbolt assembly tool - T10134- from crankshaft flange. To do
this, unscrew the hexagon socket head bolts -E- from crank‐
shaft flange.
– Remove sealing lip support ring.

– Position depth gauge - VAS 6082- on crankcase flange -2-.


– Measure distance between crankshaft flange -2- and sender
wheel -1-.

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
– Measured distance -a- between crankshaft flange -2- and
is n

h re
sender wheel -1-.
ole,

spec
urposes, in part or in wh

• Specification: dimension -a- = 0.5 mm

t to the co
– If specification is not achieved, press sender wheel further in
⇒ page 47 .

rrectne
– If specification is achieved, proceed with subsequent work
steps.

ss o
cial p

f inform
mer

atio
om

n
c

i
or

Re-pressing sender wheel


thi
te

sd
va

– Secure assembly tool - T10134- on crankshaft flange -2-.


i

o
pr

cum
r
fo

en
ng

– Ensure the locating pin of the assembly tool - T10134- is seat‐


t.
yi Co
ed in the hole of the sender wheel. Cop py
ht. rig
rig ht
– Tighten hexagon socket head bolts -E- finger-tight. py by
co Vo
by lksw
cted agen
– Push assembly tool - T10134- against sealing flange -1- by Prote AG.
hand.
– Screw nut -B- onto threaded spindle by hand until it lies against
the assembly tool - T10134- .
– Push guide pin for petrol engines (red knob) -F- into crankshaft
flange.
– Screw knurled screws -H- into sealing flange -1-.
– To guide sealing flange, screw 2 M6×35 mm bolts -2- into cyl‐
inder block.

2. Cylinder block, gearbox end 47


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Tighten nut -B- of assembly tool - T10134- to 40 Nm.


– Check sender wheel installation position on the crankshaft
again ⇒ page 47
– If the specification is not achieved, tighten nut of assembly tool
- T10134- to 45 Nm.
– Check sender wheel installation position on the crankshaft
again ⇒ page 47 .

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

48 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3 Crankshaft
⇒ “3.1 Assembly overview - crankshaft”, page 49
⇒ “3.2 Crankshaft dimensions”, page 50
n AG. Volkswagen AG do
⇒ “3.3 Renewing needle bearing in crankshaft”, page 50 lkswage es n
o ot g
byV ua
3.1 Assembly overview - crankshaft ho
ir se
d ran
tee
ut or
a ac
ss

ce
le
1 - Bolt

un

pt
an
d
❑ Only tighten to 50 Nm

itte

y li
erm
when measuring crank‐

ab
ility
shaft radial clearance.

ot p

wit
Do not turn further.
is n

h re
ole,
❑ Renew

spec
urposes, in part or in wh

❑ 50 Nm + turn 90° further

t to the co
2 - Bearing cap
❑ Do not interchange

rrectne
bearing caps (mark po‐
sitions).

s
❑ Bearing cap 3 with re‐

s o
cesses for thrust wash‐
cial p

f in
ers.

form
mer

❑ Bearing shell retaining

atio
m

lugs in cylinder block


o

n
c

i
and bearing caps must
or

n thi
e

align.
t

sd
iva

o
pr

c
3 - Crankshaft

um
r
fo

en
ng

t.
❑ Axial clearance (new):
yi Co
op
0.07 ... 0.24 mm
C py
t. rig
gh ht
yri
❑ Wear limit: 0.26 mm
p by
co Vo
by lksw
cted agen
Check radial clearance with
Prote AG.

Plastigage.
❑ New: 0.03 … 0.05 mm
❑ Wear limit: 0.13 mm
❑ Do not rotate crankshaft
when checking radial
clearance.
❑ Pulling needle bearing
out of and driving into
crankshaft
⇒ “3.3 Renewing needle
bearing in crankshaft”,
page 50 .
❑ Crankshaft dimensions ⇒ “3.2 Crankshaft dimensions”, page 50 .
4 - Sealing flange with sender wheel and oil seal
❑ With engine speed sender - G28- (not illustrated).
❑ Specified torque for engine speed sender - G28- : 5 Nm.
❑ Renew sealing flange complete with oil seal and sender wheel only.
❑ Renewing crankshaft sealing flange - flywheel end
⇒ “2.2 Renewing crankshaft sealing flange - flywheel end”, page 41 .
5 - Bolt
❑ Renew
❑ 12 Nm

3. Crankshaft 49
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

6 - Thrust washers
❑ For bearing cap 3.
❑ Note fixing arrangement.
7 - Bearing shell
❑ In cylinder block.
8 - Chain sprocket
❑ Removing and installing
⇒ “3.4 Removing and installing timing chain and chain drive for oil pump”, page 106 .
❑ For oil pump drive and timing chain.
❑ Contact surfaces must be free of oil and grease.
9 - Bearing shell
❑ In bearing cap.
❑ Do not interchange used bearing shells (mark).

3.2 Crankshaft dimensions


Honing Crankshaft bearing Conrod
dimension in mm journal diameter journal diameter
Basic dimension -0.022 -0.022
54.00 47.80 AG. Volkswagen AG d
agen oes
ksw
-0.037 -0.037 byV
ol not
gu
ara
ed
Stage I -0.022 -0.022 horis nte
eo
53.75 47.55 aut ra
s c
-0.037 -0.037 s

ce
e
nl

pt
Stage II --- -0.022
du

an
itte

47.30

y li
erm

ab
-0.037

ility
ot p

wit
, is n

3.3 Renewing needle bearing in crankshaft

h re
hole

spec
Only vehicles with a dual clutch gearbox
es, in part or in w

t to the co
Special tools and workshop equipment required
♦ Adapter - 22/1- from Kukko

rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

50 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Puller - Kukko 21/2-

♦ Drift - VW 207 C-

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
Removing
urposes, in part or in wh

t to the co
– Pull out needle bearing using commercially available puller,
e.g. Kukko - 21/2- and Adapter Kukko - 22/1- .
Installing
rrectne

– Drive in flush with drift - VW 207 C- or centring mandrel -


3176- .
ss o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

3. Crankshaft 51
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

4 Pistons and conrods


⇒ “4.1 Assembly overview - pistons and conrods”, page 52. Volkswage
n AG n AG d
wage oes
⇒ “4.2 Checking piston and cylinder bore”, page
yV
olk53
s not
gu
b ara
ed
⇒ “4.3 Removing and installing oil sprayhorjets”,
is page 55 nte
eo
t
au ra
⇒ “4.4 Separating new conrod”, page
ss 56 c

ce
e
nl

pt
4.1 Assembly overview - pistons and con‐
du

an
itte

y li
rods
erm

ab
ility
ot p

wit
, is n

h re
Note
hole

spec
es, in part or in w

t to the co
All bearing points and running surfaces must be oiled before as‐
sembly.

rrectness of i
1 - Circlip
l purpos

2 - Piston pin

nf
ercia

❑ If difficult to remove,

or
heat piston to 60°C.

m
m

atio
m

❑ Remove and install with


o

n in
c

drift - 10 - 14- .
or

thi
te

sd
iva

3 - Piston

o
r
rp

cu
o

m
❑ Checking
f

en
ng

t.
⇒ “4.2 Checking piston
yi Co
op
and cylinder bore”, page
C py
t. rig
gh
53 .
ht
pyri by
Vo
co lksw
by
❑ Mark installation posi‐ Prote
cted AG.
agen
tion and cylinder num‐
ber.
❑ Arrow on piston crown
points to belt pulley end.
❑ Install using piston ring
clamp.
4 - Compression rings
❑ Offset gaps by 120°.
❑ Remove and install
compression rings with
piston ring pliers.
❑ “TOP” faces towards
piston crown.
❑ Checking ring gap
⇒ “4.2 Checking piston
and cylinder bore”, page
53 .
❑ Checking ring-to-groove
clearance
⇒ “4.2 Checking piston
and cylinder bore”, page
53 .
5 - Oil scraper rings
❑ Carefully remove and install 3-part oil scraper rings by hand.
❑ Checking ring gap ⇒ “4.2 Checking piston and cylinder bore”, page 53 .
❑ Ring-to-groove clearance not measurable.

52 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

6 - Conrod bolt
❑ Oil threads and contact surface.
❑ To measure radial clearance, tighten to corresponding specified torque but not further.
❑ Renew
❑ M 7 × 0.75: 20 Nm + 90° further
❑ M 8 × 1: 30 Nm + 90° further
7 - Conrod bearing cap
❑ The caps only fit in one position and only on the appropriate conrod due to the breaking procedure
(cracking) separating the cap from the conrod.
❑ Marking -A-: mark with cylinder number
❑ Marking -B-: mark paired conrods and conrod bearing caps
8 - Bearing shell
❑ Do not interchange used bearing shells.
AG. Volkswagen
❑ Insert bearingswshells
agen centrally. AG does
k not
y Vol gu
Checking radial
se
d b clearance with Plastigage: ara
nte
ri
ho eo
❑ New:
au
t 0.020 … 0.060 mm ra
c
ss
❑ Wear limit: 0.090 mm ce
e
nl

pt
du

❑ Do not rotate crankshaft when checking radial clearance. an


itte

y li
erm

ab
9 - Pressure relief valve ility
ot p

❑ Opening pressure of pressure relief valve: 1.8 … 2.2 bar


wit
, is n

h re

❑ 27 Nm
hole

spec

10 - Oil spray jet


es, in part or in w

t to the co

❑ For piston cooling.


11 - Conrod
rrectness of i

❑ Renew as set only.


l purpos

❑ Marking -A-: mark with cylinder number


❑ Marking -B-: mark paired conrods and conrod bearing caps
nform
ercia

❑ Guided axially by piston.


m

at
om

ion
c

in t
or

4.2 Checking piston and cylinder bore


his
ate

do
priv

⇒ “4.2.1 Checking piston”, page 53


um
for

en
ng

t.
yi
⇒ “4.2.2 Checking cylinder bores”, page 54
Co
Cop py
t. rig
⇒ “4.2.3 Piston and cylinder dimensions”, page 54
gh ht
pyri by
Vo
o
by c lksw
4.2.1 Checking piston
cted agen
Prote AG.

Special tools and workshop equipment required


♦ External micrometer 75…100 mm
Checking piston
– Measure approx. 12 mm from lower edge of skirt, at 90° angle
to piston pin axis. Difference between actual and nominal di‐
ameter: not more than 0.04 mm. Nominal dimension
⇒ “4.2.3 Piston and cylinder dimensions”, page 54

4. Pistons and conrods 53


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Checking piston ring gap


– Push ring squarely from above down into cylinder bore to ap‐
prox. 15 mm from bottom end of cylinder. n AG. Volkswagen A G do
wage es n
olks ot g
Piston ring New Wear by Vlimit ua
dimensions in mm ed ran
ris tee
tho or
u
1st compression ring 0.20 … 0.40 ss a 1.0 ac

ce
le
2nd compression ring 0.40 … 0.60 1.0

un

pt
an
d
itte
Oil scraper ring 0.20 … 0.80 ---1)

y li
erm

ab
ility
1) No wear limit details available ot p

wit
is n

h re
ole,

Checking ring-to-groove clearance

spec
urposes, in part or in wh

Clean annular groove before check.

t to the co
Piston ring New Wear limit
dimensions in mm

rrectne
1st compression ring 0.04 … 0.08 0.15

ss
2nd compression ring 0.02 … 0.06 0.15

o
cial p

f i
Oil scraper ring Not measurable

nform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
r

4.2.2 Checking cylinder bores


p

cum
r
fo

en
ng

t.
yi
Special tools and workshop equipment required
Co
Cop py
t. rig
gh
♦ Cylinder gauge 50…100 mm
ht
pyri by
Vo
co lksw
by
Checking cylinder bores
cted agen
Prote AG.

– Take measurements at 3 positions in both lateral direction


-A- and longitudinal direction -B-. Difference between actual
and nominal diameter max. 0.08 mm.
– Nominal dimension
⇒ “4.2.3 Piston and cylinder dimensions”, page 54

Note

Cylinder bores must not be measured when cylinder block is


mounted on engine and gearbox support - VAS 6095- , as meas‐
urements may be incorrect.

4.2.3 Piston and cylinder dimensions


Honing dimen‐ Piston diame‐ Cylinder bore diame‐
sion ter 2) ter
Basic dimen‐ mm 76.460 76.51
sion
Stage I mm 76.710 76.76
Stage II mm 76.960 77.01
2) Measure pistons approx. 12 mm from lower edge.

54 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

4.3 Removing and installing oil spray jets


Special tools and workshop equipment required
♦ Socket - T10545-
Removing
– Remove noise insulation ⇒ General body repairs, exterior;
Rep. gr. 66 ; Noise insulation; Assembly overview - noise in‐
sulation .
– Remove sump
⇒ “1.3 Removing and installing sump”, page 127 .
– Remove oil pump
⇒ “1.4 Removing and installing oil pump”, page 130 .

Note

♦ The crank web of the respective cylinder must be positioned


so that the socket - T10545- can be inserted in the pressure
relief valve as close to vertical as possible.
♦ Furthermore, the corners of the socket - T10545- and of the
pressure relief valve must engage well.

– Turn the crankshaft using the securing bolt of the vibration


damper until the respective bolt is accessible.
– Unscrew pressure relief valve -1- using socket - T10545- .
– Remove oil spray jets -2-.
Installing
n AG. Volkswagen AG do
lkswage es n
o ot g
yV ua
Caution ir se
d b ran
o tee
th or
u
Risk of damage to soil
s spray jets.
a ac
ce
le
un

♦ Do not bend oil spray jets.


pt
an
d
itte

y li

♦ Check that oil spray jets can operate freely after reinstal‐
rm

ab
pe

lation of pistons.
ility
ot

wit
, is n

♦ Bent oil spray jets must be renewed.


h re
hole

spec
es, in part or in w

t to the co

1- Pressure relief valve, 27 Nm


rrectness of i

2- Oil spray jet


l purpos

• Installation position: align leading edge of oil spray jet arrow


with machined surface of cylinder block.
nform
ercia

– Install oil pump


⇒ “1.4 Removing and installing oil pump”, page 130 .
m

a
com

tio

– Install sump
n in
r

⇒ “1.3 Removing and installing sump”, page 127 .


te o

thi
s
iva

do

– Install noise insulation ⇒ General body repairs, exterior; Rep.


r
rp

cum

gr. 66 ; Noise insulation; Assembly overview - noise insula‐


fo

en
g

tion .
n

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

4. Pistons and conrods 55


AG. Volkswagen
Passat 2006 ➤ , Passat 2011 ks➤
wag,ePassat Variant 2011
n AG do
es➤
not , Touran 2003 ➤
Vol
4-cylinder direct-injection d b engine (1.4 l, natural gas, EA 111,
y gu turbocharger, supercharger) - Edition
ara
se nte
11.2015 thori
eo
au ra
c
ss
4.4 Separating new conrod

ce
e
nl

pt
du

an
itte
On a new conrod, it is possible that the breaking point has not

y li
erm

ab
fully separated. Proceed as follows, when the conrod bearing cap

ility
ot p
cannot be removed by hand:

wit
, is n

h re
– Mark cylinder allocation of conrod ⇒ Item 11 (page 53)
hole

spec
– Gently clamp conrod, as shown in illustration, in a vice with
es, in part or in w

t to the co
soft aluminium jaws.

rrectness of i
Note
l purpos

♦ To prevent damage to the conrod, only clamp conrod in lightly.


♦ Conrod is clamped below the dashed line.

nform
mercia

at
– Unscrew the two bolts -arrows- approx. 5 turns.
om

ion
c

in t
or

his
ate

do
priv

cum
or

– Using a plastic hammer, carefully knock against conrod bear‐


f

en
ng

ing cap in -direction of arrow- until it is loose.


t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

56 Rep. gr.13 - Crankshaft group


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

15 – Cylinder head, valve gear


1 Cylinder head
⇒ “1.1 Assembly overview - cylinder head”, page 57
⇒ “1.2 Removing and installing cylinder head”, page 59
⇒ “1.3 Removing and installing camshaft housing”, page 64
⇒ “1.4 Checking compression”, page 72

1.1 Assembly overview - cylinder head

1 - Bolt
❑ 20 Nm
2 - High-pressure pump
❑ For fuel supply.
❑ With fuel pressure regu‐
lating valve - N276- .
❑ Removing and installing
⇒ “8.2 Removing and in‐
stalling high-pressure
pump”, page 263 .
3 - Cable guide
❑ Bolt to camshaft hous‐
AG. Volkswagen AG d
ing with 8 Nm torque. ksw
agen oes
not
Vol
y gu
4 - Bleeder hose to air filter ise
d b ara
nte
or
❑ Check for damage, and auth eo
ra
renew if necessary ss c

ce
e
nl

pt
5 - Bolt
du

an
itte

y li
❑ 10 Nm
erm

ab
ility
ot p

6 - Hall sender - G40-

wit
, is n

❑ With O-ring.

h re
hole

spec
❑ Renew O-ring if dam‐
es, in part or in w

aged.
t to the co
7 - Stud
❑ 6 Nm
rrectness of i

8 - Bolt
l purpos

❑ Tighten from inside out‐


wards.
nf
ercia

❑ Renew
rm
m

atio

❑ 10 Nm + turn 90° further


om

n in
or c

9 - Camshaft housing
thi
te

sd
iva

o
r
rp

Note
cu
o

m
f

en
ng

t.
yi Co
The strainer for oil circuit must be Cop py
installed in cylinder head.
t. rig
gh ht
pyri by
Vo
co lksw
by
❑ Removing and installing ⇒ “1.3 Removing and installing camshaft housing”, page 64 . Prote
cted AG.
agen

❑ Remove sealant residue.


❑ Carefully clean sealing surfaces. They must be oil and grease free.
❑ Before fitting, coat with sealant ⇒ Electronic Parts Catalogue (ETKA)

1. Cylinder head 57
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

10 - Bolt
❑ 20 Nm
11 - Lifting eye
12 - Turbocharger
❑ Removing and installing ⇒ “1.2 Removing and installing turbocharger”, page 166 .
13 - Oil pressure switch - F1-
❑ Checking ⇒ “2.1 Checking oil pressure and oil pressure switch”, page 133 .
❑ If seal is leaking, nip open and renew.
❑ 20 Nm
14 - Cylinder head gasket
❑ Metal gasket.
❑ After renewing, renew entire coolant.
❑ Renew
15 - Cylinder head

Note

The strainer for oil circuit must be


installed in cylinder head.
❑ Removing and installing ⇒ “1.2 Removing and installing cylinder head”, page 59 .
❑ Check for distortion ⇒ page 59 .
❑ Sealing surfaces to camshaft housing must be oil and grease free.
❑ After renewing, renew entire coolant.
16 - Guide pins
❑ 20 Nm
17 - Dowel pin
18 - Oil strainer
AG. Volkswagen AG d
❑ Inserted into cylinder head. agen oes
olksw not
y V gu
❑ Renew. rise
d b ara
nte
tho eo
19 - Support element s au ra
c
s
❑ Do not interchange.
ce
le
un

pt
an

❑ With hydraulic valve clearance compensation.


d
itte

y li
erm

ab

❑ Oil contact surface.


ility
ot p

20 - Roller rocker finger


wit
is n

h re

❑ Check roller bearing for ease of movement.


ole,

spec
urposes, in part or in wh

❑ Oil contact surface.


t to the co

❑ When installing, secure to supporting element using securing clip.


21 - Seal
rrectne

Note
ss o

Note the different sealing types


cial p

f in

when removing and installing the


form
mer

camshaft housing ⇒ page 64 .


atio
om

❑ Renew.
n
c

i
or

n thi
e

❑ Qty. 4.
t

sd
iva

o
r

❑ Inserted into cylinder head.


p

cum
r
fo

en
ng

22 - Cylinder head bolt


t.
yi Co
op py
❑ Renew. t. C rig
gh ht
pyri by
Vo
co lksw
by
cted agen
58
Prote AG.
Rep. gr.15 - Cylinder head, valve gear
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
❑ Follow installation instructions and sequence when loosening and tightening ⇒ page 63 .
23 - Roller tappet
❑ Lightly coat contact surface with engine oil.
24 - O-ring
❑ Renew.
❑ Moisten with oil before inserting.
n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se
Checking cylinder head for distortion tho tee
or
au ac
Use straightedge 500 mm - VAS 6075- and feeler gauge for
ss

ce
e
checking.

nl

pt
du

an
itte

y li
Max. permissible distortion: 0.05 mm

erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
1.2 Removing and installing cylinder head
l purpos

nf
ercia

Special tools and workshop

or
equipment required

m
m

atio
om

♦ Support bracket - 10 - 222

n in
or c

A-

thi
te

sd
iva

♦ Adapter - 10 - 222 A /8-

o
r
rp

cu
(Passat)
o

m
f

en
ng

t.
yi Co
♦ Adapter - 10 - 222 A /26- Cop py
. rig
(Touran)
t
gh ht
pyri by
Vo
co
♦ Adapter - 10-222 A/30-
by lksw
cted agen
Prote
(Touran)
AG.

♦ Hook - 10 - 222 A /10-


(Touran, not illustrated)
♦ Shackle - 10 - 222 A /12-
(Touran, not illustrated)
♦ Bracket - T10358-
♦ Torque wrench - V.A.G
1332-
♦ Torque wrench - V.A.G

1. Cylinder head 59
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1331-

DANGER!

Before working on the natural gas system, always observe


⇒ “2.2 Safety precautions when working on natural gas sys‐
tem”, page 4 !!!

WARNING

• Make sure that the tank shut-off valve on each of the nat‐
ural gas tanks is closed.

Note

♦ When installing an exchange cylinder head, all the contact


surfaces between the support elements, roller rocker arms
and the cams must be oiled before installing the camshaft
housing.
♦ The plastic packing pieces for protecting the open valves must
not be removed until immediately before fitting cylinder head.
♦ If the cylinder head is replaced, all the coolant in the system
must also be renewed.
♦ All bearing points and running surfaces must be oiled before
assembly.

– Empty gas system ⇒ Fuel supply system – natural gas en‐


n AG. Volkswagen AG do
gines; Rep. gr. 20 ; Fuel tank; Releasing pressure
olkswagein high- es n
ot g
pressure line . d byV ua
ra e nte
ris
Removing utho eo
ra
a c
ss
– Loosen union nut at threaded connection of low-pressure line
ce
le
un

-arrow-, while at the same time counterholding at gas rail with


pt
an
d

a spanner.
itte

y li
rm

ab
pe

– Allow residual gas to escape.


ility
ot

wit
, is n

– Remove regulating flap control unit - J808- and throttle valve


h re

module - J338-
hole

spec

⇒ “7.4 Removing and installing regulating flap control unit J808


es, in part or in w

and throttle valve module J338 ”, page 258 .


t to the co

– Removing intake manifold


⇒ “7.1 Assembly overview - intake manifold”, page 244 .
rrectness of i

– Remove turbocharger
l purpos

⇒ “1.2 Removing and installing turbocharger”, page 166 .


– Remove thermostat housing from cylinder head
nform
ercia

⇒ “2.1 Assembly overview - thermostat”, page 144 .


m

– Removing and installing valve timing housing


com

tion in

⇒ “2.1 Removing and installing valve timing housing (timing


r
te o

thi

case)”, page 74
s
iva

do
r

– Remove timing chain and drive chain for oil pump


rp

cum
fo

⇒ “3.4 Removing and installing timing chain and chain drive


en
ng

t.
yi
for oil pump”, page 106 .
Co
Cop py
t. rig
gh
Touran
ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

60 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Unscrew securing bolt for gearbox and attach bracket -


T10358- as shown.
– Attach hooks of support bracket - 10 - 222 A- to bracket -
T10358- as shown.
– Turn spindle until the hooks are lightly tensioned.

– Unhook hook -1- from left lifting eye and push spindle onto left
side of support bracket - 10 - 222 A- .
Passat
Continuation for all vehicles
– Removing and installing camshaft housing
⇒ “1.3 Removing and installing camshaft housing”,
page 64 .

Note agen
AG. Volkswagen AG d
oes
olksw not
y V gu
b ara
Ensure that roller rocker
orise fingers and support elements are not
d
nte
interchanged. aut h eo
ra
ss c
ce
e
nl

– Remove roller rocker fingers together with support elements


pt
du

an

and lay aside on a clean surface.


itte

y li
erm

ab

– Loosen and unscrew cylinder head bolts in the given se‐


ility
ot p

quence.
wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

1. Cylinder head 61
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Specified sequence for loosening cylinder head bolts


– Carefully remove cylinder head.
Installing
• The pistons must not be positioned at TDC.

Note
AG. Volkswagen AG d
agen oes
ksw
♦ Do not remove new cylinder
by Vol
head gasket from its packing
not
gu until
immediately beforerise installing.
d ara
nte
tho eo
♦ Handle new sgasket
sa
u
with extreme care. Damage will cause ra
c
leakage.

ce
e
nl

pt
du

♦ The strainer for oil circuit must be installed in cylinder head.

an
itte

y li
erm

ab
ility
ot p

– Place clean cloths in cylinders so that no dirt or emery cloth

wit
particles can get in between cylinder wall and piston.
, is n

h re
hole

– Now carefully clean sealing surfaces of cylinder head and cyl‐

spec
inder block. When doing this, ensure that surfaces are not
es, in part or in w

t to the co
scored or scratched (if abrasive paper is used, grade must not
be less than 100).
– Carefully remove metal particles, emery residue and cloths.

rrectness of i
– Set No. 1 cylinder piston to top dead centre, then turn crank‐
l purpos

shaft approx. 45° in direction of engine rotation.


– Fit new cylinder head gasket. The part number must be read‐
nf
ercia

able.
rm
m

atio
m

– Fit cylinder head. When doing this, observe centring pins in


o

n in
c

cylinder block.
or

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

62 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
wage
n AG. Volkswagen AG do
e
11.2015
ks s no
Vol t gu
by ara
Specified tightening sequence for cylinder head bolts ris
ed
nte
tho eo
– Tighten cylinder head bolts observing given tightening
ss
au se‐ ra
c
quence and specified stages ⇒ page 63 .

ce
e
nl

pt
du

an
– Install supporting elements in cylinder head and fit respective

itte

y li
roller rocker finger onto respective valve stem end or support‐

erm

ab
ing element.

ility
ot p

wit
, is n
– Install camshaft housing

h re
⇒ “1.3 Removing and installing camshaft housing”,

hole

spec
page 64 .

es, in part or in w

t to the co
– Adjust valve timing ⇒ “3.2 Adjusting valve timing”, page 90 .
Further assembly is basically the reverse of the dismantling se‐

rrectness of i
quence.
l purpos
Note

nf
ercia

or
Natural gas system may not be operated until tested accordingly.

m
m

atio
om

n in
or c

thi
e

WARNING
t

sd
iva

o
r
rp

cu
o

m
• Operating the natural gas system without having tested it
f

en
ng

t.
for leaks according to specifications may result in severe
yi Co
op
injuries or death.
C py
t. rig
gh ht
yri by
The necessary scope of the leakage test depends on the pres‐
op Vo
by c lksw
cted
sure section which has been worked on.
agen
Prote AG.

Note the following allocation!

Allocation:
⇒ “3.1 Different pressure sections of natural gas supply system”,
page 214
– Open fuel tank shut-off valves -N361/N362/N363/N429- (de‐
pending on vehicle model and equipment level) using hand
wheel - T50026- .
– Check gas system
⇒ “3 Checking natural gas supply system for leaks”,
page 214
Specified torques:
Cylinder head bolts
Stage Bolts (renew) Specified torque/ addi‐
tional specified angle
1. 1 ... 10 Pre-tighten by hand
2. 1 ... 10 30 Nm
3. 1 ... 10 90°
4. 1 ... 10 90°
5. 1 ... 10 90°
♦ Gearbox securing bolt ⇒ Rep. gr. 34 ; Removing and installing
gearbox; Specified torque for gearbox
♦ Securing bolts for intake manifold
⇒ “7.1 Assembly overview - intake manifold”, page 244
♦ Securing bolts for regulating flap control unit - J808- and throt‐
tle valve module - J338-
⇒ “7.1 Assembly overview - intake manifold”, page 244

1. Cylinder head 63
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Securing bolts for turbocharger


⇒ “1.1 Assembly overview - turbocharger”, page 162
♦ Securing bolts for thermostat housing
⇒ “2.1 Assembly overview - thermostat”, page 144
♦ Securing bolts for valve timing housing cover
⇒ “1.2 Assembly overview - cylinder block (pulley end)”, page
28

1.3 Removing and installing camshaft housing

Special tools and workshop


equipment required AG. Volkswagen AG d
agen oes
ksw
♦ Dial gauge - VAS 6079- byV
ol not
gu
ara
ed
is nte
♦ Puller - T10094 A- hor eo
aut ra
c
♦ Dial gauge adapter - ss

ce
e

T10170- or dial gauge


nl

pt
du

an
adapter - T10170 A-
itte

y li
erm

ab
♦ Camshaft clamp - T10171

ility
ot p

A-

wit
, is n

h re
♦ Counterhold - T10172-
hole

spec
♦ Locking pin - T40011-
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

64 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

1. Cylinder head 65
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Spark plug socket and extension - 3122 B-


♦ Torque wrench - V.A.G 1331-
♦ Sealant ⇒ Electronic Parts Catalogue (ETKA)
Removing

DANGER!

Before working on the natural gas system, always observe


⇒ “2.2 Safety precautions when working on natural gas sys‐
tem”, page 4 !!!

WARNING

• Make sure that the tank shut-off valve on each of the nat‐
ural gas tanks is closed.
AG. Volkswagen AG d
agen oes
lksw not
– Empty gas system ⇒ Fuel supply system d–bnatural
yV
o
gas en‐ gu
ara
gines; Rep. gr. 20 ; Fuel tank; Releasing orisepressure in high- nte
eo
pressure line . auth
ra
ss c

ce
e
nl

pt
du

an
Note
itte

y li
erm

ab
ility
♦ The camshafts are mounted in the camshaft housing on this
ot p

wit
engine. Before removing camshaft housing, first remove valve
, is n

h re
timing housing.
hole

spec
♦ Removing and installing valve timing housing
es, in part or in w

t to the co
⇒ “2.1 Removing and installing valve timing housing (timing
case)”, page 74
♦ The camshaft housing sealing surface must not be reworked.

rrectness of i
l purpos

– First check whether a coded radio is fitted. If so, obtain anti-


theft coding.
nform
ercia

– With ignition switched off, disconnect battery earth strap.


m

at

– Remove air filter


om

ion

⇒ “6.2 Removing and installing air filter housing”, page 243 .


c

in t
or

his
te

– Drain coolant ⇒ “1.2 Draining and filling coolant”, page 137 .


a

do
priv

cum
or

– Remove coolant hoses and line/wiring guides.


f

en
ng

t.
yi Co
– Unscrew securing bolts and remove camshaft sealing covers Cop py
-1-.
t. rig
gh ht
pyri by
Vo
co
– Remove turbocharger
by lksw
cted agen
Prote
⇒ “1.2 Removing and installing turbocharger”, page 166 .
AG.

– Removing and installing valve timing housing


⇒ “2.1 Removing and installing valve timing housing (timing
case)”, page 74
– Turn crankshaft to TDC for No. 1 cylinder. Then turn crank‐
shaft 2 full turns in direction of engine rotation and remove
camshaft timing chain sprockets with timing chain
⇒ “3.2 Adjusting valve timing”, page 90 .
– Unbolt camshaft sealing covers.
– Pull connectors off fuel pressure sender for low-pressure -
G410- and off high-pressure pump.
– Unscrew earth cable from camshaft housing.

66 Rep. gr.15 - Cylinder head, valve gear


AG. Volkswagen AG d
agen oes
olksw not
y V gu
ise Passat 2006 ➤ , Passat 2011 ➤ , Passat nte Variant 2011 ➤ , Touran 2003 ➤
d b ara
r
4-cylinder direct-injection
autho
engine (1.4 l, natural gas, EA 111, turbocharger,
eo
ra supercharger) - Edition
ss c
11.2015

ce
e
nl

pt
du

an
– Remove ignition coils. Use puller -T10094 A- for this purpose

itte

y li
⇒ “1.4 Removing and installing ignition coils with output stage”,
erm

ab
page 289 .

ility
ot p

wit
, is n

– Remove cable guide with wiring harness from camshaft hous‐

h re
hole

ing.

spec
es, in part or in w

t to the co
WARNING

Fuel supply lines are under pressure! Wear eye protection and

rrectness of i
gloves to avoid injuries and skin contact. Before loosening
l purpos

hose connections, wrap a cloth around the connection. Then


release pressure by carefully pulling hose off connection.

nf
ercia

orm
m

atio
m

– Pull connector and fuel supply line -arrows- off high-pressure


o

n in
c

pump.
or

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

1. Cylinder head 67
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Remove wiring guide -2- and remove connector -4- from Hall
sender - G40- .

Note

Use a spanner to counterhold threaded connections on high pres‐


sure pump and on lower part of intake manifold when loosening
union nuts.

– Loosen union nuts -3- and -1- of high-pressure line.


– Pull out oil dipstick.
– Remove lower part of intake manifold
⇒ “7.3 Removing and installing lower part of intake manifold”,
page 256 .
– Unbolt left lifting eye.
– Loosen camshaft housing bolts from outside to inside, alter‐
nately and diagonally and remove.
– Carefully lift camshaft housing off.
Installing
• The pistons must not be positioned at TDC.
AG. Volkswagen AG d
agen oes
olksw not
Note d by V gu
ara
rise nte
tho eo
The strainer for oil circuit must be installeds ain cylinder head.
u ra
c
s

ce
le
un

pt
– Remove sealant residues from cylinder head and camshaft

an
d
itte

housing with a rotating brush, e.g. a hand drill with a plastic

y li
rm

ab
brush (wear eye protection).
pe

ility
ot

wit
– Clean sealing surfaces carefully. They must be free of oil and
, is n

h re
grease.
hole

– Also prevent dirt and residual sealant from entering cylinder spec
es, in part or in w

head. t to the co

Caution
rrectness of i
l purpos

Before using camshaft clamp - T10171 A- you must check that


the pins on the tool project by at least 7 mm.
nform
ercia

If this is not the case, the camshaft clamp is defective and must
be renewed.
m

a
com

tio

The camshaft clamp must not be positioned using any kind of


n in
r
te o

hammer.
thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

68 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Turn inlet and exhaust camshafts until camshaft clamp -


T10171 A- can be inserted into holes in camshaft to stop.
– Screw in an M6 bolt hand-tight to secure camshaft clamp -
T10171 A- , but do not tighten.

Note

Camshaft housings with different sealing variants in area of spark


plug recess have been fitted.

Sealing on cylinder head with no sealing ring in area of spark plug


recess

Caution

No sealant is applied in area of the oil strainer -1-.

– Apply thin, even coat of sealant on clean camshaft housing


sealing surface. See hatched area in illustration.

Note

Sealant must not be applied too thickly; otherwise excess sealant


can enter oil channels and cause damage to engine.

Sealing on cylinder head with sealing ring in area of spark plug


recess
– Place new seals into grooves in cylinder head.

Caution
AG. Volkswagen AG d
agen oes
ksw
No sealant is applied inbyarea
Vol
of the oil strainer -1-. not
gu
ara
ed
ris nte
ho eo
aut ra
ss c
– Apply thin, even coat of sealant on clean camshaft housing
ce
e
nl

pt

sealing surface. See hatched area in illustration.


du

an
itte

y li
erm

– Do not apply sealant in area of -arrows-.


ab
ility
ot p

Sealing on cylinder head with machined chamfer in area of spark


wit
, is n

plug recess
h re
hole

spec
es, in part or in w

Caution
t to the co

No sealant is applied in area of the oil strainer -1-.


rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted
69
agen
Prote AG.
1. Cylinder head
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Apply thin, even coat of sealant - D 154 103 A1- on clean


camshaft housing sealing surface. See hatched area in illus‐
tration.
– Apply sealant -D 176 600 A1- to the chamfer -arrows- of cyl‐
inder head.
The sealant bead must be 2 mm thick.

Note

Sealant must not be applied too thickly; otherwise excess sealant


can enter oil channels and cause damage to engine.

Caution agen
AG. Volkswagen AG d
oes
olksw not
byV gu
Ensure that all roller rocker fingers contact valve rised stem ends ara
nte
-1- correctly and that they are clipped into their
ut respective sup‐
ho eo
ra
port elements -2-. s s a c

ce
le

Proceed with extreme caution when fitting the camshaft hous‐


un

pt
an
d

ing onto the cylinder head in order to prevent the roller rocker
itte

y li
fingers from sliding down!
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

– When fitting camshaft housing onto cylinder head, first fit cam‐
pr

cum
r
fo

shaft housing at angle shown in illustration onto dowel pins


en
ng

t.
-arrows-.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

70 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Then, carefully lower camshaft housing in


-direction of arrow- towards cylinder head.

Note

Ensure that no oil residue can drip onto sealing surfaces.

Note

Ensure that no oil residue can drip onto sealing surfaces.

– Tighten new camshaft housing securing bolts to specified tor‐


que ⇒ page 71 .
Observe given procedure ⇒ page 71 .

Note
. Volkswagen AG
gen AG does
swa
After installing the camshaft housing, wait about 30 y Vminutes for
olk not
gu
the sealant to dry. rised b ara
nte
ho eo
aut ra
– Adjust valve timing ⇒ “3.2 Adjusting valve
s s
timing”, page 90 . c

ce
e
nl

pt
du

Further assembly is basically the reverse of the dismantling se‐

an
itte

quence. In the process, note the following:

y li
erm

ab
ility
ot p

wit
, is n

Note

h re
hole

spec
Natural gas system may not be operated until tested accordingly.
es, in part or in w

t to the co
WARNING

rrectness of i
• Operating the natural gas system without having tested it
l purpos

for leaks according to specifications may result in severe


injuries or death.
nf
ercia

o
The necessary scope of the leakage test depends on the pres‐
rm
m

atio

sure section which has been worked on.


om

n in
c

Note the following allocation!


or

thi
te

sd
iva

o
r
rp

cu
o

Allocation:
f

en
ng

t.
yi
⇒ “3.1 Different pressure sections of natural gas supply system”,
Co
op py
page 214
. C rig
ht ht
rig by
py Vo
– Open fuel tank shut-off valves -N361/N362/N363/N429- (de‐
co lksw
by
cted agen
pending on vehicle model and equipment level) using hand Prote AG.
wheel - T50026- .
– Check gas system
⇒ “3 Checking natural gas supply system for leaks”,
page 214
Specified torques:
Component Specified torque Procedure
Securing bolts for cam‐ 10 Nm + turn 90° Tighten mount‐
shaft housing/renew further ings from centre
outwards

1. Cylinder head 71
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Removing and installing valve timing housing


⇒ “2.1 Removing and installing valve timing housing (timing
case)”, page 74
♦ Install turbocharger
⇒ “1.2 Removing and installing turbocharger”, page 166 .
♦ Install crankshaft belt pulley
⇒ “1.5 Removing and installing pulley”, page 34 .
♦ Connect fuel lines
⇒ “8.2 Removing and installing high-pressure pump”,
page 263 . n AG. Volkswagen AG do
lkswage es n
o ot g
yV
1.4 Checking compression d b ua
ran
ir se tee
tho
u or
a ac
ss
Special tools and workshop

ce
le
un

pt
equipment required

an
d
itte

y li
erm

ab
♦ Spark plug socket and ex‐

ility
ot p

tension - 3122 B-

wit
is n

h re
♦ Torque wrench - V.A.G
ole,

1331-

spec
urposes, in part or in wh

♦ Compression tester - V.A.G

t to the co
1763-
♦ Puller - T10094 A-

rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

Test prerequisite
• Engine oil temperature must be at least 30°C.
Procedure
– Remove air filter
⇒ “6.2 Removing and installing air filter housing”, page 243 .
– Remove ignition coils. Use puller - T10094 A- for this purpose.

72 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Unscrew spark plugs with spark plug socket and extension -


3122 B-
⇒ “1.4 Removing and installing ignition coils with output stage”,
page 289 .
– Remove fuse for fuel pump control unit voltage supply from
fuse holder under left side of dash panel. Fuse assignment:
⇒ Current flow diagrams, Electrical fault finding and Fitting lo‐
cations.

Note

Removing fuse interrupts voltage supply for fuel pump control


unit.
. Volkswagen AG
gen AG does
swa
Connect ⇒ Vehicle y Vdiagnostic tester and perform guided
olk not
gu function
“Releasing pressure
ised b
in the natural gas high-pressure araline”.
nte
r
tho eo
– Checks aucompression using compression tester - V.A.G 1763- ra
c ,
adapter
s - V.A.G 1381/1- and adapter - V.A.G 1381/5A- .

ce
le
un

pt
an
d
itte

y li
erm

Note

ab
ility
ot p

wit
is n

Using compression tester: ⇒ Operating instructions .

h re
ole,

spec
urposes, in part or in wh

– Operate starter until tester shows no further pressure in‐


crease. t to the co

Compression pressures:
rrectne

New bar pressure Wear limit bar pres‐ Difference between


sure cylinders bar pres‐
s

sure
s o
cial p

f i

10.0 … 15.0 7.0 max. 3.0


nform
mer

– Insert spark plugs using spark plug socket and extension -


atio
m

3122 B- and tighten to 25 Nm.


o

n
c

i
or

n thi
e

Further assembly is basically the reverse of the dismantling se‐


t

sd
va

quence.
i

o
pr

cum
r
fo

– Read event memory, rectify any faults and then clear fault
en
ng

t.
yi Co
memory: ⇒ Vehicle diagnostic tester “Guided Fault Finding”. . Cop py
rig
ht ht
rig
The readiness code must be generated if the event memory has
py by
co Vo
been cleared.
by lksw
cted agen
Prote AG.

1. Cylinder head 73
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2 Cover for timing chain


⇒ “2.1 Removing and installing valve timing housing (timing
case)”, page 74

2.1 Removing and installing valve timing


housing (timing case)
⇒ “2.1.1 Removing and installing valve timing housing (Passat)”,
page 74
⇒ “2.1.2 Removing and installing control housing (Touran)”, page
80

2.1.1 Removing and installing valve timing housing (Passat)

Special tools and workshop


equipment required
♦ Support bracket - 10-222A-
♦ Adapter - 10 - 222 A /8-
♦ Counterhold - 3415-
♦ Pins - 3415/1-
♦ Torque wrench - V.A.G
1331-

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

74 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Torque wrench - V.A.G 1332-


♦ Silicone adhesive sealant ⇒ Electronic Parts Catalogue (ET‐
KA)
Removing

DANGER!

Before working on the natural gas system, always observe


⇒ “2.2 Safety precautions when working on natural gas sys‐
tem”, page 4 !!!

WARNING

• Make sure that the tank shut-off valve on each of the nat‐
ural gas tanks is closed.

– Empty gas system ⇒ Fuel supply system – natural gas en‐


gines; Rep. gr. 20 ; Fuel tank; Releasing pressure in high-
pressure line .
– Mark the direction of rotation of the poly V-belt and remove
belt ⇒ “1.3 Removing and installing poly V-belt”, page 30 .
– Turn crankshaft in direction of engine rotation to TDC for no.
1 cylinder ⇒ “3.1 Checking valve timing”, page 88 .
– Remove coolant pump
⇒ “2.2 Removing and installing coolant pump”, page 145 .

– Carefully loosen union nut -arrow- and allow residual gas to


escape.

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c
ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

– Unscrew securing nuts/bolts -arrows- for gas pressure regu‐


spec
es, in part or in w

lator bracket.
t to the co

Caution
rrectness of i

Ensure that high-pressure lines are not kinked.


l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Cover for timing chain 75


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Push gas pressure regulator -1- in direction of -arrow- and se‐


cure to side with wire.
– Remove banjo bolt from oil supply pipe to turbocharger.
– Remove air conditioner compressor from bracket with refrig‐
erant lines still connected ⇒ Heating, air conditioning; Rep.
gr. 87 .
– Remove bracket for tensioning element and air conditioner
compressor.
– Remove alternator.

– Position support bracket - 10 - 222 A- with adapter - 10 - 222


A /8- and hook - 10 - 222 A /10- as shown in illustration.
– Fit adapter - 10 - 222 A /8- behind bolts -arrow 1- and
-arrow 2-.

WARNING

Not not fit adapter - 10 - 222 A /8- on edges of wing.


The wing will otherwise be damaged.

AG. Volkswagen AG d
agen oes
olksw not
yV gu
– Take up weight of engine and remove securing
ised b bolts ara
nte
-arrows-. ut
hor eo
a ra
s c
– Remove sump s
ce
le

⇒ “1.3 Removing and installing sump”, page 127 .


un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i

– Now remove pulley securing bolt. Hold pulley with counterhold


- 3415- and -3415/1- .
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

76 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Remove Allen bolts for valve timing housing andgehexagon


n AG. Volkswagen AG do
swa es n
bolts indicated by -arrows-. yV
olk ot g
u b ara
ed nte
– Remove valve timing housing. thoris e or
au ac
ss

ce
le
un
Note

pt
an
d
itte

y li
rm

ab
Note that crankshaft bearing bush remains in sealing flange.
pe

ility
ot

wit
, is n
Installing

h re
hole

spec
es, in part or in w

t to the co
Note

♦ In vehicles as of August 2009, a diamond coated washer is

rrectness of i
installed. The diamond coated washer prevents the crankshaft
from being turned when the securing bolt is tightened.
l purpos

♦ Install a diamond-coated washer -7- if a washer was not fitted


as original equipment ⇒ Electronic Parts Catalogue “ETKA”.

nform
ercia

♦ The washer is fitted -7- between the bearing bush -5- and the
m

a
com

t
crankshaft chain sprocket.

ion in
r
te o

♦ Note that all contact surfaces from the securing bolt to the

thi
s
iva

crankshaft chain sprocket must be free of oil and grease.

do
r
rp

cum
fo

en
ng

t.
yi Co
– Clean sealing surfaces carefully. They must be free of oil and . Cop py
grease.
ht rig
rig ht
py by
co Vo
1 - Securing bolt
by lksw
cted agen
Prote AG.
2 - Crankshaft belt pulley
3 - Diamond coated washer (clipped onto crankshaft belt pulley)
4 - Crankshaft oil seal
5 - Bearing bush
6 - O-ring
7 - Diamond coated washer

Note

♦ The valve timing housing is still sealed to engine with a gasket


and, additionally, with silicone adhesive sealant ⇒ Electronic
Parts Catalogue .
♦ The silicone adhesive sealant ⇒ Electronic Parts Catalogue
is intended to prevent leaks between the valve timing housing
and the joints -1- and -2-.
♦ Sealant spots must have a diameter of 10 mm and a thickness
of approx. 1 mm.
♦ Do not apply sealant until directly before the valve timing
housing is fitted.

2. Cover for timing chain 77


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Apply silicone adhesive sealant to joints camshaft housing/


cylinder head -1- and cylinder head/cylinder block -2-.
– Fit new gasket onto dowel pins.
– When fitting, install two -M6x80- studs into cylinder head and
cylinder block as a guide.
– Fit valve timing housing with crankshaft bearing bush simul‐
taneously onto studs, dowel pins and crankshaft journal.

AG. Volkswagen AG d
Note agen oes
olksw not
V gu
d by ara
ise nte
Ensure that timingthhousing
or is not canted. eo
au ra
ss c
– Tighten valve timing housing securing bolts observing speci‐

ce
le
un

pt
fied tightening procedure ⇒ page 79 .

an
d
itte

y li
rm

ab
Align engine mountings as follows:
pe

ility
ot

wit
, is n

h re
hole

spec
♦ There must be a distance -a- of at least 10 mm between engine
es, in part or in w

support and longitudinal member (right side).

t to the co
♦ The side surface of the engine support -2- should be located
parallel to the support arm -1-.

rrectness of i
Install crankshaft belt pulley
l purpos

⇒ “1.5 Removing and installing pulley”, page 34 . nform


mercia

a
com

tion in
r
te o

thi
s
iva

do
r

– Tighten union nut -arrow- to 5 Nm +70° additional specified


rp

cum
fo

angle.
en
ng

t.
yi Co
op
– Counterhold on union with an open-end spanner
C py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

78 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Tighten securing bolts and nuts -arrows- on bracket for gas


pressure regulator to 8 Nm.

Note

♦ On no account must the union nut be tightened further than


specified, otherwise the special connection will be damaged
and the pressure line must be renewed.
♦ Natural gas system may not be operated until tested accord‐
ingly.

Further assembly is basically the reverse of the dismantling se‐


quence.

WARNING

• Operating the natural gas system without having tested it


for leaks according to specifications may result in severe
injuries or death.
The necessary scope of the leakage test depends on the pres‐
sure section which has been worked on.
AG. Volkswagen AG d
Note the following allocation! agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
Allocation: s au ra
c
⇒ “3.1 Different pressure sections of natural gas supply system”, s ce
e
nl

page 214
pt
du

an
itte

y li
– Open fuel tank shut-off valves -N361/N362/N363- using hand
erm

ab

wheel - T50026- .
ility
ot p

wit
, is n

– Check gas system


h re

⇒ “3 Checking natural gas supply system for leaks”,


hole

spec

page 214
es, in part or in w

t to the co

Specified torques:
Component: Specified torque Procedure
rrectness of i

securing bolts for valve


timing housing cover
l purpos

Stage 1 (all bolts) hand-tight Pre-tighten in di‐


agonal sequence
nform
ercia

M6 10 Nm In diagonal se‐
m

at

quence
om

ion
c

M10 50 Nm In diagonal se‐


in t
or

his
e

quence
at

do
priv

cum

♦ Securing bolts for gas pressure regulator ⇒ page 228


for

en
ng

t.
yi
♦ Specified torques for assembly mountings
Co
Cop py
⇒ “2 Assembly mountings”, page 25
t. rig
gh ht
pyri by
Vo
o
♦ Securing bolts for coolant pump
c by lksw
cted agen
⇒ “2.2 Removing and installing coolant pump”, page 145
Prote AG.

♦ Securing bolt for crankshaft pulley


⇒ “1.2 Assembly overview - cylinder block (pulley end)”, page
28
♦ Securing bolts for sump
⇒ “1.3 Removing and installing sump”, page 127
♦ Securing bolts for pressure pipe
⇒ “7.1 Assembly overview - intake manifold”, page 244

2. Cover for timing chain 79


AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant
rised
2011 ➤ , Touran 2003 ➤ nte
o eo
4-cylinder direct-injection engine (1.4 l,anatural
ut
h
gas, EA 111, turbocharger, supercharger) ra - Edition
s c
11.2015 s

ce
e
nl

pt
du

an
2.1.2 Removing and installing control housing (Touran)

itte

y li
erm

ab
ility
ot p

wit
, is n
Special tools and workshop

h re
equipment required

hole

spec
es, in part or in w
♦ Support bracket - 10-222A-

t to the co
♦ Adapter - 10 - 222 A /26-
♦ Adapter - 10-222 A/30-

rrectness of i
♦ Counterhold - 3415- l purpos

♦ Pins - 3415/1-

nf
ercia

♦ Torque wrench - V.A.G

orm
1331-
m

atio
om

n in
♦ Hook - 10 - 222 A /10- (not
or c

thi
illustrated)
te

sd
iva

o
r

♦ Shackle - 10 - 222 A /12-


rp

cu
o

m
(not illustrated)
f

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

80 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Torque wrench - V.A.G 1332-


♦ Silicone adhesive sealant
Removing

DANGER!

Before working on the natural gas system, always observe


⇒ “2.2 Safety precautions when working on natural gas sys‐
tem”, page 4 !!!

WARNING

• Make sure that the tank shut-off valve on each of the nat‐
ural gas tanks is closed.

– Empty gas system ⇒ Fuel supply system – natural gas en‐


gines; Rep. gr. 20 ; Fuel tank; Releasing pressure in high-
pressure line .
– Mark the direction of rotation of the poly V-belt and remove
belt ⇒ “1.3 Removing and installing poly V-belt”, page 30 .
– Turn crankshaft in direction of engine rotation to TDC of
No. 1 cylinder ⇒ “3.1 Checking valve timing”, page 88
agen
AG. . Volkswagen AG d
o w es n
olks ot g
– Remove coolant pump db
yV ua
ran
⇒ “2.2 Removing and installing coolant
orisepump”, page 145 . tee
th or
s au ac
s
– Carefully loosen union nut -arrow- and allow residual gas to

ce
e
nl

escape.

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

– Unscrew securing nuts/bolts -arrows- for gas pressure regu‐


nform

lator bracket.
mercia

at
om

Caution
on
c

in t
or

his
te

Ensure that high-pressure lines are not kinked.


a

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

2. Cover for timing chain 81


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015 gen AG
. Volkswagen AG
d
wa oes
olks not
yV gu
– Push gas pressure regulator
ed b -1- in direction of -arrow- and se‐
ara
nte
ris
cure to side withuwire.
tho eo
ra
sa c
– Remove banjo bolt from oil supply pipe to turbocharger.
s

ce
e
nl

pt
du

– Remove air conditioner compressor from bracket with refrig‐

an
itte

y li
erant lines still connected ⇒ Heating, air conditioning; Rep.
erm

ab
gr. 87 .

ility
ot p

wit
, is n

– Remove bracket for tensioning element and air conditioner

h re
compressor.
hole

spec
es, in part or in w

– Remove alternator.

t to the co
Note

rrectness of i
♦ The Touran has different versions of the front end.
l purpos

♦ The shape of the headlights is a distinguishing characteristic.

nf
ercia

o
♦ Determine which version of the front end is at hand and use

rm
the correct adapters accordingly.
m

atio
om

n in
or c

Vehicles ► 11.06

thi
te

sd
iva

o
r
rp

cu
Small headlights -arrow 1-: adapter - 10-222A/22- .
o

m
f

en
ng

t.
yi Co
Vehicles from 12.06 ► 05.10 t. Cop py
rig
gh ht
Large headlights with curve -arrows 2-: adapter - 10-222A/26- . yri
p by
co Vo
by lksw
cted
Vehicles 06.10 ►
agen
Prote AG.

Large headlights without curve -arrow 3-: adapter - 10-222A/30- .

82 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Fit engine support bracket - 10-222A- with adapter and take


up weight of engine in installation position.

– Take up weight of engine and remove securing bolts


-arrows-.
– Remove sump
⇒ “1.3 Removing and installing sump”, page 127 .

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
e
nl

pt
du

an
itte

y li
– Now remove pulley securing bolt. Hold pulley with counterhold
erm

ab
ility
- 3415- and -3415/1- .
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Cover for timing chain 83


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Remove Allen bolts for valve timing housing and hexagon


bolts indicated by -arrows-.
– Remove valve timing housing.

Note

Note that crankshaft bearing bush remains in sealing flange.

Installing

Note

♦ From model year 2009, a diamond-coated washer is installed.


The washer prevent the crankshaft from being turned when
the securing bolt is tightened.
♦ Install a diamond-coated washer -7- if none was already fitted
⇒ Electronic Parts Catalogue “ETKA”.
♦ The washer is fitted -7- between the bearing bush -5- and the
crankshaft chain sprocket.
♦ Note that all contact surfaces from the securing bolt to the
crankshaft chain sprocket must be free of oil and grease. n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
ed ran
– Clean sealing surfaces carefully. They must be freethoof
r oil and
is tee
grease. au or
ac
ss

ce
1 - Securing bolt
le
un

pt
an
d
itte

2 - Crankshaft belt pulley

y li
erm

ab
ility
3 - Diamond coated washer (clipped onto crankshaft belt pulley)
ot p

wit
is n

4 - Crankshaft oil seal

h re
ole,

spec
5 - Bearing bush
urposes, in part or in wh

t to the co
6 - O-ring
7 - Diamond coated washer

Note rrectness o
cial p

f in

♦ The valve timing housing is still sealed to engine with a gasket


form
mer

and, additionally, with silicone adhesive sealant ⇒ Electronic


atio

Parts Catalogue .
om

n
c

i
or

♦ The silicone adhesive sealant ⇒ Electronic Parts Catalogue


thi
e

is intended to prevent leaks between the valve timing housing


t

sd
iva

and the joints -1- and -2-.


pr

cum
r
fo

en
ng

♦ Sealant spots must have a diameter of 10 mm and a thickness


t.
yi Co
op
of approx. 1 mm. C py
t. rig
gh ht
yri
♦ Do not apply sealant until directly before the valve timing
p by
co Vo
by lksw
housing is fitted. Prote
cted AG.
agen

84 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Apply silicone adhesive sealant to joints camshaft housing/


cylinder head -1- and cylinder head/cylinder block -2-.
– Fit new gasket onto dowel pins.
– When fitting, install two -M6x80- studs into cylinder head and
cylinder block as a guide.
– Fit valve timing housing with crankshaft bearing bush simul‐
taneously onto studs, dowel pins and crankshaft journal.

Note

Ensure that timing housing is not canted.

– Tighten valve timing housing securing bolts observing speci‐


fied tightening procedure ⇒ page 86 .
Align engine mountings as follows:

♦ There must be a distance -a- of at least 10 mm between engine


support and longitudinal member (right side).
♦ The side surface of the engine support -2- should be located
parallel to the support arm -1-.
Install crankshaft belt pulley
⇒ “1.5 Removing and installing pulley”, page 34 .

AG. Volkswagen AG d
agen oes
o lksw not
y V gu
d b ara
rise nte
– Tighten union nut -arrow-
utho to 5 Nm +70° additional specified eo
ra
angle. ss a c
ce
le

– Counterhold on union with an open-end spanner


un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Cover for timing chain 85


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Tighten securing bolts and nuts -arrows- on bracket for gas


pressure regulator to 8 Nm. gen AG
. Volkswagen AG
a does
ksw not
y Vol gu
b ara
ed nte
Note oris eo
th
au ra
c
ss
♦ On no account must the union nut be tightened further than

ce
le
un

pt
specified, otherwise the special connection will be damaged

an
d
itte

and the pressure line must be renewed.

y li
rm

ab
pe

ility
♦ Natural gas system may not be operated until tested accord‐
ot

ingly.

wit
, is n

h re
hole

spec
Further assembly is basically the reverse of the dismantling se‐
es, in part or in w

quence.

t to the co
WARNING

rrectness of i
• Operating the natural gas system without having tested it
l purpos

for leaks according to specifications may result in severe


injuries or death.

nform
ercia

The necessary scope of the leakage test depends on the pres‐


m

sure section which has been worked on.

a
com

tion in
Note the following allocation!
r
te o

thi
s
iva

do
r
rp

cum
fo

Allocation:

en
ng

t.
yi
⇒ “3.1 Different pressure sections of natural gas supply system”,
Co
op py
page 214 t. C rig
gh ht
pyri by
5-seater
co Vo
by lksw
cted agen
Prote AG.
– Open fuel tank shut-off valves -N361/N362/N363- using hand
wheel - T50026- .
7-seater
– Open fuel tank shut-off valves -N361/N362/N363/N429- using
hand wheel - T50026- .
All vehicles
– Check gas system
⇒ “3 Checking natural gas supply system for leaks”,
page 214
Specified torques:
Component: Specified torque Procedure
securing bolts for valve
timing housing cover
Stage 1 (all bolts) hand-tight Pre-tighten in di‐
agonal sequence
M6 10 Nm In diagonal se‐
quence
M10 50 Nm In diagonal se‐
quence
♦ Securing bolts for gas pressure regulator
⇒ “5.1 Assembly overview - gas pressure regulator”,
page 228
♦ Specified torques for assembly mountings
⇒ “2 Assembly mountings”, page 25
♦ Securing bolts for coolant pump
⇒ “2.2 Removing and installing coolant pump”, page 145

86 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Securing bolt for crankshaft pulley n AG. Volkswagen AG do


wage
⇒ “1.2 Assembly overview - cylinder block Volks(pulley end)”, page es n
ot g
28 d by ua
ran
se ri tee
ho
♦ Securing bolts for sump au
t or
ac
⇒ “1.3 Removing and installing
ss sump”, page 127

ce
e
nl

pt
du
♦ Securing bolts for pressure pipe

an
itte

y li
⇒ “7.1 Assembly overview - intake manifold”, page 244
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Cover for timing chain 87


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3 Chain drive
⇒ “3.1 Checking valve timing”, page 88
⇒ “3.2 Adjusting valve timing”, page 90
⇒ “3.3 Checking timing chain”, page 99
⇒ “3.4 Removing and installing timing chain and chain drive for
oil pump”, page 106

3.1 Checking valve timing

Special tools and workshop


equipment required
♦ Spark plug socket and ex‐
tension - 3122 B-
♦ Torque wrench - V.A.G
1331-
♦ Dial gauge - VAS 6079-
AG. Volkswagen AG d
♦ Puller - T10094 A- agen oes
olksw not
y V gu
d b ara
♦ Dial gauge adapter - orise nte
T10170- or dial gauge auth eo
ra
adapter - T10170 A- (ob‐ ss c
serve note ⇒ page 89 ).

ce
e
nl

pt
du

an
itte

♦ Camshaft clamp - T10171

y li
erm

ab
A-

ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

Note

The mounting points for securing the camshaft clamp were modi‐
fied. A new special tool designated camshaft clamp - T10171 A-
has been introduced. Previous camshaft clamp - T10171- can
continue to be used if modified as described below.

88 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Place template -1- onto camshaft clamp - T10171- as shown.


– Mark camshaft clamp - T10171- at mark -2- using a centre
punch.
– Drill through camshaft clamp - T10171 - using a 7 mm bit.
– Deburr hole on both sides.
– Additionally mark tool designation -T10171- with an »A«.
Test procedure
– Remove lower part of front right wheel housing liner ⇒ General
body repairs; Rep. gr. 66 ; Wheel housing liner; Removing
and installing front wheel housing liner .
– Remove air filter
⇒ “6.2 Removing and installing air filter housing”, page 243 .
. Volkswagen AG
a gen AG d
– Remove spark plug from No. 1 Vocylinder.
lksw To do this, use puller
oes
not
gu
- T10094 A- and spark plug ed bsocket
y and extension - 3122 B- ara
nte
⇒ “1.4 Removing and installing
thoris ignition coils with output stage”, eo
page 289 . sa
u ra
c s

ce
e
nl

pt
– Release and pull off connector -2-.
du

an
itte

y li
erm

– Remove oil pressure switch - F1- -1-.

ab
ility
ot p

– Then remove bolts for both camshaft covers -3-.

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
ercia

– Unclip engine pre-wiring harness -1-.


m

at

– Pull coolant pipe -2- and engine pre-wiring harness -1- away
om

io

from cylinder head.


n
c

in t
or

his
e

– Remove both bolts -3- from cylinder head.


at

do
priv

cum
for

en
ng

t.
Note
yi Co
Cop py
t. rig
gh ht
yri
If the dial gauge adapter - T10170 A- is used, the ball head does p by
co Vo
not need to be unscrewed from the dial gauge - VAS 6079- . The
by lksw
cted agen
Prote
ball head is fitted onto the flat side of the rod.
AG.

– Screw dial gauge adapter - T10170- into spark plug hole to


stop.
– Insert dial gauge - VAS 6079- with extension from dial gauge
adapter - T10170- to stop and lock using lock nut -arrow-.
– Turn crankshaft in direction of engine rotation, to TDC for No.
1 cylinder. Note position of small needle on dial gauge.

3. Chain drive 89
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

The holes -arrows- in the camshaft must align as shown. Other‐


wise turn crankshaft one rotation (360°) further.

Note
olkswagen AG
en AG. V
♦ If crankshaft is turned 0.01
olkmm
swa passed TDC, turn dcrankshaft
g oes
no
two full turns in engine d bdirection of rotation to set crankshaft
yV t gu
arat
an
TDC for No. 1 cylinder.
ho
rise tee
t or
au
♦ Permissible deviation from TDC for No. 1 cylinder: ± 0.01 mm.
ac
ss

ce
e
nl

pt
du

an
itte

y li
Caution
erm

ab
ility
ot p

wit
Before using camshaft clamp - T10171 A- you must check that
, is n

h re
the pins on the tool project by at least 7 mm.
hole

spec
If this is not the case, the camshaft clamp is defective and must
es, in part or in w

t to the co
be renewed.
The camshaft clamp must not be positioned using any kind of
hammer.

rrectness of i
l purpos

– Insert camshaft clamp - T10171 A- to stop in camshaft open‐

nf
ercia

ings.

orm
m

atio
Locking pins -arrows 1- must engage in holes -arrows 2-. Inscrip‐
om

tion “TOP” -arrow 3- must be readable from above.


n in
or c

thi
e

If camshaft clamp - T10171 A- cannot be inserted into camshaft


t

sd
iva

openings to stop, then timing is incorrect and must be readjusted


r
rp

cu
o

⇒ “3.2 Adjusting valve timing”, page 90 .


f

en
ng

t.
yi Co
op
Timing is OK if camshaft clamp - T10171 A- can be fitted into C py
t. rig
camshaft openings to stop. gh ht
pyri by
Vo
o
by c lksw
Further assembly is basically the reverse of the dismantling se‐ Prote
cted AG.
agen
quence. In the process, note the following:
♦ Renew oil seals for camshaft sealing cover and oil them before
fitting.

3.2 Adjusting valve timing

90 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Special tools and workshop


equipment required
♦ Dial gauge - VAS 6079-
♦ Puller - T10094 A-
♦ Dial gauge adapter -
T10170- or dial gauge
adapter - T10170 A- (ob‐
serve note ⇒ page 93 ).
♦ Camshaft clamp - T10171
A-
♦ Counterhold - T10172-
♦ Locking pin - T40011-

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

3. Chain drive 91
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Torque wrench - V.A.G


1601-
♦ Counterhold - 3415-
♦ Locking pin - T10340-
♦ Torque wrench - V.A.G
1331-

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

♦ Spark plug socket and extension - 3122 B-


nform
ercia

Procedure
m

a
com

tio

DANGER!
n in
r
te o

thi
s
iva

Before working on the natural gas system, always observe


do
r
rp

⇒ “2.2 Safety precautions when working on natural gas sys‐


um
fo

tem”, page 4 !!!


en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
WARNING
cted agen
Prote AG.

• Make sure that the tank shut-off valve on each of the nat‐
ural gas tanks is closed.

– Empty gas system ⇒ Fuel supply system – natural gas en‐


gines; Rep. gr. 20 ; Fuel tank; Releasing pressure in high-
pressure line .
– Remove valve timing housing
⇒ “2.1 Removing and installing valve timing housing (timing
case)”, page 74 .

92 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– To turn crankshaft, reinstall bearing bush, crankshaft pulley


-2- and crankshaft bolt -3- and securely tighten crankshaft bolt
(use counterhold - 3415- ).
– Remove spark plug from No. 1 cylinder. To do this, use puller
- T10094 A- and spark plug socket and extension - 3122 B-
⇒ “1.4 Removing and installing ignition coils with output stage”,
page 289 .

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
ho eo
– Release and pull off connector -2-. aut ra
c
ss
– Remove oil pressure switch - F1- -1-.

ce
e
nl

pt
du

an
itte
– Then remove bolts for both camshaft covers -3-.

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

– Unclip engine pre-wiring harness -1-.


– Pull coolant pipe -2- and engine pre-wiring harness -1- away

nf
ercia

from cylinder head.

orm
m

atio
– Remove both bolts -3- from cylinder head.
om

n in
or c

thi
te

sd
a

Note
iv

o
r
rp

cu
o

m
f

en
ng

If the dial gauge adapter - T10170 A- is used, the ball head does
t.
yi Co
not need to be unscrewed from the dial gauge - VAS 6079- . The Cop py
t. rig
ball head is fitted onto the flat side of the rod. gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.
– Screw dial gauge adapter - T10170- into spark plug hole to
stop.
– Screw dial gauge - VAS 6079- and extension -T10170/1- in to
stop and lock in position with lock nut -arrow-.
– Turn crankshaft in direction of engine rotation, to TDC for No.
1 cylinder. Note position of small needle on dial gauge.
– Then turn crankshaft 2 revolutions in engine direction of rota‐
tion.

3. Chain drive 93
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Press tensioning plate -1- in direction of -arrow- and lock pis‐


ton with locking pin - T40011- .

– Mark direction of rotation of timing chain -3- using coloured felt


tip marker pen.

Note

♦ Camshaft adjuster centre bolt -2- has a left-hand thread.


♦ Counterhold using counterhold - T10172- .
AG. Volkswagen AG d
agen oes
olksw not
V
– Remove bolts -2- and -4-, and remove camshaft adjuster
d by -1- gu
ara
with timing chain -3-. rise nte
tho eo
au ra
– Install camshaft adjuster -1- again. ss c

ce
e
nl

pt
– Renew bolts -2- and -4-, and tighten bolts -2- and -4- to speci‐
du

an
itte

fied torque, stage 1 ⇒ page 99 .

y li
erm

ab
ility
ot p

Caution

wit
, is n

h re
hole

spec
Before using camshaft clamp - T10171 A- you must check that
es, in part or in w

the pins on the tool project by at least 7 mm.

t to the co
If this is not the case, the camshaft clamp is defective and must
be renewed.

rrectness of i
The camshaft clamp must not be positioned using any kind of
l purpos

hammer.
nform
ercia

– Turn inlet and exhaust camshafts until camshaft clamp -


m

at
om

T10171 A- can be inserted into holes in camshaft to stop.


ion
c

in t
or

Locking pins -arrows 1- must engage in holes -arrows 2-. Inscrip‐


his
ate

tion “TOP” -arrow 3- must be readable from above.


do
priv

cum
for

en
ng

t.
yi Co
Note t. Cop py
rig
gh ht
yri by
Camshafts must not be pushed axially whilst turning.
cop Vo
by lksw
cted agen
Prote AG.

94 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Screw M6 bolt hand-tight into corresponding bore -arrows- (do


not tighten) to secure camshaft clamp - T10171 A- .

Note

Note that there are different securing points for the camshaft
clamp - T10171 A- .

– Remove camshaft sprocket bolts. It is absolutely necessary to


use counterhold - T10172- for this.
AG. Volkswagen AG d
agen oes
olksw not
Note ed byV gu
ara
ris nte
ho eo
ut
The camshaft clamp - T10171 A- must not sbe
s used as a counter‐
a ra
c
hold.

ce
e
nl

pt
du

an
itte

y li
– Remove one camshaft sprocket.
erm

ab
ility
ot p

wit
Caution
, is n

h re
hole

spec
If the camshaft adjuster has been removed, the guide sleeve
es, in part or in w

must seat in the camshaft when installing!

t to the co
– Place timing chain over camshaft sprockets, observing chain

rrectness of i
direction of rotation, and install camshaft sprocket again.
l purpos

– Tighten camshaft bolts until camshaft sprockets can still just


be turned on camshafts.

nform
ercia

– Tension timing chain by removing locking pin - T40011- .


m

at
om

ion
c

– Turn crankshaft in engine direction of rotation to TDC for No.

in t
or

1 cylinder. Permissible deviation from TDC for No. 1 cylinder:

his
ate

do
± 0.01 mm.
priv

cum
for

en
ng

t.
yi Co
op
Note C py
ht. rig
rig ht
py by
o Vo
If crankshaft is turned 0.01 mm passed TDC, turn crankshaft two by c lksw
cted agen
full turns in engine direction of rotation to set crankshaft at TDC Prote AG.
for No. 1 cylinder.

– Unscrew plug -arrow- from crankcase.


– Screw locking pin - T10340- to stop into crankcase.
– Tighten locking pin - T10340- to 30 Nm.

3. Chain drive 95
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Locking pin - T10340- locks crankshaft in direction of engine ro‐


tation.
– Using counterhold tool - T10172- , hold camshaft sprockets
-1- and -5- in this position.

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
– Tighten bolts -2- and -4-aut to specified torque, stage 1 ra
c
⇒ page 99 . ss

ce
e
nl

pt
du

an
itte

y li
Note
erm

ab
ility
ot p

wit
Crankshaft must not move and timing chain -3- must remain ten‐
, is n

h re
sioned on both sides when tightening camshaft bolts.
hole

spec
es, in part or in w

– Remove camshaft clamp - T10171 A- .

t to the co
rrectness of i
l purpos

– Unscrew locking pin - T10340- from crankcase.


– Turn crankshaft 2 turns in direction of engine rotation to TDC
nf
ercia

of No. 1 cylinder. Permissible deviation from TDC of No. 1 cyl‐


inder: ± 0.01 mm. orm
m

atio
om

n in
or c

Caution
thi
te

sd
iva

o
r
rp

cu

Before using camshaft clamp - T10171 A- you must check that


o

m
f

the pins on the tool project by at least 7 mm.


en
ng

t.
yi Co
op py
If this is not the case, the camshaft clamp is defective and must t. C rig
gh ht
be renewed. yri
p by
o Vo
by c lksw
cted
The camshaft clamp must not be positioned using any kind of
agen
Prote AG.
hammer.

– Insert camshaft clamp - T10171 A- to stop in camshaft open‐


ings.
If camshaft clamp - T10171 A- cannot be fitted:
– Repeat adjustment.
If camshaft clamp - T10171 A- can be inserted:

96 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Screw locking pin - T10340- to stop into crankcase.


– Tighten locking pin - T10340- to 30 Nm.
AG. Volkswagen AG d
agen oes
– Remove camshaft clamp - T10171 A- ; counterhold Vol at cam‐
ksw not
gu
shaft sprockets with counterhold tool - T10172-
d by . ara
se ri nte
ho eo
aut ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

3. Chain drive 97
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Tighten bolts -2- (left-hand thread) and -4- to specified torque,


stage 2 ⇒ page 99 .

Note

♦ Camshaft adjuster centre bolt -2- has a left-hand thread.


♦ Camshaft sprockets must not move on camshaft whilst tight‐
ening.

Further assembly is basically the reverse of the dismantling


nAG. Volkswagense‐
AG do
quence. In the process, note the following: wage es n
olks o t gu
yV
db ara
rise nte
tho eo
Note au ra
c
ss

ce
e
nl

The locking pin - T10340- remains in the crankcase until the

pt
du

an
crankshaft pulley is installed.
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
Note
hole

spec
es, in part or in w

Natural gas system may not be operated until tested accordingly.

t to the co
WARNING

rrectness of i
l purpos

• Operating the natural gas system without having tested it


for leaks according to specifications may result in severe
injuries or death.

nf
ercia

orm
The necessary scope of the leakage test depends on the pres‐
m

atio
m

sure section which has been worked on.


o

n in
or c

Note the following allocation!


thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

Allocation:
t.
yi Co
op
⇒ “3.1 Different pressure sections of natural gas supply system”, C py
ht. rig
page 214 rig ht
py by
co Vo
by lksw
– Open fuel tank shut-off valves -N361/N362/N363/N429- (de‐ Prote
cted AG.
agen
pending on vehicle model and equipment level) using hand
wheel - T50026- .
– Check gas system
⇒ “3 Checking natural gas supply system for leaks”,
page 214
♦ Removing and installing valve timing housing
⇒ “2.1 Removing and installing valve timing housing (timing
case)”, page 74
♦ Install crankshaft belt pulley
⇒ “1.5 Removing and installing pulley”, page 34 .
♦ Install poly V-belt
⇒ “1.3 Removing and installing poly V-belt”, page 30 .
♦ Renew oil seals for camshaft sealing cover and oil them before
fitting.

98 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Specified torques:
Component: Specified Specified Note
camshaft adjuster/ torque, torque, stage
camshaft sprocket stage 1 2
Securing bolt for 40 Nm (left- Turn 90° fur‐ Renew
camshaft adjuster hand thread) ther
-2-
Securing bolt for 50 Nm Turn 90° fur‐ Renew
camshaft sprocket ther
-4-
♦ Spark plug ⇒ “1.3 Test data, spark plugs”, page 289
♦ Securing bolt for crankshaft pulley
⇒ “1.2 Assembly overview - cylinder gblockAG.(pulley
Volkswagend)”,
en AG page
a en does
28 Vo lksw not
y gu
db ara
♦ Securing bolts for valveotiming
ris
e housing cover nte
eo
⇒ “1.2 Assembly overview
auth
- cylinder block (pulley end)”, page ra
28 ss c

ce
e
nl

pt
du

an
3.3 Checking timing chain
itte

y li
erm

ab
ility
ot p

Special tools and workshop equipment required

wit
, is n

h re
♦ Torque wrench - VAS 6583-
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
a

♦ Test tool - T10550-


iv

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

♦ Camshaft clamp - T10550/1-


♦ Indicator - T10550/2-
♦ Scale sleeve - T10550/3-
• The engine oil temperature must be at least 40°C ⇒ Vehicle
diagnostic tester.
• The engine must not necessarily be at »TDC« position.
– Carry out function Timing chain elongation ⇒ Vehicle di‐
agnostic tester.

3. Chain drive 99
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Remove right front wheel ⇒ Running gear, axles, steering;


Rep. gr. 44 ; Wheels, tyres .
– Remove noise insulation ⇒ Body, front; Rep. gr. 50 ; Noise
insulation; Assembly overview - noise insulation .
– Remove front right wheel housing liner ⇒ General body re‐
pairs, exterior; Rep. gr. 66 ; Removing and installing wheel
housing liner .
– Remove poly V-belt
⇒ “1.3 Removing and installing poly V-belt”, page 30 .
– Drain coolant ⇒ “1.2 Draining and filling coolant”, page 137 .
Vehicles with condensate trap on charge air pipe
– Clamp off coolant hoses -1- with hose clips up to 40 mm -
3093- .
– Open clips -arrows-.
– Pull off coolant hoses -1- on charge air pipe -2-.

Vehicles with engine preheater heater element - Z97-


– Unclip wire -1- to engine preheater heater element - Z97- on
charge air pipe -2- -arrow-.

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss
ce

Vehicles with auxiliary heater:


e
nl

pt
du

an
itte

– Open clamps, and pull coolant hoses off coolant pipes -1-.
y li
erm

ab
ility

– Remove auxiliary heater with exhaust pipe and coolant hoses


ot p

wit

still connected ⇒ Auxiliary heater, supplementary heater; Rep.


, is n

h re

gr. 82 ; Auxiliary heater, supplementary heater; Removing and


hole

spec

installing auxiliary/supplementary heater .


es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

100 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Continuation for all vehicles:


n AG. Volkswagen AG do
– Pull off securing clip on charge
olks
wageair cooler in es n
ot g
-direction of arrow-. d by V ua
ran
e
ris tee
– Pull charge air uhose
tho -arrow- off charge air cooler. or
a ac
ss

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
– Remove securing bolt -arrow- for charge air pipe -1-.

rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
– Release and pull off connector -1- on oil level and oil temper‐
yi Co
op py
ature sender - G266- . t. C rig
gh ht
pyri by
– Unclip bracket -2- on subframe for electric wire to oil level and
co Vo
by lksw
cted
oil temperature sender - G266- .
agen
Prote AG.

– Unscrew securing bolt -arrow- for charge air pipe -1-.

3. Chain drive 101


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Lift off engine cover panel at points -1- and pull it forwards in
direction of -arrow-.
– Remove air filter housing
⇒ “6.2 Removing and installing air filter housing”, page 243 .

– Pull off fuel supply line -1- and line leading to activated char‐
coal filter -2- by pressing release tabs.

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
le
un

pt
an
d

– Pull off hose -1- from pressure pipe.


itte

y li
rm

ab
pe

– Unscrew securing bolts -2- from pressure pipe and remove

ility
ot

pressure pipe.

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
ercia

– Unscrew hose clip -1- on charge air pipe.


m

a
com

– Open hose retainer -2- and pull out hose. tion in


r
te o

thi

– Unscrew securing bolt for charge air pipe -3- and pull off con‐
s
iva

do

nector from charge air pressure sender - G31- with intake air
r
rp

cum

temperature sender 2 - G299- .


fo

en
ng

t.
yi
– Remove holder -4-.
Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

102 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– To do this, unscrew bolts -arrows-.


– Remove bracket -1-.

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
s c
– Unscrew bolts -arrows- and remove charge pressure sender - s

ce
le

G31- -1-.
un

pt
an
d
itte

y li
– Remove charge air pipe downwards.
rm

ab
pe

ility
– Release and pull off connector -2-.
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

Disregard item -1-.

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

– Then remove bolts for both camshaft covers -3-.


– Unclip wiring harness -1-.
– Pull coolant pipe -2- and wiring harness -1- away from cylinder
head.
– Lever both camshaft covers -3- out of cylinder head.

3. Chain drive 103


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– The hole in the exhaust camshaft -left arrow- must be posi‐


tioned as shown in the illustration.
– If necessary, turn crankshaft in direction of engine rotation.

– Insert camshaft clamp - T10550/1- to stop in camshaft open‐


ings.
– The locking pin -arrow A- must engage in hole -arrow B- in
exhaust camshaft.
– Inscription “TOP” must be readable from above.

– Bolt on camshaft clamp - T10550/1- hand-tight.


. Volkswagen AG
gen AG does
– Use one bolt of the camshaft covers for this purpose -arrow-.
Vol
ksw
a
not
by gu
ara
ed nte
oris eo
th
au ra
c
ss

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
– Screw indicator - T10550/2- into hole in sump.
– Align centring point vertically so that the tip faces upwards.
rrectne

– Tighten centring point with knurled nut.


ss o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

104 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Position scale sleeve - T10550/3- on belt pulley.

Caution

There is a risk of injury caused by trapping fingers.


The scale sleeve - T10550/3- is equipped with magnets.
Proceed with great care when joining the components.
Note that the components are joined quickly by the magnetic
force.

– Align scale sleeve - T10550/3- with indicator - T10550/2- as


shown in illustration.

– Fit torque wrench - VAS 6583- with a suitable socket to crank‐


shaft bolt.
– Push torque wrench - VAS 6583- clockwise and keep it pushed
with a torque of 40 Nm.
– Set scale sleeve - T10550/3- and indicator - T10550/2- to »0«.

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

3. Chain drive 105


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
. Volkswagen AG
gen AG does
– Switch setting of torque wrench - VAS 6583- , and push
Vol
kswit
a
not
slowly anti-clockwise. ed
by gu
ara
is nte
or
– Keep torque wrench - VAS 6583- pushed with
au a torque
th of eo
ra
40 Nm. ss c

ce
e
nl

pt
– Read value on the scale.

du

an
itte

y li
– If the chain skips during the test, renew timing chain

erm

ab
ility
⇒ “3.4 Removing and installing timing chain and chain drive

ot p

wit
for oil pump”, page 106 .
, is n

h re
hole

spec
es, in part or in w

Note

t to the co
If the chain skips, it can be heard and felt clearly.

rrectness of i
Conclusions after the test
l purpos

– If a chain elongation of up to 28° has been determined during


the test, the timing chain is OK.

nf
ercia

or
– If a chain elongation of 29° and more has been determined,

m
m

atio
the timing chain is not OK and must be renewed
om

⇒ “3.4 Removing and installing timing chain and chain drive

n in
or c

for oil pump”, page 106 .

thi
te

sd
iva

o
Installation is carried out in the reverse order. In the process, note
r
rp

cu
o

m
the following:
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
Note pyri by
Vo
co lksw
by
cted agen
Prote AG.
♦ The scale sleeve - T10550/3- is equipped with magnets.
♦ Do not use any levers for removing the scale sleeve -
T10550/3- from the belt pulley!

– Turn scale sleeve - T10550/3- towards right by approx. 45° so


that the indicator - T10550/2- is not positioned within the range
of the scale anymore.
– Grasp behind scale sleeve - T10550/3- with both hands.
– Push your thumbs onto the bolt of the belt pulley, and pull off
scale sleeve - T10550/3- .
– Renew oil seals for camshaft sealing cover and oil them before
fitting.
– Replenish coolant
⇒ “1.2 Draining and filling coolant”, page 137 .
Specified torque
♦ ⇒ “4.1 Assembly overview - valve gear”, page 117
♦ ⇒ “2.1 Assembly overview - charge air system”, page 180
♦ ⇒ “7.1 Assembly overview - intake manifold”, page 244
♦ ⇒ “2.2 Assembly overview - charge-air hose connections”,
page 181
♦ ⇒ Body, front; Rep. gr. 50 ; Noise insulation, Assembly over‐
view - noise insulation
♦ ⇒ General body repairs, exterior; Rep. gr. 66 ; Removing and
installing wheel housing liner .
♦ ⇒ Running gear, axles, steering; Rep. gr. 44 ; Wheels, tyres

3.4 Removing and installing timing chain and chain drive for oil pump

106 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Special tools and workshop


equipment required
♦ Dial gauge - VAS 6079-
♦ Puller - T10094 A-
♦ Dial gauge adapter -
T10170- or dial gauge
adapter - T10170 A- (ob‐
serve note ⇒ page 109 ).
♦ Camshaft clamp - T10171
A-
♦ Counterhold - T10172-
♦ Locking pin - T40011-

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

3. Chain drive 107


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Spark plug socket and extension - 3122 B-


♦ Counterhold - 3415-
♦ Torque wrench - V.A.G 1331-
Removing

DANGER!

Before working on the natural gas system, always observe


⇒ “2.2 Safety precautions when working on natural gas sys‐
tem”, page 4 !!!

WARNING

• Make sure that the tank shut-off valve on each of the nat‐
AG. Volkswagen AG d
ural gas tanks is closed. lksw
agen oes
n o ot g
yV ua
db ran
ir se tee
o
– Empty gas system ⇒ aFuel
uth
supply system – natural gas en‐ or
ac
gines; Rep. gr. 20 ; Fuel tank; Releasing pressure in high-
ss

ce
e

pressure line .
nl

pt
du

an
itte

y li
erm

– Lift engine cover panel at points -1- and pull it forwards in di‐

ab
ility
rection of -arrow-.
ot p

wit
, is n

– Remove air filter

h re
hole

⇒ “6.2 Removing and installing air filter housing”, page 243


spec
es, in part or in w

– Drain coolant ⇒ “1.2 Draining and filling coolant”, page 137 . t to the co
rrectness of i
l purpos

nform
mercia

at

– Remove coolant hoses and line/wiring guides -arrows-.


om

ion
c

in t

– Unscrew securing bolts of camshaft cover -1-.


or

his
ate

do
riv

– Remove spark plug from No. 1 cylinder. To do this, use puller


p

cum

- T10094 A- and spark plug socket and extension - 3122 B-


for

en
g

⇒ “1.4 Removing and installing ignition coils with output stage”,


n

t.
yi Co
page 289 . Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

108 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Release and pull off connector -2-.


– Remove oil pressure switch - F1- -1-.
– Then remove bolts for both camshaft covers -3-.

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss

ce
le
un

pt
– Unclip engine pre-wiring harness -1-.

an
d
itte

y li
erm

ab
– Pull coolant pipe -2- and engine pre-wiring harness -1- away

ility
ot p

from cylinder head.

wit
is n

h re
– Remove both bolts -3- from cylinder head.
ole,

spec
urposes, in part or in wh

t to the co
Note

If the dial gauge adapter - T10170 A- is used, the ball head does

rrectne
not need to be unscrewed from the dial gauge - VAS 6079- . The
ball head is fitted onto the flat side of the rod.

ss o
cial p

f inform
– Screw dial gauge adapter - T10170- into spark plug hole to
mer

stop.

atio
om

n
c

– Screw dial gauge - VAS 6079- and extension -T10170/1- in to

i
or

n thi
stop and lock in position with lock nut -arrow-.
te

sd
iva

o
r

– Turn crankshaft in direction of engine rotation, to TDC for No.


p

cum
r
fo

1 cylinder. Note position of small needle on dial gauge.


en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

3. Chain drive 109


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

The holes -arrows- in the camshaft must align as shown. Other‐


wise turn crankshaft one rotation (360°) further.

Note

♦ If crankshaft is turned 0.01 mm past TDC, turn crankshaft two


full turns in direction of engine rotation to set crankshaft in di‐
rection of engine rotation at TDC for No. 1 cylinder.
♦ Permissible deviation from TDC for No. 1 cylinder: ± 0.01 mm.

Caution

Before using camshaft clamp - T10171 A- you must check that


the pins on the tool project by at leasto7lksmm.
wa AG. V gen AG
agen do
If this is not the case, theVocamshaft
lksw clamp is defective and
es n
ot g must
be renewed. se
d by ua
ran
i tee
or
The camshaft clamp
ut
h
must not be positioned using any kind of or
ac
sa
hammer. s

ce
le
un

pt
an
d
itte

y li
erm

ab
– Insert camshaft clamp - T10171 A- to stop in camshaft open‐
ility
ot p

ings.
wit
is n

h re
ole,

Locking pins -arrows 1- must engage in holes -arrows 2-. Inscrip‐ spec
tion “TOP” -arrow 3- must be readable from above.
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
m

– Screw an M6 bolt hand-tight into corresponding bore


o

n
c

-arrows- (but do not tighten) to secure camshaft clamp -


i
or

n thi
e

T10171 A- .
t

sd
iva

o
pr

cum
r
fo

en
ng

Note
t.
yi Co
Cop py
t. rig
gh ht
Note that there are different securing points for the camshaft pyri by
Vo
co
clamp - T10171 A- .
by lksw
cted agen
Prote AG.

– Remove valve timing housing


⇒ “2.1 Removing and installing valve timing housing (timing
case)”, page 74 .

110 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Pull cover -1- off chain sprocket for oil pump.

– Press tensioning rail in -direction of arrow- by hand and lock


piston of chain tensioner with locking pin - T40011- .

AG. Volkswagen AG d
agen oes
olksw not
V gu
– Mark direction of rotation of timing chain -3- usingsecoloured
db
y
felt ara
nte
tip marker pen. thori
eo
au ra
ss c

ce
e
nl

Note

pt
du

an
itte

y li
erm

ab
Camshaft adjuster securing bolt -2- has a left-hand thread.

ility
ot p

wit
, is n

– Unscrew bolts -2- and -4-, and remove camshaft adjuster -1-

h re
hole

together with timing chain -3-. Counterhold using counterhold

spec
- T10172- .
es, in part or in w

t to the co
rrectness of i
– Hold oil pump chain sprocket with counterhold - T10172- and
loosen securing bolt -1-.
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

3. Chain drive 111


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Use a screwdriver on bolt -2- to release tensioning spring -1-


then remove tensioning spring -1-.
– Unscrew securing bolt -3- and remove chain tensioner.
– Mark direction of rotation of oil pump drive chain -2- using felt-
tip marker.

– Unscrew securing bolt for chain sprocket -1- and remove chain
sprockets -1- and -3- together with drive chain for oil pump
-2-.
Installing
• The crankshaft must be positioned at TDC for No. 1 cylinder.
AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c
ce
e
nl

pt
du

an
itte

y li
erm

ab

– Push chain sprocket -1- in -direction of arrow- onto crankshaft


ility
ot p

journal as far as the stop.


wit
, is n

h re
hole

spec

Caution
es, in part or in w

t to the co

Cast lug -2- on chain sprocket -1- must seat in groove -3- on
crankshaft journal.
rrectness of i
l purpos

nf
ercia

orm
m

atio
m

– Mark position of chain sprocket and crankshaft to cylinder


o

n in
c

block using a felt-tip marker.


or

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

112 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Place oil pump drive chain -3- onto drive chain sprocket -1-
and position drive chain sprocket -2- onto oil pump drive shaft
at same time.

Note

♦ Note running direction mark on oil pump drive chain.


♦ Oil pump drive sprocket only fits on oil pump drive shaft in one
position -arrow-.

– Hold oil pump drive sprocket with counterhold - T10172- .


– Tighten securing bolt -1- to 20 Nm + 90° further.

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
– Position chain tensioner on oil pump drive chain and tighten ss c

ce
e

securing bolt -3- to 15 Nm.


nl

pt
du

an
itte

– Lever tensioning spring -1- onto bolt -2- using a screwdriver.


y li
erm

ab
ility
ot p

wit
, is n

Note
h re
hole

spec

♦ Note marks -arrows-.


es, in part or in w

t to the co

♦ The crankshaft must not rotate.


rrectness of i

– Tighten chain sprocket -3- hand-tight with new securing bolt.


l purpos

– Place timing chain -1- on crankshaft chain sprocket -4-, ex‐


haust camshaft chain sprocket -3-, and tighten camshaft ad‐
nform
ercia

juster -2- hand-tight using a new securing bolt.


m

at
om

ion
c

in t

Note
or

his
ate

do
riv

♦ Note running direction mark on timing chain -1-.


p

cum
for

en
ng

♦ Ensure guide sleeve is installed between inlet camshaft and


t.
yi Co
op
camshaft adjuster.
C py
t. rig
gh ht
yri by
♦ Camshaft adjuster securing bolt -2- has a left-hand thread.
op Vo
by c lksw
cted agen
Prote AG.

3. Chain drive 113


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Timing chain must lie on guide rail -1- and crankshaft chain
sprocket -arrow-.

– Install chain tensioner -1- and tighten securing bolts -2- to


9 Nm.
– Tension timing chain by pulling locking pin - T40011- from
chain tensioner.
– Check marks on crankshaft chain sprocket and cylinder block;
they must align.

Note

Use counterhold tool -T10172- .

– Tighten securing bolt -2- and bolt -4- to specified torque,


stage 1 ⇒ page 116 .
– Check valve timing ⇒ “3.1 Checking valve timing”, page 88
If timing is not OK:

Note

♦ The camshaft adjuster securing bolt -2- has a left-hand thread.agen AG. Volkswagen AG do
w es n
olks ot g
♦ Camshaft sprockets must not move on camshaft whilst
d b tight‐
yV ua
ran
ening. ho
ris
e
tee
t or
au
♦ Tighten securing bolts -2- and -4- to specifiedsstorque, stage 2 ac
⇒ page 116 .
ce
le
un

pt
an
d
itte

y li
erm

ab

– Unscrew bolt -arrow- and remove camshaft clamp - T10171


ility
ot p

A- from camshaft housing.


wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
by
114
copy Vo
by lksw
Rep. gr.15 - Cylinder head, valve gear cted agen
Prote AG.
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Install oil pump wheel cover -1-.


– Install valve timing housing
⇒ “2.1 Removing and installing valve timing housing (timing
case)”, page 74 . wage
n AG. Volkswagen AG do
es ks not
Vol gu
– Install crankshaft pulleyed by ara
nte
⇒ “1.5 Removing and tho
rinstalling
is pulley”, page 34 . eo
au ra
– Install poly V-beltss c

ce
le

⇒ “1.3 Removing and installing poly V-belt”, page 30 .


un

pt
an
d
itte

– Renew oil seals for camshaft sealing cover and oil them before

y li
rm

ab
fitting.
pe

ility
ot

wit
Further assembly is basically the reverse of the dismantling se‐
, is n

h re
quence.
hole

spec
es, in part or in w

t to the co
Note

Natural gas system may not be operated until tested accordingly.

rrectness of i
l purpos

WARNING

nform
ercia

• Operating the natural gas system without having tested it


m

a
for leaks according to specifications may result in severe
com

tio
injuries or death.

n in
r
te o

thi
The necessary scope of the leakage test depends on the pres‐

s
iva

do
sure section which has been worked on.
r
rp

cum
fo

en
g

Note the following allocation!


n

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
Allocation:
co lksw
by
cted agen
⇒ “3.1 Different pressure sections of natural gas supply system”, Prote AG.
page 214
– Open fuel tank shut-off valves -N361/N362/N363/N429- (de‐
pending on vehicle model and equipment level) using hand
wheel - T50026- .
– Check gas system
⇒ “3 Checking natural gas supply system for leaks”,
page 214

3. Chain drive 115


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Specified torques:
Component: Specified Specified Note
camshaft adjuster/ torque, torque, stage
camshaft sprocket stage 1 2
Securing bolt for 40 Nm (left- Turn 90° fur‐ Renew
camshaft adjuster hand thread) ther
-2-
Securing bolt for 50 Nm Turn 90° fur‐ Renew
camshaft sprocket ther agen
AG. Volkswagen AG d
o
-4- Vol
ksw es n
ot g
d by ua
ran
e
♦ Spark plug ⇒ “1.3 Test data, sparkthoplugs”,
ris page 289 tee
or
au ac
♦ Securing bolt for crankshaft pulley
ss

ce
e

⇒ “1.2 Assembly overview - cylinder block (pulley end)”, page


nl

pt
du

28

an
itte

y li
erm

ab
♦ Securing bolts for valve timing housing cover

ility
ot p

⇒ “1.2 Assembly overview - cylinder block (pulley end)”, page

wit
, is n

28

h re
hole

spec
♦ Securing bolt for oil pump sprocket
es, in part or in w

⇒ “1.1 Assembly overview – sump/oil pump”, page 124

t to the co
– Push engine cover panel down at points -1- in direction of
-arrow- until it engages.

rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

116 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

4 Valve gear
⇒ “4.1 Assembly overview - valve gear”, page 117
⇒ “4.2 Measuring axial play of camshaft”, page 119
⇒ “4.3 Removing and installing valve stem seals”, page 119

4.1 Assembly overview - valve gear

1 - Bolt
❑ Left-hand thread.
❑ Renew
❑ 40 Nm + turn 90° further
2 - Camshaft adjuster
❑ Must not be dismantled.
❑ Removing and installing
⇒ “3.2 Adjusting valve
timing”, page 90 .
3 - Camshaft chain sprocket
❑ Note position when in‐
stalling timing chain.
4 - O-ring
❑ Renew if damaged.
❑ Before installing, coat AG. Volkswagen AG d
agen
lightly with engine oil. Volksw
oes
not
gu
d by ara
5 - Inlet camshaft control valve orise nte
eo
1 - N205- aut
h
ra
ss c
6 - Bolt
ce
le
un

pt
an

❑ 10 Nm
d
itte

y li
erm

ab

7 - Bolt
ility
ot p

❑ Tighten from inside out‐


wit
is n

h re

wards.
ole,

spec

❑ Renew
urposes, in part or in wh

t to the co

❑ 10 Nm + turn 90° further


8 - Camshaft housing
rrectne

❑ Removing and installing


⇒ “1.3 Removing and in‐
stalling camshaft hous‐
ss

ing”, page 64 .
o
cial p

f in

❑ Remove sealant resi‐


form
mer

due.
atio
m

❑ Before fitting, coat with sealant ⇒ Electronic Parts Catalogue


o

n
c

i
or

9 - Bolt
thi
te

sd
va

❑ 10 Nm
i

o
pr

cum
r
fo

en
ng

10 - Cap yi
t.
Co
op
❑ For inlet camshaft.
C py
t. rig
gh ht
yri
❑ For exhaust camshaft. p by
o Vo
by c lksw
cted agen
11 - Roller rocker finger Prote AG.

❑ Check roller bearing.


❑ Oil contact surface.
❑ When installing, secure to supporting element using securing clip.

4. Valve gear 117


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

12 - Valve cotters
13 - Valve stem seal
❑ Renew.
n AG. Volkswagen AG do
ks wage es
14 - Support element Vol
not
gu
d by ara
❑ Check oil spray holes. orise nte
eo
th
❑ With hydraulic valve clearance compensation.ss au ra
c
❑ Do not interchange.

ce
e
nl

pt
du

an
❑ Before installing, check camshaft axial clearance ⇒ “4.2 Measuring axial play of camshaft”, page 119 .

itte

y li
erm

ab
❑ Oil contact surface.

ility
ot p

wit
15 - Valve guide
, is n

h re
❑ Checking ⇒ “5.1 Checking valve guides”, page 122 .
hole

spec
es, in part or in w

16 - Valve spring

t to the co
❑ To remove and install with cylinder head removed, use valve spring tool - 3362- .
❑ With cylinder head installed ⇒ “4.3 Removing and installing valve stem seals”, page 119 .

rrectness of i
17 - Cylinder head
l purpos

❑ Removing and installing ⇒ “1.2 Removing and installing cylinder head”, page 59 .
❑ Rework valve seat ⇒ “5.2 Reworking valve seats”, page 122

nform
ercia

❑ Reworking sealing surface ⇒ page 118


m

at
om

18 - Valves

ion
c

in t
r

❑ Do not rework, only lapping-in is permitted.


o

his
ate

❑ Valve dimensions ⇒ page 119

do
priv

cum
or

19 - Exhaust camshaft
f

en
ng

t.
yi Co
❑ Do not interchange with inlet camshaft. t. Cop py
rig
gh
❑ Checking axial clearance ⇒ “4.2 Measuring axial play of camshaft”, page 119 .
ht
pyri by
Vo
co lksw
❑ Coat with oil before inserting (also axial bearing shoulder).
by
cted agen
Prote AG.
20 - Guide sleeve
21 - Inlet camshaft
❑ With cam for high-pressure pump
❑ Before removing, remove and renew bucket tappet for high-pressure pump.
❑ Do not interchange with exhaust camshaft.
❑ Checking axial clearance ⇒ “4.2 Measuring axial play of camshaft”, page 119 .
❑ Coat with oil before inserting (also axial bearing shoulder).
22 - Bolt
❑ Renew
❑ 50 Nm + turn 90° further

Reworking cylinder head sealing surface


Cylinder head reworking dimension: a = at least 108.25 mm

Note

When the sealing surface has been reworked, the valves must be
set deeper by the same amount (valve seat inserts reworked) or
valves will contact pistons. When doing this, ensure that the per‐
missible minimum dimension is maintained ⇒ page 119 .

118 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

4.2 Measuring axial play of camshaft


Special tools and workshop equipment required
♦ Universal dial gauge bracket - VW 387-

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
♦ Dial gauge
hole

spec
es, in part or in w

Perform measurements with camshaft housing removed and cap

t to the co
fitted.
Checking camshaft axial clearance

rrectness of i
Wear limit: max. 0.40 mm
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
or

Valve dimensions
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
yri
Note p by
co Vo
by lksw
cted agen
Prote AG.
Valves must not be reworked. Only lapping-in is permitted.

Dimension Inlet valve Exhaust valve


Diameter a mm 29.5 26.0
Diameter b mm 5.973 5.953
c mm 100.9 100.5
α ∠° 45 45

4.3 Removing and installing valve stem seals

4. Valve gear 119


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Special tools and workshop


equipment required
♦ Spark plug socket and ex‐
tension - 3122B-
♦ Valve spring tool - 3362-
with thrust piece - 3362/1-
♦ Valve stem seal puller -
3364-
♦ Valve stem seal fitting tool -
3365-
♦ Pressure hose - VW 653/3-

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
Removing
l purpos

• (With cylinder head installed)


nform
ercia

– Remove camshaft housing


⇒ “1.3 Removing and installing camshaft housing”, page 64 .
m

at
om

io

– Remove roller rocker fingers and place onto a clean surface.


n
c

in t
or

When doing this, ensure that the roller rocker fingers are not
his
ate

interchanged.
do
priv

cum
or

– Remove spark plugs using spark plug socket and extension -


f

en
ng

t.
3122 B- .
yi Co
Cop py
t. rig
– Set piston of respective cylinder to “bottom dead centre”. gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

120 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Attach valve spring tool - 3362- with thrust piece - 3362/1- .


– Screw pressure hose - VW 653/3- into spark plug thread.
– Connect pressure hose to compressed air system supplying
at least 6 bar and remove valve springs.
– Pull off valve stem seals using valve stem seal puller - 3364- .
Installing

AG. Volkswagen AG d
agen oes
– Place plastic sleeve supplied on respective valve stem. VoThis
lksw not
gu
will prevent damage to new valve stem seal. d by ara
ise r nte
ho eo
– Place new valve stem seal in valve stem sealaufitting
t
tool - ra
c
3365- . ss

ce
e
nl

pt
du

– Oil valve stem seal sealing lip and press carefully onto the

an
itte

y li
valve guide.
erm

ab
ility
ot p

– Install camshaft housing

wit
⇒ “1.3 Removing and installing camshaft housing”, page 64 .
, is n

h re
hole

– Adjust valve timing ⇒ “3.2 Adjusting valve timing”, page 90 .

spec
es, in part or in w

Further assembly is basically the reverse of the dismantling se‐

t to the co
quence. In the process, note the following:
Specified torques:

rrectness of i
♦ Camshaft housing
l purpos

⇒ “1.1 Assembly overview - cylinder head”, page 57


♦ Removing and installing valve timing housing

nform
ercia

⇒ “2.1 Removing and installing valve timing housing (timing


case)”, page 74
m

at
om

ion
c

♦ Fuel lines
in t
or

⇒ “8.2 Removing and installing high-pressure pump”,


his
ate

page 263
do
priv

cum
or

♦ Spark plugs
f

en
ng

t.
yi
⇒ “1.2 Assembly overview - ignition system”, page 287
Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

4. Valve gear 121


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

5 Inlet and exhaust valves


⇒ “5.1 Checking valve guides”, page 122
⇒ “5.2 Reworking valve seats”, page 122

5.1 Checking valve guides


Special tools and workshop equipment required
♦ Universal dial gauge bracket - VW 387-

♦ Dial gauge
Test procedure
– Insert new valve into guide. The end of the valve stem must
be flush with the guide. On account of differing stem diame‐
ters, only use inlet valve in inlet guide and exhaust valve in
exhaust guide.
– Determine rock by moving valve in direction of -arrow-.
Wear limit: 0.8 mm AG. Volkswagen AG d
agen oes
olksw not
If rock tolerance is exceeded: d by V gu
ara
rise nte
– Renew cylinder head. utho eo
ra
s a c
s
ce
le
un

pt
an
d
itte

y li
rm

ab

5.2 Reworking valve seats


pe

ility
ot

wit
, is n

Special tools and workshop equipment required


h re
hole

spec

♦ Depth gauge
es, in part or in w

t to the co

♦ Valve seat refacing tool


rrectness of i

Note
l purpos

♦ When repairing engines with leaking valves, it is not sufficient


to rework or renew valve seats and valves. Particularly on high
nform
ercia

mileage engines, it is necessary also to check valve guides for


wear ⇒ “5.1 Checking valve guides”, page 122 .
m

a
com

tio

♦ Valve seats are only to be reworked to the extent required to


n in
r
te o

yield a proper surface appearance. Before beginning to rework


thi
s

valve seats, calculate the maximum permissible reworking di‐


iva

do
r

mensions. If the reworking dimension is exceeded, the hy‐


rp

cum
fo

draulic valve clearance compensation can no longer be


en
ng

t.
yi
guaranteed and the cylinder head must be renewed.
Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

122 Rep. gr.15 - Cylinder head, valve gear


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

The max. permissible reworking dimension is calculated as fol‐


lows:
– Insert valve and press firmly against seat.
n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
Note
ir se
d ran
tee
tho
u or
a ac
If the valve is to be renewed as part of a repair, use a new
ss valve

ce
e

for the calculation.


nl

pt
du

an
itte

y li
erm

– Measure distance between end of valve stem and upper edge

ab
ility
of cylinder head.
ot p

wit
, is n

– Calculate maximum permissible reworking dimension from

h re
hole

measured distance and minimum dimension.

spec
es, in part or in w

Minimum dimensions: inlet valve 7.6 mm, exhaust valve 7.6 mm

t to the co
Measured distance minus minimum dimension = max. permissi‐
ble reworking dimension.

rrectness of i
Example:
l purpos

-Measured distance 8.0 mm


Minimum dimension 7.6 mm

nform
ercia

=max. perm. rework dimension 3) 0.4 mm


m

at
om

ion
3) The max. permissible reworking dimension is shown as dimension “b” in the
c

in t
r

illustrations for reworking valve seats.


o

his
ate

do
priv

Reworking inlet valve seat


um
for

en
ng

t.
yi
a = 28.7 mm in diameter
Co
op py
b = max. permissible reworking dimension1
t. C rig
gh ht
yri
c = 1.5…1.8 mm
p by
co Vo
Z
by lksw
= cylinder head lower edge
Prote
cted agen
α
AG.
= 45° valve seat angle
β = 30° upper correction angle
γ = 60° lower correction angle
4) Calculating max. permissible reworking dimension ⇒ page 122 .
Reworking exhaust valve seat.
a = 25.0 mm in diameter
b = max. permissible reworking dimension1
c = approx.1.8 mm
Z = Cylinder head lower edge
α = 45° valve seat angle
β = 30° upper correction angle
γ = 60° lower correction angle
5) Calculating max. permissible reworking dimension ⇒ page 122 .

5. Inlet and exhaust valves 123


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

17 – Lubrication
1 Sump, oil pump
⇒ “1.1 Assembly overview – sump/oil pump”, page 124
⇒ “1.2 Engine oil”, page 126
⇒ “1.3 Removing and installing sump”, page 127
⇒ “1.4 Removing and installing oil pump”, page 130

1.1 Assembly overview – sump/oil pump

1 - Oil dipstick
❑ The oil level must not be
above the max. mark!
❑ Markings ⇒ page 126 .
2 - Engine oil cooler
3 - O-ring
❑ Renew
4 - Coolant pipe
❑ For engine oil cooler
❑ Specified torque, brack‐ AG. Volkswagen AG d
et to crankcase: 20 Nm. lksw
agen oes
not
o
yV gu
5 - Bolt rised b ara
nte
o eo
❑ 8 Nm aut
h
ra
ss c
6 - Cap

ce
le
un

pt
an
❑ Renew seal if damaged.
d
itte

y li
erm

ab
7 - Seal

ility
ot p

❑ Renew if damaged.

wit
is n

h re
ole,

8 - Oil filter

spec
urposes, in part or in wh

❑ Loosen with oil filter tool

t to the co
- 3417- .
❑ Observe installation in‐
structions on oil filter. rrectne
❑ With non-return valve.
s

❑ 20 Nm
s o
cial p

9 - Valve timing housing


inform
mer

❑ Additionally apply sili‐


atio

cone adhesive sealant


om

⇒ Electronic Parts
c

i
or

Catalogue when instal‐


thi
te

sd
a

ling
iv

o
pr

cum
r
fo

Removing and installing valve timing housing


en
ng

t.
yi
⇒ “2.1 Removing and installing valve timing housing (timing case)”, page 74
Co
Cop py
ht. rig
❑ When installing, install two -M6x80- studs in cylinder block and camshaft housing as a guide. rig ht
py by
co Vo
❑ To guide valve timing housing, secure sump in position with two bolts.
by lksw
cted agen
Prote AG.
10 - Bolt
❑ 10 Nm
11 - Securing bolt
❑ Removing and installing crankshaft pulley ⇒ “1.5 Removing and installing pulley”, page 34

124 Rep. gr.17 - Lubrication


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
❑ Contact surface for securing bolt must be free of oil and grease.
❑ Oil threads before inserting.
❑ Secure pulley against turning with counterhold tool - 3415-
❑ The turning further angle can be measured with a commercial protractor.
❑ Renew AG. Volkswagen AG d
agen oes
❑ 150 Nm + turn 180° further
o lksw not
yV gu b ara
ed
12 - Belt pulley ris nte
utho eo
ra
❑ With diamond ss acoated washer c

ce
le

❑ Observe note on diamond coated washers ⇒ page 38 .


un

pt
an
d

❑ Contact surfaces of pulley must be free of oil and grease.


itte

y li
erm

ab
❑ Removing and installing poly V-belt ⇒ “1.3 Removing and installing poly V-belt”, page 30 .

ility
ot p

❑ Secure pulley against turning with counterhold - 3415- .

wit
is n

h re
ole,

13 - Seal

spec
urposes, in part or in wh

❑ Renew.

t to the co
14 - Bearing bush
❑ Contact surfaces of bearing bush must be free of oil and grease.

rrectne
15 - Gasket

s
❑ Renew if damaged.

s o
cial p

f
16 - Chain sprocket

inform
mer

❑ Removing and installing

atio
⇒ “3.4 Removing and installing timing chain and chain drive for oil pump”, page 106 .
om

n
c

❑ For oil pump drive.

i
or

n thi
te

sd
a

17 - Bolt
iv

o
pr

cum
r

❑ Renew
fo

en
ng

t.
yi
❑ 20 Nm + turn 90° further
Co
Cop py
t. rig
gh
18 - Sprocket
ht
pyri by
Vo
co lksw
by
❑ Removing and installing Prote
cted AG.
agen
⇒ “3.4 Removing and installing timing chain and chain drive for oil pump”, page 106 .
❑ For oil pump.
❑ Lock with counterhold - T10172- .
19 - Drive chain
❑ Removing and installing
⇒ “3.4 Removing and installing timing chain and chain drive for oil pump”, page 106 .
❑ For oil pump.
❑ Before removing, mark direction of rotation (installation position).
20 - Bolt
❑ 10 Nm
21 - Oil level and oil temperature sender - G266-
❑ Renew if damaged.
❑ Checking: ⇒ Current flow diagrams, Electrical fault finding and Fitting locations.
22 - Oil drain plug
❑ With attached seal.
❑ Renew.
❑ 30 Nm
23 - Bolt
❑ Loosen and tighten flywheel end bolts only with long-reach Allen key - T10058- .
❑ 13 Nm

1. Sump, oil pump 125


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015 en AG. V
olkswagen AG
ag does
ksw not
Vol gu
24 - Bolt ed
by ara
nte
ris
❑ 40 Nm tho eo
au ra
c
ss
25 - Sump

ce
le
un

pt
❑ Removing and installing ⇒ “1.3 Removing and installing sump”, page 127 .

an
d
itte

y li
❑ Clean sealing surface before fitting.

erm

ab
ility
ot p
❑ Apply silicone adhesive sealant ⇒ Electronic Parts Catalogue when installing

wit
is n

h re
26 - Bolt

ole,

spec
❑ Renew

urposes, in part or in wh

t to the co
❑ 14 Nm + turn 90° further
27 - Oil pump

rrectne
Caution

ss
The oil supply line must

o
cial p

f
be renewed on the tur‐

inform
bocharger if a new oil
mer

pump or oil suction pipe

atio
m

is fitted.
o

n
c

i
or

n thi
te

sd
a

❑ with oil suction pipe


iv

o
pr

cum
r

❑ Specified torque oil suction pipe: 9 Nm


fo

en
ng

t.
yi Co
28 - Bolt Cop py
t. rig
gh
❑ 5 Nm
ht
pyri by
Vo
o
by c lksw
cted
29 - Oil separator
agen
Prote AG.

Markings on oil dipstick


1 - Max. mark
2 - Min. mark
a - Area above hatched field up to max. mark: do not top up with
engine oil!
b - Oil level within hatched zone: can be topped up with engine
oil.
c - Area from min. mark up to hatched field: top up with max. 0.5
l of engine oil!

1.2 Engine oil


Oil capacities
With oil filter, 3.6 l

Note

♦ The oil level must not be above the max. mark - danger of
damage to catalytic converter! Markings ⇒ page 126 .
♦ Finding metal shavings or a large quantity of small metal par‐
ticles during engine repair could indicate that the conrod bear‐
ings are damaged. To prevent this from causing further
damage, perform the following repairs:
♦ Thoroughly clean oil channels.
♦ Renew oil filter.

126 Rep. gr.17 - Lubrication


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Engine oil specifications


⇒ Maintenance ; Booklet ; Service tables
Changing engine oil: “Engine oil: drain or extract”.
⇒ Maintenance ; Booklet ; Service tables

1.3 Removing and installing sump


Special tools and workshop equipment required
♦ Allen key, long reach 5 mm - T10058-

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

♦ Torque wrench - V.A.G 1331-

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
m

♦ Wedge - T10383/2-
o

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

1. Sump, oil pump 127


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Cutting tool - T10561-

♦ Hand drill with plastic brush


♦ Flat scraper
♦ Eye protection
♦ Silicone sealant ⇒ Electronic Parts Catalogue
Removing
– Remove noise insulation ⇒ General body repairs, exterior;
Rep. gr. 50 ; Removing and installing noise insulation .
– Drain engine oil ⇒ Maintenance ; Booklet 36.1 .
– Disconnect front exhaust pipe from catalytic converter
⇒ “1.1 Assembly overview – emission control”, page 283 .
– Remove front right wheel housing liner ⇒ General body re‐
pairs, exterior; Rep. gr. 66 ; Wheel housing liner; Assembly
overview - front wheel housing liner . n AG. Volkswagen AG age does
ksw not
– Pull 3-pin connector off oil level and oil temperature
by
Vol sender - gu
ara
G266- -1-. ris
ed
nte
tho eo
– Remove bolts from sump. ss au ra
c
ce
le
un

pt
an
d
itte

Note
y li
rm

ab
pe

ility

♦ The sump is sealed with liquid sealant ⇒ Electronic Parts


ot

wit
, is n

Catalogue .
h re
hole

spec

♦ When hardened, the sealant has a high adhesive strength.


es, in part or in w

t to the co

♦ Two bolts must be loosened but not removed to secure the


sump from falling after seal has been cut.
rrectness of i

– Cut through seal between oil sump -4- and engine -1-.
l purpos

– Use cutting tool - T10561- to do this.


nform
ercia

• Centre the cut between bolts -3- only.


m

– Position cutting tool - T10561- on seal -arrows- without it cant‐


com

tio

ing.
n in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

128 Rep. gr.17 - Lubrication


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Drive in cutting tool - T10561- -3- using a hammer as far as it


will go -arrow-.
– Do not cant cutting tool - T10561- when doing this.
– Do not cutting tool - T10561- sideways.
AG. Volkswagen AG d
– Do not lever with cutting tool - T10561- . agen oes
olksw not
byV gu
ara
– Perform procedure at other points as described untilris oil sump
ed
nte
is detached. aut
ho eo
ra
ss c

ce
e
nl

pt
du
Note

an
itte

y li
erm

ab
A sucking noise will be audible when the strength of the seal has

ility
ot p
been overcome.

wit
, is n

h re
hole

spec
– Use wedge - T10383/2- to further loosen detached positions.
es, in part or in w

t to the co
– Using a plastic hammer, carefully drive in wedge.
– Drive in wedge - T10383/2- only to same depth as sealing
surface.

rrectness of i
– Release sump carefully from adhesive.
l purpos

– Remove bolts which are still holding the sump.

nform
ercia

– Remove sump.
m

at
om

– Remove sealant residue from cylinder block with a flat scraper.

ion
c

in t
or

his
e

– Remove sealant residues on sump with a rotating brush, e.g.


at

do
riv

an electric drill with plastic brush attachment (wear eye pro‐


p

cum
or

tection).
f

en
ng

t.
yi Co
op
– Clean sealing surfaces. They must be free of oil and grease. C py
ht. rig
rig ht
Installing
py by
co Vo
by lksw
cted agen
Prote AG.

Note

♦ Observe expiry date of sealing compound.


♦ The sump must be installed within 5 minutes of applying sili‐
cone sealing compound.
♦ Sump can be positioned more easily and with greater security
if M6 studs are inserted into the cylinder block flange at two
positions as guides.

1. Sump, oil pump 129


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Cut off tube nozzle at forward marking (diameter of nozzle ap‐


prox. 3 mm).
– Apply silicone sealing compound, as shown, to clean sealing
surface on sump. Sealant bead must be:
♦ 2…3 mm thick.
♦ Run bead along inner side of bolt holes -arrows-.

Note
n AG. Volkswagen AG do
wage
The sealing compound bead must not be thicker, otherwiseyex‐ Volks es n
ot g
cessive sealing compound will enter the sump and may block
ir se
d b the ua
ran
oil suction pipe strainer. tho tee
or
au ac
ss
– Install sump immediately and tighten all sump bolts lightly.

ce
e
nl

pt
du

an
itte

– Tighten oil sump bolts to specified torque ⇒ page 130 .

y li
erm

ab
ility
ot p

wit
, is n

Note

h re
hole

spec
Let sealing compound dry for approx. 30 minutes after installing
es, in part or in w

sump. Only then fill with engine oil.

t to the co
Specified torques:

rrectness of i
Component Specified Note
l purpos

torque
Securing bolt 13 Nm Loosen and tighten fly‐

nf
ercia

sump/crankcase wheel-end bolts with Allen

orm
key, long reach 5 mm -
m

atio
m

T10058-
o

n in
or c

Bolt for securing 40 Nm

thi
te

sump to gearbox

sd
iva

o
r
rp

cu
Oil drain plug 30 Nm Renew (with captive seal)
o

m
f

en
ng

t.
yi Co
♦ Securing bolts, front exhaust pipe/catalytic converter Cop py
. rig
⇒ “1.1 Assembly overview – emission control”, page 283
t
gh ht
pyri by
Vo
co lksw
by
cted agen
1.4 Removing and installing oil pump
Prote AG.

Caution

The oil supply line must be renewed on the turbocharger if a


new oil pump or oil suction pipe is fitted.

Special tools and workshop equipment required

130 Rep. gr.17 - Lubrication


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Counterhold - T10172-

Removing
– Remove sump
⇒ “1.3 Removing and installing sump”, page 127 .
– Hold oil pump chain sprocket with counterhold - T10172- .
– Loosen chain sprocket securing bolt.

Note

Do not remove bolt completely.

– Press chain tensioner in direction of -arrow- with a screwdriv‐


er.
. Volkswagen AG
gen AG d
– Remove chain
Vol
sprocket
ksw
a
securing bolt.oes not
y gu
db ar
– Takeorchain
ise sprocket off oil pump and out of chain.
an
tee
th or
au ac
ss
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

– Loosen oil pump securing bolts -arrows- and remove them.


t to the co

– Remove oil pump from cylinder block.


Installing
rrectness of i
l purpos

Caution
nf
ercia

The oil supply line must be renewed on the turbocharger if a


orm

new oil pump or oil suction pipe is fitted.


m

atio
om

n in
or c

thi
e

– Install oil pump and tighten securing bolts to 14 Nm + 90° fur‐


t

sd
iva

ther.
o
r
rp

cu
o

m
f

en
ng

Specified torque oil suction pipe: 9 Nm yi


t.
Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen

131
Prote AG.
1. Sump, oil pump
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Press chain tensioner in direction of -arrow- with a screwdriv‐


er.
– Seat chain sprocket in chain and fit chain sprocket onto oil
pump shaft.

– Observe installation position of chain sprocket on oil pump


shaft -arrows-.
– Screw in chain sprocket securing bolt.
– Hold chain sprocket with counterhold - T10172- .

– Position torque wrench - V.A.G 1331- as shown.


G. Volkswagen
– Tighten securing bolt toag20
lksw
en ANm + 90° further.
AG do
es n
Vo ot g
by ua
– Install sump i⇒ edpage 127 . ran
rs tee
ho
aut or
ac
ss
ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

132 Rep. gr.17 - Lubrication


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2 Oil filter, oil pressure switch


⇒ “2.1 Checking oil pressure and oil pressure switch”,
page 133

2.1 Checking oil pressure and oil pressure switch

Special tools and workshop


equipment required
♦ Oil pressure tester - V.A.G
1342-
♦ Voltage tester - V.A.G
1527B-
♦ Auxiliary measuring set -
V.A.G 1594C-
♦ 24 mm jointed spanner -
T40175-

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i

Note
l purpos

Functional check and repair of the optical and acoustic oil pres‐
sure warning: ⇒ Current flow diagrams, Electrical fault finding and
nform
ercia

Fitting locations
m

at
om

io

Test procedure
n
c

in t
or

his
e

The oil pressure switch is located on the gearbox side beneath


at

do
riv

the two camshaft covers.


p

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

2. Oil filter, oil pressure switch 133


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Pull connector off oil pressure switch - F1- -arrow-.

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c

ce
e

– Remove oil pressure switch - F1- using 24 mm jointed spanner


nl

pt
du

- T40175- and screw switch into oil pressure tester - V.A.G

an
itte

y li
1342- .
erm

ab
ility
ot p

– Screw tester into cylinder head in place of oil pressure switch.

wit
, is n

h re
– Connect brown wire of tester to earth (-).
hole

spec
– Connect voltage tester - V.A.G 1527B- to battery positive (+)
es, in part or in w

t to the co
and oil pressure switch using cable from auxiliary measuring
set - V.A.G 1594C- .
– If LED lights up, replace pressure switch - F1- .

rrectness of i
If LED does not light up:
l purpos

– Start engine and increase speed slowly. At 0.3…0.7 bar the


LED must light up, otherwise renew oil pressure switch.

nform
ercia

– Increase engine speed further. At 2,000 rpm and an oil tem‐


m

at
om

perature of 80°C the oil pressure should be at least 2.0 bar.

ion
c

in t
or

At higher engine speeds, the oil pressure must not exceed 7.0
his
ate

bar. do
priv

cum
or

Oil pressure values at oil temperature of 80°C:


f

en
ng

t.
yi Co
op
At idling speed: at least 1.3 bar. C py
ht. rig
rig ht
by
At 2,000 rpm: at least 2.0 bar. copy Vo
by lksw
cted agen
Prote
Specified torque:
AG.

♦ Oil pressure switch: 20 Nm

134 Rep. gr.17 - Lubrication


Passat 2006 n A➤
G. V, oPassat
lkswagen2011
AG do ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
wage
4-cylinder direct-injection Vengine
olks (1.4 l, natural gas, EA es n
111,
ot g turbocharger, supercharger) - Edition
by ua
rised ran
t
11.2015
ee
tho or
s au ac
s
19 – Cooling

ce
e
nl

pt
du

an
itte

y li
erm

ab
1 Cooling system, coolant

ility
ot p

wit
, is n

h re
⇒ “1.1 Coolant hose schematic diagram”, page 135
hole

spec
⇒ “1.2 Draining and filling coolant”, page 137
es, in part or in w

t to the co
⇒ “1.3 Checking cooling system for leaks”, page 141

rrectness of i
WARNING
l purpos

• Always observe
⇒ “2.4 Safety precautions when working on cooling sys‐

nform
ercia

tem”, page 7 before working on the cooling system.


m

at
om

ion
c

in t
or

Caution

his
ate

do
priv

cum
or

♦ When doing any repair work, especially in the engine com‐


f

en
g

partment, pay attention to the following due to the cram‐


n

t.
yi Co
op
ped conditions: C py
t. rig
gh ht
yri by
♦ Route all the various lines (e.g. for fuel, hydraulics, acti‐ cop Vo
by lksw
vated charcoal filter system, coolant and refrigerant, brake cted agen
Prote AG.
fluid and vacuum) and electrical wiring in their original po‐
sitions.
♦ To avoid damage to lines, ensure sufficient clearance from
all moving or hot components.

Note

♦ Hoses are secured with spring-type clips. In case of repair,


only use spring-type clips.
♦ Hose clip pliers - VAS 6340- or spring-type clip pliers - VAS
5024A- are recommended for use in installing spring-type
clips.
♦ When installing coolant hoses, route stress-free so that they
do not come into contact with other components (observe
markings on coolant connection and hose).

Test for leaks in cooling system using cooling system tester -


V.A.G 1274 B- and adapter for cooling system tester - V.A.G
1274/8- and adapter for cooling system tester - V.A.G 1274/9- .

1.1 Coolant hose schematic diagram

1. Cooling system, coolant 135


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1 - Expansion tank
n AG. Volkswagen AG do
wage
2 - Coolant pump olks es n
ot g
byV ua
d ran
3 - Gas regulator with high- ir se tee
ho
pressure valve for gas mode - aut or
ac
N372- ss

ce
le
un

pt
4 - Intake manifold

an
d
itte

y li
erm

ab
5 - Cylinder head/cylinder

ility
ot p

block

wit
is n

❑ If renewed, refill system

h re
ole,

with fresh coolant.

spec
urposes, in part or in wh

6 - Heat exchanger for heater

t to the co
unit
7 - Thermostat housing

rrectne
8 - Radiator/cooler

s
9 - Engine oil cooler

s o
cial p

f i
10 - Coolant circulation pump -

nform
V50-
mer

atio
m

❑ Removing and installing


o

n
c

⇒ “2.4 Removing and in‐

i
or

n thi
stalling coolant circula‐
te

sd
va

tion pump V50 ”,


i

o
pr

c
page 155 .

um
r
fo

en
ng

t.
yi
11 - Turbocharger
Co
Cop py
t. rig
❑ Removing and installing
gh ht
yri by
⇒ “1.2 Removing and in‐ cop Vo
by lksw
cted
stalling turbocharger”,
agen
Prote AG.
page 166 .
12 - Circulation pump - V55-
❑ Optional equipment.
13 - Auxiliary heater
❑ Optional equipment.

136 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1.2 Draining and filling coolant

Special tools and workshop


equipment required
♦ Refractometer - T10007 A-
♦ Hose clip pliers - VAS
6340-
♦ Cooling system charge unit
- VAS 6096-

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re

Draining
hole

spec
es, in part or in w

t to the co

WARNING

Steam may escape when expansion tank is opened. Wear eye


rrectness of i

protection and protective clothing to avoid eye injuries and


scalding. Cover cap with cloth and open carefully.
l purpos

nform
ercia

– Open filler cap on coolant expansion tank.


m

at

– Remove engine splash protection.


om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

1. Cooling system, coolant 137


n AG. Volkswagen AG do
lkswage es n
Vo ot g
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ d , Touran 2003 ➤
by ua
ran
ir se
4-cylinder direct-injection engine (1.4 l, natural gas, EAth 111, turbocharger, supercharger) - Editione o
o te
u ra
11.2015 ss
a c

ce
e
nl

pt
du
– Pull off retaining clip -arrow- and remove coolant hose from

an
itte

y li
radiator.

erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia
– Detach spring-type clip and pull off coolant hose -2-.

orm
m

atio
Disregard item -1-.
om

n in
or c

thi
te

sd
a
Note
iv

o
r
rp

cu
o

m
f

en
ng
Observe environmental regulations for disposal.
t.
yi Co
Cop py
t. rig
gh ht
Filling yri
p by
co Vo
by lksw
cted agen
Prote AG.
Caution

Only distilled water may be used for mixing with coolant addi‐
tives. The use of distilled water ensures optimum protection
against corrosion.

138 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Note

♦ The amount of water used in the coolant mixture has a great


influence on its effectiveness. Because the water quality dif‐
fers from country to country and even region to region, the
quality of the water to be used has been defined. Distilled AG. Vwa‐
olkswagen AG
agen
ter fulfils all requirements. For this reason, we olrecommend
ksw
does
not
using distilled water when mixing coolantefor d b topping up or re‐
y V gu
ara
placing coolant. thoris nte
e or
au ac
♦ Use only coolant additives which conform
ss with the ⇒ Elec‐
tronic Parts Catalogue (ETKA) . Other coolant additives may

ce
e
nl

pt
du
reduce corrosion protection substantially. The resulting dam‐

an
itte

y li
age could lead to loss of coolant and subsequent severe
erm

ab
damage to the engine.

ility
ot p

wit
, is n

♦ The correct coolant solution ratio helps prevent damage due

h re
to freezing and corrosion as well as scaling. Moreover, the
hole

spec
boiling temperature is raised. Therefore, the cooling system
es, in part or in w

must be filled all year round with coolant additive.

t to the co
♦ Because of its higher boiling point, the coolant improves en‐
gine reliability under heavy loads, particularly in countries with

rrectness of i
tropical climates.
l purpos

♦ ONLY refractometer - T10007A- may be used for determining


current anti-freeze value.

nf
ercia

♦ The normal frost protection must be at least -25 °C, in coun‐

or
tries with arctic conditions to -36 °C. When climatic conditions

m
m

atio
require a stronger frost protection, only then may the frost pro‐
om

n in
tection be increased. But it may only be increased to -48°C.
or c

thi
Otherwise, the cooling effect of the coolant will be impaired.
te

sd
iva

o
r

♦ The coolant concentration must not be reduced by adding wa‐


rp

cu
o

m
ter even in warmer seasons and in warmer countries. Frost
f

en
ng

t.
yi
protection must be guaranteed down to at least -25°C.
Co
Cop py
t. rig
gh
♦ Read off anti-freeze figures for respective replenished anti-
ht
pyri by
freeze.
o Vo
by c lksw
cted agen
Prote AG.
♦ The temperature read off the refractometer - T10007A- equa‐
tes to the »ice flocculation point«. Flakes of ice can start
forming in the coolant below this temperature.
♦ Do not reuse old coolant.
♦ Use only a water/anti-freeze mixture as a slip agent for coolant
hoses.

Recommended mixing ratios (use only distilled water for mixing):


Frost protection Amount of anti- Coolant ad‐ Distilled wa‐
to freeze ditive 6) ter 6)
-25°C 40 % 2.25 l 3.35 l
-36°C 50 % 2.8 l 2.8 l
6) The quantity of coolant can vary depending upon vehicle equipment.

1. Cooling system, coolant 139


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
AG. Volkswagen AG d
11.2015 ksw
agen oes
n
ol ot g
yV ua
db ran
– Press connection againstor
is radiator
e
and slide retaining clip tee
-arrow- into groove.auth or
ac
ss
– Install engine splash protection.

ce
e
nl

pt
du

an
With cooling system charge unit - VAS 6096-
itte

y li
erm

ab
– Fill coolant circuit using cooling system charge unit -

ility
ot p

VAS 6096- ⇒ Operating instructions for cooling system charge

wit
, is n

unit VAS 6096 .

h re
hole

spec
Without cooling system charge unit - VAS 6096-
es, in part or in w

t to the co
rrectness of i
– Fill with coolant up to max. marking on expansion tank.
l purpos

With or without cooling system charge unit - VAS 6096-


– Fit expansion tank cap.

nf
ercia

orm
– Turn off heater controls.
m

atio
om

n in
Vehicles with no auxiliary heater
or c

thi
te

sd
– Start engine and maintain an engine speed of about 2,000 rpm
iva

o
r

for about 3 minutes.


rp

cu
o

m
f

en
ng

– Run engine until radiator fan - V7- cuts in.


t.
yi Co
Cop py
. rig
Vehicles with auxiliary heater
ht ht
rig by
copy Vo
by lksw
cted agen
Prote
Caution
AG.

Do not switch auxiliary heater on until the cooling circuit has


been filled as subsequently described.

140 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Connect vehicle diagnostic, testing and information system -


VAS 5051B- as follows:
– Push diagnosis cable connector onto diagnosis connection in
driver footwell.
– Start engine and maintain an engine speed of about 2,000 rpm
for about 3 minutes.
– Press buttons on display for “Vehicle self-diagnosis”, “18 -
Auxiliary heater” and “03 - Final control diagnosis” one after
the other.
– Press right arrow button on display up to final control diagnosis
for heater coolant shut-off valve - N279- .
– Initiate final control diagnosis for heater coolant shut-off valve
- N279- . Continue to maintain engine speed at approx.
2,000 rpm for about 1 minute.
– Run engine until radiator fan - V7- cuts in.
Continuation for all vehicles

WARNING

Steam may escape when expansion tank is opened. Wear eye


protection and protective clothing to avoid eye injuries and
scalding. Cover cap with cloth and open carefully.

– Check coolant level and top up if necessary. When the engine


is at normal operating temperature, the coolant level must be
on the max. mark; when the engine is cold, between the min.
and max. marks.
olkswagen AG
en AG. V
1.3 Checking cooling system
Vol
ksw
ag
for leaks does
not
gu
by ara
ed nte
oris eo
th
au ra
c
ss
ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

1. Cooling system, coolant 141


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Special tools and workshop


equipment required
♦ Cooling system tester -
V.A.G 1274 B-
♦ Adapter for cooling system
tester - V.A.G 1274/8-
AG. Volkswagen AG d
♦ Adapter for cooling system agen oes
olksw not
V
tester - V.A.G 1274/9- ed by gu
ara
ris nte
ho eo
aut ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

Test prerequisite
• Engine at operating temperature.
Test procedure

WARNING

Steam may escape when expansion tank is opened. Cover cap


with cloth and open carefully.

– Open cap on coolant expansion tank.


– Screw adapter for cooling system tester - V.A.G 1274/8- onto
expansion tank.
– Clamp connector - V.A.G 1274 B/1- into adapter for cooling
system tester - V.A.G 1274/8- .
– Join connection piece - V.A.G 1274 B/1- to cooling system
tester - V.A.G 1274 B- using connecting hose supplied.
– Use hand pump on tester to create a pressure of about 1.0 bar.

142 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

WARNING

Risk of scalding! Before disconnecting cooling system tester -


V.A.G 1274 B- from connecting hose or connector - V.A.G
1274 B/1- , always relieve existing pressure. To do this, press
pressure relief valve on cooling system tester - V.A.G 1274 B-
until pressure gauge displays value of »0«.

If pressure drops:
– Find leaks and rectify.
Check pressure relief valve in cap.
– Screw cap into adapter for cooling system tester - V.A.G
1274/9- .
– Clamp connector - V.A.G 1274 B/1- into adapter for cooling
system tester - V.A.G 1274/9- .
– Join connection piece - V.A.G 1274 B/1- to cooling system
tester - V.A.G 1274 B- using connecting hose supplied.
– Use hand pump on cooling system tester to create a pressure
of max. 1.6 bar. G. Volkswagen nA AG do
wage es n
The pressure relief valve must
y V not open.
olks ot g
ua
b
ed ran
If the pressure relief tvalve
ho
ris opens prematurely: tee
or
au ac
– Renew sealingsscap.
ce
e
nl

pt

– Increase pressure to over 1.6 bar.


du

an
itte

y li
erm

The pressure relief valve must open.


ab
ility
ot p

If the pressure relief valve does not open:


wit
, is n

h re

– Renew sealing cap.


hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

1. Cooling system, coolant 143


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2 Coolant pump, regulation of cooling


system
⇒ “2.1 Assembly overview - thermostat”, page 144
⇒ “2.2 Removing and installing coolant pump”, page 145
⇒ “2.3 Removing and installing coolant pump pulley”, page 151
⇒ “2.4 Removing and installing coolant circulation pump V50 ”,
page 155

2.1 Assembly overview - thermostat


Thermostat side

1 - Connection
2 - O-ring
❑ Renew.
3 - Spring
4 - Plunger
❑ Do not cant when instal‐
ling.
5 - Thermostat 2 AG. Volkswagen AG d
agen
❑ Opening starts at 96°C olksw
oes
not
byV gu
ara
d
6 - Coolant temperature send‐ orise nte
eo
er - G62- aut
h
ra
ss c
❑ Before removing, re‐
ce
e
nl

lease pressure in cool‐


pt
du

an

ing system if necessary.


itte

y li
erm

ab

7 - Retaining clip
ility
ot p

wit

❑ Check for secure seat‐


, is n

h re

ing.
hole

spec

8 - Thermostat housing
es, in part or in w

t to the co

❑ Securing bolts, 10 Nm
9 - Seal
rrectness of i

❑ Renew.
l purpos

10 - Thermostat 1
❑ Opening starts at 80°C
nform
ercia

11 - To expansion tank.
m

at
om

❑ Coolant hose schematic


ion
c

diagram
in t
or

his
e

⇒ “1.1 Coolant hose


at

do
riv

schematic diagram”,
p

cum

page 135 .
for

en
ng

t.
yi Co
12 - Connection . Cop py
rig
ht ht
rig
13 - Coolant pipe py by
co Vo
by lksw
❑ Coolant hose schematic diagram ⇒ “1.1 Coolant hose schematic diagram”, page 135 . cted agen
Prote AG.

14 - Coolant pipe
❑ Coolant hose schematic diagram ⇒ “1.1 Coolant hose schematic diagram”, page 135 .
15 - Bolt
❑ 5 Nm

144 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

16 - From bottom of radiator.


❑ Coolant hose schematic diagram ⇒ “1.1 Coolant hose schematic diagram”, page 135 .
17 - To top of radiator
❑ Coolant hose schematic diagram ⇒ “1.1 Coolant hose schematic diagram”, page 135 .

2.2 Removing and installing coolant pump

Special tools and workshop


equipment required
♦ Refractometer - T10007 A-
♦ Hose clip pliers - VAS
6340-
♦ Torque wrench - V.A.G
1331-
♦ 16 mm open-end spanner -
T10241- (not shown) n AG. Volkswagen AG do
swage es n
♦ Bit - T10451- (not shown) byV
olk ot g
ua
d ran
ir se
♦ Locking pin - T10060A- tho tee
or
au ac
ss

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Coolant pump, regulation of cooling system 145


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Removing
– Remove noise insulation ⇒ General body repairs, exterior;
Rep. gr. 50 ; Removing and installing noise insulation or skid
plate .
– Drain coolant ⇒ “1.2 Draining and filling coolant”, page 137 .
– Pull retaining clip in direction of -arrow- and pull out charge air
hose -1- from charge air pipe.

Note

Charge air hoses with screw-type clips are also installed.

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
e

– Unscrew securing bolt for charge air pipe -arrow-.


nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

– Remove securing bolt -arrow- for charge air pipe -1-.


nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

– Release and pull off connector -1- on oil level and oil temper‐
ature sender - G266- .
– Unclip bracket -2- for electric wire to oil level and oil tempera‐
ture sender - G266- .
Vehicles with condensate trap on charge air pipe

146 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Open clips -arrows-.


– Pull off coolant hoses -1- on charge air pipe -2-.
Vehicles with auxiliary heater

– Pull off coolant hoses for auxiliary heater - Z- from coolant


pipes -1-.
– Remove auxiliary/supplementary heater ⇒ Rep. gr. 82 ; Aux‐
iliary heater, supplementary heater; Removing and installing
auxiliary/supplementary heater .
Continuation for all vehicles

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
– Carefully press locking
ss tabs on noise insulation housing for
supercharger -arrows- outwards.
ce
le
un

pt
an
d
itte

– Pull off housing with noise insulation and place to one side.
y li
erm

ab
ility
ot p

wit
is n

Note
h re
ole,

spec
urposes, in part or in wh

Housing with noise insulation remains in vehicle.


t to the co
rrectnes

– Lift off engine cover panel at points -1- and pull it forwards in
s o
cial p

direction of -arrow-.
f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Coolant pump, regulation of cooling system 147


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Pull off fuel supply line -1- and line leading to activated char‐
coal filter -2- by pressing release tabs.

– Pull off hose -1- from pressure pipe.


– Unscrew securing bolts -2- from pressure pipe and remove
pressure pipe.

AG. Volkswagen AG d
– Unscrew hose clip -1- on charge
lksw
agenair pipe. oes
not
o
byV gu
– Open hose retainerri-2-
sed and pull out hose. ara
nte
tho eo
– Unscrew securing
s au bolt for charge air pipe -3- and pull off con‐ r ac
nector from charge air pressure sender - G31- with intake air
s
ce
le

temperature sender 2 - G299- .


un

pt
an
d
itte

y li

– Remove holder -4-.


rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co

– To do this, unscrew bolts -arrows-.


rrectness of i

– Remove bracket -1-.


l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

148 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Unscrew bolts -arrows- and remove charge pressure sender -


G31- -1-.
– Remove charge air pipe downwards.

– Release tension from supercharger poly V-belt by swinging


tensioning element using open-end spanner, 16 mm -
T10241- .
– Lock tensioning element using locking pin - T10060 A- .

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c
– Unscrew securing bolts -arrows- for tensioning element and
ce
le
un

pt

remove tensioning element.


an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

– Hold supercharger shaft with AF 16 spanner -1-.


nform
ercia

– Remove securing bolt -2- for belt pulley and remove belt pulley
m

and supercharger poly V-belt -3-.


com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

2. Coolant pump, regulation of cooling system 149


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Loosen bolts -arrows- of coolant pump using socket -


T10451- .
– Remove coolant pump with magnetic clutch for supercharger
- N421- from cylinder block.
Installing
Installation is carried out in the reverse order. When installing,
n AG. Volkswagen AG do
note the following: olkswage es n
o
yV t gu
db ara
ir se nte
ho eo
Note aut ra
c
ss

ce
le

Coolant pump seal is bonded in position. If the seal is damaged,


un

pt
an
d

the coolant pump must be renewed.


itte

y li
rm

ab
pe

ility
– Insert coolant pump with magnetic clutch for supercharger -
ot

wit
, is n

N421- into cylinder block.

h re
hole

spec
– Tighten securing bolts to specified torque ⇒ page 151 .
es, in part or in w

t to the co
– Place poly v-belt on the magnetic clutch for supercharger -
N421- .
– Bolt on supercharger pulley with poly-v-belt and new securing

rrectness of i
bolt.
l purpos

Vehicles with screw-type hose clips on charge air hoses

nform
ercia

Caution
m

a
com

tion in
The screw-type clips on the charge air pipes must be tightened
r
te o

to 5.5 Nm. If the torque is too low or too high, the charge air
thi
s
iva

hose may slip off the charge air pipe during vehicle operation.
do
r
rp

cum
fo

en
ng

t.
yi Co
Vehicles with push-fit charge air hoses Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted
Note
agen
Prote AG.

Note installation of charge air hoses.

150 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– If oil seal is renewed, place seal in groove of charge air hose.


Ensure that seal is correctly seated around groove and is not
twisted. . Volkswage n AG n AG d
wage oes
– Coat sealing surface and oil sealy with
Vol oil.
ks not
gu
b ara
ed
– Bring retaining clip to release
ho position -1-.
ris nte
eo
t
au ra
– Push charge air hose into
ss coupling as far as stop. c

ce
e
nl

pt
– Bring retaining clip to locking position -2- and then press
du

an
itte

charge air hose again.

y li
erm

ab
ility
– Pull on hose to ensure that plug-in connector is properly seat‐
ot p

wit
ed and engaged.
, is n

h re
hole

– Replenish coolant

spec
⇒ “1.2 Draining and filling coolant”, page 137 .
es, in part or in w

t to the co
Specified torques:
Component Specified torque

rrectness of i
Securing bolts for coolant pump 8 Nm
l purpos

Belt pulley to coolant pump 24 Nm


Belt pulley for supercharger 40 Nm + 90°

nf
ercia

or
Securing bolts for charge air 5 Nm

m
m

atio
pipe
om

n in
or c

Screw-type hose clips on 5.5 Nm

thi
e

charge pressure pipes


t

sd
iva

o
r
rp

cu
Securing bolts for bracket 20 Nm
o

m
f

en
ng

t.
yi Co
♦ Assembly overview – belt drive Cop py
⇒ “1.1 Assembly overview - poly V-belt drive”, page 26 ht. rig
rig ht
py by
o Vo
♦ Assembly overview - supercharger by c lksw
cted agen
⇒ “3.1 Assembly overview - supercharger”, page 192
Prote AG.

♦ Assembly overview - charge air system


⇒ “2.1 Assembly overview - charge air system”, page 180
♦ Install poly V-belt
⇒ “1.3 Removing and installing poly V-belt”, page 30 .

2.3 Removing and installing coolant pump pulley

2. Coolant pump, regulation of cooling system 151


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Special tools and workshop


equipment required
♦ Bit XZN 10 - T10154-
♦ Hose clip pliers - VAS
6340-
♦ Torque wrench - V.A.G
1331- AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

Removing
– Remove securing bolts -arrows- and remove engine splash
protection.

152 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Pull retaining clip in direction of -arrow- and pull charge air


hose -1- out of charge air pipe.

– Unscrew securing bolt for charge air pipe -arrow-.

– Lift engine cover panel at points -1- and pull it forwards in di‐ en AG. Volkswagen AG
rection of -arrow-. olks
wag does
not
yV gu
db ara
rise nte
tho eo
au ra
c
ss

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
– Separate fuel supply line -1- and line to activated charcoal filter
-2-. Press release tabs to do this.
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

2. Coolant pump, regulation of cooling system 153


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
n AG. Volkswagen AG do
swage es n
– Pull hose -1- from pressure pipe. byV
olk ot g
ua
d ran
ir se
– Unscrew securing bolts -2- from pressure pipe th and remove
o tee
or
pressure pipe. ss
au ac

ce
e
– Unscrew hose clip -1- at charge air pipe.

nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
– Open hose clip -2- and pull hose out.

rrectness of i
– Unscrew securing bolt for charge air pipe -3- and pull connec‐
l purpos

tor off charge air pressure sender - G31- with intake air tem‐
perature sender 2 - G299- .

nf
ercia

orm
m

atio
Note
om

n in
or c

thi
Charge air pressure sender - G31- with intake air temperature
te

sd
a

sender 2 - G299- is installed on rear of charge air pipe.


iv

o
r
rp

cu
o

m
f

en
ng

t.
– Remove bracket -4-.
yi Co
Cop py
t. rig
gh ht
yri by
– Loosen securing bolts -1- for coolant pump pulley. cop Vo
by lksw
cted agen
Prote AG.

WARNING

As the poly V-belt is still tensioned, the pulley securing bolts


must not yet be removed.

– Remove poly V-belt


⇒ “1.3 Removing and installing poly V-belt”, page 30 .

– Unscrew securing bolts -1- and pull pulley from coolant pump.
Installing

154 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Position pulley on coolant pump and tighten securing bolts


-1- hand-tight.
– Install poly V-belt
⇒ “1.3 Removing and installing poly V-belt”, page 30 .
– Tighten securing bolts -1- to 24 Nm.
Further installation is carried out in reverse order of removal.
When installing, note the following:

– Push engine cover panel down at points -1- in direction of


-arrow- until it engages.
Specified torques:
♦ Assembly overview - charge air system
⇒ “2.1 Assembly overview - charge air system”, page 180
♦ Assembly overview - intake manifold
⇒ “7.1 Assembly overview - intake manifold”, page 244

2.4 Removing and installing coolant circulation pump - V50-


AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c
ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

2. Coolant pump, regulation of cooling system 155


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Special tools and workshop


equipment required
♦ Refractometer - T10007 A-
♦ Hose clip pliers - VAS
6340- AG. Volkswagen AG d
agen oes
ksw
♦ Torque wrench - V.A.G byV
ol not
gu
ara
1331- rised
nte
ho eo
aut ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

Removing
– Remove securing bolts -arrows- and remove engine splash
protection.
– Drain coolant ⇒ “1.2 Draining and filling coolant”, page 137 .

156 Rep. gr.19 - Cooling


AG. Volkswagen AG d
agen oes
olksw not
yV gu
Passat 2006 ➤ise, Passat 2011 ➤ , Passat Variant 2011
d b ara ➤ , Touran 2003 ➤
nte
r
4-cylinder direct-injection engine (1.4
ut
ho l, natural gas, EA 111, turbocharger, supercharger) eo
ra - Edition
a
ss c 11.2015

ce
e
nl

pt
du

an
– Remove spring-type clips -arrows- and pull coolant hoses off.

itte

y li
erm

ab
– Pull connector -1- off and remove securing bolt -2-.

ility
ot p

wit
– Remove coolant circulation pump - V50- .

, is n

h re
hole
Installing

spec
es, in part or in w
Installation is carried out in the reverse order. When installing,

t to the co
note the following:
Specified torque

rrectness of i
Component Specified torque
l purpos

Securing bolt for continued coolant 10 Nm


circulation pump - V50- .

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

2. Coolant pump, regulation of cooling system 157


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3 Radiator/radiator fan
⇒ “3.1 Assembly overview – radiator/radiator fan”, page 158
⇒ “3.2 Removing and installing cowl together with radiator fan V7
and radiator fan 2 V177 ”, page 159
⇒ “3.3 Removing and installing radiator”, page 160

3.1 Assembly overview – radiator/radiator fan

1 - Radiator/cooler
❑ Removing and installing
⇒ “3.3 Removing and in‐ en AG. Volkswagen AG
stalling radiator”, olkswag does
not
page 160 . d by V gu
ara
ise nte
❑ After renewing,uthor
renew eo
entire coolant.
ss a ra
c

ce
e

2 - O-ring
nl

pt
du

an
itte

❑ Renew if damaged.

y li
erm

ab
ility
3 - Upper coolant hose
ot p

wit
, is n

❑ To connection on cylin‐

h re
der head.
hole

spec
❑ Coolant hose schematic
es, in part or in w

diagram t to the co
⇒ “1.1 Coolant hose
schematic diagram”,
rrectness of i

page 135 .
l purpos

4 - Expansion tank
❑ Test cooling system for
leaks using cooling sys‐
nf
ercia

tem tester - V.A.G 1274


rm
m

B- and adapter for cool‐


atio
m

ing system tester -


o

n in
or c

V.A.G 1274/8- .
thi
te

sd
iva

5 - Connector
o
r
rp

cu
o

m
f

6 - Cap
en
ng

t.
yi Co
op
❑ Check using cooling C py
t. rig
system tester - V.A.G
gh ht
pyri by
1274 B- and adapter for
co Vo
by lksw
cted
cooling system tester -
agen
Prote AG.
V.A.G 1274/9- .
❑ Pressure relief valve
must open at a pressure
of between 1.4 and
1.6 bar
7 - Bolt
❑ 5 Nm
8 - Plastic inserts
❑ For securing bolts.
9 - Bracket
10 - Cowling
11 - Bolt
❑ 5 Nm

158 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

12 - Radiator fan 2 - V177-


13 - Connector
14 - Radiator fan - V7-
❑ With radiator fan control unit - J293- .
15 - Bracket
❑ For connector.
16 - Lower coolant hose
❑ To connection for thermostat.
17 - Retaining clip
18 - Radiator outlet coolant temperature sender - G83-
19 - Nut
❑ 5 Nm

3.2 Removing and installing cowl together . Volkswagen AG


gen AG
with radiator fan - V7- and radiator fan k2
swa does
ol not
y V gu
- V177- d b ara
rise nte
o e
th or
au
Removing radiator fan ss ac

ce
le
un

– Remove engine cover panel.

pt
an
d
itte

y li
– Remove upper securing bolts of cowling -arrows-.
rm

ab
pe

ility
– Remove noise insulation ⇒ General body repairs, exterior;
ot

wit
, is n

Rep. gr. 50 ; Body - front; Noise insulation .

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
ercia

– Separate connector -1- and unscrew lower cowling securing


m

a
com

t
bolts -arrows-.
ion in
r
te o

thi

– Remove cowling downwards.


s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

3. Radiator/radiator fan 159


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Separate electrical connector -1- and free wiring.


– Unscrew nuts -arrows- and remove fan.
Installing radiator fan
Installation is carried out in the reverse order. When installing, en AG. Volkswagen AG
note the following: olks
wag does
no
yV t gu
db ara
Specified torques: rise nte
tho eo
au ra
Component ss Nm c

ce
le
Radiator fan to cowling 10

un

pt
an
d
itte

y li
Cowling to radiator rm 5

ab
pe

ility
ot

wit
3.3 Removing and installing radiator
, is n

h re
hole

spec
es, in part or in w

Special tools and workshop

t to the co
equipment required
♦ Refractometer - T10007 A-

rrectness of i
♦ Hose clip pliers - VAS
l purpos

6340-
♦ Torque wrench - V.A.G

nform
ercia

1331-
m

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

Removing
– Drain coolant ⇒ “1.2 Draining and filling coolant”, page 137 .
– Pull coolant hoses off radiator.
– Pull connectors off thermal switch and radiator fan.

160 Rep. gr.19 - Cooling


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Remove cowling together with radiator fans


⇒ “3.2 Removing and installing cowl together with radiator fan
V7 and radiator fan 2 V177 ”, page 159
– Remove radiator securing bolts and take out radiator forwards.

Note
n AG. Volkswagen AG do
wage es n
To prevent damage to condenser yV
olks
or to refrigerant lines and ot gho‐
ua
ses, ensure that lines and ir se hoses are not stretched, kinked or bent.
d b ran
tee
tho
u or
a ac
– Remove retaining clamp(s) for refrigerant lines.
ss

ce
le
un

pt
– Unbolt condenser from radiator and secure to lock carrier.

an
d
itte

y li
rm

Installing

ab
pe

ility
ot

Installation is carried out in the reverse order. When installing,

wit
, is n

note the following:

h re
hole

spec
Filling with new coolant
es, in part or in w

⇒ “1.2 Draining and filling coolant”, page 137 .

t to the co
– Electrical connections and routing ⇒ Current flow diagrams,
Electrical fault finding and Fitting locations.

rrectness of i
Specified torques:
l purpos

Component Nm

nform
ercia

Radiator fan to cowling 10


m

Cowling to radiator 5
a
com

tion in
r

♦ Securing bolts for radiator


te o

thi

⇒ “3.1 Assembly overview – radiator/radiator fan”, page 158


s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

3. Radiator/radiator fan 161


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

21 – Turbocharging/supercharging
1 Turbocharger
⇒ “1.1 Assembly overview - turbocharger”, page 162
⇒ “1.2 Removing and installing turbocharger”, page 166
⇒ “1.3 Checking vacuum unit for turbocharger”, page 170
⇒ “1.4 Adjusting vacuum unit for turbocharger”, page 172
⇒ “1.5 Renewing vacuum unit for turbocharger”, page 177

Note

♦ Secure all hose connections with hose clips which conform to


production standard.
♦ Hose connections and hoses for charge air system must be
free of oil and grease before assembly. The oil seal and seal‐
ing surface must only be oiled lightly for plug-in connectors.
⇒ “2.2 Assembly overview - charge-air hose connections”,
page 181
♦ Charge air system must be free of leaks.
♦ Renew self-locking nuts. AG. Volkswagen AG d
agen oes
ksw
Spring-type clip pliers - VAS 5024A- y V or hose clip pliers - VAS
l not
♦ b
o gu
ara
6340- are recommended fororinstallation
ised
of spring-type clips. nte
h eo
ut
♦ Fill turbocharger with engine
ss a oil at oil supply line connection. ra
c
ce
e

♦ After installing turbocharger, run engine for about 1 minute at


nl

pt
du

an

idle and do not rev up immediately. This ensures that the tur‐
itte

y li

bocharger is fully primed with oil.


erm

ab
ility
ot p

wit
, is n

h re

1.1 Assembly overview - turbocharger


hole

spec
es, in part or in w

Parts l and ll
t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

162 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

Part 1

1. Turbocharger 163
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1 - Charge pressure control


solenoid valve - N75-
2 - Bolt
❑ 10 Nm
3 - Bolt
❑ 7 Nm
4 - Turbocharger air recircula‐
tion valve - N249-
❑ To remove, pressure
pipe must be removed
⇒ page 168 .
5 - O-ring
❑ Renew if damaged.
6 - Turbocharger
❑ Removing and installing
⇒ “1.2 Removing and in‐
stalling turbocharger”,
page 166 .
❑ Checking turbocharger
vacuum unit
⇒ “1.3 Checking vac‐
uum unit for turbocharg‐ agen
AG. Volkswagen AG d
oes
er”, page 170 . olksw not
y V gu
d b ara
❑ Removing and installing orise nte
vacuum unit for turbo‐ auth eo
ra
charger ss c
⇒ “1.5 Renewing vac‐

ce
le
un

pt
uum unit for turbocharg‐

an
d
itte

y li
er”, page 177 .
rm

ab
pe

ility
❑ Adjusting vacuum unit
ot

wit
for turbocharger
, is n

h re
⇒ “1.4 Adjusting vac‐
hole

uum unit for turbocharg‐


spec
es, in part or in w

er”, page 172 .


t to the co
7 - Connecting hose
8 - Connecting hose
rrectness of i
l purpos

Part II
nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

164 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1 - Bolt
❑ 8 Nm
2 - Coolant pipe
3 - O-ring
❑ Renew
4 - Stud
❑ 20 Nm
5 - Turbocharger
❑ Removing and installing
⇒ “1.2 Removing and in‐
stalling turbocharger”,
page 166 .
❑ Checking turbocharger
vacuum unit
⇒ “1.3 Checking vac‐
uum unit for turbocharg‐
er”, page 170 .
❑ Removing and installing
vacuum unit for turbo‐
charger
⇒ “1.5 Renewing vac‐
uum unit for turbocharg‐
er”, page 177 .
❑ Adjusting vacuum unit
for turbocharger
⇒ “1.4 Adjusting vac‐
uum unit for turbocharg‐
er”, page 172 .
6 - Gasket n AG. Volkswagen AG do
lkswage es n
❑ Renew byV
o ot g
ua
d ran
ir se
7 - Nut utho tee
or
a ac
❑ Renew studs and fas‐ ss
tening nuts.
ce
le
un

pt
an
d

❑ Screw studs into cylinder head until they project only by 25 mm.
itte

y li
erm

ab

❑ Coat studs with high-temperature paste.


ility
ot p

❑ Observe tightening sequence and specified torques: items -A- to -I-.


wit
is n

h re

❑ 25 Nm
ole,

spec
urposes, in part or in wh

8 - Coolant pipe
t to the co

9 - Gasket
❑ Renew
rrectne

10 - Bolt
❑ 8 Nm
ss o
cial p

11 - Oil return pipe


inform
mer

❑ To remove, catalytic converter needs to be removed


atio
m

12 - Banjo bolt
o

n
c

i
or

❑ Secured to valve timing housing.


thi
te

sd
va

❑ 20 Nm
i

o
pr

cum
r
fo

en
ng

13 - Seal yi
t.
Co
op
❑ Renew.
C py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

1. Turbocharger 165
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

14 - Oil supply pipe

Caution
Oil supply line must be
renewed when installing
a new turbocharger.

15 - Banjo bolt
❑ 30 Nm

1.2 Removing and installing turbocharger


Special tools and workshop equipment required
♦ Hose clip pliers - VAS 6340-

♦ Torque wrench - V.A.G 1331-


AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c
ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co

Removing

Caution
rrectness of i
l purpos

When a mechanical fault is found on the turbocharger, e.g. a


destroyed compressor impeller, it is not only sufficient to renew
the turbocharger. To prevent this from causing further damage,
nform
ercia

perform the following repairs:


m

♦ Check air filter housing, air filter element and intake hoses
com

tion in

for soiling.
r
te o

thi

♦ Check complete charged air routing and charge air cooler


s
iva

do

for foreign objects.


r
rp

cum
fo

en
g

If foreign objects are found in the charge air system, the charg‐
n

t.
yi Co
op
ed air routing must be cleaned and the charge air cooler must C py
ht. rig
be renewed, if necessary. rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

166 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Note

Before carrying out further work, disconnect battery earth strap.


Check whether a coded radio is fitted. Obtain anti-theft coding first
if necessary.
AG. Volkswagen AG d
agen oes
olksw not
– Disconnect battery ⇒ Electrical system; Rep. gr. d27 by ; Discon‐
V gu
ara
necting and reconnecting battery . orise nte
eo
h
ut ra
– Lift engine cover panel at points -1- and pull
ss a
it forwards in di‐ c
rection of -arrow-.

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

– Unbolt heat shield over turbocharger -arrows-.


– Open and close expansion tank cap to release pressure in

nform
ercia

cooling system.
m

at
om

i
– Now, drain coolant

on
c

in t
⇒ “1.2 Draining and filling coolant”, page 137 .
or

his
ate

do
priv

cum
or

Note
f

en
ng

t.
yi Co
op py
Pull coolant hoses off engine with hose clip pliers - VAS 6340- .
t. C rig
gh ht
pyri by
Vo
o
by c lksw
cted
– Observe rules for cleanliness
agen
Prote AG.
⇒ “3.1 Rules for cleanliness”, page 9 .

– Pull off connecting hoses -1- and coolant hoses -3-.


– Unscrew bracket -2- and securing nuts -4- from turbocharger.

1. Turbocharger 167
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Unscrew securing bolt -2- and remove upper coolant pipe.

n AG. Volkswagen AG do
Note lkswage es n
o ot g
byV ua
d ran
ir se
The lower coolant pipe can only be removed following th the removal
o tee
or
of the catalytic converter. ss
au ac

ce
e
nl

pt
du
– Unscrew bolts -1-, and remove

an
itte

y li
pressure pipe

erm

ab
.

ility
ot p

wit
, is n

h re
hole

spec
– Remove securing bolts -arrows- of engine splash protection.
es, in part or in w

t to the co
– Remove wiring for Lambda probe after catalytic converter -
G130- and for alternator from cable guides -arrows-.

rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
– Pull connector off Lambda probe after catalytic converter -
o

m
f

en
ng

G130- and remove.


t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

– Open hose clip -3- and remove charge air pipe -2-.
– Unbolt exhaust pipe from catalytic converter -arrows-.

168 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
AG. Volkswagen A 11.2015
n G do
wage es n
Volks ot g
– Unbolt exhaust pipe ed
by to rear silencer -arrows-. ua
ran
oris tee
th or
au ac
ss

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
– Loosen securing bolts of double clamp -arrows- and pull ex‐
haust pipe to rear.
l purpos

– Also pull out exhaust pipe together with flexible joint.

nf
ercia

– Remove catalytic converter together with charge air pipe

or
downwards.

m
m

atio
m

– Unscrew securing bolt -arrow- for oil return pipe -2- from tur‐
o

n in
or c

bocharger.

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
o Vo
– Pull oil return pipe downwards. by c lksw
cted agen
Prote AG.
– Unbolt charge air hose -1- from turbocharger.
– Unscrew banjo bolts of oil supply pipe -arrows- from turbo‐
charger and valve timing housing.

– Remove oil supply pipe.


– Unscrew all securing nuts from exhaust manifold -1-.
– Pull exhaust manifold out upwards with turbocharger.

Note

The turbocharger can only be renewed together with the exhaust


manifold.

Installing

Caution

Oil supply line must be renewed when installing a new turbo‐


charger.

Installation is carried out in the reverse order. When installing,


note the following:

1. Turbocharger 169
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Observe tightening sequence and specified torques: items


-A- to -I-
⇒ “1.1 Assembly overview - turbocharger”, page 162 .
. Volkswagen AG
a gen AG does
♦ Renew seals, gaskets and self-locking
Vol
ksw nuts. not
gu
by ara
d
♦ Fill turbocharger with engine orisoil
e
at oil supply line connection. nte
eo
th
u ra
♦ After installing turbocharger,
ss a
run engine for about 1 minute at c
idling speed to ensure that oil is supplied to turbocharger.

ce
le
un

pt
an
d

♦ Hose connections and hoses for charge air system must be


itte

y li
erm

free of oil and grease before assembly.

ab
ility
ot p

♦ Secure all hose connections with hose clips which conform to

wit
is n

production standard.

h re
ole,

spec
♦ Install exhaust system and align it free of stress.
urposes, in part or in wh

t to the co
♦ When installing air pipes with plug-in connector, ensure that
securing clip -arrow- audibly engages into retaining lug -A-.

rrectne
Fitting hose connections with plug-in connector
⇒ “2.2 Assembly overview - charge-air hose connections”,
page 181

ss o
cial p

f
Specified torques:

inform
mer

atio
m

Note
o

n
c

i
or

n thi
te

Observe tightening sequence for exhaust manifold.

sd
iva

o
pr

cum
r
fo

en
ng

♦ Assembly overview - turbocharger


t.
yi Co
⇒ “1.1 Assembly overview - turbocharger”, page 162 t. Cop py
rig
gh ht
yri
♦ Assembly overview - charge air system p by
co Vo
⇒ “2.1 Assembly overview - charge air system”, page 180
by lksw
cted agen
Prote AG.
♦ Assembly overview – catalytic converter and add-on parts
⇒ “1.1 Assembly overview – emission control”, page 283

– Push engine cover panel down at points -1- in direction of


-arrow- until it engages.

1.3 Checking vacuum unit for turbocharger


Special tools and workshop equipment required

170 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
n AG. Volkswagen AG do
♦ Hand vacuum pump
olks
w-aVAS
ge 6213- es n
ot g
yV ua
db ran
rise tee
tho or
au ac
ss

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
– Check retaining clip -1- is seated correctly on vacuum unit

rrectness of i
linkage.
l purpos

Securing nut -2- must be locked with sealing paint.

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
– Pull hose -arrow- off vacuum unit. py by
co Vo
by lksw
cted agen
Prote AG.

– Fit hose -2- onto vacuum unit connection.


– Push sliding ring -1- on hand vacuum pump - VAS 6213- to
stop in direction of -arrow-.

1. Turbocharger 171
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Operate hand vacuum pump - VAS 6213- until a pressure of


700 mbar is displayed on pressure gauge.
Linkage of vacuum unit -1- must move in direction of -arrow-.
If pressure of 700 mbar is displayed:
Vacuum unit is OK.
If pressure drops abruptly:
– Renew vacuum unit
⇒ “1.5 Renewing vacuum unit for turbocharger”, page 177 .

1.4 Adjusting vacuum unit kfor


swa
turbocharger
gen AG. Volkswagen AG do
es n
Vol ot g
d by ua
ran
e
ris tee
Note utho or
a ac
ss

ce
e

The vacuum unit must only be adjusted when the linkage has
nl

pt
du

an
been loosened.
itte

y li
erm

ab
ility
ot p

wit
, is n

Special tools and workshop

h re
equipment required
hole

spec
es, in part or in w

♦ Pressure regulating valve -

t to the co
VAS 6342-
♦ Dial gauge set, 4-part - VAS

rrectness of i
6341-
l purpos

♦ Hand vacuum pump - VAS


6213-
nf
ercia

♦ Turbocharger tester -
or

V.A.G 1397A-
m
m

atio
m

♦ Universal dial gauge brack‐


o

n in
or c

et - VW 387-
thi
te

sd
iva

♦ Dial gauge extension, 30


o
r
rp

cu

mm - VAS 6341/3- (not


o

m
f

en
ng

shown)
t.
yi Co
Cop py
.
♦ Flat pickup - VAS 6341/4-
t rig
gh ht
yri by
(not shown) cop Vo
by lksw
cted agen
Prote AG.

172 Rep. gr.21 - Turbocharging/supercharging


n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
ir se
d Passat 2006 ➤ , Passat 2011 ran ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
tee
o
4-cylinder
auth direct-injection engine (1.4 l, natural gas, EA or 111, turbocharger, supercharger) - Edition
ac
ss 11.2015

ce
le
un

pt
an
d
Procedure
itte

y li
rm

ab
– Lift engine cover panel at points -1- and pull it forwards in di‐
pe

ility
ot

rection of -arrow-.

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

ti
– Unbolt heat shield over turbocharger -arrows-.

on in
r
te o

thi
– Open and close expansion tank cap to release pressure in

s
iva

cooling system.

do
r
rp

cum
fo

– Now drain coolant.

en
ng

t.
yi Co
Cop py
t. rig
gh ht
yri
Note
p by
co Vo
by lksw
cted agen
Prote AG.
Pull coolant hoses off engine with hose clip pliers - VAS 6340- .

– Pull off connecting hoses -1- and coolant hoses -3-.


– Unscrew securing nuts -4- from turbocharger.

– Unscrew securing bolt -2- and remove upper coolant pipe.

Note

The lower coolant pipe can only be removed following the removal
of the catalytic converter.

– Unscrew bolts -1- and remove pressure pipe.

1. Turbocharger 173
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Remove securing bolts -arrows- of engine splash protection.


– Remove wiring for Lambda probe after catalytic converter -
G130- and for alternator from cable guides -arrows-.

– Pull connector off Lambda probe after catalytic converter -


G130- and remove.

– Open hose clip -3- and remove charge air pipe -2-.
– Unbolt exhaust pipe from catalytic converter -arrows-.
– Remove catalytic converter downwards.
– Pull hose -arrow- from vacuum unit on turbocharger.
Checking vacuum unit adjustment ⇒ page 170 . agen
AG. Volkswagen AG d
oes
olksw not
V gu
Continuation if the vacuum unit has been renewed ed by or the linkage ara
nte
is
loosened. hor eo
aut ra
– Remove sealing paint from lock nuts -2-.
s c
ce
le
un

pt
an
d
itte

y li
rm

ab

– Pull off retaining clip -1- and loosen lock nut -2- on vacuum
pe

ility

unit linkage.
ot

wit
, is n

h re

– Pre-adjust bypass flap -2- on vacuum unit linkage -1- via


hole

spec

knurled screw, so that bypass flap can just be turned by hand.


es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

174 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Turn knurled nut 2 turns further.


– Tighten lock nut hand-tight.

– Connect up hand vacuum pump . V-oVAS


lkswag6213-
en AG , turbocharger
tester - V.A.G 1397A- gen AG
kto
swaconnection -II- and pressure control
does
o l not
valve - VAS 6342-d byas
V shown in illustration. gu
ar e an
ris tee
– Close pressure
ut
ho control valve - VAS 6342- at lever -2-. or
sa ac
– Push sliding
s
ring -1- on hand vacuum pump - VAS 6213- to

ce
e
nl

pressure gauge in direction of -arrow-.

pt
du

an
itte

y li
– Switch on turbocharger tester - V.A.G 1397A- and set sliding
erm

ab
switch to position -II-.

ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

1. Turbocharger 175
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Secure universal dial gauge bracket - VW 387- to turbocharg‐


er.

Note

The dial gauge linkage and the vacuum unit linkage must align.

– Secure dial gauge - VAS 6341/1- with dial gauge extension,


30 mm - VAS 6341/3- and flat pickup - VAS 6341/4- to uni‐ AG. Volkswagen
versal dial gauge bracket - VW 387- . lksw
agen AG do
es n
Vo ot g
by ua
– With pressure at 0 bar, set dial gauge - VAS 6341/1-
ris
ed to 1 mm ran
tee
preload. utho or
sa ac
– Operate hand vacuum pump - VAS 6213- s
until a pressure of

ce
le

800 mbar is displayed on turbocharger tester - V.A.G 1397A- .


un

pt
an
d
itte

y li
– Vent system via pressure control valve - VAS 6342- so that
rm

ab
pressure reading drops to 0 mbar.
pe

ility
ot

wit
, is n

– Repeat this procedure approx. 3-5 times.

h re
hole

spec
es, in part or in w

Note

t to the co
This procedure is intended to prevent the vacuum unit bypass flap

rrectness of i
or linkage from jamming.
l purpos

Note

nform
mercia

The values in mm refer to the read value (includes 1 mm preten‐

a
com

tio
sion).

n in
r
te o

thi
s
iva

– Vent system via pressure control valve - VAS 6342- so that

do
r
rp

c
pressure reading drops to 0 mbar.
um
fo

en
ng

t.
yi
– Set dial gauge - VAS 6341/1- to 0.
Co
Cop py
t. rig
gh ht
pyri by
Vo
co
Note
by lksw
cted agen
Prote AG.

♦ The following measurements must be performed in continuous


sequence. Do not allow the pressure to drop to 0 between
measurements.
♦ Do not knock against linkage throughout the entire measure‐
ment procedure.

– Operate hand vacuum pump - VAS 6213- until turbocharger


tester - V.A.G 1397A- indicates 500 +/- 5 mbar.
– Read off and note value indicated on dial gauge - VAS
6341/1- .
– Operate vacuum pump - VAS 6213- until turbocharger tester
- V.A.G 1397A- indicates 800 +/- 5 mbar.
– Vent system via pressure control valve - VAS 6342- so that
pressure reading drops to 500 +/- 5 mbar.
– Read off and note value indicated on dial gauge - VAS
6341/1- .
– Add values 1 and 2 together and divide by 2.
– The result (mean value) should be 5.5 +/- 0.25 mm.

176 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Correct setting if the result (average) is not 5.5 +/- 0.25 mm,
tighten lock nut hand-tight and repeat measurement.
– If the result (mean value) is 5.5 +/- 0.25 mm, tighten the lock
nut to 9 Nm and secure with sealing paint.
– Secure retaining clip to vacuum unit linkage.
Installation is carried out in the reverse order. When installing,
note the following:

♦ Renew seals, gaskets and self-locking nuts.


♦ Hose connections and hoses for charge air system must be
free of oil and grease before assembly.
♦ Secure all hose connections with hose clips which conform to
production standard.
♦ If renewed, place oil seal in groove of charge air hose. Ensure
seal is correctly seated in groove.
♦ Lightly moisten seal with engine oil. AG. Volkswagen AG d
agen oes
lksw not
♦ Bring retaining clip to release positiond by -arrow-.
Vo gu
ara
ise nte
r
♦ When installing air pipes with ut plug-in connector, ensure that
ho eo
ra
securing clip -arrow- audibly
ss a engages into retaining lug -A-. c

ce
e
nl

Specified torques:

pt
du

an
itte

y li
♦ Assembly overview - turbocharger
erm

ab
⇒ “1.1 Assembly overview - turbocharger”, page 162 .

ility
ot p

wit
, is n

♦ Assembly overview – charge air system

h re
⇒ “2.1 Assembly overview - charge air system”, page 180
hole

spec
es, in part or in w

♦ Removing and installing parts of exhaust system

t to the co
⇒ “1.1 Assembly overview – emission control”, page 283

1.5 Renewing vacuum unit for turbocharger


rrectness of i
l purpos

Special tools and workshop equipment required


♦ Torque wrench - V.A.G 1331-
nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

Removing
– Release vacuum hose on vacuum reservoir -arrow- and pull it
off.

1. Turbocharger 177
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
n AG. Volkswagen AG do
swage es n
– Lift engine cover panel at points b-1- y V and pull it forwards in di‐
olk ot g
ua
rection of -arrow-. ir se
d ran
tee
tho
u or
a ac
ss

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
– Unbolt heat shield over turbocharger -arrows-.

rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
yri by
– Pull hose -1- from pressure pipe and unscrew securing bolts cop Vo
by lksw
-2- for pressure pipe. cted agen
Prote AG.

– Remove pressure pipe.

– Pull hose -arrow- from vacuum unit.


– Remove sealing paint from securing nut -2-.

178 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Pull off retaining clip -1- and loosen securing nut -2- on vacuum
unit linkage.
– Unscrew knurled nut from vacuum unit stud.
AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
– Unscrew securing bolts -arrows- for vacuum unit and remove
hole

spec
vacuum unit from turbocharger.
es, in part or in w

t to the co
Installing
Installation is carried out in the reverse order. When installing,
note the following:

rrectness of i
♦ Linkage must be adjusted after installing vacuum unit
l purpos

⇒ “1.4 Adjusting vacuum unit for turbocharger”, page 172 .


♦ Specified torque for vacuum unit to turbocharger: 10 Nm

nform
ercia

♦ Renew seals, gaskets and self-locking nuts.


m

at
om

ion
c

♦ Hose connections and hoses for charge air system must be

in t
or

free of oil and grease before assembly.

his
ate

do
riv

♦ Secure all hose connections with hose clips which conform to


p

cum
for

production standard.

en
ng

t.
yi Co
op
Specified torques:
C py
ht. rig
rig ht
py by
♦ Securing bolts for heat shield co Vo
by lksw
⇒ “1.1 Assembly overview – emission control”, page 283
cted agen
Prote AG.

♦ Securing bolts for pressure pipe


⇒ “2.1 Assembly overview - charge air system”, page 180

1. Turbocharger 179
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2 Charge air system


⇒ “2.1 Assembly overview - charge air system”, page 180 agen
AG. Volkswagen AG d
oes
olksw not
V gu
⇒ “2.2 Assembly overview - charge-air hose connections”, d by ara
page 181 rise nte
tho eo
au ra
⇒ “2.3 Checking charge air system for leaks”, page 182 ss c

ce
le
un

pt
⇒ “2.4 Removing and installing charge air cooler”, page 186

an
d
itte

y li
rm

ab
pe

ility
Note

ot

wit
, is n

h re
hole
♦ Spring-type clip pliers - VAS 5024A- or hose clip pliers - VAS

spec
6340- are recommended for installation of spring-type clips. es, in part or in w

t to the co
♦ Secure all hose connections with hose clips which conform to
production standard.

rrectness of i
♦ Hose connections and hoses for charge air system must be
free of oil and grease before assembly. The oil seal and seal‐
l purpos

ing surface must only be oiled lightly for plug-in connectors


⇒ page 181 .

nform
ercia

♦ Charge air system must be free of leaks.


m

a
com

tion in
2.1 Assembly overview - charge air system
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

180 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1 - Charge air cooler


❑ Removing and installing
⇒ “2.4 Removing and in‐
stalling charge air cool‐
er”, page 186 .
2 - Bolt
❑ 5 Nm
AG. Volkswagen AG d
3 - Mounting wage
n oes
Volks not
gu
❑ For echarge
db
y air cooler. ara
nte
is
or eo
4 - Seal
au
th ra
ss c
❑ Renew if damaged.

ce
e
nl

pt
du

an
5 - Charge air hose
itte

y li
erm

ab
6 - Intake manifold connection

ility
ot p

❑ With seals.

wit
, is n

h re
hole

7 - Throttle valve control mod‐

spec
ule - J338-
es, in part or in w

t to the co
❑ Clean
⇒ “7.5 Cleaning throttle
valve module J338 ”,

rrectness of i
page 260 .
❑ If renewed, erase learnt
l purpos

values and adapt en‐


gine control unit - J623-
nf
ercia

⇒ Vehicle diagnostic
or

tester “Guided func‐


m
m

atio

tions”.
om

n in
or c

8 - Bolt
thi
te

sd
iva

❑ 7 Nm
o
r
rp

cu
o

m
f

9 - Hose clip
en
ng

t.
yi Co
op
10 - Charge air hose
C py
t. rig
gh ht
yri by
11 - Bolt cop Vo
by lksw
cted agen
❑ 10 Nm
Prote AG.

12 - Charge air pipe


13 - Charge air pressure sender - G31- with intake air temperature sender 2 - G299-
14 - Bolt
❑ 5 Nm
15 - Charge air hose
❑ To turbocharger.
16 - Charge air pipe
17 - Charge air hose

2.2 Assembly overview - charge-air hose


connections

Caution

The seal in the plug-in connector can be damaged if the se‐


curing clip is in the locked position when fitting the connector.
This can cause leakage. Observe installation instructions.

2. Charge air system 181


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Removing:
– Release plug-in connector by pulling out retaining clip
-arrow-. Separate hose/pipe without tools.
Installing
– If renewed, place oil seal in groove of charge air hose. Make
sure that the seal is correctly seated in the groove all round
the complete circumference and that it is not twisted.
– Lubricate sealing surface and seal with oil.

– Bring retaining clip to release position -1-.


– Push charge air hose into coupling to stop.
– Bring securing clip to locking position -2- and then push charge
air hose again.
– Check if plug-in connector seats correctly and is properly en‐
gaged by pulling hose.

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

2.3 Checking charge air system for leaks


h re
hole

spec
es, in part or in w

Special tools and workshop equipment required


t to the co

♦ Charge air system tester - V.A.G 1687-


rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

182 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Hose clip pliers - VAS 6340-

♦ Engine bung set - VAS 6122- (not shown)


– Lift engine cover panel at points -1- and pull it forwards in di‐
rection of -arrow-.
– Press hose locking mechanism and pull hose for crankcase
breather -1- off intake connecting pipe.
– Also pull crankcase breather hose off valve timing housing.

Caution

Crankcase breather hose must be pulled off during leak test to


prevent damage to engine.

AG. Volkswagen AG d
agen oes
olksw not
– Seal intake connecting pipe with a bung from d by V engine bung set gu
ara
- VAS 6122- . orise nte
eo
th
u ra
– Remove spring-type clips -2- fromss intake
a
hose and remove c
intake hose.
ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co

– Renew spring-type clips -arrows- with screw-type clips from


rrectne

charge air system tester - V.A.G 1687- .


ss o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Charge air system 183


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Slide adapter - V.A.G 1687/6- into intake hose -2- and secure
hose to intake connecting pipe with screw-type clips -1- from
charge air system tester - V.A.G 1687- .
Prepare charge air system tester - V.A.G 1687- as follows:

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
le
un

– Unscrew pressure regulating valve -2- and close valves -3-

pt
an
d
itte

and -4-.

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

– Connect charge air system tester - V.A.G 1687- as shown.

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

184 Rep. gr.21 - Turbocharging/supercharging


AG. Volkswagen AG d
agen oes
olksw not
y V gu
Passat 2006 ➤ , Passat 2011 ➤ rise, Passat Variant 2011 ➤ , Touran 2003
d b ara ➤
nte
4-cylinder direct-injection engine (1.4 l, natural gas,autEA 111, turbocharger, supercharger) - Editione or
ho
a
ss 11.2015 c

ce
le
un

pt
an
d
– Connect pressure hose -1- (compressed air supply) to charge

itte

y li
air system tester - V.A.G 1687- .

rm

ab
pe

ility
ot

wit
, is n

h re
Note

hole

spec
es, in part or in w
If there is water in the sight glass, drain at water drain screw -6-.

t to the co
– Open valve -3-.

rrectness of i
– Adjust pressure to 0.5 bar with pressure regulating valve -2-.

l purpos
Caution

nform
ercia
The pressure must not exceed 0.5 bar! If the pressure is too
m

a
high this can cause damage to the engine.
com

tion in
r
te o

thi
s
iva

do
– Open valve -4- and wait until the test circuit is filled. If neces‐
r
rp

cum
sary readjust pressure to 0.5 bar.
fo

en
ng
t.
yi Co
– Check the charge air system for leaks by hearing, touching, Cop py
with commercially available leak detector spray or using ultra‐
t. rig
gh ht
yri
sonic tester - V.A.G 1842- .
p by
co Vo
by lksw
cted agen
Prote AG.

Note

♦ Slight leaks in the area of the intake connecting pipe


-arrows- are permissible, as the intake hoses are not designed
for high-pressure.
♦ A small amount of air escapes through the valves and enters
the engine. Therefore a holding pressure test is not possible.
♦ How to use the ultrasonic tester - V.A.G 1842- ⇒ operating
instructions
♦ Depressurise test circuit by detaching coupling from adapter -
V.A.G 1687/6- before removing adapter.
♦ Hose connections and hoses must be free of oil and grease
before assembly.
♦ After testing compression, secure intake hoses again with
spring-type clips.

– Push engine cover panel down at points -1- in direction of


-arrow- until it engages.

2. Charge air system 185


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2.4 Removing and installing charge air cool‐


er
⇒ “2.4.1 Removing and installing charge air cooler (Passat)”,
page 186
⇒ “2.4.2 Removing and installing charge air cooler (Touran)”,
page 189 agen
AG. Volkswagen AG d
oes
olksw not
V
2.4.1 Removing and installing charge air cooler (Passat) by gu
d ara
ise nte
or eo
h
aut ra
ss c
Special tools and workshop

ce
e
nl

pt
equipment required
du

an
itte

y li
♦ Refractometer - T10007-
erm

ab
ility
ot p

♦ Hose clip pliers - VAS

wit
, is n

6340-

h re
hole

spec
♦ Torque wrench
es, in part or in w

(5 … 50 Nm) - V.A.G 1331-

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

Removing
– Remove noise insulation or skit plate ⇒ General body repairs,
exterior; Rep. gr. 50 ; Removing and installing noise insulation
or skid plate .
– Remove front bumper ⇒ General body repairs, exterior; Rep.
gr. 63 ; Assembly overview - front bumper .

186 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Vehicles with push-fit charge air hoses


– Release securing clip on right of charge air cooler in direction
of -arrow- and pull off hose -arrow-.
– Release and pull off charge air hose in same way on left-hand
side.

Vehicles with screw-type hose clips on charge air hoses


– Loosen hose clip -arrow-.
– Pull off charge air hose -1- on left of charge air cooler -2-.
– Also loosen hose clip on right-hand side and pull off charge air
AG. Volkswagen AG d
hose. lksw
agen oes
n o ot g
yV ua
Continuation for allrisvehicles
ed
b ran
tee
tho o
– Drain coolant
s a ⇒ “1.2 Draining and filling coolant”,
u page 137 .r ac
s ce
e

– Remove air filter


nl

pt
du

⇒ “6.2 Removing and installing air filter housing”, page 243 .


an
itte

y li
erm

ab
ility
ot p

– Release retaining clip -arrow-.


wit
, is n

h re

– Pull off coolant hose -1- from radiator.


hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

– Undo and remove bolts -arrows- of cowling.


in t
or

his
te

– Release connector -1- and pull off.


a

do
priv

cum
or

– Remove cowling downwards.


f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Charge air system 187


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
AG. Volkswagen AG d
– Unscrew bolts -arrows-. ksw
agen oes
not
Vol
y gu
– Remove radiator -1- downwards. ise
d b ara
nte
or eo
th
au ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
– Undo and remove coolant pump bolts -arrows- of the radiator
support.

rrectness of i
– Pull out bottom of radiator from mounting.
l purpos

– Tilt radiator backwards.

nform
ercia

Vehicles with air conditioner


m

at
om

ion
c

Note

in t
or

his
ate

do
riv

Make sure that the coolant lines/hoses are not excessively


p

cum
or

stretched, kinked or bent.


f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
– Undo and remove condenser bolts -arrows-. pyri by
Vo
co lksw
by
cted agen
– Secure condenser to lock carrier. Prote AG.

Continuation for all vehicles


– Remove radiator downwards.
Installing
Install in reverse order. In the process, note the following:
Vehicles with screw-type hose clips on charge air hoses

Caution

The screw-type clips on the charge air pipes must be tightened


to 5.5 Nm. If the torque is too low or too high, the charge air
hose may slip off the charge air pipe during vehicle operation.

Vehicles with push-fit charge air hoses

Note

Note installation of charge air hoses.

188 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
. Volkswage
11.2015
AG n AG d
agen oes
olksw not
– If renewed, place oil seal in groove of d bycharge
V air hose. Ensure gu
ara
that seal is correctly seated aroundorise groove and is not twisted. nte
eo
th
u ra
– Coat sealing surface and oilssseal
a
with oil. c

ce
le
un
– Bring retaining clip to release position -1-.

pt
an
d
itte

y li
– Push charge air hose into coupling as far as stop.

rm

ab
pe

ility
– Bring retaining clip to locking position -2- and then press
ot

wit
, is n
charge air hose again.

h re
hole

spec
– By pulling on hose, check whether plug-in connector seats
es, in part or in w

correctly and is properly engaged.

t to the co
Continuation for all vehicles
Fill with new coolant

rrectness of i
⇒ “1.2 Draining and filling coolant”, page 137 .
l purpos

– Electrical connections and routing ⇒ Current flow diagrams,


Electrical fault finding and Fitting locations.

nform
mercia

a
com

tion in
Specified torque
r
te o

thi
s
iva

Component Specified torque

do
r
rp

cum
fo

Radiator to charge air cooler 5 Nm

en
ng

t.
yi Co
Cowling to radiator 5 Nm
Cop py
t. rig
gh
Charge air cooler to lock carrier 5 Nm
ht
pyri by
Vo
co lksw
by
Condenser to charge air cooler cted 5 Nm
agen
Prote AG.
Screw-type hose clips on charge air pipes 5.5 Nm

2.4.2 Removing and installing charge air cooler (Touran)

2. Charge air system 189


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
AG. Volkswagen AG d
Special tools and workshoplkswagen oes
not
equipment required d by Vo gu
ara
e nte
ris
♦ Refractometer
ut - T10007-
ho eo
ra
sa c
♦ Hose clip pliers
s
- VAS

ce
e
nl

6340-

pt
du

an
itte

y li
♦ Torque wrench - V.A.G
erm

ab
1331-

ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

Removing
– Remove front bumper cover ⇒ General body repairs, exterior;
Rep. gr. 63 ; Removing and installing bumper cover
– Remove air filter
⇒ “6.2 Removing and installing air filter housing”, page 243 .
– Pull connectors off thermal switch and radiator fan.
– Remove radiator
⇒ “3.3 Removing and installing radiator”, page 160 .

Note

To prevent damage to condenser or to refrigerant lines/hoses,


ensure that the lines and hoses are not stretched, kinked or bent.

– Remove retaining clamp(s) for refrigerant lines.

190 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, .natural
AG Volkswaggas,
en AGEA 111, turbocharger, supercharger) - Edition
agen does
Volksw not
g
11.2015
y ua
db ran
rise tee
– Make a paper template
tho with the specified dimensions. or
s au ac
s

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
– Fit the template on the plastic bracket at the front right so that
l purpos

it rests against the edges at the top and left.


– Mark the intersection on the template -arrow- with a centre

nf
ercia

o
punch.

rm
m

atio
m

– Drill a hole into the plastic bracket with a 5-mm drill bit.
o

n in
or c

thi
– Drill or cut the hole to 16 mm.
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.
– Unscrew securing bolt -arrow-.

– Unscrew securing bolts -arrows-.


– Remove charge air cooler downwards.
Installing
Installation is carried out in the reverse order. When installing,
note the following:
Specified torques:
Component Nm
Cowling to radiator 5
Radiator to charge air cooler 5
Charge air cooler to condenser 5

2. Charge air system 191


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3 Supercharger
⇒ “3.1 Assembly overview - supercharger”, page 192
⇒ “3.2 Removing and installing supercharger”, page 194
⇒ “3.3 Removing and installing drive unit seal for supercharger”,
page 201

3.1 Assembly overview - supercharger

1 - Housing with noise insula‐


tion
❑ For silencer.
2 - Silencer
❑ For intake air. AG. Volkswagen AG d
agen oes
lksw not
3 - Intake hose d byV
o gu
ara
e nte
❑ Secure with spring-type horis
eo
clips. aut ra
ss c

ce
e

4 - Bolt
nl

pt
du

an
❑ Self-tapping bolt.
itte

y li
erm

ab
❑ The securing bolt may

ility
ot p

only be tightened using

wit
, is n

an impact wrench if the

h re
wrench speed is maxi‐
hole

spec
mum 500 rpm and a
es, in part or in w

maximum tightening tor‐

t to the co
que of 7 Nm is set.
❑ 7 Nm rrectness of i

5 - Bolt
l purpos

❑ 7 Nm
6 - Bolt
nform
ercia

❑ Self-tapping bolt.
m

at
om

❑ The securing bolt may


ion
c

only be tightened using


in t
or

an impact wrench if the


his
ate

do
riv

wrench speed is maxi‐


p

mum 500 rpm and a


um
for

en
g

maximum tightening tor‐


n

t.
yi Co
que of 7 Nm is set. Cop py
ht. rig
❑ 7 Nm
rig ht
py by
co Vo
by lksw
cted
7 - O-ring
agen
Prote AG.

❑ Renew.
8 - Pressure pipe
9 - Noise insulation
10 - Housing
❑ For noise insulation.
11 - Silencer
❑ For charge air.
❑ With seal.
❑ Renew seal between supercharger and intake silencer.
12 - Belt pulley
❑ For supercharger.

192 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
. Volkswage
11.2015
AG n AG d
agen oes
olksw not
13 - Bolt db
yV gu
ara
ise nte
❑ 8 Nm tho
r eo
au ra
c
14 - Coolant pump
ss
with magnetic clutch for supercharger - N421-

ce
e
nl

pt
du
15 - Poly V-belt

an
itte

y li
❑ For supercharger.
erm

ab
ility
ot p

16 - Bolt

wit
, is n

h re
❑ 23 Nm
hole

spec
17 - Tensioning element
es, in part or in w

t to the co
❑ For supercharger poly V-belt.
❑ Relieve tension with spanner.

rrectness of i
❑ Lock with locking pin - T10060 A- .
l purpos

18 - Bolt
❑ To loosen and tighten securing bolt, counterhold supercharger shaft with spanner.

nform
ercia

❑ Renew.
m

❑ 40 Nm + turn 90° further

at
om

ion
c

19 - Supercharger

in t
or

his
e

❑ Removing and installing ⇒ “3.2 Removing and installing supercharger”, page 194 .
at

do
priv

c
❑ Removing and installing drive unit seal for supercharger

um
for

⇒ “3.3 Removing and installing drive unit seal for supercharger”, page 201

en
ng

t.
yi Co
op
❑ Repair kit for supercharger ⇒ Electronic Parts Catalogue (ETKA) C py
t. rig
gh ht
yri by
20 - Bolt cop Vo
by lksw
cted agen
❑ 25 Nm Prote AG.

3. Supercharger 193
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3.2 Removing and installing supercharger

Special tools and workshop


equipment required
♦ Spring-type clip pliers -
VAS 5024A-
♦ Torque wrench - V.A.G
1331-
♦ Guide pins - T10341-
♦ Locking pin - T10060 A-

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
r

Removing
o

his
ate

do
riv

– Lift engine cover panel at points -1- and pull it forwards in di‐
p

cum
or

rection of -arrow-.
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

194 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Detach spring-type clip from intake hose -arrow-.

– Separate fuel supply line -1- and line to activated charcoal filter
-2-. Press release tabs to do this.

– Unscrew hose clip -1- at charge air pipe.


– Remove securing bolt for charge air pipe -2-.
n AG. Volkswagen AG
– Remove intake manifold, and layolks
witato
ge one side does
not
⇒ “7.1 Assembly overview d-bintake
yV manifold”, page 244 . gu
ar
e an
ris tee
– Remove front right wheel
ut
ho housing liner ⇒ General body re‐ or
pairs; Rep. gr. 66 ;ssWheel housing liner; Removing and
a ac
installing front wheel housing liner .
ce
e
nl

pt
du

an

Remove poly V-belt


itte

y li
erm

⇒ “1.3 Removing and installing poly V-belt”, page 30 .


ab
ility
ot p

– Remove right drive shaft ⇒ Running gear, axles, steering;


wit
, is n

Rep. gr. 40 ; Repairing drive shafts; Removing and installing


h re
hole

drive shafts .
spec
es, in part or in w

– Remove Lambda probe after catalytic converter - G130- -1-.


t to the co

– Unbolt exhaust pipe from catalytic converter -arrows-.


rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

3. Supercharger 195
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Unbolt exhaust pipe to front silencer -arrows-.


– Prise front exhaust pipe out of mounting using a lever.
– Pull exhaust pipe out forwards, together with flexible joint.

– Push securing clip at charge air cooler in direction of -arrow-


and pull hose -arrow- off.

– Unscrew securing bolt forswcharge


agen
AG.air pipe -arrow-
Volkswagen AG
doeand
s no
remove
charge air pipe -1- downwards.
by Volk t gu
ara
ed nte
oris e
th or
au ac
ss
ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co

– Opens clips for hose guides -2- and push hoses to one side.
rrectness of i

– Carefully press locking lugs on noise insulation housing


-arrows- outwards.
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

196 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Pull off front housing with noise insulation.

– Slacken supercharger poly V-belt by swinging tensioning ele‐


ment in direction of -arrow- with 16 mm spanner.
– Lock tensioning element using locking pin - T10060 A- .

– Unscrew securing bolts -arrows- for tensioning element and


remove tensioning element.
– Hold supercharger shaft with 16 mm spanner -1-.

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c
ce
le
un

pt
an
d
itte

– Remove securing bolt -2- for pulley and remove pulley and
y li
erm

ab

supercharger poly V-belt -3-.


ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

3. Supercharger 197
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Unscrew securing bolts -1- for supercharger and remove su‐


percharger together with intake silencer.
Removing intake silencer for charge air:

n AG. Volkswagen AG do
lkswage es n
– Pull intake silencer for charge air -2- together withbpressure
yV
o ot g
ua
d
pipe in direction of -arrow-. o
ir se
ran
tee
th or
u
Installing ss
a ac

ce
e
nl

pt
du

an
itte

Note

y li
erm

ab
ility
ot p

♦ Renew O-rings on pressure pipe ⇒ Item 7 (page 192) .

wit
, is n

h re
♦ Before installing, lightly moisten O-rings with engine oil.
hole

spec
es, in part or in w

♦ The pressure pipe can only be pushed in one position into the

t to the co
intake silencer for charge air (note locating element).

rrectness of i
– Push intake silencer for charge air -2- together with pressure
pipe in direction of -arrow- into intake connecting pipe.
l purpos

– Press intake silencer for charge air -2- against crankcase to


allow both dowel sleeves -3- to sit in holes.

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co
– Turn guide pins - T10341- hand-tight to stop in both lower
by lksw
cted agen
Prote
threaded holes.
AG.

– Renew oil seal -1- and ensure it is correctly seated in the


groove.
– Push supercharger together with intake silencer onto guide
pins - T10341- and tighten upper securing bolts hand-tight.
– Remove guide pins - T10341- .
– Tighten lower securing bolts hand-tight.

198 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection enginelk(1.4 n AG. Volkswagen AG o
swagel, natural gas, EA d111,
es n turbocharger, supercharger) - Edition
o ot g
db
yV ua
ra 11.2015
e nte
ris
tho eo
– Tighten securing bolts
au -1- evenly in diagonal sequence to ra
c
ss
specified torque ⇒ page 200 .

ce
e
nl

pt
du
– Install poly V-belt -3- for compressor along with belt pulley.

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

Tighten new securing bolt -2- to specified torque ⇒ page 200 .


– Hold supercharger shaft with 16 mm spanner -1-.

nform
ercia

– Install tensioner.
m

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

– Tighten securing bolts -arrows- to specified torque


⇒ page 200 .

– Hold tensioner using a 16 mm spanner and pull out pin -


T10060 A- .
– Position housing with noise insulation onto supercharger.

Note

Ensure correct position of noise insulation in housing.

3. Supercharger 199
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Press housing together with noise insulation against super‐ AG. Volkswagen AG d
charger until locking lugs -arrows- click into place. agen oes
olksw not
y V gu
b ara
Perform further installation in reverse order, paying attention riseto
d
nte
the following: utho eo
ra
s a c
s

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
♦ Renew seals, gaskets and self-locking nuts.
♦ Hose connections and hoses for charge air system must be

rrectne
free of oil and grease before assembly.
♦ Secure all hose connections with hose clips which conform to

ss
production standard.

o
cial p

f inform
♦ Install exhaust system and align it free of stress.
mer

atio
m

♦ When installing air pipes with plug-in connector, ensure that


o

n
c

securing clip -arrow- audibly engages into retaining lug -A-.

i
or

n thi
te

sd
a

Fitting hose connections with plug-in connector


iv

o
r

⇒ “2.2 Assembly overview - charge-air hose connections”,


p

cum
r
fo

page 181

en
ng

t.
yi Co
op
Specified torques:
C py
t. rig
gh ht
pyri by
Vo
Component Specified torque Note
co lksw
by
cted agen
Prote AG.
Securing bolts for super‐ 25 Nm Tighten in diago‐
charger nal sequence
Securing bolt for super‐ 40 Nm + turn 90° Renew
charger pulley further
Securing bolts for ten‐ 23 Nm
sioning element
♦ Assembly overview – charge air system
⇒ “2.1 Assembly overview - charge air system”, page 180
♦ Assembly overview – catalytic converter and add-on parts
⇒ “1.1 Assembly overview – emission control”, page 283
♦ Intake manifold and add-on parts
⇒ “7.1 Assembly overview - intake manifold”, page 244

– Push engine cover panel down at points -1- in direction of


-arrow- until it engages.
– Fit vacuum hose onto connection -arrow-.

200 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3.3 Removing and installing drive unit seal


for supercharger
Special tools and workshop equipment required
♦ Gearbox bracket - T10108-
♦ Assembly tool - T10208-
♦ Puller hooks - T20143-
♦ Repair kit for supercharger ⇒ Electronic Parts Catalogue (ET‐
KA)

Note

All components in the repair kit must be used!


AG. Volkswagen AG d
agen oes
Removing olksw not
V gu
d by ara
ise nte
– Remove supercharger hor eo
⇒ “3.2 Removing and installing aut
supercharger”, page 194 ra
ss c

ce
le

– Secure compressor on the gearbox support - T10108- with 2


un

pt
bolts-arrow-.

an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

– Pry off the circlip -1- with a slot-head screwdriver -2-.

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

– Pull out the seal -1- with the puller hooks - T20143/1- .
Installing

3. Supercharger 201
Passat 2006 ➤ , Passat 2011 ➤ , ePassat
ag n AG. VolVariant
kswagen A2011
G do ➤ , Touran 2003 ➤
es n
ksw
4-cylinder direct-injectionbengine
yV
ol (1.4 l, natural gas, EA 111, ot g turbocharger, supercharger) - Edition
ua
d
11.2015 or
ise ran
te
th eo
au ra
c
– Put together assemblys cone
s
-T10208/5- and assembly sleeve

ce
e
-T10208/4- .

nl

pt
du

an
itte

y li
– Slide the new seal -1- onto the assembly sleeve in the
erm

ab
-arrow direction- -T10208/5- -T10208/4- via the assembly

ility
ot p

cone.

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

– Pull down the assembly cone - T10208/5- from the assembly


sleeve in the -arrow direction- -T10208/4- .

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

– Slide the assembly sleeve - T10208/4- onto the compressor


shaft.

– Using the thrust piece - T10208/2- , press in the seal via the
assembly sleeve - T10208/4- up to the stop.

202 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Press in the new circlip -1- up to the stop also using the as‐
sembly tool - T10208/2- .
Changing the compressor fluid

– Undo the securing bolts for the drive unit according to the
specified sequence -A- to -H-.
– Turn the gearbox support - T10108- until the shaft points to
the floor.

– Unscrew the securing bolts and remove the drive unit -1-.
– Drain compressor oil completely from drive unit.
– Collect the escaping fluid in a suitable container.
– Turn the gearbox support - T10108- until the pair of gears point
upwards.
AG. Volkswagen AG d
agen o
– Remove sealant olksresidues from compressor
w es nand drive unit with
ot g
yV
a rotatingsebrush,
db e.g. a hand drill with a plastic brush
ua
ran (wear eye
protection).
thori tee
o
au ra
– Thoroughly
ss clean sealing surfaces. They must be free cof oil
ce
e

and grease.
nl

pt
du

an
itte

– Dirt and sealant residue must not be allowed to enter the in‐
y li
erm

ab

stallation space.
ility
ot p

wit
, is n

h re

Caution
hole

spec
es, in part or in w

Add only the oil specified in repair set ⇒ Electronic Parts Cata‐
t to the co

logue (ETKA) .
rrectness of i

– Fill the space -arrow- with new oil (44 ml) from the repair set.
l purpos

nform
ercia

Note
m

at
om

Sealant must not be applied too thickly, otherwise excess sealant


on
c

may enter the space and cause damage.


in t
or

his
ate

do
riv

Do not apply sealant until directly before the drive unit is fitted.
p

cum
for

en
ng

t.
– Apply sealant to the sealing surface on the compressor.
Cop
yi Co
py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

3. Supercharger 203
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Bead of sealant must be 2 … 3 mm thick and must run closer to


inside edge in area of bolt holes.
– Tighten new securing bolts for drive unit in given sequence to
specified torque ⇒ page 204 .
– Install supercharger
⇒ “3.2 Removing and installing supercharger”, page 194
Specified torques:
Component Specified torque Tightening se‐
quence
Securing bolts for drive 12 Nm -A- through -H-
unit

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

204 Rep. gr.21 - Turbocharging/supercharging


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

24 – Mixture preparation - injection


1 Injection system
⇒ “1.1 General notes on injection.”, page 205

1.1 General notes on injection.


♦ The engine control unit - J623- is equipped with self-diagnosis.
Before carrying outgrepairs
en AG. V and afor
olksw genfault
AG ofinding, first read event
memory. Also Volthe
kswavacuum hoses and dconnections
es n
ot g must be
checkede(unmetered
d by air). ua
ra
is nte
or
♦ Fuelau hoses in engine compartment must be secured ronly
th eo
ac with
spring-type
ss clips. The use of clamp or screw-type clips is not
permissible.

ce
e
nl

pt
du

an
itte

♦ For trouble-free operation of electrical components, a voltage

y li
erm

ab
of at least 11.5 V is necessary.

ility
ot p

wit
♦ Do not use sealants containing silicone. Particles of silicone
, is n

h re
drawn into the engine will not be burnt in the engine and dam‐
hole

age the Lambda probe.

spec
es, in part or in w

t to the co
♦ Vehicles are fitted with a crash fuel shut-off circuit. It reduces
the danger of a fire in a crash as the fuel pump is switched off
via the fuel pump relay. The system also improves the starting
characteristics of the engine. When door is opened, the fuel rrectness of i
pump is activated for 2 seconds to build up pressure in the fuel
l purpos

system.
nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

1. Injection system 205


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2 Injectors
⇒ “2.1 Assembly overview - fuel rail with injectors”, page 206
⇒ “2.2 Releasing high pressure in fuel system”, page 207
⇒ “2.3 Removing and installing injectors”, page 208
⇒ “2.4 Renewing seal on injector”, page 211

2.1 Assembly overview - fuel rail with injectors

1 - Seal
❑ Renew all, if lower part
of intake manifold has
been removed
⇒ “2.4 Renewing seal on
injector”, page 211
❑ Before installing, mois‐
ten lightly with clean en‐
gine oil.
2 - Spring element
❑ Observe proper seating
of injector. . Volkswagen AG
gen AG does
❑ Injector must be re‐Volkswa not
newed if spring eelement
d by gu
ara
is damaged.horis nte
e t or
au ac
3 - Injectors ss
ce
e
nl

pt
du

an

Note
itte

y li
erm

ab
ility

If injectors are removed, they must


ot p

be renewed.
wit
, is n

h re
hole

❑ Injector, cylinder 1 -
spec
es, in part or in w

N30-
t to the co

❑ Injector, cylinder 2 -
N31-
rrectness of i

❑ Injector, cylinder 3 -
N32-
l purpos

❑ Injector, cylinder 4 -
N33-
nf
ercia

❑ With Teflon seal and


orm

support washer.
m

atio
m

❑ The support washer


o

n in
or c

cannot be renewed indi‐


thi
te

vidually.
sd
iva

o
r
rp

cu

❑ Removing and installing


o

m
f

en
ng

injectors ⇒ “2.3 Removing and installing injectors”, page 208 . yi


t.
Co
op py
4 - Lower part of intake manifold t. C rig
gh ht
yri by
❑ Removing and installing lower part of intake manifold cop Vo
by lksw
⇒ “7.3 Removing and installing lower part of intake manifold”, page 256 cted agen
Prote AG.

206 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Caution
If only lower part of in‐
take manifold is to be re‐
moved, ensure injectors
remain in cylinder head.
To remove, use hold-
down device - T10510- .
Reason: if injectors have
been removed, they
must be renewed.

2.2 Releasing high pressure in fuel system

WARNING
AG. Volkswagen AG d
Risk of injury caused by high fuel pressure. agen oes
olksw not
byV gu
ara
♦ The injection system consists of a high-pressure
rised section nte
(maximum approx. 120 bar) and a low-pressure
ut
ho
section eo
ra
(approx. 7 bar). ss a c

ce
e
nl

♦ Prior to opening the high-pressure section, e.g. when re‐

pt
du

an
moving the high-pressure pump, fuel rail, injectors, a fuel
itte

y li
erm

line, or the fuel pressure sender - G247- , the fuel pressure

ab
ility
in the high-pressure section must be reduced to a residual
ot p

wit
pressure of approx. 7 bar. The appropriate procedure is
, is n

h re
described as follows.
hole

spec
es, in part or in w

t to the co
Special tools and workshop equipment required
♦ Vehicle diagnostic tester

rrectness of i
Releasing high pressure in fuel system:
l purpos

– Connect vehicle diagnostic tester and then carry out the func‐
tion “Reducing high fuel pressure” in “Guided functions”.
nf
ercia

or
• The fuel pressure will drop to the specified value.
m
m

atio
m

– Switch off ignition.


o

n in
or c

thi
e

The fuel rail is still filled with fuel, but the fuel is not under high
t

sd
iva

pressure anymore.
o
r
rp

cu
o

m
f

en
ng

t.
yi Co
WARNING . Cop py
rig
ht ht
rig by
py
Risk of injury, avoid skin contact with fuel. co Vo
by lksw
cted agen
Prote
♦ Always wear eye protection and protective clothing when
AG.

opening the fuel system.


♦ Wrap a clean cloth around the connection before opening
the high-pressure section in order to catch escaping fuel.

– After the high pressure has been released, the high-pressure


system must be opened »immediately«. To do this, wrap a
clean cloth around the connection before opening it. Catch the
escaping fuel.

2. Injectors 207
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Note

♦ If the high-pressure system is not opened immediately, the


pressure will rise again due to reheating effects.
♦ Now the ignition must not be switched on anymore, because
switching the ignition on would cause the pressure to rise
again.

Concluding measures
– Clear event memory and generate the readiness code in en‐
gine control unit using “Guided functions” mode.

2.3 Removing and installing injectors

DANGER!

Before working on the natural gas system, always observe


⇒ “2.2 Safety precautions when working on natural gas sys‐
tem”, page 4 !!!

WARNING

• Make sure that the tank shut-off valve on each of the nat‐
ural gas tanks is closed.

– Empty gas system ⇒ Fuel supply system – natural gas en‐


gines; Rep. gr. 20 ; Fuel tank; Releasing pressure in high- AG. Volkswagen AG d
pressure line . agen oes
olksw not
yV g b ua
ed ran
oris tee
th or
Note au ac
ss

ce
e
nl

pt
If injectors are removed, they must be renewed.
du

an
itte

y li
erm

Special tools and workshop equipment required ab


ility
ot p

wit
, is n

♦ Torque wrench - V.A.G 1331- h re


hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

208 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Tool set - T10133-

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
Removing ir se
d ran
tee
tho
or
Remove air filter au ac
ss
⇒ “6.2 Removing and installing air filter housing”, page 243 .

ce
e
nl

pt
du

Remove regulating flap control unit - J808- and throttle valve

an
itte

y li
module - J338-
erm

ab
⇒ “7.4 Removing and installing regulating flap control unit J808

ility
ot p

and throttle valve module J338 ”, page 258 .

wit
, is n

h re
– Remove intake manifold and lower part of intake manifold
hole

spec
⇒ “7.3 Removing and installing lower part of intake manifold”,
es, in part or in w

page 256 .

t to the co
– Press O-ring upwards by hand as shown, and remove it from
injector.

rrectness of i
– Screw slide hammer - T10133/3- to puller - T10133/15- .
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
op py
– Then insert puller - T10133/15- into groove -arrow- on injector.
t. C rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Injectors 209
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Pull injector out by tapping carefully.


Installing

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

210 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Thoroughly clean injector holes in cylinder head using nylon


brush - T10133/4- .
– Renew O-rings between injector and lower part of intake mani‐
fold and moisten slightly with clean engine oil.

Note

The Teflon seal on the injector must not be oiled or greased.

– Push new injector into hole in cylinder head to stop by hand.

Note

The injector must insert easily. If necessary wait until the seal has
contracted sufficiently.

– Ensure correct position of injectors in cylinder head. n AG. Volkswagen AG do


swage es n
– Place lower part of intake manifold carefully on injectors bandyV
olk ot g
ua
tighten securing bolts to 20 Nm ir se
d ran
tee
⇒ “7.3 Removing and installing lower part of intakeutmanifold”,
ho
or
page 256 . ss
a ac

ce
le
un

– Install intake manifold

pt
an
d

⇒ “7.1 Assembly overview - intake manifold”, page 244 .


itte

y li
rm

ab
pe

– Install regulating flap control unit - J808- and throttle valve

ility
ot

module - J338-

wit
, is n

⇒ “7.4 Removing and installing regulating flap control unit J808

h re
hole

and throttle valve module J338 ”, page 258 .

spec
es, in part or in w

t to the co
Note

rrectness of i
Natural gas system may not be operated until tested accordingly.
l purpos

WARNING

nform
mercia

• Operating the natural gas system without having tested it

a
com

tio
for leaks according to specifications may result in severe

n in
injuries or death.
r
te o

thi
s
iva

do

The necessary scope of the leakage test depends on the pres‐


r
rp

cum

sure section which has been worked on.


fo

en
ng

t.
yi
Note the following allocation!
Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
Allocation:
cted agen
Prote AG.
⇒ “3.1 Different pressure sections of natural gas supply system”,
page 214
– Open fuel tank shut-off valves -N361/N362/N363/N429- (de‐
pending on vehicle model and equipment level) using hand
wheel - T50026- .
– Check gas system
⇒ “3 Checking natural gas supply system for leaks”,
page 214
– Install air filter
⇒ “6.2 Removing and installing air filter housing”, page 243 .

2.4 Renewing seal on injector

2. Injectors 211
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Special tools and workshop


equipment required
♦ Hold-down device -
T10510-

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

DANGER! h re
hole

spec

Before working on the natural gas system, always observe


es, in part or in w

⇒ “2.2 Safety precautions when working on natural gas sys‐


t to the co

tem”, page 4 !!!


rrectness of i
l purpos

WARNING

• Make sure that the tank shut-off valve on each of the nat‐
nf
ercia

ural gas tanks is closed.


rm
m

atio
om

n in
or c

thi
te

sd
iva

Note
o
r
rp

cu
o

m
f

en
ng

t.
yi
♦ Renew the seals, if the lower part of intake manifold has been
Co
op py
removed. t. C rig
gh ht
pyri by
♦ The support washer and spring elements cannot be renewed
co Vo
by lksw
cted
individually.
agen
Prote AG.

♦ If the support washer or spring element are damaged, the in‐


jector must be renewed.

Procedure
• The injectors remain installed while the seals are renewed.
• Use hold-down tool - T10510- for removing and installing.

212 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Remove O-ring -3-.


– Check support washer -2- and spring element -1- for damage.

– Moisten new O-ring with oil, and fit new O-ring -3- in front of
support washer -2-.
• If the spring element -1- is not damaged, it can be reused.
Further installation is carried out in the reverse sequence of re‐
moval. G. Volkswagen nA AG do
wage e
– Place lower part of intake manifold Vol carefully on injectors and ot gu
ks sn
by
tighten securing bolts to 20 ris
e Nm
d ara
nte
⇒ “7.3 Removing and installing
ut
ho lower part of intake manifold”, eo
ra
page 256 . ss a c

ce
le

– Install intake manifold


un

pt
an
d

⇒ “7.1 Assembly overview - intake manifold”, page 244 .


itte

y li
erm

ab
– Install regulating flap control unit - J808- and throttle valve

ility
ot p

module - J338-

wit
is n

⇒ “7.4 Removing and installing regulating flap control unit J808

h re
ole,

and throttle valve module J338 ”, page 258 .

spec
urposes, in part or in wh

Note t to the co
rrectne

Natural gas system may not be operated until tested accordingly.


ss o
cial p

WARNING
f inform
mer

• Operating the natural gas system without having tested it


atio
m

for leaks according to specifications may result in severe


o

n
c

injuries or death.
i
or

n thi
te

sd
a

The necessary scope of the leakage test depends on the pres‐


iv

o
pr

sure section which has been worked on.


um
r
fo

en
ng

t.
yi
Note the following allocation!
Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
Allocation: cted agen
Prote AG.
⇒ “3.1 Different pressure sections of natural gas supply system”,
page 214
– Open fuel tank shut-off valves -N361/N362/N363/N429- (de‐
pending on vehicle model and equipment level) using hand
wheel - T50026- .
– Check gas system
⇒ “3 Checking natural gas supply system for leaks”,
page 214
– Install air filter
⇒ “6.2 Removing and installing air filter housing”, page 243 .

2. Injectors 213
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3 Checking natural gas supply system


for leaks
⇒ “3.1 Different pressure sections of natural gas supply system”,
page 214 AG. Volkswagen AG d
agen oes
olksw not
⇒ “3.2 Determining pressure in gas system”, page 217 d by V gu
ara
ise nte
r
⇒ “3.3 Determining operating mode of natural gas vehicles”,
ut
ho page eo
ra
217 ss a c

ce
e
nl
⇒ “3.4 Activating/deactivating natural gas mode”, page 218

pt
du

an
itte

y li
⇒ “3.5 Checking gas system for leaks”, page 219
erm

ab
ility
ot p

wit
, is n

DANGER!

h re
hole

spec
♦ Risk of explosion and danger to life due to escaping nat‐
es, in part or in w

t to the co
ural gas.
♦ Leaks in natural gas system may lead to uncontrolled es‐
cape of natural gas.

rrectness of i
Risk of explosion leading to serious injuries or death.
l purpos

• Check natural gas system for leaks.

nform
mercia

at
Depending on the respective section of the natural gas supply
om

io
system, different procedures are described in this chapter.

n
c

in t
or

his
e

• These depend on the pressure section


at

do
riv

⇒ “3.1 Different pressure sections of natural gas supply sys‐


p

cum
or

tem”, page 214 that has been worked on, as well as on the
f

en
ng

actual pressure of the natural gas system


t.
yi Co
op
⇒ “3.2 Determining pressure in gas system”, page 217 .
C py
t. rig
gh ht
yri by
– After working on high-pressure section, perform leakage test
op Vo
by c lksw
according to manufacturer specifications ⇒ Maintenance ; cted agen
Prote AG.
Booklet 35.1 ; Description of work; Performing visual inspec‐
tion of natural gas tanks for corrosion and leakage test .
– After working on low pressure section, perform leakage test.
⇒ “3.5 Checking gas system for leaks”, page 219

3.1 Different pressure sections of natural


gas supply system
⇒ “3.1.1 High-pressure section”, page 215
⇒ “3.1.2 low-pressure section”, page 216
• The pressure sections are defined via the respective compo‐
nents of the natural gas system.
• The pressure system comprises the high-pressure section and
the low-pressure section.
• The scope of the necessary leakage test
⇒ “3.5 Checking gas system for leaks”, page 219 upon com‐
pletion of repair work will be different depending on the pres‐
sure section that has been worked on.
• The allocation does not depend on the actual pressure in the
respective section.
• Example: if the actual pressure in the high-pressure section is
below 5 bar, proceed according to instructions described here
⇒ “3.1.1 High-pressure section”, page 215 .

214 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

3.1.1 High-pressure section


The high-pressure section comprises the following:
♦ all gas-conducting components from filler neck to (and includ‐
ing) pressure regulator.
♦ All components that belong to high-pressure section are
marked »blue« in illustration.

1 - Natural gas tank


❑ Different types/versions
possible: made of steel
or fibre-reinforced com‐
posite
2 - Tank shut-off valve with sol‐
enoid valve
❑ Different amount de‐
pending on type and ve‐
hicle model
3 - High-pressure line
4 - Natural gas tank
❑ Different types/versions
possible: made of steel
or fibre-reinforced com‐
posite wage
n AG. Volkswagen AG do
es n
olks ot g
5 - Tank shut-off valve with sol‐ byV ua
d ran
enoid valve ir se tee
tho
u or
❑ Different amount de‐ ss
a ac
pending on type and ve‐

ce
e
nl

pt
hicle model
du

an
itte

y li
6 - High-pressure line
erm

ab
ility
ot p

7 - Connecting piece

wit
, is n

h re
hole

Note
spec
es, in part or in w

t to the co
Different designs possible depend‐
ing on vehicle type
rrectness of i

❑ Connecting piece with


2 connections
l purpos

❑ T-piece design
❑ Cross-piece design
nf
ercia

orm

8 - Filling connection with filler


m

atio
m

line
o

n in
or c

9 - High-pressure line
thi
te

sd
iva

o
r

10 - Pressure regulator
rp

cu
o

m
f

en
ng

❑ Pressure regulator serves as transition between yi


t.
Co
op py
♦ high-pressure section and t. C rig
gh ht
pyri by
Vo
♦ low-pressure section
co lksw
by
cted agen
Prote AG.

3. Checking natural gas supply system for leaks 215


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Necessary leakage test

DANGER!

♦ Risk of explosion and danger to life due to escaping nat‐


ural gas.
♦ Leaks in natural gas system may lead to uncontrolled es‐
cape of natural gas.
Risk of explosion leading to serious injuries or death.
• Check natural gas system for leaks.

– After working on high-pressure section, perform leakage test


according to manufacturer specifications ⇒ Maintenance ;
Booklet 35.1 ; Description of work; Performing visual inspec‐
tion of natural gas tanks for corrosion and leakage test .

3.1.2 low-pressure section


The low-pressure section comprises all gas-conducting compo‐
nents from the pressure regulator and up to the gas injection
valves »green«

9 - High-pressure line
– After working on high-
pressure section, per‐
form leakage test ac‐
cording to manufacturer
specifications ⇒ Mainte‐
nance ; Booklet 35.1 ;
Description of work;
Performing visual in‐
spection of natural gas
tanks for corrosion and
leakage test . agen
AG. Volkswagen AG d
oes
olksw not
❑ (High-pressure section) byV gu
ara
ed
ris nte
o eo
10 - Pressure regulator aut
h
ra
ss c
– After working on high-
ce
le
un

pt

pressure section, per‐


an
d
itte

form leakage test ac‐


y li
rm

ab

cording to manufacturer
pe

ility

specifications ⇒ Mainte‐
ot

wit
, is n

nance ; Booklet 35.1 ;


h re

Description of work;
hole

spec

Performing visual in‐


es, in part or in w

spection of natural gas


t to the co

tanks for corrosion and


leakage test .
❑ Pressure regulator
rrectness of i

serves as transition be‐


tween
l purpos

♦ high-pressure section and


nform
ercia

♦ low-pressure section
m

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw

216
cted agen
Prote AG.
Rep. gr.24 - Mixture preparation - injection
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

11 - Low-pressure line

Note

If the low-pressure line is detached


or renewed, an additional leakage
test will be necessary at the union
nut of the high-pressure line -9- on
the pressure regulator -10-.

12 - Gas rail with gas injection valves and pressure and temperature sender
13 - Intake manifold

Necessary leakage test

DANGER!

♦ Risk of explosion and danger to life due to escaping nat‐


ural gas.
♦ Leaks in natural gas system may lead to uncontrolled es‐
cape of natural gas.
Risk of explosion leading to serious injuries or death.
• Check natural gas system for leaks.

– After working on low pressure section, perform leakage test.


⇒ “3.5.2 Checking gas system for leaks after working on the
low-pressure section”, page 222

3.2 Determining pressure in gas system


Read system pressure using respective function ⇒ Vehicle diag‐
nostic tester gen AG
. Volkswagen AG
d a oes
o lksw not
Special tools and workshop equipment
db
y V required gu
ara
e nte
ris
♦ Diagnosis system VCI, Win7
ut - VAS 6150C-
ho eo
ra
a c
ss
– Switch ignition on.
ce
e
nl

pt
du

– Connect vehicle diagnostic tester , and start self-diagnosis.


an
itte

Basic characteristics of vehi-


y li
erm

cle
ab
ility
ot p

– Select engine code BSX , and confirm.


wit
, is n

h re


hole

⇒ 01 Engine electronics
spec

Measured val-
ues
es, in part or in w

t to the co

– MWB 187.2

• Further procedure depends on the determined system pres‐


rrectness of i

sure; allocation
⇒ “3.5 Checking gas system for leaks”, page 219
l purpos

3.3 Determining operating mode of natural


nform
ercia

gas vehicles
m

at
om

Natural gas operating mode indicator in dash panel insert


ion
c

in t
or

his
ate

do
riv

Note
p

cum
for

en
ng

t.
The type of indicator may vary depending on the vehicle type and
yi Co
op
model year.
C py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen

217
Prote AG.
3. Checking natural gas supply system for leaks
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Start vehicle, and ensure that natural gas mode is indicated in


dash panel insert.
The vehicle is in natural gas mode if:
• The natural gas mode is indicated by the symbol -1- in the left
fuel gauge.
• »CNG consumption« and »kg/h« is displayed in the multi-
function display in area -2-.

3.4 Activating/deactivating natural gas


mode
Special tools and workshop equipment required
♦ Hand wheel - T50026-

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c
ce
e

♦ Vehicle diagnosis, testing and information system - VAS


nl

pt
du

5051B-
an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf

• The fuel tank must be run empty, provided that the vehicle is
ercia

fully functional and fit for the road.


rm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote
218
AG.
Rep. gr.24 - Mixture preparation - injection
AG. Volkswagen AG d
agen oes
olksw no
Passat
d byV 2006 ➤ , Passat 2011 ➤ , tPassat
gu
ara Variant 2011 ➤ , Touran 2003 ➤
e
4-cylinder direct-injection
oris engine (1.4 l, natural gas, EA 111, turbocharger,
nte
e supercharger) - Edition
th or
s au ac 11.2015
s

ce
le
un

pt
Deactivating natural gas mode

an
d
itte

y li
erm

ab
ility
ot p
Note

wit
is n

h re
ole,

When the gauge for natural gas shows “Tank empty”

spec
urposes, in part or in wh

⇒ page 217 , and the engine control unit has switched to petrol

t to the co
mode, there is still a pressure of about 12 bar in the high-pressure
section of the natural gas system.

rrectne
– Activate »Petrol mode« using function Release pressure in
natural gas high-pressure line ⇒ Vehicle diagnostic

s
tester.

s o
cial p

f inform
DANGER!
mer

atio
om

n
♦ Risk of explosion and danger to life due to escaping nat‐
c

i
or

n
ural gas.

thi
te

sd
iva

o
♦ Leaks in natural gas system may lead to uncontrolled es‐
pr

cum
r
fo

cape of natural gas.

en
ng

t.
yi Co
op
Risk of explosion leading to serious injuries or death. C py
ht. rig
rig ht
by
• Check natural gas system for leaks. copy Vo
by lksw
cted agen
Prote AG.

– Close fuel tank shut-off valve -N361- , -N362- , -N363- and -


N429- using handwheel - T50026- or suitable wrench (SW 5)
(depending on valve version).
– Pull relay for gas shut-off valves - J908- out of relay carrier.
Activating natural gas mode
– Insert relay for gas shut-off valves - J908- into relay carrier.
– Open fuel tank shut-off valve -N361- , -N362- , -N363- and -
N429- using handwheel - T50026- or suitable wrench (SW 5)
(depending on valve version).
– Resume function Release pressure in natural gas
high-pressure line ⇒ Vehicle diagnostic tester to activate
natural gas system.

DANGER!

♦ Risk of explosion and danger to life due to escaping nat‐


ural gas.
♦ Leaks in natural gas system may lead to uncontrolled es‐
cape of natural gas.
Risk of explosion leading to serious injuries or death.
• Check natural gas system for leaks.

• Scope of the leakage test depends on the pressure section


⇒ “3.1 Different pressure sections of natural gas supply sys‐
tem”, page 214 which has been worked on.

3.5 Checking gas system for leaks


– Determine pressure in natural gas system.
⇒ “3.2 Determining pressure in gas system”, page 217

3. Checking natural gas supply system for leaks 219


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Test prerequisites
• If the actual pressure does not equal the required minimum
pressure (of approx. 5 bar), refuel the vehicle.
• The natural gas tanks must be filled up to maximum pressure.
• However, the fill level after filling must be ≥ 160 bar (80%).
• In order to avoid uncontrolled escape of natural gas after re‐
fuelling and before leakage test, pull relay for gas shut-off
valves - J908- out of relay carrier.

Note

♦ The gas shut-off valves are closed electrically upon pulling out
the relay for gas shut-off valves - J908- . The gas system can
still be filled.
♦ This will deactivate the gas system and it prevents the leakage
of larger amounts of gas through any possible leaks after the
gas system has been filled. en AG. V
olkswagen AG
ag does
ksw not
y Vol gu
– Drive to the petrol station in petrol ed mode.
b ara
nte
oris eo
th
After refuelling au ra
c
ss

ce
– Drive back to the workshop in petrol mode.
e
nl

pt
du

an
itte

– Before driving the vehicle into the workshop, reactivate natural

y li
erm

ab
gas mode by inserting the relay for gas shut-off valves - J908-

ility
ot p

into the relay carrier.

wit
, is n

h re
hole

spec
Note
es, in part or in w

t to the co
♦ The fuel tank shut-off valves will be activated for only two sec‐
onds after the ignition has been switched on.
rrectness of i

♦ During the activation, a mechanical »clicking« noise can be


heard.
l purpos

♦ During activation of the fuel tank shut-off valves , pay particular


attention to noises coming from leaking gas in the section be‐
nform
ercia

ing repaired.
m

at
om

♦ If the injectors are not activated, perform an adaption drive to


on
c

in t

activate the gas system.


or

his
ate

♦ To ensure successful results from the adaption drive, the en‐


do
priv

gine must repeatedly be operated with partial load during the


um
for

en
g

drive.
n

t.
yi Co
op py
♦ To check whether the natural gas system has been activated
t. C rig
gh ht
yri
successfully, consult the fuel gauge of the natural gas system p by
co Vo
⇒ page 217
by lksw
cted agen
Prote AG.

• Before driving the vehicle into the workshop, check if any noise
from leaking gas can be heard.

220 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

If noise can be heard:

DANGER!

♦ Risk of explosion and danger to life due to escaping nat‐


ural gas.
♦ Leaks in natural gas system may lead to uncontrolled es‐
cape of natural gas.
Risk of explosion leading to serious injuries or death.
• Check natural gas system for leaks.
G. Volkswagen AG d
• Do not perform any kind of work on the natural gaslksystem
swa
gen A oes
not
if noises from leaking gas can be heard. db
y Vo gu
ara
ise nte
• If such noises can be heard, do not drive
ut
hothe vehicle into
r eo
the workshop. a ra
ss c

ce
e

• Park the vehicle outside, and set up a safety area.


nl

pt
du

an
itte

y li
erm

ab
ility
ot p

– Set up a safety area, and observe safety precautions

wit
⇒ “2.2 Safety precautions when working on natural gas sys‐
, is n

h re
tem”, page 4 .
hole

spec
– Set the petrol mode using the function Release pressure in
es, in part or in w

t to the co
natural gas high-pressure line ⇒ Vehicle diagnostic
tester.

rrectness of i
– Wait until no noise from escaping gas can be heard.
l purpos

If no noise from escaping gas can be heard:


– Drive the vehicle into the workshop.

nf
ercia

o
– Loosen all threaded connections already loosened during re‐

rm
m

pair work, and tighten them according to specifications.

atio
om

n in
c

– Drive vehicle out of workshop.


or

thi
te

sd
a

– Deactivate petrol mode using function Release pressure in


iv

o
r
rp

natural gas high-pressure line ⇒ Vehicle diagnostic cu


o

m
f

en
ng

tester.
t.
yi Co
Cop py
– Check if noise from escaping gas can be heard.
t. rig
gh ht
pyri by
Vo
o
If no noise can be heard: by c lksw
cted agen
Prote AG.
– Drive the vehicle into the workshop.
– Perform leakage test necessary after working on the high-
pressure section ⇒ page 222 , or the leakage test necessary
after working on the low-pressure section
⇒ “3.5.2 Checking gas system for leaks after working on the
low-pressure section”, page 222 .

3. Checking natural gas supply system for leaks 221


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015 . Volkswage AG n AG d
agen oes
olksw not
3.5.1 Checking gas system for leaks after ise
db
yV gu
ara
nte
working on the high-pressure section
r
tho eo
s au ra
c
s

ce
e
nl

pt
DANGER!

du

an
itte

y li
erm

ab
♦ Risk of explosion and danger to life due to escaping nat‐

ility
ot p
ural gas.

wit
, is n

h re
♦ Leaks in natural gas system may lead to uncontrolled es‐

hole

spec
cape of natural gas.

es, in part or in w

t to the co
Risk of explosion leading to serious injuries or death.
• Check natural gas system for leaks.

rrectness of i
l purpos
Test pressure: 160 - 200 bar
• A leakage test according to manufacturer specifications

nform
ercia

⇒ Maintenance ; Booklet 35.1 ; Description of work; Perform‐


ing visual inspection of gas tanks for corrosion and leakage
m

at
om

i
test must be performed at max. system pressure of 200 bar.

on
c

in t
or

• Not all filling systems are capable of pressurising the gas sys‐

his
ate

tem up to the maximum pressure.

do
priv

cum
or

• Minimum pressure is 160 bar.


f

en
ng

t.
yi Co
op
The vehicle must not be delivered to the customer without a leak‐
C py
t. rig
gh
age test performed successfully.
ht
pyri by
Vo
co lksw
by
3.5.2 Checking gas system for leaks after
cted agen
Prote AG.

working on the low-pressure section


Special tools and workshop equipment required
♦ Gas leak tester for natural gas vehicles - VAS 6227-

♦ Leak detector spray (commercially available)

Note

♦ The test »Checking gas system for leaks after working on the
low-pressure section« does not replace the »Leakage test ac‐
cording to manufacturer specifications« which must be per‐
formed according to the maintenance schedule.
♦ Any work including leakage tests on the natural gas system
must be performed only by specially trained personnel.
♦ Check the gas system for leaks if gas-conducting components
in the low-pressure section have been loosened or renewed
⇒ “3.1.2 low-pressure section”, page 216 .

222 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
AG. Volkswagen
11.2015
n AG do
wage es n
olks ot g
Test prerequisites: ed by V ua
ran
ir s te
• Test pressure:au5 bar in low-pressure section, 160 - 200 bar ate or a
tho
transition between
ss low-pressure section and high-pressure c
section ⇒ “3.1.2 low-pressure section”, page 216

ce
e
nl

pt
du

an
itte

• Activating the system guarantees that the required minimum

y li
erm

ab
pressure of 5 bar is attained.

ility
ot p

• If the system is not activated, it is impossible to perform a re‐

wit
, is n

h re
liable test. Fill natural gas system.
hole

spec
• All screwed connections tightened to specifications.
es, in part or in w

t to the co
If shut-off valves have been closed electrically or mechanically
beforehand:

rrectness of i
– Reinsert relay for gas shut-off valves - J908- .
l purpos

– Open shut-off valves -N361- , -N362- , -N363- or -N429- , de‐


pending on type and version.

nf
ercia

– Reactivate natural gas system

or
⇒ “3.4 Activating/deactivating natural gas mode”, page 218 .

m
m

atio
om

n in
or c

DANGER!

thi
te

sd
iva

o
r
rp

cu
Risk of explosion and danger to life due to sources of ignition
o

m
f

in the vicinity of the natural gas system.


en
ng

t.
yi Co
op py
♦ Escaping natural gas may ignite and cause an explosion. t. C rig
gh ht
pyri by
♦ Risk of explosion leading to serious injuries or death.
co Vo
by lksw
cted agen
Prote AG.
• Always make sure there are no possible sources of igni‐
tion close to the natural gas system.

• Observe safety instructions


⇒ “2.2 Safety precautions when working on natural gas sys‐
tem”, page 4

Note

♦ The gas leak detector can only be used to find out whether
there is any gas in the surrounding air.
♦ Any other result than a green LED for »O. K.« is not permitted
on the gas leak detector. If a yellow or red LED lights up, a
leak detection spray must be used to obtain clear proof of
whether gas is really escaping from the vehicle's natural gas
system or not. When leak detection spray is being used, it must
be ensured that no bubbles come out of the sprayed area
within a testing time of 3 minutes. Any leaks that occur must
be repaired, and the test must then be repeated.

Procedure
– Read system pressure using ⇒ Vehicle diagnostic tester
⇒ “3.2 Determining pressure in gas system”, page 217 .
– All connections and components which have been opened or
exchanged, must be checked with gas leak tester for natural
gas vehicles - VAS 6227- and leak detector spray.
– Guide the gas leak tester around the point to be tested (»repair
area«), and take measurements every 90° for at least 5 sec‐
onds.

3. Checking natural gas supply system for leaks 223


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
. Volkswagen AG
a gen AG does
– Spray the respective connection or component Vol with leak de‐
ksw not
gu
tector spray, and observe approx. 3 minutes.
ed Ensure that there
by ara
nte
are no bubbles. tho
ris eo
au ra
• If the leakage test does not detectssa concentration of natural c

ce
e
gas and consequently no gas leak, the vehicle can be taken

nl

pt
du
into operation.

an
itte

y li
erm

ab
• If the leakage test detects a gas leak, the cause of fault must

ility
be determined and eliminated. The leakage test must then be ot p

wit
, is n

carried out again.

h re
hole

spec
• The vehicle must not be delivered to the customer without a
es, in part or in w

leakage test performed successfully.

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

224 Rep. gr.24 - Mixture preparation - injection


n AG. Volkswagen AG
lkswage Passat 2006 ➤ d,oPassat
es n 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder ddirect-injection
by
Vo engine (1.4 l, natural
ot g
uagas, EA 111, turbocharger, supercharger) - Edition
ran
ho
ris
e
tee 11.2015
ut or
a ac
ss

ce
le
4 Gas injectors
un

pt
an
d
itte

y li
⇒ “4.1 Removing and installing gas rail with gas injectors N366 ,
erm

ab
ility
N367 , N368 , N369 ”, page 225
ot p

wit
is n

4.1 Removing and installing gas rail with

h re
ole,

spec
gas injectors -N366- , -N367- , -N368- ,
urposes, in part or in wh

t to the co
-N369-

rrectne
DANGER!

Before working on the natural gas system, always observe

ss o
⇒ “2.2 Safety precautions when working on natural gas sys‐
cial p

f i
tem”, page 4 !!!

nform
mer

atio
om

n
c

i
or

n thi
WARNING
te

sd
iva

o
pr

cum
• Make sure that the tank shut-off valve on each of the nat‐
r
fo

en
ng

ural gas tanks is closed.


t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
Special tools and workshop equipment required
c by lksw
cted agen
Prote AG.
♦ Torque wrench - V.A.G 1410-

Removing
– Empty gas system ⇒ Fuel supply system – natural gas en‐
gines; Rep. gr. 20 ; Fuel tank; Releasing pressure in high-
pressure line .
– Lift engine cover panel at points -1- and pull it forwards in di‐
rection of -arrow-.
– Remove securing bolts -1-.

4. Gas injectors 225


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Carefully loosen union nut -2- and allow residual gas to es‐
cape.
– Detach spring-type clips and pull off hose -4- on activated
charcoal filter system solenoid valve 1 - N80- and pressure
pipe -5-.
– Unscrew securing bolt for pressure pipe -5- on turbocharger
and pull pressure pipe off.
– Pull off all connectors and hose connections on intake con‐
necting pipe -3- and regulating flap control unit - J808- .

– Unscrew intake connecting pipe securing bolts -arrows- and


pull intake connecting pipe upwards with regulating flap con‐
trol unit - J808- .

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c
ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

226 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Pull connector -2- off gas rail sensor - G401- .


– Pull connector -3- off gas injector and remove securing bolts
-1-.
– Remove gas rail together with gas injectors.
Installing
Installation is carried out in the reverse order. When installing,
note the following:
– Ensure that retaining clips are seated properly.
– Position fuel rail with gas injectors on intake manifold and
press it in evenly.

Note

♦ On no account must the union nut be tightened further than


specified, otherwise the special connection will be damaged
and the pressure line must be renewed.
♦ Natural gas system may not be operated until tested accord‐
ingly.

WARNING

• Operating the natural gas system without having tested it


for leaks according to specifications may result in severe
injuries or death.
The necessary scope of the leakage test depends on the pres‐
sure section which has been worked
gen AG
. Volkswaon.
gen AG
a does
lksw not
Note the following
db
y Vallocation!
o gu
ara
e nte
ris
utho eo
ra
a c
Allocation:
ss
ce
le

⇒ “3.1 Different pressure sections of natural gas supply system”,


un

pt
an

page 214
d
itte

y li
rm

ab

– Open fuel tank shut-off valves -N361/N362/N363/N429- (de‐


pe

ility

pending on vehicle model and equipment level) using hand


ot

wit
, is n

wheel - T50026- .
h re
hole

spec

– Check gas system


es, in part or in w

⇒ “3 Checking natural gas supply system for leaks”,


t to the co

page 214
Specified torques:
rrectness of i

Component Specified tor‐


l purpos

que
Securing bolts to bracket 8 Nm
nform
ercia

Low-pressure line to gas rail union (counterhold 5 Nm + turn


m

on union with a spanner) 70° further


a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

4. Gas injectors 227


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

5 Gas pressure regulator


⇒ “5.1 Assembly overview - gas pressure regulator”, page 228
⇒ “5.2 Removing and installing gas pressure regulator”,
page 233
⇒ “5.3 Removing and installing tank pressure sensor G400 ”, page
238

5.1 Assembly overview - gas pressure reg‐


ulator
⇒ “5.1.1 Assembly overview - gas pressure regulator, Passat”,
page 228
⇒ “5.1.2 Assembly overview - gas pressure regulator, Touran”,
page 231

5.1.1 Assembly overview - gas pressure regulator, Passat

1 - Connector
2 - Tank pressure sensor -
G400-
❑ 20 Nm AG. Volkswagen AG d
agen
❑ Removing and installing Volksw
oes
not
gu
⇒ page 238 d by ara
rise nte
o eo
3 - Coolant hoses auth
ra
ss c
4 - Spring-type clips

ce
le
un

pt
an
❑ Remove and install with
d
itte

y li
hose clip pliers - VAS
erm

ab
6340- .

ility
ot p

wit
is n

5 - Low-pressure line

h re
ole,

❑ Specified torque for un‐

spec
urposes, in part or in wh

ion nut: first tighten

t to the co
hand-tight and then turn
90° further.
6 - High-pressure line

WARNING rrectness o
cial p

Observe screw fixture


inform

regulations for newly in‐


mer

stalled fuel lines (initial


atio
m

installation) ⇒ page 230


o

n
c

i
or

n thi
e

The screw fixture regula‐


t

sd
va

tions only apply to fuel


i

o
pr

cum
r

lines that were not al‐


fo

en
ng

ready installed!
t.
yi Co
Cop py
t. rig
gh ht
yri by
❑ Specified torque for un‐ cop Vo
by lksw
ion nut: first tighten
cted agen
Prote AG.
hand-tight and then turn
90° further.
7 - Securing bolt
❑ 8 Nm
8 - Securing nut
❑ 8 Nm

228 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

9 - Bracket
10 - Bonded rubber mounting
❑ Screw on hand-tight
11 - Gas regulator with high-pressure valve for gas mode - N372-
❑ Removing and installing ⇒ page 233
12 - Pipe connection
❑ Counterhold on pipe connection when loosening fuel line.
❑ 20 Nm
13 - Pipe connection
❑ Counterhold on pipe connection when loosening fuel line.
❑ 20 Nm

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

5. Gas pressure regulator 229


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Note

The screw fixture regulations only apply to fuel lines that were not
already installed.

Screw fixture regulations for newly installed fuel lines (initial in‐
stallation)
The production date for fuel lines is engraved as a code -arrow-
on the lines.
♦ Up to and including production date »10E« -arrow- union nuts
on fuel lines are first tightened hand-tight, then tightened by
turning 90° further.
♦ From production date »10F« -arrow- union nuts on fuel lines
are first tightened hand-tight, then tightened by turning 180°
further.
♦ As of production month July 2010, the identification has been
changed; refer to the list below ⇒ page 230

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

230 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Identification of production date


M Year
on
th
2010 2011 2012 2013 2014 2015
n AG. Volkswagen AG do
Ja 10A BA CA DA EA l wage
ksFA es n
Vo ot
nu (AA) ed
by gu
ara
ar thoris nte
eo
y au ra
c
ss
Fe 10B BB CB DB EB FB

ce
e
nl

pt
br (AB)

du

an
itte
ua

y li
erm

ab
ry

ility
ot p

M 10C BC CC DC EC FC

wit
, is n

h re
ar (AC)
hole

ch

spec
es, in part or in w

Ap 10D BD CD DD ED FD

t to the co
ril (AD)
M 10E BE CE DE EE FE

rrectness of i
ay (AE)
Ju 10F BF CF DF EF FF
l purpos

ne (AF)
Ju AG BG CG DG EG FG

nf
ercia

o
ly (10G)

rm
m

atio
Au AH BH CH DH EH FH
om

n in
gu (10H)
or c

st

thi
te

sd
iva

Se AJ (10J) BJ CJ DJ EJ FJ

o
r
rp

cu
pt
o

m
f

en
ng

e
t.
yi Co
op
m C py
ht. rig
be rig ht
py by
r
co Vo
by lksw
cted agen
Prote
O AK BK CK DK EK FK
AG.

ct (10K)
ob
er
N AL (10L) BL CL DL EL FL
ov
e
m
be
r
D AM BM CM DM EM FM
ec (10M)
e
m
be
r

5.1.2 Assembly overview - gas pressure regulator, Touran

5. Gas pressure regulator 231


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1 - Connector
2 - Tank pressure sensor -
G400-
❑ Specified torque: 20 Nm
❑ Removing and installing
⇒ page 240
3 - Coolant hoses
4 - Spring-type clips
❑ Remove and install with
hose clip pliers - VAS
6340- .
5 - Low-pressure line
❑ Specified torque for un‐
ion nut: first tighten
hand-tight and then turn
90° further.
6 - High-pressure line

WARNING
On fuel lines that are
newly installed (initial in‐
stallation), union nuts
should first be tightened
hand-tight, then turned
180° further. AG. Volkswagen AG d
agen oes
lksw not
In case of repair, union by
Vo gu
ara
nuts are also first tight‐ rised
nte
ened hand-tight, then ho eo
aut ra
turned 90° further. ss c
ce
le
un

pt
an
d
itte

❑ Specified torque for un‐


y li
erm

ab

ion nut: first tighten


ility
ot p

hand-tight and then turn


wit

90° further.
is n

h re
ole,

7 - Securing bolt
spec
urposes, in part or in wh

❑ 8 Nm
t to the co

8 - Securing nut
❑ 8 Nm
rrectne

9 - Bracket
ss

10 - Bonded rubber mounting


o
cial p

f in

❑ Screw on hand-tight
form
mer

11 - Bracket
atio
om

n
c

12 - Gas regulator with high-pressure valve for gas mode - N372-


i
or

n thi
te

❑ Removing and installing ⇒ page 235


sd
iva

o
pr

cum
r

13 - Pipe connection
fo

en
ng

t.
yi
❑ Counterhold on pipe connection when loosening fuel line.
Co
Cop py
t. rig
❑ 20 Nm opyri
gh by
Vo
ht
by c lksw
14 - Pipe connection Prote
cted AG.
agen

❑ Counterhold on pipe connection when loosening fuel line.


❑ 20 Nm

232 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

5.2 Removing and installing gas pressure


regulator
⇒ “5.2.1 Removing and installing gas pressure regulator, Passat”,
page 233
⇒ “5.2.2 Removing and installing gas pressure regulator, Touran”,
page 235

5.2.1 Removing and installing gas pressure


regulator, Passat
Special tools and workshop equipment required
♦ Torque wrench - V.A.G 1331-

♦ Hose clamps up to 25 mm - 3094-


AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
♦ Engine bung set - VAS 6122-
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
op py
Removing t. C rig
gh ht
yri by
– Observe safety precautions ⇒ page 3 .
op Vo
by c lksw
cted agen
Prote AG.
– Observe rules for cleanliness ⇒ page 9 .
– Observe safety precautions when working on natural gas sys‐
tem ⇒ page 4 .

5. Gas pressure regulator 233


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

WARNING

Release pressure in the system before working on the natural


gas system.

– Release pressure in high-pressure line ⇒ Fuel supply system


– natural gas engines; Rep. gr. 20 ; Fuel tanks; Releasing
pressure in high-pressure line .
– Detach exhaust hanger -1-, and loosen clamp -2-.
– Remove exhaust pipe.
– Remove protective covers on underbody ⇒ Fuel supply agsys‐
en AG. V
olkswagen AG
does
tem – natural gas engines; Rep. gr. 20 ; Fuel tank; olksw
Assembly not
y V gu
overview - protective covers . isedb ara
n r tee
ho
aut or
ac
ss

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

– Close mechanical shut-off valves -1- and -2- using handwheel

spec
urposes, in part or in wh

- T50026- .

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
va

– Close mechanical shut-off valve -1- using handwheel -


i

o
pr

cum
r

T50026- .
fo

en
ng

t.
yi Co
– Release and unplug connectors -1-. t. Cop py
rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

234 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Open clamps, and pull off coolant hoses.


– Clamp off coolant hoses -2- with hose clips up to 25 mm -
3094- .

WARNING

Risk of scalding! Allow engine to cool before pulling off coolant


hoses.

– Unbolt low-pressure line -4- and high-pressure line -3- from


gas pressure regulator (counterhold on union with an open-
end wrench).
– Immediately seal open connections with suitable plugs from
engine bung set - VAS 6122- .

– Unscrew securing bolts and nuts -arrows- from bracket.


Installing
Install in reverse order. In the process, note the following:

WARNING

Observe screw fixture regulations for newly installed fuel lines


(initial installation) ⇒ page 230
The screw fixture regulations only apply to fuel lines that were
not already installed!

– Observe test prerequisites ⇒ Rep. gr. 00 ; Gas system test;


Test prerequisites for gas systems
wage
n AG..Volkswagen AG do
e ks s no
Vol t
– Perform gas system d test
by ⇒ Maintenance ; Booklet 35.1gu;aDe‐ran
scription of work; ise
rPerforming visual inspection of natural gas tee
tho
or
tanks for corrosion
s au and leakage test . ac
s
ce
le

Specified torque
un

pt
an
d
itte

♦ ⇒ “5.1.1 Assembly overview - gas pressure regulator, Passat”,


y li
rm

ab

page 228
pe

ility
ot

wit

♦ ⇒ Fuel supply system – natural gas engines; Rep. gr. 20 ;


, is n

h re

Fuel tank; Assembly overview - protective covers


hole

spec
es, in part or in w

5.2.2 Removing and installing gas pressure


t to the co

regulator, Touran
rrectness of i

Special tools and workshop equipment required


l purpos

♦ Torque wrench - V.A.G 1331-


nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

5. Gas pressure regulator 235


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Hose clamps up to 25 mm - 3094-

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
o eo
♦ Handwheel - T50026-
aut
h
ra
ss c

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

♦ Engine bung set - VAS 6122- nform


mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

♦ Vehicle diagnostic tester


Removing
– Observe safety precautions ⇒ page 3 .
– Observe rules for cleanliness ⇒ page 9 .
– Observe safety precautions when working on natural gas sys‐
tem ⇒ page 4 .

236 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Detach exhaust hanger -1-, and loosen clamp -2-.


– Remove exhaust pipe.
– Remove protective covers on underbody ⇒ Fuel supply sys‐
tem – natural gas engines; Rep. gr. 20 ; Fuel tank; Assembly
overview - fuel tank .

– Release and unplug connectors -1-.


– Close mechanical shut-off valves -2- on all natural gas tanks
using hand wheel - T50026- .

WARNING

Release pressure in the system before working on the natural


gas system.

– Release pressure in high-pressure line ⇒ Fuel supply system


– natural gas engines; Rep. gr. 20 ; Fuel tanks; Releasing
pressure in high-pressure line .
– Disconnect battery ⇒ Electrical system; Rep. gr. 27 ; Battery;
Disconnecting and reconnecting battery .

– Release and unplug connectors -1-. AG. Volkswagen AG d


agen oes
olksw not
y V gu
– Clamp off coolant hoses -2- with hose clips ise
dup
b to 25 mm - ara
nte
3094- . thor eo
au ra
ss c ce
le

WARNING
un

pt
an
d
itte

y li
erm

Risk of scalding! Allow engine to cool before pulling off coolant


ab
ility

hoses.
ot p

wit
is n

h re
ole,

spec

– Open clamps, and pull off coolant hoses.


urposes, in part or in wh

t to the co

– Unbolt low-pressure line -4- and high-pressure line -3- from


gas pressure regulator.
– Counterhold on union with open-end wrench while doing so.
rrectne

– Immediately seal open connections with suitable plugs from


s

engine bung set - VAS 6122- .


s o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

5. Gas pressure regulator 237


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015 gen AG
. Volkswagen AG
d wa oes
olks not
yV gu
– Unscrew securing bolts and nuts -arrows-isefrom
d b bracket. ara
nte
r
ho eo
Installing au
t ra
c
ss
Installation is performed in the reverse order of removal.

ce
le
un

pt
an
d
itte

y li
rm

ab
WARNING

pe

ility
ot

wit
On fuel lines that are newly installed (initial installation), union , is n

h re
nuts should first be tightened hand-tight, then turned 180° fur‐
hole

spec
ther.
es, in part or in w

t to the co
In case of repair, union nuts are also first tightened hand-tight,
then turned 90° further.

rrectness of i
– Observe test prerequisites ⇒ Rep. gr. 00 ; Gas system test;
l purpos

Test prerequisites for gas systems .

nform
ercia

– Perform gas system test ⇒ Maintenance ; Booklet 35.1 ; De‐


scription of work; Performing visual inspection of natural gas
m

a
tanks for corrosion and leakage test .
com

tion in
r

Specified torques
te o

thi
s
iva

do
♦ ⇒ page 228
r
rp

cum
fo

♦ ⇒ Fuel supply system – natural gas engines; Rep. gr. 20 ;

en
ng

t.
yi Co
Fuel tank; Assembly overview - fuel tank t. Cop py
rig
gh ht
♦ ⇒ Rep. gr. 26 ; Exhaust pipes/silencers; Assembly overview yri
p by
o Vo
- silencers
c by lksw
cted agen
Prote AG.

5.3 Removing and installing tank pressure


sensor - G400-
⇒ “5.3.1 Removing and installing tank pressure sensor G400 ,
Passat”, page 238
⇒ “5.3.2 Removing and installing tank pressure sensor G400 ,
Touran”, page 240

5.3.1 Removing and installing tank pressure


sensor - G400- , Passat
Special tools and workshop equipment required
♦ Torque wrench - V.A.G 1331-

238 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Engine bung set - VAS 6122-

Removing
– Observe safety precautions ⇒ page 3 .
– Observe rules for cleanliness ⇒ page 9 .
– Observe safety precautions when working on natural gas sys‐
tem ⇒ page 4 . wage
n AG. Volkswagen AG do
e
olks s no
yV t gu
edb ara
WARNING ho
ris nte
eo
aut ra
ss c
Release pressure in the system before working on the natural
ce
e
nl

gas system.
pt
du

an
itte

y li
erm

ab
ility
ot p

– Release pressure in high-pressure line ⇒ Fuel supply system wit


, is n

– natural gas engines; Rep. gr. 20 ; Fuel tanks; Releasing h re


pressure in high-pressure line .
hole

spec
es, in part or in w

– Detach exhaust hanger -1-, and loosen clamp -2-.


t to the co

– Remove exhaust pipe.


– Remove protective covers on underbody ⇒ Fuel supply sys‐
rrectness of i

tem – natural gas engines; Rep. gr. 20 ; Fuel tank; Assembly


l purpos

overview - protective covers .


nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
or

– Close mechanical shut-off valves -1- and -2- using handwheel


f

en
ng

t.
yi
- T50026- .
Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

5. Gas pressure regulator 239


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Close mechanical shut-off valve -1- using handwheel -


T50026- .

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot
– Release and disconnect connector -1- from tank pressure

wit
, is n

h re
sensor - G400- . hole

spec
Unscrew sensor -2-.
es, in part or in w

t to the co
– Immediately seal open connections with suitable plugs from
engine bung set - VAS 6122- .

rrectness of i
Installing
l purpos

Install in reverse order. In the process, note the following:


Specified torque

nform
ercia

♦ ⇒ “5.1.1 Assembly overview - gas pressure regulator, Passat”,


m

a
page 228
com

tion in
r

♦ ⇒ Fuel supply system – natural gas engines; Rep. gr. 20 ;


te o

thi
Fuel tank; Assembly overview - protective covers

s
iva

do
r
rp

cum
fo

5.3.2 Removing and installing tank pressure

en
ng

t.
yi Co
op
sensor - G400- , Touran
C py
t. rig
gh ht
pyri by
Vo
o
Special tools and workshop equipment required
c by lksw
cted agen
Prote AG.
♦ Torque wrench - V.A.G 1331-

♦ Handwheel - T50026-

240 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Vehicle diagnostic tester


Removing
– Observe safety precautions ⇒ page 3 .
– Observe rules for cleanliness ⇒ page 9 .
– Observe safety precautions when working on natural gas sys‐
tem ⇒ page 4 .
– Detach exhaust hanger -1-, and loosen clamp -2-.
– Remove exhaust pipe.
AG . Volkswagen AG
– Remove protective covers on underbody ⇒ Fuel ksw
supply
agen sys‐ does
not
l
tem – natural gas engines; Rep. gr. 20 ; Fuel
by tank; Assembly
Vo gu
ara
overview - fuel tank . ris
ed
nte
tho eo
s au ra
c
s

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
– Release and unplug connectors -1-.
es, in part or in w

t to the co
– Close mechanical shut-off valves -2- on all natural gas tanks
using hand wheel - T50026- .

rrectness of i
WARNING
l purpos

Release pressure in the system before working on the natural


gas system.

nf
ercia

orm
m

atio
m

– Release pressure in high-pressure line ⇒ Fuel supply system


o

n in
or c

– natural gas engines; Rep. gr. 20 ; Fuel tanks; Releasing

thi
te

pressure in high-pressure line .


sd
iva

o
r
rp

cu
– Disconnect battery ⇒ Electrical system; Rep. gr. 27 ; Battery;
o

m
f

en
ng

Disconnecting and reconnecting battery .


t.
yi Co
Cop py
t. rig
gh ht
– Release and disconnect connector -1- from tank pressure pyri by
Vo
o
by c
sensor - G400- .
lksw
cted agen
Prote AG.
Unscrew sensor -2- from gas pressure regulator.
Installing
Install in reverse order. In the process, note the following:
Specified torques
♦ ⇒ page 228
♦ ⇒ Fuel supply system – natural gas engines; Rep. gr. 20 ;
Fuel tank; Assembly overview - fuel tank

5. Gas pressure regulator 241


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

6 Air filter
⇒ “6.1 Assembly overview - air filter housing”, page 242
⇒ “6.2 Removing and installing air filter housing”, page 243

6.1 Assembly overview - air filter housing


Removing and installing air filter
⇒ “6.2 Removing and installing air filter housing”, page 243 .

1 - Bolt
❑ 1.6 Nm
2 - Air filter upper part
3 - Vacuum hose

Caution
To prevent damage to AG. Volkswagen AG d
the connection and to the lksw
agen oes
not
vacuum hose, do not use d by Vo gu
ara
sharp-edged tools when orise nte
disconnecting hose. aut h eo
ra
ss c

ce
le
un

pt
❑ Renew if damaged.
an
d
itte

y li
❑ From camshaft housing.
erm

ab
ility
ot p

4 - Spring-type clip
wit
is n

❑ Remove and install us‐ h re


ole,

ing spring-type clip pli‐


spec
urposes, in part or in wh

ers - VAS 5024A- .


t to the co

5 - Intake hose
6 - Cover
rrectne

7 - Intake air duct


s

8 - Air filter lower part


s o
cial p

❑ With captive securing


inform

bolt.
mer

atio

❑ With intake connection.


om

n
c

❑ Specified torque setting:


or

n thi
e

8 Nm
t

sd
iva

o
pr

9 - Water drain connection


um
r
fo

en
ng

❑ When installing, arrows


t.
yi Co
op
on lower part of air filter
C py
t. rig
gh
and water drain union
ht
pyri by
Vo
must align.
o
by c lksw
cted agen
Prote AG.
10 - O-ring
❑ Renew.
11 - Filter element

242 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

6.2 Removing and installing air filter hous‐


ing
Removing
– Pull coolant hose upwards out of brackets -arrows-.
– Press fastener -1- and pull intake air duct cover out upwards.

– Press fastener -arrows- and pull intake air duct upwards.

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c
ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

– Release spring-type clip -1- and pull intake hose and vacuum
wit
is n

hose off air filter.


h re
ole,

spec

– Loosen securing bolt -2- and pull air filter housing upwards
urposes, in part or in wh

from locating pins -arrows-.


t to the co

Installing
rrectne

Install in reverse order. In the process, note the following:


– Push air filter housing onto locating pins -arrows- from above.
ss o
cial p

f inform
mer

atio
om

n
c

– Tighten new securing bolt -2- to 8 Nm and slide spring-type


or

n thi
e

clip -1- with intake hose onto air filter connection.


t

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

6. Air filter 243


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

7 Intake manifold
⇒ “7.1 Assembly overview - intake manifold”, page 244
⇒ “7.2 Removing and installing upper part of intake manifold”,
page 251
⇒ “7.3 Removing and installing lower part of intake manifold”,
page 256
⇒ “7.4 Removing and installing regulating flap control unit J808
and throttle valve module J338 ”, page 258
⇒ “7.5 Cleaning throttle valve module J338 ”, Vpage 260
olkswa . gen AG
gen AG does
swa
7.1 Assembly overview
db
yV
olk - intake manifold not
gu
ara
e nte
ris
Parts l and ll utho eo
ra
a c
ss

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

244 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Part I

Note

♦ If hoses have been removed during repair, ensure that all ho‐
ses are firmly connected after reinstallation.
♦ Tug on hoses having catches to make sure they are securely
seated.

1 - Intake air temperature


sender 3 - G520- with intake
manifold pressure sender 3 -
G583-
2 - Bolt
❑ 3 Nm
3 - Bolt
❑ Self-tapping bolt.
❑ 7 Nm
4 - Intake connecting pipe agen
AG. Volkswagen AG d
oes
olksw not
5 - Seal ed byV gu
ara
ris nte
ho eo
aut ra
WARNING ss c

ce
e
nl

Operating
• the natural gas

pt
du

an
system without having
itte

y li
tested it for leaks accord‐
erm

ab
ility
ing to specifications may
ot p

wit
result in severe injuries or
, is n

h re
death.
hole

spec
The necessary scope of
es, in part or in w

t to the co
the leakage test de‐
pends on the pressure
section which has been
worked on.
rrectness of i
l purpos

Note the following allo‐


cation!
nf
ercia

orm

Allocation:
m

atio
m

⇒ “3.1 Different pressure sec‐


o

n in
c

tions of natural gas supply sys‐


or

thi
e

tem”, page 214


t

sd
iva

o
r
rp

cu

❑ Renew.
o

m
f

en
ng

t.
❑ Before installing, lightly coat seal with clean engine oil. Cop
yi Co
py
ht. rig
6 - Regulating flap control unit - J808- rig ht
py by
o Vo
❑ Removing and installing by c lksw
cted agen
⇒ “7.4 Removing and installing regulating flap control unit J808 and throttle valve module J338 ”,
Prote AG.

page 258 .

Note

Regulating flap control units with


plastic housing need not be adapted
to the engine control unit - J623- .
❑ If renewed, erase learnt values and adapt engine control unit - J623- ⇒ Vehicle diagnostic tester “Guided
functions”.

7. Intake manifold 245


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

7 - Bolt
❑ Self-tapping bolt.
❑ 7 Nm
8 - Intake connecting pipe
9 - Intake manifold connection
10 - Bolt
❑ Self-tapping bolt.
❑ 7 Nm
11 - Bolt
❑ Self-tapping bolt.
❑ 7 Nm
12 - Gas rail sensor - G401-
❑ 20 Nm
13 - Gas rail with gas injectors

WARNING
Operating
• the natural gas
system without having
tested it for leaks accord‐
ing to specifications may
result in severe injuries or
death.
The necessary scope of
the leakage test de‐
pends on the pressure
section which has been
worked on. swage
n AG. Volkswagen AG do
es n
olk ot g
byV ua
Note the following allo‐ ir se
d ran
tee
cation! utho
or
a ac
ss
ce
e
nl

pt

Allocation: ⇒ “3.1 Different pressure sections of natural gas supply system”, page 214
du

an
itte

y li

❑ Removing and installing


erm

ab
ility

⇒ “4.1 Removing and installing gas rail with gas injectors N366 , N367 , N368 , N369 ”, page 225 .
ot p

wit
, is n

❑ Ensure securing clips are properly seated when installing.


h re
hole

❑ Gas injector 1 - N366-


spec
es, in part or in w

❑ Gas injector 2 - N367-


t to the co

❑ Gas injector 3 - N368-


❑ Gas injector 4 - N369-
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

246 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

14 - Low-pressure line

WARNING
Operating
• the natural gas
system without having
tested it for leaks accord‐
ing to specifications may
result in severe injuries or
death.
The necessary scope of
the leakage test de‐
pends on the pressure
section which has been
worked on.
Note the following allo‐
cation!

Allocation: ⇒ “3.1 Different pressure sections of natural gas supply system”, page 214
❑ Specified torque for union nut: 5 Nm + turn 70° further
15 - Bolt
❑ 3 Nm
16 - Intake manifold pressure sender - G71-
17 - O-ring
❑ Renew.
AG. Volkswagen AG d
agen
18 - Upper part of intake manifold Volksw
oes
not
gu
d by ara
ise nte
or eo
WARNING aut
h
ra
ss c
Operating
• the natural gas

ce
le
un

pt
system without having

an
d
itte

tested it for leaks accord‐

y li
rm

ab
ing to specifications may
pe

ility
result in severe injuries or
ot

wit
death.
, is n

h re
hole

The necessary scope of spec


the leakage test de‐
es, in part or in w

t to the co

pends on the pressure


section which has been
worked on.
rrectness of i

Note the following allo‐


l purpos

cation!
nform
ercia

Allocation: ⇒ “3.1 Different pressure sections of natural gas supply system”, page 214
m

a
com

❑ Removing and installing ⇒ “7.2 Removing and installing upper part of intake manifold”, page 251 .
ion in
r
te o

thi

Note
s
iva

do
r
rp

cum
fo

♦ If the intake manifold was re‐


en
ng

t.
yi
moved, you must check that all
Co
op py
hoses are securely connected t. C rig
gh ht
on the intake manifold after in‐ pyri by
Vo
o
stallation.
by c lksw
cted agen
Prote AG.
♦ Tug on hoses having catches to
make sure they are securely
seated.

7. Intake manifold 247


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
❑ To remove: Removing and installing regulating flap control unit - J808- and throttle valve module - J338-
⇒ “7.4 Removing and installing regulating flap control unit J808 and throttle valve module J338 ”,
page 258
19 - Bolt
❑ 20 Nm
20 - Fuel pressure sender - G247-
❑ Checking fuel pressure in high-pressure section
⇒ “9.1 Checking fuel pressure sender G247 ”, page 268 .
❑ 22 Nm
21 - Screw-in part
❑ 80 Nm
22 - Gasket

WARNING
Operating
• the natural gas
system without having
tested it for leaks accord‐
ing to specifications may
result in severe injuries or
death.
The necessary scope of
the leakage test de‐
pends on the pressure
section which has been
worked on.
Note the following allo‐
cation!

Allocation: ⇒ “3.1 Different pressure sections of natural gas supply system”, page 214
❑ Renew.
❑ Note installation position.wagen AG. Volkswagen AG doe
ks s no
Vol t gu
23 - Lower part of intake
ed manifold
by ara
ris nte
ho eo
aut ra
WARNING
ss c
ce
le
un

Operating
• the natural gas
pt
an
d

system without having


itte

y li
rm

tested it for leaks accord‐


ab
pe

ility

ing to specifications may


ot

wit

result in severe injuries or


, is n

h re

death.
hole

spec

The necessary scope of


es, in part or in w

t to the co

the leakage test de‐


pends on the pressure
section which has been
rrectness of i

worked on.
l purpos

Note the following allo‐


cation!
nform
mercia

Allocation: ⇒ “3.1 Different pressure sections of natural gas supply system”, page 214
a
com

tion in

❑ Removing and installing ⇒ “7.3 Removing and installing lower part of intake manifold”, page 256 .
r
te o

thi
s
iva

24 - Bolt
do
r
rp

cum

❑ 20 Nm
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo

248
by lksw
cted agen
Prote
Rep. gr.24 - Mixture preparation - injection
AG.
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

25 - Throttle valve control module - J338-


❑ Removing and installing
⇒ “7.4 Removing and installing regulating flap control unit J808 and throttle valve module J338 ”,
page 258 .
❑ Clean ⇒ “7.5 Cleaning throttle valve module J338 ”, page 260 .
❑ If renewed, erase learnt values and adapt engine control unit - J623- ⇒ Vehicle diagnostic tester “Guided
functions”.
26 - Bolt
❑ 7 Nm
27 - Pressure pipe
❑ From turbocharger
28 - Retaining clip
29 - Bolt
❑ 7 Nm

Part II AG. Volkswagen AG d


agen oes
olksw not
V gu
d by ara
e
Note horis nte
eo
aut ra
ss c
♦ If hoses have been removed during repair, ensure that all ho‐

ce
e
nl

ses are firmly connected after reinstallation.

pt
du

an
itte

y li
♦ Tug on hoses having catches to make sure they are securely
erm

ab
seated.

ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

7. Intake manifold 249


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1 - Connection
❑ For fuel supply.
2 - Activated charcoal filter sol‐
enoid valve 1 - N80-
3 - Connecting hose
4 - Connecting pipe
5 - Connecting hose
❑ To intake manifold con‐
nection.
6 - Connecting hose
7 - Connecting hose
❑ To pressure pipe.
8 - Bolt
❑ 8 Nm
9 - Fuel pipe
❑ High-pressure.
❑ Specified torque for un‐ n AG. Volkswagen AG do
ion nuts: 18 Nm. lkswage es n
o ot g
byV ua
10 - Connection ir se
d ran
tee
ho
❑ To intake connecting s aut or
ac
pipe. s
ce
e
nl

pt
du

11 - Non-return valve an
itte

y li
❑ For crankcase ventila‐
erm

ab
ility
tion.
ot p

wit
, is n

12 - Connecting hose
h re
hole

spec

13 - Charge pressure control


es, in part or in w

solenoid valve - N75-


t to the co

14 - Bolt
❑ 5 Nm
rrectness of i

15 - Connecting hose
l purpos

❑ To turbocharger.
nf
ercia

16 - Connecting hose
orm

❑ To vacuum unit.
m

atio
om

n in

17 - Connection
or c

thi
e

❑ For crankcase ventilation.


t

sd
iva

o
r
rp

cu

❑ Connected to valve timing housing.


o

m
f

en
ng

t.
18 - Connecting hose
yi Co
Cop py
❑ For crankcase ventilation.
t. rig
gh ht
pyri by
Vo
o
19 - Fuel hose
c by lksw
cted agen
Prote AG.
❑ For fuel supply.
❑ Low-pressure.
❑ To high-pressure pump.

250 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

7.2 Removing and installing upper part of


AG. Volkswagen AG d
agen
intake manifold by Vol
ksw oes
not
gu
ara
ed nte
oris e
th or
au ac
ss

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

Special tools and workshop equipment required

nform
ercia

♦ Torque wrench - V.A.G 1331-


m

a
com

tion in
♦ Torque wrench VAS 6854
r
te o

thi
Removing

s
iva

do
r
rp

cum
fo

en
g

DANGER!
n

t.
yi Co
Cop py
t. rig
gh ht
Removing the intake manifold opens the low-pressure section yri
p by
o Vo
of natural gas system. For this reason, a leakage test must
c by lksw
cted agen
always be performed after completion of work ⇒ Maintenance ;
Prote AG.

Booklet 35.1 ; Description of work; Performing visual inspec‐


tion of gas tanks for corrosion and leakage test .
• Before working on the natural gas system, always observe
⇒ “2.2 Safety precautions when working on natural gas
system”, page 4 !!!

WARNING

• Make sure that the tank shut-off valve on each of the nat‐
ural gas tanks is closed.

– Empty gas system ⇒ Fuel supply system – natural gas en‐


gines; Rep. gr. 20 ; Fuel tank; Releasing pressure in high-
pressure line .
– Lift engine cover panel at points -1-, and remove it in direction
of -arrow-.

7. Intake manifold 251


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Open connection -1- at gas rail whilst counterholding at rail


-2- with open-end spanner, »AF 16 mm«.

Note

Warning: residual gas may escape when opening! The quantity


of the escaping gas is small, and the pressure is low.

– Disconnect hoses from intake manifold.

– Loosen bolts -arrows-, and remove intake manifold.

– Open hose clamps -1- and -2-, and pull off intake hose.

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c
ce
le
un

pt
an
d

– Pull off connectors -a- and -b-.


itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote
252
AG.
Rep. gr.24 - Mixture preparation - injection
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Loosen hose clamps -arrows-, and pull off hoses.

– Loosen bolts -1- and -2-.

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c
ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

– Pull off hoses »item 5« and »item 10«.


wit
is n

h re

– Also pull off hose of crankcase breather valve »item 11«.


ole,

spec
urposes, in part or in wh

– Remove hose set, and place it to right side.


t to the co

Note
rrectne

♦ Ensure correct position of the clamp on noise insulation.


ss o

♦ The clamp must be positioned so that it is still easily accessible


cial p

f i

after installation of the intake manifolds.


nform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
yri
– Open clamp -a-, and slide it in direction of -arrow-.
p by
co Vo
by lksw
cted agen
Prote AG.

7. Intake manifold 253


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Unscrew clamp »item 9«, and push charge air hose »item 10«
off throttle valve module - J338- -7-.

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
u or
a ac
ss
ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by

254
co Vo
by lksw
Rep. gr.24 - Mixture preparation - injection cted agen
Prote AG.
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
n AG. Volkswagen AG do
swage es n
– Unscrew 5 securing bolts -arrows- of bintake yV
olk
connecting pipe. ot g
ua
d ran
ir se
– Pull pressure sender connector toff h gas rail. Disconnect all re‐
o tee
or
maining hoses still connectedss ato
u
intake connecting pipe. ac

ce
le
un

pt
an
d
itte
Note

y li
rm

ab
pe

ility
The intake connecting pipe can now be removed upwards.
ot

wit
, is n

h re
hole

– Disconnect connector of intake manifold pressure sender -

spec
G71- .
es, in part or in w

t to the co
– Loosen and unscrew 6 securing bolts for upper part of intake
manifold ⇒ Item 24 (page 248) .

rrectness of i
Installing
l purpos

Installation is carried out in the reverse order. When installing,


note the following:

nform
ercia

♦ The charge air hose should not be reinstalled to the throttle


valve module before the intake connecting pipe has been se‐
m

a
com

ti
cured at its 5 securing points.

on in
r
te o

thi
♦ Seals and O-rings must be renewed and coated lightly with

s
iva

clean engine oil before installing.

do
r
rp

cum
fo

♦ Hose connections and hoses for charge air system must be

en
ng

t.
yi
free of oil and grease before assembly.
Co
Cop py
t. rig
gh
♦ Secure all hose connections with hose clips which conform to
ht
pyri by
Vo
production standard.
co lksw
by
cted agen
Prote AG.

Note

Natural gas system may not be operated until tested accordingly.

WARNING

• Operating the natural gas system without having tested it


for leaks according to specifications may result in severe
injuries or death.
The necessary scope of the leakage test depends on the pres‐
sure section which has been worked on.
Note the following allocation!

Allocation:
⇒ “3.1 Different pressure sections of natural gas supply system”,
page 214
– Open fuel tank shut-off valves -N361/N362/N363/N429- (de‐
pending on vehicle model and equipment level) using hand
wheel - T50026- .
– Check gas system
⇒ “3 Checking natural gas supply system for leaks”,
page 214
Specified torque:
♦ Securing bolts
⇒ “7.1 Assembly overview - intake manifold”, page 244

7. Intake manifold 255


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

7.3 Removing and installing lower part of in‐


take manifold

DANGER!

Before working on the natural gas system, always observe


⇒ “2.2 Safety precautions when working on natural gas sys‐
tem”, page 4 !!!

WARNING

• Make sure that the tank shut-off valve on each of the nat‐
ural gas tanks is closed.

– Empty gas system ⇒ Fuel supply system – natural gas en‐


gines; Rep. gr. 20 ; Fuel tank; Releasing pressure in high-
pressure line .

Caution

If only lower part of intake manifold is to be removed, ensure


injectors remain in cylinder head.
To remove, use hold-down device - T10510- .
Reason: if injectors have been removed, they must be re‐
newed.

– Remove regulating flap control unit - J808- with throttle valve


module - J338-
⇒ “7.4 Removing and installing regulating flap control unit J808
and throttle valve module J338 ”, page 258 . Volkswag AG. en AG
agen does
– Remove intake manifold yV
olks
w not
gu
⇒ “7.1 Assembly overview - intakeisemanifold”, page 244 .
d b ara
nte
r
ho eo
To remove and install securing bolt
sa
ut -arrow-, use holder for bits ra
c
with 5/16'' drive - V.A.G 1766/2-s and special wrench, long reach
ce
le

- 3320/2- .
un

pt
an
d
itte

y li

Removing
rm

ab
pe

ility

– Insert hold-down device - T10510- in the two holes on cylinder


ot

wit

head.
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw

256
cted agen
Prote
Rep. gr.24 - Mixture preparation - injection
AG.
Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Push pin -1- in direction of -arrow- until hold-down device is


securely seated on injectors.
– Tighten knurled nuts -1- and -2- hand-tight.
– Pull lower part of intake manifold evenly off injectors.
Installing
– Fit new gasket on cylinder head.

Note

Renew the injector seals before installing the lower part of intake
manifold ⇒ “2.4 Renewing seal on injector”, page 211 !

– Press lower part of intake manifold evenly onto injectors.


– Remove hold-down device - T10510- .

n AG. Volkswagen AG do
lkswage Note es n
o ot g
byV ua
d ran
ir se
On renewal,th erase learnt values and adapt intake manifold
o tee flap
or
potentiometer
ss
au
- G336- to engine control unit - J623- ⇒ Vehicleac
diagnostic tester “Guided functions”.
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility

Note
ot p

wit
, is n

h re

Natural gas system may not be operated until tested accordingly.


hole

spec
es, in part or in w

t to the co

WARNING
rrectness of i

• Operating the natural gas system without having tested it


for leaks according to specifications may result in severe
l purpos

injuries or death.
The necessary scope of the leakage test depends on the pres‐
nf
ercia

sure section which has been worked on.


orm
m

atio

Note the following allocation!


om

n in
or c

thi
te

sd
iva

Allocation:
o
r
rp

cu

⇒ “3.1 Different pressure sections of natural gas supply system”,


o

m
f

en
ng

page 214
t.
yi Co
Cop py
– Open fuel tank shut-off valves -N361/N362/N363/N429- (de‐
t. rig
gh ht
yri
pending on vehicle model and equipment level) using hand
p by
co Vo
lksw
wheel - T50026- .
by
cted agen
Prote AG.
– Check gas system
⇒ “3 Checking natural gas supply system for leaks”,
page 214
Specified torque:
♦ Securing bolts
⇒ “7.1 Assembly overview - intake manifold”, page 244

7. Intake manifold 257


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

7.4 Removing and installing regulating flap


control unit - J808- and throttle valve
n AG. Volkswagen AG do
wage
module - J338- by
Volks es n
ot g
u ara
ed nte
ris
tho e or
au
Note ss
ac

ce
e
nl

pt
du
To remove throttle valve module - J338- , regulating flap control

an
itte

y li
unit - J808- must first be removed.
erm

ab
ility
ot p

wit
Special tools and workshop equipment required
, is n

h re
hole

♦ Torque wrench - V.A.G 1410-

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

♦ Hose clip pliers - VAS 6340-

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

Removing regulating flap control unit - J808-


– Lift engine cover panel at points -1- and pull it forwards in di‐
rection of -arrow-.

258 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
AG. Volkswagen AG d
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, ksw
turbocharger,
agen supercharger)
oes
not
- Edition
ol
byV gu 11.2015
d ar an
e
ris tee
ho
– Remove securing bolts -1-. au
t or
ac
ss
– Detach spring-type clips and pull off hose -2- on activated

ce
le
un

pt
charcoal filter system solenoid valve 1 - N80- and pressure

an
d
itte

y li
pipe -3-.

erm

ab
ility
ot p
– Unscrew securing bolt for pressure pipe -3- on turbocharger

wit
is n
and pull pressure pipe -3- off.

h re
ole,
– Pull off all connectors and hose connections on intake con‐

spec
urposes, in part or in wh
necting pipe -4- and regulating flap control unit - J808- .

t to the co
rrectne
– Unscrew intake connecting pipe securing bolts -arrows- and

ss
pull intake connecting pipe upwards with regulating flap con‐

o
cial p

f
trol unit - J808- .

inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.
– Unscrew securing bolts -arrows-.
Removing throttle valve module - J338-
– Detach coolant hose -1- from hose clips.

– Pull connector -2- off intake air temperature sender 3 - G520-


with intake manifold pressure sender 3 - G583- .
– Remove charge air hose -3- from throttle valve module - J338-
and charge air pipe.

7. Intake manifold 259


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Unscrew securing bolts -arrows- and pull throttle valve module


- J338- from intake manifold connection.
Installing
Installation is carried out in the reverse order. When installing,
note the following:
♦ Seals and O-rings must be renewed and coated lightly with
clean engine oil before installing.
♦ Hose connections and hoses for charge air system must be
free of oil and grease before assembly.
♦ Secure all hose connections with hose clips which conform to
production standard.

– Push engine cover panel down at points -1- in direction of


-arrow- until it engages.
If a new regulating flap control unit or throttle valve module has
been installed:
– Erase learnt values and adapt engine control unit - J623- to
regulating flap control unit and throttle valve module ⇒ Vehicle
diagnostic tester “Guided functions”.

Note

Regulating flap control units with plastic housing need not be


adapted to the engine control unit - J623- .

Specified torques:
♦ Assembly overview - part I, intake manifold
⇒ “7.1 Assembly overview - intake manifold”, page 244 . n AG. Volkswagen AG do
lkswage es n
o ot g
yV ua
7.5 Cleaning throttle valve module - J338- d b ran
ir se tee
tho
u or
a ac
ss
ce
le

Note
un

pt
an
d
itte

y li
erm

♦ If a new engine control unit - J623- is installed the throttle valve ab


ility
module must be adjusted. Adaptation must be performed only
ot p

wit
with a new or cleaned throttle valve module, because soiling
is n

h re

or coking at the end stop of the throttle valve can lead to in‐
ole,

spec

correct adaptation values.


urposes, in part or in wh

t to the co

♦ When cleaning the throttle valve housing it must not be


scratched.
rrectne

– Remove air filter


⇒ “6.2 Removing and installing air filter housing”, page 243 .
ss

– Remove throttle valve module


o
cial p

⇒ “7.4 Removing and installing regulating flap control unit J808


inform

and throttle valve module J338 ”, page 258 .


mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

260 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Open throttle valve by hand and lock in open position using a


suitable object (e.g. wood or plastic wedge) -arrow-.

WARNING

Acetone is highly inflammable. Please observe the accidental


regulations and safety notes when handling with highly inflam‐
mable fluids. Do not use compressed air when cleaning the
throttle valve. Wear eye protection and protective clothing to
avoid possible injury and skin contact.

– Thoroughly clean throttle valve housing, especially around the


closed throttle valve -arrows- using commercially available
acetone according to DIN 53247 and a brush.
– Wipe off throttle valve housing using a lint-free cloth.
– Allow acetone to evaporate completely, and reinstall throttle
valve module after cleaning
⇒ “7.4 Removing and installing regulating flap control unit J808
and throttle valve module J338 ”, page 258 .
– Erase learnt values and adapt engine control unit - J623- to
throttle valve module ⇒ Vehicle diagnostic tester “Guided func‐
tions”.

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c
ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

7. Intake manifold 261


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

8 High-pressure pump
⇒ “8.1 Assembly overview - high-pressure pump”, page 262
⇒ “8.2 Removing and installing high-pressure pump”, page 263
n AG. Volkswagen AG do
8.1 Assembly overview - high-pressure yV
olkswage es n
ot g
pump d b ua
ran
ir se tee
tho
u or
a ac
ss
WARNING

ce
e
nl

pt
du

an
itte

y li
The injection system consists of a high-pressure section (max‐

erm

ab
imum approx. 120 bar) and a low-pressure section (approx. 6

ility
ot p
bar).

wit
, is n

h re
Prior to opening the high-pressure area, e.g. when removing
hole

spec
the high-pressure pump, fuel rail, injectors, a fuel line, or the
es, in part or in w

fuel pressure sender - G247- , the fuel pressure in the high-

t to the co
pressure area must be reduced to a residual pressure of
approx. 6 bar. The appropriate procedure is described in chap‐
ter ⇒ “2.2 Releasing high pressure in fuel system”, page 207 .

rrectness of i
l purpos

1 - Roller tappet

nform
ercia

❑ Lightly coat with engine


m

at
oil when installing.
om

ion
c

in t
2 - O-ring
or

his
ate

❑ Renew.

do
priv

cum
❑ Lightly coat with engine
for

en
g

oil when installing.


n

t.
yi Co
Cop py
3 - High-pressure pump with
t. rig
gh ht
yri
fuel pressure regulating valve -
p by
co Vo
by lksw
N276- Prote
cted AG.
agen

Caution
Only grasp high-pres‐
sure pump on housing
when removing and in‐
stalling!
When the high-pressure
piston spring package
loosens the high-pres‐
sure pump will leak and
must be replaced.

4 - Bolt
❑ Tighten bolts evenly.
❑ 20 Nm
5 - Connection
❑ High-pressure.
6 - Union nut
❑ Observe safety precau‐
tions
⇒ “2.1 Safety precau‐
tions when working on
fuel supply system”,
page 3 .

262 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
❑ Counterhold when loosening connection to high-pressure pump.
AG. Volkswagen AG d
❑ 18 Nm swagen oes
olk no t gu
yV
db ara
7 - Fuel hose rise nte
tho eo
❑ Low-pressure. s au ra
c
s
❑ With spring-type clip.

ce
le
un

pt
an
d
8 - Connection

itte

y li
rm

ab
❑ Low-pressure. pe

ility
ot

wit
, is n

h re
hole

spec
8.2 Removing and installing high-pressure
es, in part or in w

pump

t to the co
Special tools and workshop equipment required

rrectness of i
♦ Torque wrench - V.A.G 1410-
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
♦ Hose clip pliers - VAS 6340- Prote AG.

Removing
Observe safety precautions
⇒ “2.1 Safety precautions when working on fuel supply system”,
page 3 .
Observe rules for cleanliness
⇒ “3.1 Rules for cleanliness”, page 9 .

8. High-pressure pump 263


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Lift engine cover panel at points -1- and pull it forwards in di‐
rection of -arrow-.

WARNING

The injection system consists of a high-pressure section (max‐


imum approx. 120 bar) and a low-pressure section (approx. 6
bar).
Prior to opening the high-pressure area, e.g. when removing
the high-pressure pump, fuel rail, injectors, a fueleline, orolkthe
AG. V swagen AG
fuel pressure sender - G247- , the fuel pressure ag n
ksw in the high-
does
ol not
pressure area must be reduced to a dresidualby
V pressure of gu
ara
approx. 6 bar. The appropriate procedure
oris is described in chap‐
e nte
eo
ter ⇒ “2.2 Releasing high pressureauin
th fuel system”, page 207 . ra
css

ce
e
nl

pt
du

an
itte

y li
– Separate fuel supply line -arrow-.
erm

ab
ility
ot p

– Remove intake connecting pipe ⇒ Item 8 (page 246) .

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
– Pull connector and fuel supply line -arrows- off high-pressure
m

atio
m

pump.
o

n in
or c

thi
te

sd
iva

Note
o
r
rp

cu
o

m
f

en
ng

t.
yi
Catch escaping fuel in a cloth.
Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

264 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Remove wiring guide -2- and take clip -4- off high-pressure
line.

Note

Use a spanner to counterhold threaded connections on high pres‐


sure pump and on lower part of intake manifold when loosening
union nuts.

Caution

Only grasp high-pressure pump on housing when removing


and installing!
When the high-pressure piston spring package loosens the
high-pressure pump will leak and must beoreplaced.
lkswa
AG. V gen AG
agen does
olksw not
y V gu
db ara
– Loosen union nuts -3-oris and -1- of high-pressure line.
e nte
h eo
aut ra
s c
– Evenly unscrews securing bolts -arrows-.

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness

– Pull high-pressure pump -3- and roller tappet -1- out of cam‐
o
cial p

f i

shaft housing.
nform
mer

Installing
atio
om

Installation is carried out in the reverse order. When installing,


c

i
or

n thi

note the following:


te

sd
iva

o
pr

cum
r
fo

en
ng

Note
t.
yi Co
Cop py
t. rig
♦ Moisten high-pressure pump roller tappet with clean engine
gh ht
pyri by
oil.
o Vo
by c lksw
cted agen
Prote AG.
♦ The high-pressure pump O-ring must be renewed.

– Slide roller tappet -1- into camshaft housing.

8. High-pressure pump 265


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Insert new, lubricated O-ring -2- in groove of high-pressure


pump -3-.
– Place high-pressure pump -3- onto camshaft housing.

– Screw in securing bolts -arrows- by hand until bolt heads are


seated on flange.
– Tighten securing bolts -arrows- evenly until flange is seated
on camshaft housing.
– Tighten securing bolts to specified torque ⇒ page 267 .

AG. Volkswagen AG d
agen oes
ksw
– Tighten union nuts by V of high-pressure line -1- and -3-
ol not
guhand-tight.
ara
d
ise nte
– Install wiring
thor guide -2- and fit clip -4- on high-pressure line.
eo
au ra
s c
Tighten securing
s bolt for cable guide to specified torque
ce
le

⇒ page 267 .
un

pt
an
d
itte

y li
rm

ab
pe

ility

Note
ot

wit
, is n

h re

Use a spanner to counterhold threaded connections on high-


hole

spec

pressure pump and on lower part of intake manifold when tight‐


es, in part or in w

ening union nuts.


t to the co

– Tighten union nuts -1- and -3- of high-pressure line to specified


rrectness of i

torque ⇒ page 267 .


l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

266 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Secure fuel supply line and connector -arrows- on high-pres‐


sure pump.

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
– Reconnect fuel supply line -arrow-.
ot

wit
, is n

h re
– Install intake connecting pipe and air filter
hole

spec
⇒ “6.2 Removing and installing air filter housing”, page 243 .
es, in part or in w

t to the co
Specified torques:
Component Specified torque

rrectness of i
Securing bolts for high-pressure 20 Nm
pump
l purpos

Securing bolt for cable guide 8 Nm

nform
ercia

Union nuts for high-pressure lines 18 Nm


m

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

8. High-pressure pump 267


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

9 Senders and sensors


⇒ “9.1 Checking fuel pressure sender G247 ”, page 268

9.1 Checking fuel pressure sender - G247-


Special tools and workshop equipment required
♦ Assembly tool - T10118-

n AG. Volkswagen AG do
lkswage es n
o ot g
byV ua
d ran
ir se tee
tho
or
♦ Double hexagon
ss
au
socket, 1/2", 27 mm - VAS 5301/7- ac ce
le

♦ Digital pressure gauge - VAS 6394/1-


un

pt
an
d
itte

y li

♦ Test adapter - VAS 5570-


erm

ab
ility
ot p

wit
is n

WARNING
h re
ole,

spec

The injection system consists of a high-pressure section (max‐


urposes, in part or in wh

imum approx. 120 bar) and a low-pressure section (approx. 6


t to the co

bar).
Prior to opening the high-pressure area, e.g. when removing
rrectne

the high-pressure pump, fuel rail, injectors, a fuel line, or the


fuel pressure sender - G247- , the fuel pressure in the high-
pressure area must be reduced to a residual pressure of
ss o

approx. 6 bar. The appropriate procedure is described in chap‐


cial p

f in

ter ⇒ “2.2 Releasing high pressure in fuel system”, page 207 .


form
mer

atio
om

n
c

Procedure
i
or

n thi
te

sd
a

– Lift engine cover panel at points -1- and pull it forwards in di‐
iv

o
r

rection of -arrow-.
p

cum
r
fo

en
ng

t.
– Remove air filter
yi Co
op
⇒ “6.2 Removing and installing air filter housing”, page 243 .
C py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

268 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Remove fuel pressure sender - G247- -1-.

– Instead of fuel pressure sender - G247- , screw in adapter -


6394/2- and tighten to 22 Nm.

AG. Volkswagen AG d
agen oes
olksw not
y V gu
b ara
– Open cover -2- of risedigital pressure gauge - VAS 6394/1- and
d
nte
tighten fuel pressure
utho
sender - G247- to digital pressure gauge eo
ra
to 22 Nm. ss a c
ce
le
un

– Screw pressure line -1- of digital pressure gauge - VAS


pt
an
d

6394/1- hand-tight to adapter - 6394/2- .


itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectne

– Connect test adapter - VAS 5570- between fuel pressure


sender - G247- -1- and connector.
ss o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

9. Senders and sensors 269


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Connect vehicle diagnosis, testing and information system -


VAS 5051B- -1- as follows:
– Push diagnostic cable connector -2- onto diagnostic connec‐
tion in driver footwell.
– Switch on ignition.
– Press following keys on display in succession:
Vehicle self-diagnosis

Vehicle self-diagnosis

01 - Engine electronics

011 - Measured values

– There, enter 141 and acknowledge with Q .


Display field 3 shows the actual value reported to the vehicle by
the fuel pressure sender - G247- .
AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
le
un

pt
an
d
itte

y li
rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

270 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Switch on digital pressure gauge - VAS 6394/1- by pressing


key -A- briefly once.

Note

When button -A- is pressed for 2 seconds, the illumination will be


switched on for 20 seconds.

Digital pressure gauge - VAS 6394/1- should display 0 bar; if this


is not the case, press key -C-sw briefly
agen once for zero
AG. Volkswagen AGpoint
does compen‐
sation. by
Volk not
gu
ara
ed n
– Start engine. thoris tee
or
au a
– Compare pressure
ss displayed by digital pressure gauge - VAS c

ce
le

6394/1- with actual value of vehicle diagnosis, testing and in‐


un

pt
formation system - VAS 5051B- .

an
d
itte

y li
erm

ab
The pressures may deviate by up to 5 bar.

ility
ot p

wit
If pressures do not correspond, fuel pressure sender - G247-
is n

h re
must be renewed.
ole,

spec
urposes, in part or in wh

t to the co
WARNING

Digital pressure gauge - VAS 6394/1- is subject to high fuel

rrectne
pressure! With engine running, pull connector off fuel pressure
regulating valve - N276- . This reduces fuel pressure to approx.
6 bar. Switch off ignition. Place a cleaning cloth around fuel

ss
pressure sender - G247- , then reduce residual pressure by
o
cial p

f i
carefully loosening fuel pressure sender - G247- .
nform
mer

atio
om

n
c

i
or

n thi
e

Note
t

sd
iva

o
pr

cum
r
fo

♦ When the engine is idling and the electrical connector is pulled


en
ng

t.
off the fuel pressure regulating valve - N276- the pressure in
yi Co
op py
the high-pressure area will drop to approx. 6 bar. . C rig
ht ht
rig by
py
♦ Once the high-pressure in the high-pressure area is reduced,
co Vo
by lksw
cted
open the system immediately as the pressure will rise again
agen
Prote AG.
due to warming.

– Renew fuel pressure sender - G247- and again compare both


measured values.
If measured values again fail to correspond:
– Check wiring ⇒ Vehicle diagnostic tester.
If measured values correspond:
– Further testing is carried out with “Guided Fault Finding” ⇒ Ve‐
hicle diagnostic tester.

9. Senders and sensors 271


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

10 Engine control unit


⇒ “10.1 Removing and installing engine control unit J623 (Passat
▶10.2010)”, page 272
⇒ “10.2 Removing and installing engine control unit J623 with
protective housing (Passat ► 10.2010)”, page 273
⇒ “10.3 Removing and installing engine control unit J623 (Passat
11.2010▶)”, page 274
⇒ “10.4 Removing and installing engine control unit J623 with
protective housing (Passat 11.2010▶)”, page 276
⇒ “10.5 Removing and installing engine control unit J623 (Tour‐
an)”, page 278
⇒ “10.6 Removing and installing engine control unit J623 with
protective housing (Touran)”, page 279

10.1 Removing and installing engine control


unit - J623- (Passat ▶10.2010)
If you wish to replace the engine control unit, connect the vehicle
diagnosis, testing and information system - VAS 5051B- and carry
out the guided function “Renew control unit”.
Removing
– Switch off ignition.
– Remove wiper arms ⇒ Electrical system; Rep. gr. 92 ; Wind‐
screen wiper system; Removing and installing wiper arms .
– Remove plenum chamber cover: ⇒ General body repairs, ex‐
terior; Rep. gr. 64 ; Removing and installing plenum chamber
cover n AG. Volkswagen A ge G do
swa es
– Pull connector -1-byoff
Vol heated windscreen control unit
k not
gu - J505- .
a d ran
se
– Slide connector
tho
ri locking devices -2- on engine control unit
teeout‐
or
wards and
ss
au
pull off both connectors. ac
ce
e

– Remove securing bolts -3-.


nl

pt
du

an
itte

y li

– Remove retainer frame with engine control unit from plenum


erm

ab

chamber.
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i

– Press locking device -1- outwards and slide engine control unit
l purpos

-2- in -direction of arrow-.


Installing
nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

272 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Slide engine control unit -1- into retaining frame in


-direction of arrow-.
– Fit retainer frame with engine control unit onto retainer -4-.
Specified torque of securing nuts for retainer -4-: 6 Nm.

– Tighten securing bolts -3- to 7 Nm.


– Fit connectors to engine control unit and slide locking devices
-2- inwards.
– Fit connector -1- to heated windscreen control unit - J505- .
– Install plenum chamber cover ⇒ General body repairs, exte‐
rior; Rep. gr. 64 ; Removing and installing plenum chamber
. Volkswagen AG
cover . kswagen AG does
n ol ot g
yV
– Install wiper arms
ed ⇒ Electrical system; Rep. gr. 92 ;raWind‐
b ua
nte
ris
screen wiper
th system; Removing and installing wiper arms
o eo .
au ra
c
ss
ce
le
un

pt
an
d
itte

10.2 Removing and installing engine control


y li
erm

ab

unit - J623- with protective housing


ility
ot p

wit
is n

(Passat ► 10.2010)
h re
ole,

spec

If you wish to replace the engine control unit, connect the vehicle
urposes, in part or in wh

diagnosis, testing and information system - VAS 5051B- and carry


t to the co

out the guided function “Renew control unit”.


Special tools and workshop equipment required
rrectne

♦ Grip pliers
ss

Removing
o
cial p

f in

– Switch off ignition.


form
mer

atio

– Remove wiper arms ⇒ Electrical system; Rep. gr. 92 ; Wind‐


om

screen wiper system; Removing and installing wiper arms .


n
c

i
or

n thi
e

– Remove plenum chamber cover: ⇒ General body repairs, ex‐


t

sd
va

terior; Rep. gr. 64 ; Removing and installing plenum chamber


i

o
pr

cum
r

cover
fo

en
ng

t.
yi Co
– Remove bolts -1-. Cop py
t. rig
gh ht
yri
– Cover the plenum chamber with a clean cloth so that it is not
p by
co Vo
scratched.
by lksw
cted agen
Prote AG.
– Raise engine control unit with retaining frame slightly.
– Release engine control unit in direction of -arrow- and pull out
slightly.

10. Engine control unit 273


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Bend the upper ends -1- of locking clip outwards.


– Remove shear-head bolts -2- using grip pliers and remove
locking clip.

AG. Volkswagen AG d
agen oes
olksw not
y V gu
d b ara
rise nte
tho eo
au ra
ss c

ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

– Slide connector locking devices -1- on engine control unit out‐

h re
wards and pull off both connectors.
ole,

spec
urposes, in part or in wh

– Remove engine control unit.

t to the co
Installing

rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n
– Slide engine control unit -1- in direction of -arrow- in retaining

thi
te

sd
a

frame until it engages.


iv

o
pr

cum
r
fo

– Tighten the retaining frame.

en
ng

t.
yi Co
op
Specified torque: 6 Nm C py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

– Fit connectors to engine control unit and slide locking devices


-1- inwards.
– Take a new locking clip and tighten new shear-head bolts
evenly until heads shear off.

10.3 Removing and installing engine control


unit - J623- (Passat 11.2010▶)
If you wish to renew the engine control unit, connect the ⇒ Vehicle
diagnostic tester and carry out the guided function “Renew control
unit”.

274 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015
n AG. Volkswagen AG do
swage es n
Removing byV
olk ot g
ua
d ran
ir se
– Switch off ignition.
tho tee
or
au ac
– Remove wiper arms ⇒ Electrical system; Rep. gr. 92 ; Wind‐
s s

ce
le
screen wiper system; Removing and installing wiper arms .
un

pt
an
d
itte

y li
– Remove plenum chamber cover ⇒ General body repairs; Rep.
erm

ab
gr. 50 ; Front body, plenum chamber cover .

ility
ot p

wit
– Press retaining frame down in -direction of arrow- and remove
is n

h re
engine control unit.
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n
– Push connector locking devices in -direction of arrow- and pull

thi
te

sd
a

off connector.
iv

o
pr

cum
r
fo

Installing
en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

– Fit connectors to engine control unit and slide locking devices


to stop in direction of -arrow-.

– Insert engine control unit into retaining frame and press re‐
taining frame upwards in -direction of arrow-.
– Fit plenum chamber cover ⇒ General body repairs; Rep. gr.
50 ; Front body, plenum chamber cover .
– Fit wiper arms ⇒ Electrical system; Rep. gr. 92 ; Windscreen
wiper system; Removing and installing wiper arms

10. Engine control unit 275


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

10.4 Removing and installing engine control


unit - J623- with protective housing
(Passat 11.2010▶)
If you wish to renew the engine control unit, connect the ⇒ Vehicle
diagnostic tester and carry out the guided function “Renew control
unit”.
Removing
– Switch off ignition.
– Remove wiper arms ⇒ Electrical system; Rep. gr. 92 ; Wind‐
screen wiper system; Removing and installing wiper arms .
– Remove plenum chamber cover ⇒ General body repairs; Rep.
gr. 50 ; Front body, plenum chamber cover .
– Press retaining frame down in -direction of arrow- and remove
engine control unit.

– Unscrew shear-head bolts -arrows- using pliers.

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
ho eo
aut ra
ss c
ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec

– Insert screwdriver between both locking plates -arrow-.


es, in part or in w

t to the co

– Carefully press screwdriver in direction of -arrow- and bend


locking bar -1- upwards at the same time.
rrectness of i
l purpos

nform
mercia

at
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

276 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Bend locking bar -1- in direction of -arrow- until it can be pulled


off connectors.

– Push connector locking devices in -direction of arrow- and pull


off connector.
Installing

AG. Volkswagen AG d
agen oes
olksw not
byV gu
ara
ed
ris nte
– Fit connectors to engine control unit and slideulocking
tho
devices eo
ra
to stop in direction of -arrow-. ss a c

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
– Fit locking bar -1- onto connectors and press it in direction of
l purpos

-arrow-.
– Guide pin -2- to stop into hole on engine control unit.
nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

10. Engine control unit 277


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Secure locking bar with new shear-head bolts to engine con‐


trol unit -arrows-.
– Tighten shear-head bolts evenly until heads shear-head off
-arrows-.

– Insert engine control unit into retaining frame and press re‐
taining frame upwards in -direction of arrow-.
– Fit plenum chamber cover ⇒ General body repairs; Rep. gr.
50 ; Front body, plenum chamber cover .
– Fit wiper arms ⇒ Electrical system; Rep. gr. 92 ; Windscreen
wiper system; Removing and installing wiper arms

10.5 Removing and installing engine control


unit - J623- (Touran)
If you wish to renew the engine control unit, connect the ⇒ Vehicle
diagnostic tester and carry out the guided function “Renew control
unit”.
Removing AG. Volkswagen AG d
agen oes
ksw
– Switch off ignition. byV
ol not
gu
d ara
ise nte
– Remove wiper arms and plenum chamber cover thor ⇒ Electrical eo
system; Rep. gr. 92 ; Windscreen wiper system;
s au Removing ra
c
and installing windscreen wiper system .
s
ce
le
un

pt

– Remove plenum chamber bulkhead ⇒ General body repairs;


an
d
itte

y li

Rep. gr. 50 ; Body - front; Plenum chamber bulkhead .


erm

ab
ility
ot p

– Loosen securing bolts -arrows- of control unit cover.


wit
is n

h re

– Then remove securing nuts for control unit bracket -arrows-.


ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

278 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Release connectors on engine control unit and pull off con‐


nector.

AG. Volkswagen AG d
agen oes
olksw not
V gu
d by ara
ise nte
or eo
h
aut ra
ss c

ce
e
nl

pt
du

an
itte

y li
erm

ab
– Press catches -1- and -2- outwards. Then pull engine control

ility
unit off control unit bracket in -direction of arrow-. ot p

wit
, is n

Installing

h re
hole

spec
– Push engine control unit onto control unit bracket until it en‐
es, in part or in w

gages in catches.

t to the co
– Fit connectors to engine control unit and lock in position.

rrectness of i
l purpos

nform
mercia

at
– Tighten securing bolts -arrows- to 10 Nm.
om

ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
o
by c lksw
cted agen
Prote AG.

– Tighten securing bolts -arrows- to 5 Nm.


– Install plenum chamber bulkhead ⇒ General body repairs;
Rep. gr. 50 ; Body - front; Plenum chamber bulkhead .
– Install wiper arms and plenum chamber cover ⇒ Electrical
system; Rep. gr. 92 ; Windscreen wiper system; Removing
and installing windscreen wiper system .

10.6 Removing and installing engine control


unit - J623- with protective housing
(Touran)
Special tools and workshop equipment required

10. Engine control unit 279


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

♦ Hot air blower from wiring harness repair set - VAS 1978-

♦ Nozzle attachment from wiring harness repair set - VAS 1978-


If you wish to renew the engine control unit, connect the ⇒ Vehicle
diagnostic tester and carry out the guided function “Renew control
unit”.
AG. Volkswagen AG d
Removing agen oes
olksw not
y V gu
d b ara
– Switch off ignition.
orise nte
th eo
u ra
– Removesswiper
a arms and plenum chamber cover ⇒ Electrical c
system; Rep. gr. 92 ; Windscreen wiper system; Removing
ce
le
un

pt

and installing windscreen wiper system .


an
d
itte

y li

– Remove plenum chamber bulkhead ⇒ General body repairs;


erm

ab
ility

Rep. gr. 50 ; Body - front; Plenum chamber bulkhead .


ot p

wit
is n

h re
ole,

spec

Note
urposes, in part or in wh

t to the co

The shear-head bolt threads are coated with locking compound.


Heating the shear-head bolt with a hot air blower releases the
locking effect of the locking compound.
rrectness

Caution
o
cial p

f inform

Cover lines, connections and control units in the vicinity of the


mer

engine control unit to prevent damage through heat.


atio
om

n
c

i
or

n thi
te

sd
a

Perform settings on hot air blower -4- as shown:


iv

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

280 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

– Turn temperature setting potentiometer -2- to maximum heat


output (600°C).
– Set two-stage switch for volume of air -3- to position 3.

WARNING

When shear-head bolts are heated up, parts of the protective


housing will be subjected to a large amount of heat. Wear pro‐
tective gloves to avoid possible injury.

– Place nozzle of hot air blower close to shear-head bolt.


– Switch on hot air blower and heat bolt for about 20 to 25 sec‐
onds.
– Unscrew shear-head bolt using mole grips on bolt head.
The procedure for the second shear-head bolt is identical.
– Then remove securing nuts for control unit bracket -arrows-.
AG. Volkswagen AG d
agen oes
ksw
– Release connectors on engine by V control unit and pull off con‐t gua
ol no
nector. ris
ed ran
tee
tho or
au ac
ss

ce
e
nl

pt
du

an
itte

y li
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co

– Press catches -1- and -2- outwards. Then pull engine control
rrectness of i

unit off control unit bracket in -direction of arrow-.


l purpos

Installing
– Push engine control unit onto control unit bracket until it en‐
nform
ercia

gages in catches.
m

at
om

– Fit connectors to engine control unit and lock in position.


ion
c

in t
or

his
ate

do
priv

cum
for

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
– Tighten securing bolts -arrows- to 10 Nm.
py by
co Vo
by lksw
cted agen
– Install cover of protective housing.
Prote AG.

10. Engine control unit 281


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
AG. Volkswagen AG d
4-cylinder direct-injection engine (1.4 l, naturalksw
gas,
agen EA 111, turbocharger,
oes
not
supercharger) - Edition
ol
11.2015 d byV gu
ar
e an
ris tee
ho
– Tighten new shear-head bolts -arrows-s aevenly
ut
until heads or
ac
shear off. s

ce
e
nl

pt
du
– Install plenum chamber bulkhead ⇒ General body repairs;

an
itte

y li
Rep. gr. 50 ; Body - front; Plenum chamber bulkhead .

erm

ab
ility
ot p
– Install wiper arms and plenum chamber cover ⇒ Electrical

wit
, is n
system; Rep. gr. 92 ; Windscreen wiper system; Removing

h re
and installing windscreen wiper system .
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nf
ercia

orm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

282 Rep. gr.24 - Mixture preparation - injection


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

26 – Exhaust system
1 Emission control

Note

♦ After working on the exhaust system, ensure that the system


is not under stress and that there is sufficient clearance to the
bodywork. If necessary, loosen double clamp and align si‐
lencer and exhaust pipe so that sufficient clearance is main‐
tained to the bodywork and the support rings are evenly
loaded.
♦ Renew self-locking nuts.
wage
n AG. Volkswagen AG do
e
ks s no
Vol t gu
d by a
⇒ “1.1 Assemblyris
e overview – emission control”, pagera283
nte
utho eo
r
1.1 Assembly overview – emission control
a c a
ss

ce
le
un

pt
an
d
itte

y li
1 - Heat shield
rm

ab
pe

ility
2 - Bolt
ot

wit
, is n

❑ 10 Nm h re
hole

spec
3 - Bolt
es, in part or in w

t to the co

❑ 10 Nm
4 - Gasket
rrectness of i

❑ Renew.
l purpos

5 - Exhaust pipe
❑ With decoupling ele‐
ment.
nform
ercia

❑ Do not bend decoupling


m

a
com

element more than 10° -


ion in

otherwise it can be dam‐


r
te o

thi

aged.
s
iva

do
r
rp

6 - Lambda probe after catalyt‐


um
fo

ic converter - G130-
en
ng

t.
yi Co
op
❑ Grease only the threads
C py
t. rig
with “G 052 112 A3”;
gh ht
yri by
“G 052 112 A3” must not
cop Vo
by lksw
cted
get into the slots on the
agen
Prote AG.
probe body.
❑ If seal is leaking, nip
open and renew.
❑ Specified torque: 50 Nm
7 - Catalytic converter with ex‐
haust pipe
8 - Nut
❑ Renew.
❑ Coat studs of turbo‐
charger with high-tem‐
perature paste.
❑ 23 Nm
9 - Gasket
❑ Renew

1. Emission control 283


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

10 - Nut
❑ Renew
❑ 25 Nm
11 - Bolt
❑ 25 Nm
12 - Mounting
13 - Nut
❑ Renew.
❑ Coat studs with high-temperature paste.
❑ 23 Nm
14 - Gasket
❑ Renew
15 - Bolt
❑ 25 Nm
16 - Bolt AG. Volkswagen AG d
agen oes
❑ 10 Nm olksw not
byV gu
ara
ed
17 - Bracket horis nte
eo
aut ra
18 - Lambda probe - G39-
ss c

ce
le

❑ Grease only the threads with “G 052 112 A3”; “G 052 112 A3” must not get into the slots on the probe
un

pt
an
d

body.
itte

y li
rm

ab
❑ Remove and install with Lambda probe open ring spanner set - 3337- .
pe

ility
ot

❑ 50 Nm
wit
, is n

h re
19 - Nut
hole

spec
❑ Observe tightening sequence and specified torques: items -A- to -I- ⇒ Item 7 (page 165) .
es, in part or in w

t to the co

❑ 25 Nm
20 - Turbocharger
rrectness of i

❑ The turbocharger and the exhaust manifold can only be renewed together.
l purpos

21 - Gasket
❑ Renew.
nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

284 Rep. gr.26 - Exhaust system


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2 Exhaust pipes, silencers


⇒ “2.1 Assembly overview - silencers”, page 285
⇒ “2.2 Removing and installing front exhaust pipe”, page 286

2.1 Assembly overview - silencers

1 - Centre silencer with rear si‐


lencer
❑ Aligning exhaust sys‐
tem free of stress
n AG. Volkswagen AG do
2 - Mounting olkswage es n
ot g
byV ua
3 - Clamp ir se
d ran
tee
ho
❑ 23 Nm aut or
ac
ss
4 - Exhaust tailpipe

ce
le
un

pt
an
d
itte

5 - Mounting

y li
erm

ab
6 - Bolt

ility
ot p

wit
is n

❑ 20 Nm

h re
ole,

7 - Nut

spec
urposes, in part or in wh

❑ Renew

t to the co
❑ 25 Nm

rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

2. Exhaust pipes, silencers 285


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

2.2 Removing and installing front exhaust


pipe
Removing
– Remove Lambda probe after catalytic converter - G130- -1-.
– Unbolt exhaust pipe from catalytic converter -arrows-.

– Unbolt exhaust pipe together with decoupling element


-arrows-.
– Unhook rear exhaust system from mountings and pull system
slightly to rear in direction of -arrow-.
– Push exhaust pipe out of mounting -1-.
– Remove exhaust pipe.
Installing
Installation is performed in the reverse order of removal.
Specified torques:
♦ Lambda probe after catalytic converter - G130-
. Volkswagen AG
⇒ “1.1 Assembly overview
swagen–AG
emission control”,
does page 283
k not
Vol g
♦ Securing nutssefor
d b front exhaust pipe
y ua
ran
⇒ “1.1 Assembly
thori overview – emission control”, page 283
tee
o
au ra
c
ss
ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

286 Rep. gr.26 - Exhaust system


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

28 – Ignition system
AG. Volkswagen AG d
agen oes
ksw
1 Ignition system ol not
y V gu
d b ara
rise nte
o eo
⇒ “1.1 General notes”, page 287 . auth
ra
ss c
⇒ “1.2 Assembly overview - ignition system”, page 287

ce
e
nl

pt
du

an
⇒ “1.3 Test data, spark plugs”, page 289
itte

y li
erm

ab
⇒ “1.4 Removing and installing ignition coils with output stage”,

ility
ot p

page 289

wit
, is n

h re
⇒ “1.5 Removing and installing engine speed sender G28 ”, page
hole

spec
291
es, in part or in w

t to the co
1.1 General notes
• Observe safety precautions

rrectness of i
⇒ “2.5 Safety precautions when working on ignition system”,
page 8 .
l purpos

To prevent injuries to persons and/or damage to the injection and


ignition system, the following must be observed:

nform
mercia

♦ Do not touch or disconnect ignition cables when the engine is

at
om

i
running or being turned at starter speed.

on
c

in t
or

♦ Switch off ignition before connecting or disconnecting injection

his
ate

do
riv

and ignition system wiring as well as test instrument cables.


p

cum
for

Note the following if testers and measuring instruments have to

en
ng

t.
yi
be used during a road test:
Co
Cop py
t. rig
gh
♦ Test and measuring instruments must always be secured to
ht
pyri by
Vo
o
rear seat and operated by a second person from this location.
c by lksw
cted agen
Prote AG.
If test and measuring instruments are operated from front pas‐
senger seat and the vehicle is involved in an accident, there is a
possibility that the person sitting in this seat may receive serious
injuries when the airbag is triggered.
♦ If the engine is to be turned at starter speed without starting:
– Pull all 4-pin connectors -arrows- off ignition coils with final
output stage.
⇒ “1.4 Removing and installing ignition coils with output stage”,
page 289
– Remove fuse for fuel pump control unit - J538- from fuse hold‐
er. Fuse assignment ⇒ Current flow diagrams, Electrical fault
finding and Fitting locations
♦ The engine control unit - J623- is equipped with self-diagnosis.
♦ For trouble-free operation of electrical components, a voltage
of at least 11.5 V is necessary.
♦ Certain tests may lead to a fault being detected and stored by
the engine control unit - J623- . Therefore, after completing all
the checks and repairs, read the event memory and clear it if
necessary.

1.2 Assembly overview - ignition system

1. Ignition system 287


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

1 - Connector
❑ Black, 4-pin.
❑ With assembly tool -
T10118- .
2 - Ignition coils
❑ Ignition coil 1 with output
stage - N70-
❑ Ignition coil 2 with output
stage - N127-
❑ Ignition coil 4 with output
stage - N292-
❑ Ignition coil 3 with output
stage - N291- AG. Volkswagen AG d
agen oes
olksw not
❑ Removing and installing ed by V gu
ara
⇒ “1.4 Removing and in‐ horis nte
eo
stalling ignition coils aut ra
c
with output stage”, pagess

ce
le

289 .
un

pt
an
d
itte

y li
3 - Connector
erm

ab
❑ Black, 2-pin.

ility
ot p

wit
is n

❑ For knock sensor 1 -

h re
G61- .
ole,

spec
urposes, in part or in wh

❑ Connector contacts are

t to the co
gold-plated.
4 - Knock sensor 1 - G61-

rrectne
❑ Connector contacts are
gold-plated.

s
❑ To remove, remove su‐

s o
percharger
cial p

⇒ “3.2 Removing and in‐ f inform


mer

stalling supercharger”,
atio

page 194 .
om

n
c

i
or

5 - Bolt
thi
te

sd
a

❑ The specified torque influences the function of the knock sensor.


iv

o
pr

cum
r

❑ 20 Nm
fo

en
ng

t.
yi Co
6 - Connector t. Cop py
rig
gh
❑ Black, 3-pin.
ht
pyri by
Vo
co lksw
❑ For Hall sender - G40- .
by
cted agen
Prote AG.
7 - Hall sender - G40-
8 - O-ring
❑ Renew if damaged.
9 - Bolt
❑ 10 Nm
10 - Spark plugs
❑ If a spark plug is replaced, regrease ignition coil with final output stage
⇒ “1.4 Removing and installing ignition coils with output stage”, page 289
❑ Remove and install with spark plug socket and extension - 3122 B- .
❑ Type and electrode gap ⇒ “1.3 Test data, spark plugs”, page 289 .
❑ 25 Nm
11 - Cable guide
❑ Bolt to camshaft housing with 5 Nm torque.

288 Rep. gr.28 - Ignition system


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

12 - Earth wire
❑ Loosen or tighten only with ignition switched off.
13 - Pins
❑ Loosen or tighten only with ignition switched off.
❑ 10 Nm

1.3 Test data, spark plugs


Engine codes CDGA
Firing order 1-3-4-2
Spark plugs
VW part number 101 905 626 A
Electrode gap 0.5 … 0.6 mm
Specified torque 25 Nm
Change interval ⇒ Maintenance ; Booklet ; Time or distance de‐
pendent additional work

1.4 Removing and installing ignition coils


with output stage
Special tools and workshop equipment required
n AG. Volkswagen AG do
♦ Assembly tool - T10118- lkswage es n
ot g
o
byV ua
d ran
ir se tee
tho
u or
a ac
ss
ce
le
un

pt
an
d
itte

y li
erm

ab
ility
ot p

wit
is n

h re
ole,

spec
urposes, in part or in wh

t to the co

♦ Puller - T10094 A-
rrectness o
cial p

f inform
mer

atio
om

n
c

i
or

n thi
te

sd
iva

o
pr

cum
r
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

1. Ignition system 289


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Note

The housings for ignition coils with output stages have been
modified. As a result, these ignition coils can only be installed or
removed using puller - T10094 A- . The previous puller - T10094- gen AG
. Volkswagen AG
does
can continue to be used if modified as described below. Volkswa not
g
by ua
ed ran
ris tee
– Remove marked area -2- using suitable workshop
tho equipment or
au
to attain the new nominal dimension -B- ofss18 mm. ac

ce
e
nl
– Additionally identify the tool designation with the letter A -1-.

pt
du

an
itte

y li
Removing
erm

ab
ility
ot p

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
– Lift engine cover panel at points -1- and pull it forwards in di‐
l purpos

rection of -arrow-.
– Remove securing bolts -1- from crankcase breather connec‐

nf
ercia

o
tion and from non-return valve.

rm
m

atio
om

n in
or c

thi
te

sd
iva

o
r
rp

cu
o

m
f

en
ng

t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.
– Pull off connectors -2- and hose connection -3-.
– Pull off hose -4- from intake manifold connection.

Note

To remove ignition coil cylinder 1, press non-return valve and ho‐


ses to side.

– Fit puller - T10094 A- on ignition coil with final output stage


-arrow-.
– Pull ignition coil with final output stage out slightly.
– Fit assembly tool - T10118- as shown.
– Carefully release connector locking mechanism and pull off
connector.
Installing
– Fit puller - T10094 A- on ignition coil with final output stage.
– Push connector onto ignition coil with final output stage until it
audibly engages.

290 Rep. gr.28 - Ignition system


AG. Volkswagen AG d
agen oes
olksw not
yV gu
Passat 2006 ➤s,edPassat 2011 ➤ , Passat Variant 2011
b ara➤ , Touran 2003 ➤
nte
ri
4-cylinder direct-injection engine (1.4
ut
h l, natural gas, EA 111, turbocharger, supercharger)
o eo
ra
- Edition
a
ss c 11.2015

ce
le
un

pt
– Press ignition coil with final output stage into cylinder head in

an
d
itte

y li
direction of -arrow-.

rm

ab
pe

ility
ot

wit
, is n

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
ercia

– Push rubber sleeve -1- into hose -2-.


m

a
– Push hose -2- onto intake manifold connection -3-.
com

tion in
r

Further installation is carried out in the reverse sequence of re‐


te o

thi
s
moval.
iva

do
r
rp

cum
Specified torques of securing bolts for crankcase breather con‐
fo

en
ng

nection and for non-return valve: 10 Nm


t.
yi Co
Cop py
ht. rig
rig ht
py by
co Vo
by lksw
cted agen
Prote AG.

1.5 Removing and installing engine speed


sender - G28-
The engine speed sender - G28- is located on the sealing flange
on the flywheel end of the crankcase.

1. Ignition system 291


Passat 2006 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤ , Touran 2003 ➤
4-cylinder direct-injection engine (1.4 l, natural gas, EA 111, turbocharger, supercharger) - Edition
11.2015

Special tools and workshop


equipment required
olkswagen AG
en AG. V
♦ Hose clip pliers - VAS olkswag does
not
6340- ed
by
V gu
ara
ris nte
♦ Torque wrench
au
tho - V.A.G eo
ra
1331- ss c

ce
le
un

♦ Guide pins - T10341-

pt
an
d
itte

y li
♦ Locking pin - T10060 A-
rm

ab
pe

ility
♦ Allen key, long reach 4 mm
ot

wit
, is n

- T10370-

h re
hole

spec
es, in part or in w

t to the co
rrectness of i
l purpos

nform
mercia

a
com

tion in
r
te o

thi
s
iva

do
r
rp

cum
fo

en
ng

t.
yi Co
Cop py
t. rig
gh ht
pyri by
Vo
co lksw
by
cted agen
Prote AG.

Removing
– Remove compressor
⇒ “3.2 Removing and installing supercharger”, page 194 .
– Pull off connector -1- from engine speed sender - G28- .
– Remove gasket -2- from cylinder block and remove engine
speed sender - G28- with socket - T10370- .
Installing
– Install engine speed sender - G28- , and tighten securing bolt
to specified torque ⇒ page 292 .
Further assembly is basically the reverse of the dismantling se‐
quence.
Specified torques:
Component Specified torque
Securing bolt for engine speed send‐ 5 Nm
er - G28-
♦ Components for securing supercharger
⇒ “3.1 Assembly overview - supercharger”, page 192

292 Rep. gr.28 - Ignition system

You might also like