You are on page 1of 2

12 11 10 9 8 7 6 5 4 3 2 1

H H

Optional hang-off used for service in stowed position.


Boarding / Embarkation platform - Yard supplied
2 Remote grease points To be specified in purchase order if required.
for davit head
2 Remote grease points
for davit head 2 Grease points

Boarding / Embarkation platform - Yard supplied 4 Grease points


with back side
G G
The Max. height means the distance from profile
steel of center beam to the upside of platform

Max. Height = 250


CLOSE CLOSE

SHIP NAME
CLOSE ESOLC

OPEN
OPEN

OPEN

NEPO
LxBxH 8.50 X 3.15 X 3.30m
CAPACITY
PORT OF REGISTRY

OPEN
CLOSE

OPEN

NEPO
CLOSE ESOLC

APPROX 7810
F F

APPROX 7500
C.O.G. C.O.G.

61
°
Grease point

3 Grease points

APPROX 4240
E E
APPROX 3551

Standard Hang-off

Limit switch C5 Limit switch C6

CLOSE CLOSE

OPEN
OPEN

OPEN
CLOSE

D D

APPROX 4062 APPROX 1744


APPROX 9700
APPROX 4650
4 Grease points
OPEN

OPEN

CLOSE CLOSE

with back side


OPEN

OPEN

CLOSE CLOSE

E - 110 LIFE BOAT DAVIT

SWL HOISTING: 110 kN


C SWL LOWERING: 110 kN C
HOISTING SPEED: APPROX 5 m/min
DESIGN SPEC SOLAS: 10° TRIM, 20° LIST SIMULTANEOUSLY
DEAD SHIP LOWERING SPEED: MAXIMUM 60 m/min
ESOLC

ESOLC

NEPO NEPO

CALL SIGN DAVIT WEIGHT INCLUDE NW85 WINCH: 8000 KG


CLOSE
CLOSE

OPEN
OPEN

OPEN
OPEN

CLOSE

NOTES:
CLOSE

IMO NUMBER 5 Reissued for approval MISO ALJI WAGU 24.06.2019


1. ACCESS PLATFORMS & BOARDING, WALK WAYS, STAIRS & HANDRAILINGS, DOUBLER PLATES,
ETC.: YARD SUPPLY - TO BE FINALIZED DURING LIFEBOAT INSTALLATION. 4 Changed diameter of wire SOJI ALJI WAGU 17.07.2018
2. ELECTRIC WIRING BY YARD. 0 Issued for construction ALJI GACA WAGU 04.03.2014
3. FIELD WELDS TO BE WELDED BY YARD ARE SHOWN BY FLAG:
4. ALL FIELD WELDS TO BE PERFORMED ACC. TO APPROVED WPS. (YARD RESPONSIBILITY). REV DESCRIPTION BY CHECK APPRO DATE
B ALL FIELD WELDING IS SUBJECT TO CLASS APPROVAL PRIOR TO START WELDING. B
5. ALL STRUCTURAL STEEL TO BE S355, Q345B/D, S235 AND Q235. REVISION HISTORY
OUTFITTING STEEL TO BE S235, Q235 OR EQUIVALENT. VIKING Norsafe Life-Saving Equipment Norway AS
CLOSE CLOSE
6. FOR WINTERIZATION / ARCTIC AREAS OPERATION STEEL TO P.O Box 115 Tel: +47 37 05 85 00
BE Q345D/S355 WITH CHARPY TESTING AT -20 DEGREES.
OPEN

OPEN

4852 Færvik Fax: +47 37 05 85 01


OPEN

OPEN

CLOSE CLOSE

7. WIRE LENGTHS: WIRE AFT - ∅16 : 23 m + 2 x (H + H1) NORWAY 24/7 Service: +47 37 05 63 33
WIRE FWD - ∅16 : 28 m + 2 x (H + H1) Email: viking@viking-life.com
REMOTE LOWERING WIRE: DECK WIRE - ∅3: 14,5 m This drawing is the sole property of VIKING Norsafe Life-Saving Equipment Norway AS. It
BOAT WIRE - ∅3: 16 m + (H + H1) must not be submitted to other parties nor used in any manner detrimental to our interests.
H = HEIGHT FROM STOWAGE TO L.W.L. It shall not be copied, reproduced, used for manufacturing or sale without the written
consent of VIKING Norsafe Life-Saving Equipment Norway AS. All rights are reserved.
H1 = ADDITIONAL HEIGHT DUE TO LIST AND TRIM CONDITIONS, UNLESS OTHERWISE AGREED. DWG SIZE: SCALE: COPY OF: PART NO. WEIGHT: SHEET:
8. FOR LOCATION OF HATCHES, HOOKS AND OTHER BOAT DETAILS SEE BOAT DRAWINGS. A3 1:20 1 /2
9. C.O.G. - CENTER OF GRAVITY (DAVIT WITH LIFEBOAT) CLIENT NO: PROJECTION METHOD
E-110 General Arrangement
TOLERANCES:

A
ISO 2768-mk, ISO 13920-BF with Lifeboat Type JYN85 A
Boarding / Embarkation platform - Yard supplied
DWG No :
5
REVISION:

G-500356 PROJECT:
General Arrangement
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1

H WIRE FIXATION H
METHOD

WIRE REEVING
DIAGRAM

G G

AFT WIRE

FWD WIRE

P
P ( 1:10 )
F F

NOTES:
1. IN CASE OF VESSELS CHAMBER DECK FOUNDATIONS ARE YARD SUPPLIED.
2. FOR DIRECTION OF REACTION FORCES SEE LEGEND ON SHEET 1
3. ALL FORCES ARE NOMINAL FORCES WITHOUT ANY FACTORS
E 4. ALL FOUNDATIONS SHALL BE DESIGNED WITH A SAFETY FACTOR 4,5 AT MINIMUM. E

D D

2424 3200 820

200
SHIP SIDE
300

300
10

10

6 600 6 600 6 6
200

1880
C 6 C

1670
10 8000 - HOOK DISTANCE

10
F1
640

5 Reissued for approval MISO ALJI WAGU 24.06.2019

640
F1 4 Changed diameter of wire SOJI ALJI WAGU 17.07.2018
0 Issued for construction ALJI GACA WAGU 04.03.2014
REV DESCRIPTION BY CHECK APPRO DATE
FOOTPRINT ON DECK ( 1:25 )
1950

B 390 B
F3 REVISION HISTORY
10 VIKING Norsafe Life-Saving Equipment Norway AS
P.O Box 115 Tel: +47 37 05 85 00
640
4852 Færvik Fax: +47 37 05 85 01
10
790

NORWAY 24/7 Service: +47 37 05 63 33


Email: viking@viking-life.com
405

This drawing is the sole property of VIKING Norsafe Life-Saving Equipment Norway AS. It
520

must not be submitted to other parties nor used in any manner detrimental to our interests.
It shall not be copied, reproduced, used for manufacturing or sale without the written
1115

consent of VIKING Norsafe Life-Saving Equipment Norway AS. All rights are reserved.
DWG SIZE: SCALE: COPY OF: PART NO. WEIGHT: SHEET:
200 A3 1:20 2 /2
F2 F2
10
CLIENT NO: PROJECTION METHOD
E-110 General Arrangement
200

TOLERANCES:

A
ISO 2768-mk, ISO 13920-BF with Lifeboat Type JYN85 A
1452 555 6 DWG No :
5
REVISION:

G-500356 PROJECT:
General Arrangement
12 11 10 9 8 7 6 5 4 3 2 1

You might also like