Professional Documents
Culture Documents
Activity Record -
Month : Month/Year
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Sat
2 Sun
3 Mon
4 Tue
5 Wed
6 Thu
7 Fri
8 Sat
9 Sun
10 Mon
11 Tue
12 Wed
13 Thu
14 Fri
15 Sat
16 Sun
17 Mon
18 Tue
19 Wed
20 Thu
21 Fri
22 Sat
23 Sun
24 Mon
25 Tue
26 Wed
27 Thu
28 Fri
29 Sat
30 Sun
31 Mon
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : Month/Year
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Tue
2 Wed
3 Thu
4 Fri
5 Sat
6 Sun
7 Mon
8 Tue
9 Wed
10 Thu
11 Fri
12 Sat
13 Sun
14 Mon
15 Tue
16 Wed
17 Thu
18 Fri
19 Sat
20 Sun
21 Mon
22 Tue
23 Wed
24 Thu
25 Fri
26 Sat
27 Sun
28 Mon
29 Tue
30 Wed
31 Thu
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : Sep-17
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Fri
2 Sat
3 Sun
4 Mon
5 Tue
6 Wed
7 Thu
8 Fri
9 Sat
10 Sun
11 Mon
12 Tue
13 Wed
14 Thu
15 Fri
16 Sat
17 Sun
18 Mon
19 Tue
20 Wed
21 Thu
22 Fri
23 Sat
24 Sun
25 Mon
26 Tue
27 Wed
28 Thu
29 Fri
30 Sat
1 Sun
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : October 2017
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Sun
2 Mon
3 Tue
4 Wed
5 Thu
6 Fri
7 Sat
8 Sun
9 Mon
10 Tue
11 Wed
12 Thu
13 Fri
14 Sat
15 Sun
16 Mon
17 Tue
18 Wed
19 Thu
20 Fri
21 Sat
22 Sun
23 Mon
24 Tue
25 Wed
26 Thu
27 Fri
28 Sat
29 Sun
30 Mon
31 Tue
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : November 2017
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Wed
2 Thu
3 Fri
4 Sat
5 Sun
6 Mon
7 Tue
8 Wed
9 Thu
10 Fri
11 Sat
12 Sun
13 Mon
14 Tue
15 Wed
16 Thu
17 Fri
18 Sat
19 Sun
20 Mon
21 Tue
22 Wed
23 Thu
24 Fri
25 Sat
26 Sun
27 Mon
28 Tue
29 Wed
30 Thu
31 Fri
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : Desember 2018
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Sat
2 Sun
4 Tue 08.49 17.25 Memepelajari standar fasilitas minimum depo Wisma Aldiron
6 Thu 08.59 17.25 Mempelajari Depot area dan bagain prioritas di depot LRT jabodebek Wisma Aldiron
7 Fri 08.10 17.25 Mempelajari spesifikasi MRT dan membuat tabel Wisma Aldiron
8 Sat
9 Sun
11 Tue 08.59 17.25 Memepelajari general LAY-OUT DEPO Cibubur Wisma Aldiron
12 Wed 08.59 17.25 Memepelajari posisi penempatan mesin-mesin di depo Wisma Aldiron
13 Thu 08.59 17.25 Memepelajari gambar cad DEPO cipinang Wisma Aldiron
14 Fri 08.59 17.25 Mempelajari gambar cad depo lebak bulus Wisma Aldiron
15 Sat
16 Sun
18 Tue 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron
19 Wed 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron
20 Thu 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron
21 Fri 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron
22 Sat
23 Sun
25 Tue Natal
26 Wed cuti
27 Thu cuti
28 Fri cuti
29 Sat
30 Sun
Total 0.0
Activity Record -
Month : Desember 2017
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Fri
2 Sat
3 Sun
4 Mon
5 Tue
6 Wed
7 Thu
8 Fri
9 Sat
10 Sun
11 Mon
12 Tue
13 Wed
14 Thu
15 Fri
16 Sat
17 Sun
18 Mon
19 Tue
20 Wed
21 Thu
22 Fri
23 Sat
24 Sun
25 Mon
26 Tue
27 Wed
28 Thu
29 Fri
30 Sat
31 Sun
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : Januari 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Mon
2 Tue
3 Wed
4 Thu
5 Fri
6 Sat
7 Sun
8 Mon
9 Tue
10 Wed
11 Thu
12 Fri
13 Sat
14 Sun
15 Mon
16 Tue
17 Wed
18 Thu
19 Fri
20 Sat
21 Sun
22 Mon
23 Tue
24 Wed
25 Thu
26 Fri
27 Sat
28 Sun
29 Mon
30 Tue
31 Wed
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : February 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Thu
2 Fri
3 Sat
4 Sun
5 Mon
6 Tue
7 Wed
8 Thu
9 Fri
10 Sat
11 Sun
12 Mon
13 Tue
14 Wed
15 Thu
16 Fri
17 Sat
18 Sun
19 Mon
20 Tue
21 Wed
22 Thu
23 Fri
24 Sat
25 Sun
26 Mon
27 Tue
28 Wed
1 Thu
2 Fri
3 Sat
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : March 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Thu
2 Fri
3 Sat
4 Sun
5 Mon
6 Tue
7 Wed
8 Thu
9 Fri
10 Sat
11 Sun
12 Mon
13 Tue
14 Wed
15 Thu
16 Fri
17 Sat
18 Sun
19 Mon
20 Tue
21 Wed
22 Thu
23 Fri
24 Sat
25 Sun
26 Mon
27 Tue
28 Wed
29 Thu
30 Fri
31 Sat
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : April 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Sun
2 Mon
3 Tue
4 Wed
5 Thu
6 Fri
7 Sat
8 Sun
9 Mon
10 Tue
11 Wed
12 Thu
13 Fri
14 Sat
15 Sun
16 Mon
17 Tue
18 Wed
19 Thu
20 Fri
21 Sat
22 Sun
23 Mon
24 Tue
25 Wed
26 Thu
27 Fri
28 Sat
29 Sun
30 Mon
1 Tue
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : MEI 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Tue
2 Wed
3 Thu
4 Fri
5 Sat
6 Sun
7 Mon
8 Tue
9 Wed
10 Thu
11 Fri
12 Sat
13 Sun
14 Mon
15 Tue
16 Wed
17 Thu
18 Fri
19 Sat
20 Sun
21 Mon
22 Tue
23 Wed
24 Thu
25 Fri
26 Sat
27 Sun
28 Mon
29 Tue
30 Wed
31 Thu
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : Juni 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Fri
2 Sat
3 Sun
4 Mon
5 Tue
6 Wed
7 Thu
8 Fri
9 Sat
10 Sun
11 Mon
12 Tue
13 Wed
14 Thu
15 Fri
16 Sat
17 Sun
18 Mon
19 Tue
20 Wed
21 Thu
22 Fri
23 Sat
24 Sun
25 Mon
26 Tue
27 Wed
28 Thu
29 Fri
30 Sat
31 Sun
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : Juli 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Sun
2 Mon
3 Tue
4 Wed
5 Thu
6 Fri
7 Sat
8 Sun
9 Mon
10 Tue
11 Wed
12 Thu
13 Fri
14 Sat
15 Sun
16 Mon
17 Tue
18 Wed
19 Thu
20 Fri
21 Sat
22 Sun
23 Mon
24 Tue
25 Wed
26 Thu
27 Fri
28 Sat
29 Sun
30 Mon
31 Tue
Total 0.0
Signature:
Position
Your Name
Jabodebek LRT Project
Activity Record -
Month : Agustus 2018
Assignment No. B 39 Assignment : Depot and workshop machinery engineering
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Wed 08.10 17.25 Mempelajari machinery di depo LRT Jabodebek Wisma Aldiron
2 Thu 08.10 17.25 Mempelajari bagian bagian peralatan di depo LRT Jabodebek Wisma Aldiron
3 Fri 08.10 17.25 Mempelajari design system dan integrator di depo LRT Jabodebek Wisma Aldiron
4 Sat
5 Sun
6 Mon 08.10 17.25 Meeting internal , Mempelajari layout depo LRT Jabodebek Wisma Aldiron
7 Tue 08.10 17.25 Mempelajari dan membandingkan KP 567 dan KP 765 berkaitan dengan depo lrt jabodebek Wisma Aldiron
8 Wed 08.10 17.25 Memepelajari fasilitas operasi dan depo lrt jabodebek Wisma Aldiron
9 Thu 08.10 17.25 Mempelajari bogie press dari data design system and integrator Wisma Aldiron
10 Fri 08.10 17.25 Mempelajari washing mahinery di depo LRT Jabodebek Wisma Aldiron
11 Sat
12 Sun
13 Mon 08.10 17.25 Meeting internal , Mempelajari layout depo LRT Jabodebek Wisma Aldiron
15 Wed 08.10 17.25 Meeting depot progress at AK office cawang ,perkembangan potongan gambar depo LRT Jabodebek Wisma Aldiron
16 Thu 08.10 17.25 translate document depo facility LRT Jabodebek Wisma Aldiron
17 Fri 08.10 17.25 Mempelajari the railway technical website ,fasilitas operasi dan depo LRT Jabodebek bekasi timur Wisma Aldiron
18 Sat
19 Sun
20 Mon 08.10 17.25 Meeting internal ,Mempelajari desain kriteria lrt jabodebek Wisma Aldiron
21 Tue 08.10 17.25 Membuat tabel data systra dan desain kriteria berdasarkan kp 567 dan 765 terkait depo lrt jabodebek Wisma Aldiron
22 Wed 08.46 17.25 Mempelajari dan membandingkan KP 567 dan KP 765 berkaitan dengan depo lrt jabodebek Wisma Aldiron
23 Thu 08.46 17.25 Memepelajari General technical requirements /persyaratan umum teknis depo lrt jabodebek Wisma Aldiron
24 Fri 08.30 17.25 Mempelajari design system dan integrator di depo LRT Jabodebek Wisma Aldiron
25 Sat 08.30 14.25 Memepelajari General technical requirements /persyaratan umum teknis depo lrt jabodebek Wisma Aldiron
26 Sun
27 Mon 08.30 17.25 Meeting internal ,Mempelajari desain kriteria kp 567 dan kp 765 terkait depo LRT jabodedebek Wisma Aldiron
28 Tue 08.30 17.25 Memepelajari fasilitas operasi dan depo lrt jabodebek Wisma Aldiron
29 Wed 08.30 17.25 Mempelajari fungsi under floor wheel lathe dari video Wisma Aldiron
30 Thu 08.30 17.25 Mempelajari bogie press dari data design system and integrator Wisma Aldiron
31 Fri 08.30 17.25 Mempelajari washing mahinery di depo LRT Jabodebek Wisma Aldiron
Total 0.0
Signature: Approved By :
Activity Record -
Month : September 2018
Assignment No. B 39 Assignment : Depot and Workshop Machinery engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Sat
2 Sun
3 Mon 08.10 17.25 Meeting internal , Mempelajari layout depo LRT Jabodebek Wisma Aldiron
4 Tue 08.10 17.25 Mempelajari data teknis Depo LRT Jabodebek Wisma Aldiron
5 Wed 08.40 17.25 Mempelajari fasilitas Depo LRT Jabodebek Wisma Aldiron
6 Thu 08.10 17.25 Mempelajari land aquicision in depo lrt jabodebek Wisma Aldiron
7 Fri 08.10 17.25 Mempelajari data teknis Depo LRT Jabodebek Wisma Aldiron
8 Sat
9 Sun
12 Wed 08.40 17.25 Mempelajari data Flexible pipa material approval 1166-ENG/MNP/N-AK/CS-MSS/V/2018 Wisma Aldiron
13 Thu 09.10 17.25 Mempelajari data Flexible pipa material approval 1370-ENG/MNP/N-AK/CS-MSS/VII/2018 Wisma Aldiron
14 Fri 09.10 17.25 Mempelajri Depo minimalis lrt jabodebek dan layout depo lrt jabodebek Wisma Aldiron
15 Sat
16 Sun
17 Mon 09.00 17.25 Meeting internal , Mempelajari layout depo LRT Jabodebek Wisma Aldiron
18 Tue 09.00 17.25 Mempelajari gambar depot acsec track 1.line 3 depo access alignment Wisma Aldiron
19 Wed 09.00 17.25 Mempelajari desain system integrator dari AK di OCG Wisma Aldiron
21 Fri 08.30 17.30 Mempelajari hasil meeting depot dengan AK di OCG Wisma Aldiron
22 Sat
23 Sun
24 Mon 09.00 17.30 Meeting internal dan mempelajari mom hasil meeting tanggal 20 sep 2018 Wisma Aldiron
25 Tue 08.45 17.30 meeting depo dengan DGR,KAI dan AK Wisma Aldiron
26 Wed 08.50 17.30 Mempelajari MOM hasil meeting depo di OCG Wisma Aldiron
27 Thu 08.55 17.30 Mempelajari peraturan peraturan KP 567 yang di sempurnakan menjadi KP 765 Wisma Aldiron
28 Fri 08.45 18.30 Mempelajari lingkup pekerjaan depo fasility Wisma Aldiron
29 Sat 09.45 Piket 16.30 Membantu membuat laporan kegiatan Mr Katano dan Mr Hasegawa mengenai depo Lrt jabodebek
30 Sun
1 Mon 09.00 Meeting internal di ocg dan mempelajari KP 765 yang berhubungan dengan depo LRT jabodebek Wisma Aldiron
Total 0.0
Signature: Approved By :
Activity Record -
Month : Oktober 2018
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
2 Tue 08.49 17.25 Mempelajari lingkup pekerjaan PT Adhi Karya dan design dan system integrator dari AK Wisma Aldiron
3 Wed 08.40 17.25 diskusi dengan expert depot fasility dan machinery, mempelajari lingkup pekerjaan dan desain kriteria /kp 765 Wisma Aldiron
4 Thu 08.30 17.25 Mempelajari lingkup pekerjaan dan desain kriteria / kp 567 Wisma Aldiron
5 Fri 08.10 17.25 Mempelajari lingkup pekerjaan dan desain kriteria / kp 765 Wisma Aldiron
6 Sat
7 Sun
8 Mon 08.30 17.25 Mempelajari peraturan perkeretaapian yang ada di indonesia Wisma Aldiron
9 Tue 08.45 17.25 Meeting di AK .memperkenalkan expert depot ke PT INKA Wisma Aldiron
10 Wed 09.01 17.30 Mempelajari Lingkup pekerjaan AK untuk Depot beserta peraturan-peraturan pemerintah Wisma Aldiron
11 Thu 08.40 17.30 Membantu mencari peraturan peraturan terkait depo lrt jabodebek Wisma Aldiron
12 Fri 08.15 17.30 Membantu merubah file pdf scan menjadi ms word untuk kp 765 Wisma Aldiron
13 Sat
14 Sun
15 Mon 09.01 17.30 Merubah format PDF ke ms word kp 567 dan kp 756 Wisma Aldiron
16 Tue 09.05 17.30 Mempelajari lingkup pekerjaan depo yg di kerjakan PT Adhi karya Wisma Aldiron
17 Wed 08.19 17.30 Mempelajari missing list yang ada di depo Wisma Aldiron
18 Thu 08.10 17.30 Mempelajari desain dan system integrator terkait depo lrt Jabodebek Wisma Aldiron
19 Fri 08.10 17.30 Meeting depo LRT Jabodebek di OCG-Jopriss Wisma Aldiron
20 Sat
21 Sun
23 Tue 08.10 17.26 Review desain dipo LRT Jabodebek data from PT KAI Wisma Aldiron
24 Wed 08.50 17.30 Mempelajari milestone from PT KAI persiapan penyelenggaraan LRT Jabodebek Wisma Aldiron
25 Thu 08.50 17.30 Mengartikan bahasa mesin mesin yang ada di tabel dari PT KAI Wisma Aldiron
26 Fri 08.50 17.30 Mencari pengertian dari data-data peralatan di depo Wisma Aldiron
27 Sat 08.30 17.30 Mempelajari data spesifikasi depo manggarai Wisma Aldiron
28 Sun
30 Tue 08.50 17.30 review Desain dipo LRT , depo akses track ,milestone persiapan penyelenggaraan LRT jabodebek Wisma Aldiron
Total 0.0
Signature: Approved By :
Activity Record -
Month : November 2018
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Thu 08.49 17.25 Meeting depo LRT Jabodebek di OCG-Jopriss Wisma Aldiron
2 Fri 08.49 17.25 Mempelajari Up date progres pengadaan lahan depo per Oktober 2018 Wisma Aldiron
3 Sat
4 Sun
5 Mon 08.49 17.25 Meeting internal di OCG , Mempelajari Ref No.722 Status dan Solusi Desain Depot Wisma Aldiron
6 Tue 08.59 17.25 Mempelajari Depot area dan bagain prioritas di depot LRT jabodebek Wisma Aldiron
7 Wed 08.10 17.25 Mempelajari spesifikasi MRT dan mebuat tabel Wisma Aldiron
8 Thu 08.05 17.25 Mempelajari spesifikasi MRT dan mebuat tabel Wisma Aldiron
9 Fri 08.00 17.25 Mempelajari spesifikasi MRT dan mebuat tabel Wisma Aldiron
10 Sat
11 Sun
14 Wed 08.59 17.25 Menyalin data spesifikasi MRT ke ms word Wisma Aldiron
15 Thu 08.59 17.25 Mempelajari ,Menyalin data spesifikasi MRT ke ms word Wisma Aldiron
16 Fri 08.59 17.25 Mempelajari ,Menyalin data spesifikasi MRT ke ms word Wisma Aldiron
18 Sun
20 Tue 08.59 17.25 Mempelajari ,Menyalin data spesifikasi MRT ke ms word Wisma Aldiron
21 Wed 08.59 17.25 Mempelajari ,Menyalin data spesifikasi MRT ke ms word Wisma Aldiron
22 Thu 08.59 17.25 Mempelajari ,Menyalin data spesifikasi MRT ke ms word Wisma Aldiron
23 Fri 08.59 17.25 Mempelajari spesifikasi depot yang terletak di cibubur Wisma Aldiron
24 Sat
25 Sun
27 Tue 08.59 17.25 Mempelajari layot depot cibubur beserta peralatan mesin yang ada Wisma Aldiron
28 Wed 08.59 17.25 Mempelajari layot depot cibubur beserta peralatan mesin yang ada Wisma Aldiron
29 Thu 08.59 17.25 Mempelajari layout depo di wilayah cibubur Wisma Aldiron
30 Fri 08.59 17.25 Mempelajari spesifikasi depo dan melihat mempelajari perbandingan dengan MRT Wisma Aldiron
31 Sat
Total 0.0
Activity Record -
Month : Desember 2018
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Sat
2 Sun
4 Tue 08.49 17.25 Memepelajari standar fasilitas minimum depo Wisma Aldiron
6 Thu 08.59 17.25 Mempelajari Depot area dan bagain prioritas di depot LRT jabodebek Wisma Aldiron
7 Fri 08.10 17.25 Mempelajari spesifikasi MRT dan membuat tabel Wisma Aldiron
8 Sat
9 Sun
11 Tue 08.59 17.25 Memepelajari general LAY-OUT DEPO Cibubur Wisma Aldiron
12 Wed 08.59 17.25 Memepelajari posisi penempatan mesin-mesin di depo Wisma Aldiron
13 Thu 08.59 17.25 Memepelajari gambar cad DEPO cipinang Wisma Aldiron
14 Fri 08.59 17.25 Mempelajari gambar cad depo lebak bulus Wisma Aldiron
15 Sat
16 Sun
18 Tue 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron
19 Wed 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron
20 Thu 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron
21 Fri 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron
22 Sat
23 Sun
25 Tue Natal
26 Wed cuti
27 Thu cuti
28 Fri cuti
29 Sat
30 Sun
Total 0.0
Activity Record -
Month : Januari 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Tue
2 Wed
3 Thu 08.00 17.25 Membuat laporan depo LRT Jabodebek Wisma Aldiron
4 Fri 08.00 17.25 Membuat laporan depo LRT Jabodebek Wisma Aldiron
5 Sat 08.00 17.25 Membuat laporan depo LRT Jabodebek Wisma Aldiron
6 Sun
8 Tue 08.00 17.25 Membuat laporan depo LRT Jabodebek Wisma Aldiron
9 Wed 08.19 17.25 Mempelajari layout depo LRT jabodebek di bekasi timur Wisma Aldiron
10 Thu 08.00 17.25 Mempelajari tabel -tabel alat di depo LRT dari Mr katano Wisma Aldiron
11 Fri 08.10 17.25 Mencari perbandingan stinger yg di pakai di heavy maintenance dan light maintenance untuk depo LRT Wisma Aldiron
12 Sat
13 Sun
15 Tue 08.10 17.25 Mencari data tentang stinger system dari internet untuk kebutuhan depo LRT Jabodebek Wisma Aldiron
16 Wed 08.10 17.25 Memebuat Tabel Perbandingan Mesin yang ada light maintenance Wisma Aldiron
17 Thu 08.10 16.30 Mencari data peralatan light maintenance di depo dari internet Wisma Aldiron
18 Fri 08.10 16.30 Meeting dengan tim depo ak dan presentasi Mr Katano dengan DGR Wisma Aldiron
19 Sat
20 Sun
22 Tue 08.10 17.25 Mencari definisi beserta spesifikasinya bogie test bench dari internet Wisma Aldiron
23 Wed 08.10 17.25 Mencari definisi beserta spesifikasinya bogie test bench dari internet Wisma Aldiron
24 Thu 08.10 17.25 Mencari definisi beserta spesifikasinya bogie test bench dari internet Wisma Aldiron
25 Fri 08.10 17.25 Membantu Mr.katano dalam membuat laporan perbandingan mesin di depo LRTJABODEBEK Wisma Aldiron
26 Sat
27 Sun
29 Tue 08.10 17.25 Membantu membuat laporan presentasi Mr.katano tentang pembebanan dan perbandingan mesin di depo LRT JABODEBEK Wisma Aldiron
30 Wed 08.10 18.50 Mencari perbandingan mesin di depo dan menyandingkan dengan data dari PT.KAI Wisma Aldiron
31 Thu 08.10 17.25 Mencari perbandingan mesin di depo dan menyandingkan dengan data dari PT.KAI Wisma Aldiron
Total 0.0
Activity Record -
Month : Februari 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Fri 08.10 17.25 Mempelajari tugas tambahan dari Mr.Katano untuk mencari data alat-alat perawatan di depo Wisma Aldiron
2 Sat
3 Sun
5 Tue 08.10 17.25 Mencari nilai tegangan dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron
6 Wed 08.10 17.25 Mencari nilai tekanan udara dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron
7 Thu 08.10 17.25 Mencari nilai temperatur dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron
8 Fri 08.10 14.25 Mencari nilai ukuran tanki dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron
9 Sat 09.10 17.25 Mencari referensi perhitungan forklift load sebagai bahan perbandingan Wisma Aldiron
10 Sun
12 Tue 08.12 17.25 Menganalisa perhitungan forklift load berdasarkan hasil perhitungan Mr.katano Wisma Aldiron
13 Wed 08.15 17.25 Mencari referensi perhitungan forklift load dari internet Wisma Aldiron
14 Thu 08.17 17.25 Mempelajari perhitungan forklift load berdasarkan perhitungan Mr.katano Wisma Aldiron
15 Fri 08.10 17.25 Meeting dengan komatsu indonesia mengenai forklift FH 50-2 Wisma Aldiron
16 Sat
17 Sun
19 Tue 08.17 17.25 Membuat Laporan mingguan berdasarkan pekerjaan depo LRT Jabodebek Wisma Aldiron
20 Wed 08.14 17.25 Mencari Perbandingan perhitungan forklift load dari internet Wisma Aldiron
21 Thu 08.15 17.25 Mempelajari Floor load in the Heavy & Light Maintenance Berdasarkan MM No: 0007/MM-DEP/LRT-JKT/I/19 Wisma Aldiron
22 Fri 08.10 17.25 Mempelajari depot data information berdasarkan Ref.No 0789/STS/ENG/CVENG/OCG/1X/18 Wisma Aldiron
23 Sat
24 Sun
26 Tue 08.15 17.25 Mempelajari Additional Depot Data Berdasarkan 0886-R02-STS-ENG-CVENG-OCG-XII-18 Wisma Aldiron
27 Wed 08.17 17.25 Mencari perbandingan mesin di depo dan menyandingkan dengan data dari PT.KAI Wisma Aldiron
28 Thu 08.12 17.25 Memepelajari posisi penempatan mesin-mesin di depo Wisma Aldiron
Total 0.0
Activity Record -
Month : Maret 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Fri 08.10 17.25 Mempelajari tugas tambahan dari Mr.Katano untuk mencari data alat-alat perawatan di depo Wisma Aldiron
2 Sat
3 Sun
5 Tue 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron
6 Wed 08.10 17.25 Mencari nilai tekanan udara dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron
8 Fri 08.10 14.25 Mencari nilai ukuran tanki dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron
10 Sun
14 Thu 08.17 17.25 Mempelajari perhitungan forklift load berdasarkan perhitungan Mr.katano Wisma Aldiron
15 Fri 08.10 17.25 Meeting dengan komatsu indonesia mengenai forklift FH 50-2 Wisma Aldiron
16 Sat 08.10 13.25 Mempelajari perhitungan forklift load hasil penghitungan dari komatsu indonesia
17 Sun
19 Tue 08.17 17.25 Membuat Laporan mingguan berdasarkan pekerjaan depo LRT Jabodebek Wisma Aldiron
20 Wed 08.14 17.25 Mencari Perbandingan perhitungan forklift load dari internet Wisma Aldiron
21 Thu 08.15 17.25 Mempelajari Floor load in the Heavy & Light Maintenance Berdasarkan MM No: 0007/MM-DEP/LRT-JKT/I/19 Wisma Aldiron
22 Fri 08.10 17.25 Mempelajari depot data information berdasarkan Ref.No 0789/STS/ENG/CVENG/OCG/1X/18 Wisma Aldiron
23 Sat
24 Sun
26 Tue 08.15 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron
27 Wed 08.17 17.25 Mencari perbandingan mesin di depo dan menyandingkan dengan data dari PT.KAI Wisma Aldiron
28 Thu 08.12 17.25 Membuat tabel perbandingan perhitungan load forklift untuk kebutuhan alat angkat di depo LRT Wisma Aldiron
29 Fri 08.12 17.25 Mempelajari tabel perbandingan forklift load untuk kebutuhan alat angkat di depo LRT Wisma Aldiron
31 Sun
Total 0.0
Activity Record -
Month : April 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
2 Tue 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron
3 Wed 08.10 17.25 Mempelajari MOM Ref .MM No :0007/MM-DEP/LRT-JKT/1/19 . Floor load in the heavy & light maintenance Wisma Aldiron
4 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0007/MM-DEP/LRT-JKT/1/19 . Progress Design of Access to depot & depot Wisma Aldiron
5 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Rail Guide Lifting Jack Wisma Aldiron
7 Sun
9 Tue 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Bogie Turn Table Wisma Aldiron
10 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron
11 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
12 Fri 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron
14 Sun
16 Tue 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. 3 Alternatives test track Wisma Aldiron
17 Wed 08.10 17.25 Mempelajari Location and length of Test Track in Depot Ref MM No. : 0030/MM/-ATM/LRT-JKT/I/19 Wisma Aldiron
Mempelajari New Track Alignment including new position of Washing in Depot Ref MM No. : 0030/MM/-
18 Thu 08.11 17.25 ATM/LRT-JKT/I/19 Wisma Aldiron
19 Fri 08.17 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron
21 Sun
23 Tue 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
24 Wed 08.10 17.25 Sakit,kaki luka sobek kena besi Wisma Aldiron
25 Thu 08.25 17.25 Sakit,kaki luka sobek kena besi Wisma Aldiron
26 Fri 08.15 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron
28 Sun
29 Mon 08.12 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
30 Tue 08.12 17.25 Mempelajari Heavy Maintenance Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
Total 0.0
Activity Record -
Month : Mei 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Wed 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron
2 Thu 08.10 17.25 Mempelajari MOM Ref .MM No :0007/MM-DEP/LRT-JKT/1/19 . Floor load in the heavy & light maintenance Wisma Aldiron
3 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0007/MM-DEP/LRT-JKT/1/19 . Progress Design of Access to depot & depot Wisma Aldiron
4 Sat
5 Sun
7 Tue 09.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Rail Guide Lifting Jack Wisma Aldiron
8 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Bogie Turn Table Wisma Aldiron
9 Thu 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron
10 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron
12 Sun
14 Tue 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron
15 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
16 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. 3 Alternatives test track Wisma Aldiron
17 Fri 08.10 17.25 Mempelajari Location and length of Test Track in Depot Ref MM No. : 0030/MM/-ATM/LRT-JKT/I/19 Wisma Aldiron
18 Sat
19 Sun
Mempelajari New Track Alignment including new position of Washing in Depot Ref MM No. : 0030/MM/-
21 Tue 08.10 17.25 ATM/LRT-JKT/I/19 Wisma Aldiron
22 Wed 08.10 17.25 Mempelajari area Heavy Maintenance dan light maintenance Ref MM depot.rabu 4 Juli 18.tempat PT Adhi Karya Wisma Aldiron
23 Thu 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
24 Fri 08.10 17.25 Mempelajari area Heavy Maintenance dan light maintenance Ref MM depot.rabu 4 Juli 18.tempat PT Adhi Karya Wisma Aldiron
25 Sat
26 Sun
Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
28 Tue 08.12 17.25 18.tempat PT Adhi Karya Wisma Aldiron
29 Wed 08.12 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
30 Thu 08.12 17.25 Mempelajari Heavy Maintenance Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
Total 0.0
Activity Record -
Month : Juni 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Sat
2 Sun
5 Wed LIBUR
6 Thu LIBUR
8 Sat
9 Sun
13 Thu 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
14 Fri 08.10 17.25 Mempelajari area Heavy Maintenance dan light maintenance Ref MM depot.rabu 4 Juli 18.tempat PT Adhi Karya Wisma Aldiron
15 Sat
16 Sun
18 Tue 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Bogie Turn Table Wisma Aldiron
19 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron
20 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
21 Fri 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
22 Sat
23 Sun
Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
25 Tue 08.10 17.25 18.tempat PT Adhi Karya Wisma Aldiron
26 Wed 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
27 Thu 08.12 17.25 Mempelajari Heavy Maintenance Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
28 Fri 08.12 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
30 Sun
Total 0.0
Activity Record -
Month : Juli 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
2 Tue 08.10 17.25 18.tempat PT Adhi Karya Wisma Aldiron
3 Wed 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
4 Thu 08.10 17.25 Mempelajari Heavy Maintenance Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
5 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
6 Sat
7 Sun
9 Tue 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Bogie Turn Table Wisma Aldiron
10 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron
11 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
12 Fri 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
14 Sun
16 Tue 08.10 17.25 Mempelajari area Heavy Maintenance dan light maintenance Ref MM depot.rabu 4 Juli 18.tempat PT Adhi Karya Wisma Aldiron
18 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Bogie Turn Table Wisma Aldiron
19 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron
20 Sat
21 Sun
23 Tue 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
24 Wed 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
25 Thu 08.10 17.25 18.tempat PT Adhi Karya Wisma Aldiron
26 Fri 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
27 Sat
28 Sun
29 Mon 08.12 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
30 Tue 08.12 17.25 Mempelajari MOM MM No.KG.104/VII.1.DIV.LRT-2019.Pembahasan Depo LRT Jabodebek Wisma Aldiron
31 Wed 08.12 17.25 Mempelajari MOM No.KG.104/I/7/DIV.LRT-2018.Rencana Pembngunan Perkantoran KAI Divisi LRT di Dipo Bekasi Timur Wisma Aldiron
Total 0.0
Activity Record -
Month : Agustus 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Thu 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
2 Fri 08.10 17.25 18.tempat PT Adhi Karya Wisma Aldiron
3 Sat 08.10 17.25 Mempelajari Basic Design Ref MM No:0002 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron
4 Sun
6 Tue 08.10 17.25 Mempelajari Basic Design Ref MM No:0003 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron
7 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron
8 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
9 Fri 08.10 17.25 Mempelajari Layout Depot Ref MM No. : KG.104/V/7/DIV.LRT-2018 Wisma Aldiron
11 Sun
13 Tue 08.10 17.25 Mempelajari DED of Depo Ref MM No:0004 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron
14 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
15 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0007/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron
16 Fri 08.10 17.25 Mempelajari DED depo Ref MM No.: KG/104/VII/1/DIV.LRT-2019 Wisma Aldiron
18 Sun
20 Tue 08.10 17.25 Mempelajari DED of Depo Ref MM No:0005 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron
21 Wed 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
22 Thu 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
23 Fri 08.10 17.25 Mempelajari Pembangunan Perkantoran KAI di lokasi Depo Bekasi Timur Ref MM no. :KG.104/I/7/DIV.LRT-2018 Wisma Aldiron
24 Sat
25 Sun
27 Tue 08.10 17.25 Mempelajari Washing Machine in Depot LRTjabodebek Ref MM No :0008/MM-DEP/LRT-JKT/II/19 Wisma Aldiron
28 Wed 08.10 17.25 Mempelajari Heavy and light Maintenance Machinery ref MM No. :0030/MM-ATM/LRT-JKT/I/19 Wisma Aldiron
29 Thu 08.12 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
30 Fri 08.12 17.25 Mempelajari MOM MM No.KG.104/VII.1.DIV.LRT-2019.Pembahasan Depo LRT Jabodebek Wisma Aldiron
31 Sat
Total 0.0
Activity Record -
Month : September 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours
1 Sun
3 Tue 08.10 17.25 Mempelajari Basic Design Ref MM No:0002 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron
4 Wed 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron
5 Thu 08.10 17.25 Mempelajari Difference in Maintenance Principle Ref MM No:0002 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron
6 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron
7 Sat
8 Sun
Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
10 Tue 08.10 17.25 18.tempat PT Adhi Karya Wisma Aldiron
11 Wed 08.10 17.25 Mempelajari Layout Depot Ref MM No. : KG.104/V/7/DIV.LRT-2018 Wisma Aldiron
12 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0007/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron
13 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron
14 Sat
15 Sun
17 Tue 08.10 17.25 Mempelajari DED depo Ref MM No.: KG/104/VII/1/DIV.LRT-2019 Wisma Aldiron
18 Wed 08.10 17.25 Mempelajari Test Run Ref MM No:0002 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron
19 Thu 08.10 17.25 Mempelajari cleaning of Rolling Stock Ref MM No:0002 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron
20 Fri 08.10 17.25 Mempelajari Washing Machine in Depot Ref MM No: 0008/MM-DEP/LRT-JKT/II/19 Wisma Aldiron
21 Sat 09.10 PIKET 17.25 Mempelajari Backup Genset di Area Depot Ref MM No: 0008/MM-DEP/LRT-JKT/II/19 Wisma Aldiron
22 Sun
24 Tue 08.10 17.25 Mempelajari Pembangunan Perkantoran KAI di lokasi Depo Bekasi Timur Ref MM no. :KG.104/I/7/DIV.LRT-2018 Wisma Aldiron
25 Wed 08.10 17.25 Mempelajari Access to Washing Machine Area Ref MM No: 0008/MM-DEP/LRT-JKT/II/19 Wisma Aldiron
26 Thu 08.10 17.25 Mempelajari DED Depo Ref MM N0. : KG/104/VII/1/DIV.LRT-2019 Wisma Aldiron
27 Fri 08.10 17.25 Mempelajari Area Heavy maintenance Ref.MM No : Ref MM.No : KG.104/V/7/DIV. LRT- 2018 Wisma Aldiron
29 Sun
30 Mon 08.12 17.25 Mempelajari MOM MM No.KG.104/VII.1.DIV.LRT-2019.Pembahasan Depo LRT Jabodebek Wisma Aldiron
Total 0.0
Draf wr 103
Ref MM No. : 0030/MM/-ATM/LRT-JKT/I/19
Location and length of Test Track in Depot
1.
KAI has presented the revision location and length of test track based on the concept such as
1) Minimum 500m length
2) Access-ablity of WashingMachine (WM)
3) Train into Depot can enter without passing WM, and
4) Access-ability from 2 routes to Stabling Building.
AK,DGR and OCG Jopriss accepted the concept the new location and length of test track in Depot by maximum 650m.AK sha
Draf wr 104
1. New Track Alignment including new position of Washing in Depot
KAI decided to decrease the maximum length of washing machine by 35 m due to space constraint such as not enough distance by st
Based on proposal by KAI,AK will review the position and angle of Test track so that the effective length of Test track can be kept as l
System team of AK will manage the railway system issues based on the new alignment.
OCG jopriss and AK follow the suggestion to change the alignment based on the KAI’s concept.
Based on KAI suggestion,AK will discuss with Ak Depot consultant.The result will be accepted by DGR.
Ref MM No. : 0030/MM/-ATM/LRT-JKT/I/19
Draf wr 108
Test Track
1. To perform test under GoA3 still need confirmation from signalling team (AK and OCG)
Heavy Maintenance
2. OCG,KAI and Ak have agreed the workshop layout in heavy maintenance area
3. OCG,KAI and AK have agreed flow chart to design floor load
4. KAI planned 1 set underfloor lifting system and 1 set rail guided lifting jack in Heavy maintenance area.
Ref MM : KG.104/XII/4/DIV.LRT-2018
Draf wr 105
Heavy Maintenance
1. KAI already send list facility/machinery to AK and OCG.
2. For Bekasi Timur Depot Detail Design by AK,Ak can make a detail design with approved assumtion from OCG
Ref MM : KG.104/XII/4/DIV.LRT-2018
Draf wr 106
Bekasi Timur Depot
Washing machine and turnout arrange alternative
Initial Bekasi Timur depot track design from AK consist 2 tracks from mainline to stabling .Systra has propo
KAI needs review from AK and OCG if the turnout and washing machine reposition refer to the initial conc
Ref MM : KG.104/XII/4/DIV.LRT-2018
y maximum 650m.AK shall review in detail for about the length test track within one week.
ved assumtion from OCG about the machinery weight and size.AK already sent this assumtion to OCG.OCG will give recommendation to Ak at the and of January 2019.
tabling .Systra has proposed the change of depot access with only 1 track from mainline to depot,this will cause a problem.