Jabodebek LRT Project

Activity Record -
Month : Month/Year
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Sat

2 Sun

3 Mon

4 Tue

5 Wed

6 Thu

7 Fri

8 Sat

9 Sun

10 Mon

11 Tue

12 Wed

13 Thu

14 Fri

15 Sat

16 Sun

17 Mon

18 Tue

19 Wed

20 Thu

21 Fri

22 Sat

23 Sun

24 Mon

25 Tue

26 Wed

27 Thu

28 Fri

29 Sat

30 Sun

31 Mon

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : Month/Year
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Tue

2 Wed

3 Thu

4 Fri

5 Sat

6 Sun

7 Mon

8 Tue

9 Wed

10 Thu

11 Fri

12 Sat

13 Sun

14 Mon

15 Tue

16 Wed

17 Thu

18 Fri

19 Sat

20 Sun

21 Mon

22 Tue

23 Wed

24 Thu

25 Fri

26 Sat

27 Sun

28 Mon

29 Tue

30 Wed

31 Thu

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : Sep-17
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Fri

2 Sat

3 Sun

4 Mon

5 Tue

6 Wed

7 Thu

8 Fri

9 Sat

10 Sun

11 Mon

12 Tue

13 Wed

14 Thu

15 Fri

16 Sat

17 Sun

18 Mon

19 Tue

20 Wed

21 Thu

22 Fri

23 Sat

24 Sun

25 Mon

26 Tue

27 Wed

28 Thu

29 Fri

30 Sat

1 Sun

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : October 2017
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Sun

2 Mon

3 Tue

4 Wed

5 Thu

6 Fri

7 Sat

8 Sun

9 Mon

10 Tue

11 Wed

12 Thu

13 Fri

14 Sat

15 Sun

16 Mon

17 Tue

18 Wed

19 Thu

20 Fri

21 Sat

22 Sun

23 Mon

24 Tue

25 Wed

26 Thu

27 Fri

28 Sat

29 Sun

30 Mon

31 Tue

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : November 2017
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Wed

2 Thu

3 Fri

4 Sat

5 Sun

6 Mon

7 Tue

8 Wed

9 Thu

10 Fri

11 Sat

12 Sun

13 Mon

14 Tue

15 Wed

16 Thu

17 Fri

18 Sat

19 Sun

20 Mon

21 Tue

22 Wed

23 Thu

24 Fri

25 Sat

26 Sun

27 Mon

28 Tue

29 Wed

30 Thu

31 Fri

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : Desember 2018
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Sat

2 Sun

3 Mon 08.49 17.25 Meeting internal di OCG Wisma Aldiron

4 Tue 08.49 17.25 Memepelajari standar fasilitas minimum depo Wisma Aldiron

5 Wed 08.49 17.25 Mempelajari general layout Wisma Aldiron

6 Thu 08.59 17.25 Mempelajari Depot area dan bagain prioritas di depot LRT jabodebek Wisma Aldiron

7 Fri 08.10 17.25 Mempelajari spesifikasi MRT dan membuat tabel Wisma Aldiron

8 Sat

9 Sun

10 Mon 08.59 17.25 Meeting internal di OCG Wisma Aldiron

11 Tue 08.59 17.25 Memepelajari general LAY-OUT DEPO Cibubur Wisma Aldiron

12 Wed 08.59 17.25 Memepelajari posisi penempatan mesin-mesin di depo Wisma Aldiron

13 Thu 08.59 17.25 Memepelajari gambar cad DEPO cipinang Wisma Aldiron

14 Fri 08.59 17.25 Mempelajari gambar cad depo lebak bulus Wisma Aldiron

15 Sat

16 Sun

17 Mon 08.59 17.25 Meeting internal di OCG Wisma Aldiron

18 Tue 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron

19 Wed 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron

20 Thu 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron

21 Fri 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron

22 Sat

23 Sun

24 Mon cuti bersama

25 Tue Natal

26 Wed cuti

27 Thu cuti

28 Fri cuti

29 Sat

30 Sun

31 Mon cuti bersama

Total 0.0

Signature: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


Your Name Helmy Budisusanto Your Name Mr Katano
Jabodebek LRT Project

Activity Record -
Month : Desember 2017
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Fri

2 Sat

3 Sun

4 Mon

5 Tue

6 Wed

7 Thu

8 Fri

9 Sat

10 Sun

11 Mon

12 Tue

13 Wed

14 Thu

15 Fri

16 Sat

17 Sun

18 Mon

19 Tue

20 Wed

21 Thu

22 Fri

23 Sat

24 Sun

25 Mon

26 Tue

27 Wed

28 Thu

29 Fri

30 Sat

31 Sun

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : Januari 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Mon

2 Tue

3 Wed

4 Thu

5 Fri

6 Sat

7 Sun

8 Mon

9 Tue

10 Wed

11 Thu

12 Fri

13 Sat

14 Sun

15 Mon

16 Tue

17 Wed

18 Thu

19 Fri

20 Sat

21 Sun

22 Mon

23 Tue

24 Wed

25 Thu

26 Fri

27 Sat

28 Sun

29 Mon

30 Tue

31 Wed

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : February 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Thu

2 Fri

3 Sat

4 Sun

5 Mon

6 Tue

7 Wed

8 Thu

9 Fri

10 Sat

11 Sun

12 Mon

13 Tue

14 Wed

15 Thu

16 Fri

17 Sat

18 Sun

19 Mon

20 Tue

21 Wed

22 Thu

23 Fri

24 Sat

25 Sun

26 Mon

27 Tue

28 Wed

1 Thu

2 Fri

3 Sat

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : March 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Thu

2 Fri

3 Sat

4 Sun

5 Mon

6 Tue

7 Wed

8 Thu

9 Fri

10 Sat

11 Sun

12 Mon

13 Tue

14 Wed

15 Thu

16 Fri

17 Sat

18 Sun

19 Mon

20 Tue

21 Wed

22 Thu

23 Fri

24 Sat

25 Sun

26 Mon

27 Tue

28 Wed

29 Thu

30 Fri

31 Sat

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : April 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Sun

2 Mon

3 Tue

4 Wed

5 Thu

6 Fri

7 Sat

8 Sun

9 Mon

10 Tue

11 Wed

12 Thu

13 Fri

14 Sat

15 Sun

16 Mon

17 Tue

18 Wed

19 Thu

20 Fri

21 Sat

22 Sun

23 Mon

24 Tue

25 Wed

26 Thu

27 Fri

28 Sat

29 Sun

30 Mon

1 Tue

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : MEI 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Tue

2 Wed

3 Thu

4 Fri

5 Sat

6 Sun

7 Mon

8 Tue

9 Wed

10 Thu

11 Fri

12 Sat

13 Sun

14 Mon

15 Tue

16 Wed

17 Thu

18 Fri

19 Sat

20 Sun

21 Mon

22 Tue

23 Wed

24 Thu

25 Fri

26 Sat

27 Sun

28 Mon

29 Tue

30 Wed

31 Thu

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : Juni 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Fri

2 Sat

3 Sun

4 Mon

5 Tue

6 Wed

7 Thu

8 Fri

9 Sat

10 Sun

11 Mon

12 Tue

13 Wed

14 Thu

15 Fri

16 Sat

17 Sun

18 Mon

19 Tue

20 Wed

21 Thu

22 Fri

23 Sat

24 Sun

25 Mon

26 Tue

27 Wed

28 Thu

29 Fri

30 Sat

31 Sun

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : Juli 2018
Assignment No. Assignment :
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Sun

2 Mon

3 Tue

4 Wed

5 Thu

6 Fri

7 Sat

8 Sun

9 Mon

10 Tue

11 Wed

12 Thu

13 Fri

14 Sat

15 Sun

16 Mon

17 Tue

18 Wed

19 Thu

20 Fri

21 Sat

22 Sun

23 Mon

24 Tue

25 Wed

26 Thu

27 Fri

28 Sat

29 Sun

30 Mon

31 Tue

Total 0.0

Signature:

Position
Your Name
Jabodebek LRT Project

Activity Record -
Month : Agustus 2018
Assignment No. B 39 Assignment : Depot and workshop machinery engineering
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Wed 08.10 17.25 Mempelajari machinery di depo LRT Jabodebek Wisma Aldiron

2 Thu 08.10 17.25 Mempelajari bagian bagian peralatan di depo LRT Jabodebek Wisma Aldiron

3 Fri 08.10 17.25 Mempelajari design system dan integrator di depo LRT Jabodebek Wisma Aldiron

4 Sat

5 Sun

6 Mon 08.10 17.25 Meeting internal , Mempelajari layout depo LRT Jabodebek Wisma Aldiron

7 Tue 08.10 17.25 Mempelajari dan membandingkan KP 567 dan KP 765 berkaitan dengan depo lrt jabodebek Wisma Aldiron

8 Wed 08.10 17.25 Memepelajari fasilitas operasi dan depo lrt jabodebek Wisma Aldiron

9 Thu 08.10 17.25 Mempelajari bogie press dari data design system and integrator Wisma Aldiron

10 Fri 08.10 17.25 Mempelajari washing mahinery di depo LRT Jabodebek Wisma Aldiron

11 Sat

12 Sun

13 Mon 08.10 17.25 Meeting internal , Mempelajari layout depo LRT Jabodebek Wisma Aldiron

14 Tue 08.10 17.25 Translate document depo facility Wisma Aldiron

15 Wed 08.10 17.25 Meeting depot progress at AK office cawang ,perkembangan potongan gambar depo LRT Jabodebek Wisma Aldiron

16 Thu 08.10 17.25 translate document depo facility LRT Jabodebek Wisma Aldiron

17 Fri 08.10 17.25 Mempelajari the railway technical website ,fasilitas operasi dan depo LRT Jabodebek bekasi timur Wisma Aldiron

18 Sat

19 Sun

20 Mon 08.10 17.25 Meeting internal ,Mempelajari desain kriteria lrt jabodebek Wisma Aldiron

21 Tue 08.10 17.25 Membuat tabel data systra dan desain kriteria berdasarkan kp 567 dan 765 terkait depo lrt jabodebek Wisma Aldiron

22 Wed 08.46 17.25 Mempelajari dan membandingkan KP 567 dan KP 765 berkaitan dengan depo lrt jabodebek Wisma Aldiron

23 Thu 08.46 17.25 Memepelajari General technical requirements /persyaratan umum teknis depo lrt jabodebek Wisma Aldiron

24 Fri 08.30 17.25 Mempelajari design system dan integrator di depo LRT Jabodebek Wisma Aldiron

25 Sat 08.30 14.25 Memepelajari General technical requirements /persyaratan umum teknis depo lrt jabodebek Wisma Aldiron

26 Sun

27 Mon 08.30 17.25 Meeting internal ,Mempelajari desain kriteria kp 567 dan kp 765 terkait depo LRT jabodedebek Wisma Aldiron

28 Tue 08.30 17.25 Memepelajari fasilitas operasi dan depo lrt jabodebek Wisma Aldiron

29 Wed 08.30 17.25 Mempelajari fungsi under floor wheel lathe dari video Wisma Aldiron

30 Thu 08.30 17.25 Mempelajari bogie press dari data design system and integrator Wisma Aldiron

31 Fri 08.30 17.25 Mempelajari washing mahinery di depo LRT Jabodebek Wisma Aldiron

Total 0.0

Signature: Approved By :

Position Depot and workshop machinery engineering Position


Your Name Helmy Budisusanto Your Name
Jabodebek LRT Project

Activity Record -
Month : September 2018
Assignment No. B 39 Assignment : Depot and Workshop Machinery engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Sat

2 Sun

3 Mon 08.10 17.25 Meeting internal , Mempelajari layout depo LRT Jabodebek Wisma Aldiron

4 Tue 08.10 17.25 Mempelajari data teknis Depo LRT Jabodebek Wisma Aldiron

5 Wed 08.40 17.25 Mempelajari fasilitas Depo LRT Jabodebek Wisma Aldiron

6 Thu 08.10 17.25 Mempelajari land aquicision in depo lrt jabodebek Wisma Aldiron

7 Fri 08.10 17.25 Mempelajari data teknis Depo LRT Jabodebek Wisma Aldiron

8 Sat

9 Sun

10 Mon Cuti Wisma Aldiron

11 Tue Libur Tahun baru islam Wisma Aldiron

12 Wed 08.40 17.25 Mempelajari data Flexible pipa material approval 1166-ENG/MNP/N-AK/CS-MSS/V/2018 Wisma Aldiron

13 Thu 09.10 17.25 Mempelajari data Flexible pipa material approval 1370-ENG/MNP/N-AK/CS-MSS/VII/2018 Wisma Aldiron

14 Fri 09.10 17.25 Mempelajri Depo minimalis lrt jabodebek dan layout depo lrt jabodebek Wisma Aldiron

15 Sat

16 Sun

17 Mon 09.00 17.25 Meeting internal , Mempelajari layout depo LRT Jabodebek Wisma Aldiron

18 Tue 09.00 17.25 Mempelajari gambar depot acsec track 1.line 3 depo access alignment Wisma Aldiron

19 Wed 09.00 17.25 Mempelajari desain system integrator dari AK di OCG Wisma Aldiron

20 Thu 09.00 17.30 Meeting depot dengan AK di OCG Wisma Aldiron

21 Fri 08.30 17.30 Mempelajari hasil meeting depot dengan AK di OCG Wisma Aldiron

22 Sat

23 Sun

24 Mon 09.00 17.30 Meeting internal dan mempelajari mom hasil meeting tanggal 20 sep 2018 Wisma Aldiron

25 Tue 08.45 17.30 meeting depo dengan DGR,KAI dan AK Wisma Aldiron

26 Wed 08.50 17.30 Mempelajari MOM hasil meeting depo di OCG Wisma Aldiron

27 Thu 08.55 17.30 Mempelajari peraturan peraturan KP 567 yang di sempurnakan menjadi KP 765 Wisma Aldiron

28 Fri 08.45 18.30 Mempelajari lingkup pekerjaan depo fasility Wisma Aldiron

29 Sat 09.45 Piket 16.30 Membantu membuat laporan kegiatan Mr Katano dan Mr Hasegawa mengenai depo Lrt jabodebek

30 Sun

1 Mon 09.00 Meeting internal di ocg dan mempelajari KP 765 yang berhubungan dengan depo LRT jabodebek Wisma Aldiron

Total 0.0

Signature: Approved By :

Position Depot and workshop machinery engineering Position


Your Name Helmy Budisusanto Your Name
Jabodebek LRT Project

Activity Record -
Month : Oktober 2018
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

2 Tue 08.49 17.25 Mempelajari lingkup pekerjaan PT Adhi Karya dan design dan system integrator dari AK Wisma Aldiron

3 Wed 08.40 17.25 diskusi dengan expert depot fasility dan machinery, mempelajari lingkup pekerjaan dan desain kriteria /kp 765 Wisma Aldiron

4 Thu 08.30 17.25 Mempelajari lingkup pekerjaan dan desain kriteria / kp 567 Wisma Aldiron

5 Fri 08.10 17.25 Mempelajari lingkup pekerjaan dan desain kriteria / kp 765 Wisma Aldiron

6 Sat

7 Sun

8 Mon 08.30 17.25 Mempelajari peraturan perkeretaapian yang ada di indonesia Wisma Aldiron

9 Tue 08.45 17.25 Meeting di AK .memperkenalkan expert depot ke PT INKA Wisma Aldiron

10 Wed 09.01 17.30 Mempelajari Lingkup pekerjaan AK untuk Depot beserta peraturan-peraturan pemerintah Wisma Aldiron

11 Thu 08.40 17.30 Membantu mencari peraturan peraturan terkait depo lrt jabodebek Wisma Aldiron

12 Fri 08.15 17.30 Membantu merubah file pdf scan menjadi ms word untuk kp 765 Wisma Aldiron

13 Sat

14 Sun

15 Mon 09.01 17.30 Merubah format PDF ke ms word kp 567 dan kp 756 Wisma Aldiron

16 Tue 09.05 17.30 Mempelajari lingkup pekerjaan depo yg di kerjakan PT Adhi karya Wisma Aldiron

17 Wed 08.19 17.30 Mempelajari missing list yang ada di depo Wisma Aldiron

18 Thu 08.10 17.30 Mempelajari desain dan system integrator terkait depo lrt Jabodebek Wisma Aldiron

19 Fri 08.10 17.30 Meeting depo LRT Jabodebek di OCG-Jopriss Wisma Aldiron

20 Sat

21 Sun

22 Mon 08.10 17.30 Meeting internal di OCG-Jopriss Wisma Aldiron

23 Tue 08.10 17.26 Review desain dipo LRT Jabodebek data from PT KAI Wisma Aldiron

24 Wed 08.50 17.30 Mempelajari milestone from PT KAI persiapan penyelenggaraan LRT Jabodebek Wisma Aldiron

25 Thu 08.50 17.30 Mengartikan bahasa mesin mesin yang ada di tabel dari PT KAI Wisma Aldiron

26 Fri 08.50 17.30 Mencari pengertian dari data-data peralatan di depo Wisma Aldiron

27 Sat 08.30 17.30 Mempelajari data spesifikasi depo manggarai Wisma Aldiron

28 Sun

29 Mon 08.10 17.30 Internal meeting at ocg-jopriss Wisma Aldiron

30 Tue 08.50 17.30 review Desain dipo LRT , depo akses track ,milestone persiapan penyelenggaraan LRT jabodebek Wisma Aldiron

31 Wed Wisma Aldiron

Total 0.0

Signature: Approved By :

Position Depot and workshop machinery engineering Position


Your Name Helmy Budisusanto Your Name
Jabodebek LRT Project

Activity Record -
Month : November 2018
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Thu 08.49 17.25 Meeting depo LRT Jabodebek di OCG-Jopriss Wisma Aldiron

2 Fri 08.49 17.25 Mempelajari Up date progres pengadaan lahan depo per Oktober 2018 Wisma Aldiron

3 Sat

4 Sun

5 Mon 08.49 17.25 Meeting internal di OCG , Mempelajari Ref No.722 Status dan Solusi Desain Depot Wisma Aldiron

6 Tue 08.59 17.25 Mempelajari Depot area dan bagain prioritas di depot LRT jabodebek Wisma Aldiron

7 Wed 08.10 17.25 Mempelajari spesifikasi MRT dan mebuat tabel Wisma Aldiron

8 Thu 08.05 17.25 Mempelajari spesifikasi MRT dan mebuat tabel Wisma Aldiron

9 Fri 08.00 17.25 Mempelajari spesifikasi MRT dan mebuat tabel Wisma Aldiron

10 Sat

11 Sun

12 Mon 08.59 17.25 Meeting internal di OCG Wisma Aldiron

13 Tue 08.59 17.25 Membuat tabel spesifikasi MRT Wisma Aldiron

14 Wed 08.59 17.25 Menyalin data spesifikasi MRT ke ms word Wisma Aldiron

15 Thu 08.59 17.25 Mempelajari ,Menyalin data spesifikasi MRT ke ms word Wisma Aldiron

16 Fri 08.59 17.25 Mempelajari ,Menyalin data spesifikasi MRT ke ms word Wisma Aldiron

17 Sat 13.25 PIKET Wisma Aldiron

18 Sun

19 Mon 08.59 17.25 Meeting internal di OCG Wisma Aldiron

20 Tue 08.59 17.25 Mempelajari ,Menyalin data spesifikasi MRT ke ms word Wisma Aldiron

21 Wed 08.59 17.25 Mempelajari ,Menyalin data spesifikasi MRT ke ms word Wisma Aldiron

22 Thu 08.59 17.25 Mempelajari ,Menyalin data spesifikasi MRT ke ms word Wisma Aldiron

23 Fri 08.59 17.25 Mempelajari spesifikasi depot yang terletak di cibubur Wisma Aldiron

24 Sat

25 Sun

26 Mon 08.59 17.25 Meeting internal di OCG Wisma Aldiron

27 Tue 08.59 17.25 Mempelajari layot depot cibubur beserta peralatan mesin yang ada Wisma Aldiron

28 Wed 08.59 17.25 Mempelajari layot depot cibubur beserta peralatan mesin yang ada Wisma Aldiron

29 Thu 08.59 17.25 Mempelajari layout depo di wilayah cibubur Wisma Aldiron

30 Fri 08.59 17.25 Mempelajari spesifikasi depo dan melihat mempelajari perbandingan dengan MRT Wisma Aldiron

31 Sat

Total 0.0

Signature: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


Your Name Helmy Budisusanto Your Name Mr Katano
Jabodebek LRT Project

Activity Record -
Month : Desember 2018
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Sat

2 Sun

3 Mon 08.49 17.25 Meeting internal di OCG Wisma Aldiron

4 Tue 08.49 17.25 Memepelajari standar fasilitas minimum depo Wisma Aldiron

5 Wed 08.49 17.25 Mempelajari general layout Wisma Aldiron

6 Thu 08.59 17.25 Mempelajari Depot area dan bagain prioritas di depot LRT jabodebek Wisma Aldiron

7 Fri 08.10 17.25 Mempelajari spesifikasi MRT dan membuat tabel Wisma Aldiron

8 Sat

9 Sun

10 Mon 08.59 17.25 Meeting internal di OCG Wisma Aldiron

11 Tue 08.59 17.25 Memepelajari general LAY-OUT DEPO Cibubur Wisma Aldiron

12 Wed 08.59 17.25 Memepelajari posisi penempatan mesin-mesin di depo Wisma Aldiron

13 Thu 08.59 17.25 Memepelajari gambar cad DEPO cipinang Wisma Aldiron

14 Fri 08.59 17.25 Mempelajari gambar cad depo lebak bulus Wisma Aldiron

15 Sat

16 Sun

17 Mon 08.59 17.25 Meeting internal di OCG Wisma Aldiron

18 Tue 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron

19 Wed 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron

20 Thu 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron

21 Fri 08.59 17.25 Membuat tabel mesin-mesin depo beserta gambar dan dimensi mesin-mesin di depo lrt jabodebek di bekasi timur Wisma Aldiron

22 Sat

23 Sun

24 Mon cuti bersama

25 Tue Natal

26 Wed cuti

27 Thu cuti

28 Fri cuti

29 Sat

30 Sun

31 Mon cuti bersama

Total 0.0

Signature: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


Your Name Helmy Budisusanto Your Name Mr Katano
Jabodebek LRT Project

Activity Record -
Month : Januari 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Tue

2 Wed

3 Thu 08.00 17.25 Membuat laporan depo LRT Jabodebek Wisma Aldiron

4 Fri 08.00 17.25 Membuat laporan depo LRT Jabodebek Wisma Aldiron

5 Sat 08.00 17.25 Membuat laporan depo LRT Jabodebek Wisma Aldiron

6 Sun

7 Mon 08.00 17.25 Meeting internal di OCG Wisma Aldiron

8 Tue 08.00 17.25 Membuat laporan depo LRT Jabodebek Wisma Aldiron

9 Wed 08.19 17.25 Mempelajari layout depo LRT jabodebek di bekasi timur Wisma Aldiron

10 Thu 08.00 17.25 Mempelajari tabel -tabel alat di depo LRT dari Mr katano Wisma Aldiron

11 Fri 08.10 17.25 Mencari perbandingan stinger yg di pakai di heavy maintenance dan light maintenance untuk depo LRT Wisma Aldiron

12 Sat

13 Sun

14 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

15 Tue 08.10 17.25 Mencari data tentang stinger system dari internet untuk kebutuhan depo LRT Jabodebek Wisma Aldiron

16 Wed 08.10 17.25 Memebuat Tabel Perbandingan Mesin yang ada light maintenance Wisma Aldiron

17 Thu 08.10 16.30 Mencari data peralatan light maintenance di depo dari internet Wisma Aldiron

18 Fri 08.10 16.30 Meeting dengan tim depo ak dan presentasi Mr Katano dengan DGR Wisma Aldiron

19 Sat

20 Sun

21 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

22 Tue 08.10 17.25 Mencari definisi beserta spesifikasinya bogie test bench dari internet Wisma Aldiron

23 Wed 08.10 17.25 Mencari definisi beserta spesifikasinya bogie test bench dari internet Wisma Aldiron

24 Thu 08.10 17.25 Mencari definisi beserta spesifikasinya bogie test bench dari internet Wisma Aldiron

25 Fri 08.10 17.25 Membantu Mr.katano dalam membuat laporan perbandingan mesin di depo LRTJABODEBEK Wisma Aldiron

26 Sat

27 Sun

28 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

29 Tue 08.10 17.25 Membantu membuat laporan presentasi Mr.katano tentang pembebanan dan perbandingan mesin di depo LRT JABODEBEK Wisma Aldiron

30 Wed 08.10 18.50 Mencari perbandingan mesin di depo dan menyandingkan dengan data dari PT.KAI Wisma Aldiron

31 Thu 08.10 17.25 Mencari perbandingan mesin di depo dan menyandingkan dengan data dari PT.KAI Wisma Aldiron

Total 0.0

Signature / 署名: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


デポや工房機械工学 Your Name Mr. O.Katano
Your Name Ir.Helmy Budisusanto
Jabodebek LRT Project

Activity Record -
Month : Februari 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Fri 08.10 17.25 Mempelajari tugas tambahan dari Mr.Katano untuk mencari data alat-alat perawatan di depo Wisma Aldiron

2 Sat

3 Sun

4 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

5 Tue 08.10 17.25 Mencari nilai tegangan dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron

6 Wed 08.10 17.25 Mencari nilai tekanan udara dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron

7 Thu 08.10 17.25 Mencari nilai temperatur dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron

8 Fri 08.10 14.25 Mencari nilai ukuran tanki dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron

9 Sat 09.10 17.25 Mencari referensi perhitungan forklift load sebagai bahan perbandingan Wisma Aldiron

10 Sun

11 Mon 08.20 17.25 Meeting internal di OCG Wisma Aldiron

12 Tue 08.12 17.25 Menganalisa perhitungan forklift load berdasarkan hasil perhitungan Mr.katano Wisma Aldiron

13 Wed 08.15 17.25 Mencari referensi perhitungan forklift load dari internet Wisma Aldiron

14 Thu 08.17 17.25 Mempelajari perhitungan forklift load berdasarkan perhitungan Mr.katano Wisma Aldiron

15 Fri 08.10 17.25 Meeting dengan komatsu indonesia mengenai forklift FH 50-2 Wisma Aldiron

16 Sat

17 Sun

18 Mon 08.11 17.25 Meeting internal di OCG Wisma Aldiron

19 Tue 08.17 17.25 Membuat Laporan mingguan berdasarkan pekerjaan depo LRT Jabodebek Wisma Aldiron

20 Wed 08.14 17.25 Mencari Perbandingan perhitungan forklift load dari internet Wisma Aldiron

21 Thu 08.15 17.25 Mempelajari Floor load in the Heavy & Light Maintenance Berdasarkan MM No: 0007/MM-DEP/LRT-JKT/I/19 Wisma Aldiron

22 Fri 08.10 17.25 Mempelajari depot data information berdasarkan Ref.No 0789/STS/ENG/CVENG/OCG/1X/18 Wisma Aldiron

23 Sat

24 Sun

25 Mon 08.25 17.25 Meeting internal di OCG Wisma Aldiron

26 Tue 08.15 17.25 Mempelajari Additional Depot Data Berdasarkan 0886-R02-STS-ENG-CVENG-OCG-XII-18 Wisma Aldiron

27 Wed 08.17 17.25 Mencari perbandingan mesin di depo dan menyandingkan dengan data dari PT.KAI Wisma Aldiron

28 Thu 08.12 17.25 Memepelajari posisi penempatan mesin-mesin di depo Wisma Aldiron

Total 0.0

Signature / 署名: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


デポや工房機械工学 Your Name Mr. O.Katano
Your Name Ir.Helmy Budisusanto
Jabodebek LRT Project

Activity Record -
Month : Maret 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Fri 08.10 17.25 Mempelajari tugas tambahan dari Mr.Katano untuk mencari data alat-alat perawatan di depo Wisma Aldiron

2 Sat

3 Sun

4 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

5 Tue 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron

6 Wed 08.10 17.25 Mencari nilai tekanan udara dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron

7 Thu Libur tanggal Merah hari raya nyepi Wisma Aldiron

8 Fri 08.10 14.25 Mencari nilai ukuran tanki dari On floor wheel lathe,axle lathe ,lathe hole axle,wheelset pressing machine Wisma Aldiron

9 Sat Wisma Aldiron

10 Sun

11 Mon 08.20 17.25 Meeting internal di OCG Wisma Aldiron

12 Tue Izin sakit Wisma Aldiron

13 Wed 17.25 Izin sakit Wisma Aldiron

14 Thu 08.17 17.25 Mempelajari perhitungan forklift load berdasarkan perhitungan Mr.katano Wisma Aldiron

15 Fri 08.10 17.25 Meeting dengan komatsu indonesia mengenai forklift FH 50-2 Wisma Aldiron

16 Sat 08.10 13.25 Mempelajari perhitungan forklift load hasil penghitungan dari komatsu indonesia

17 Sun

18 Mon 08.11 17.25 Meeting internal di OCG Wisma Aldiron

19 Tue 08.17 17.25 Membuat Laporan mingguan berdasarkan pekerjaan depo LRT Jabodebek Wisma Aldiron

20 Wed 08.14 17.25 Mencari Perbandingan perhitungan forklift load dari internet Wisma Aldiron

21 Thu 08.15 17.25 Mempelajari Floor load in the Heavy & Light Maintenance Berdasarkan MM No: 0007/MM-DEP/LRT-JKT/I/19 Wisma Aldiron

22 Fri 08.10 17.25 Mempelajari depot data information berdasarkan Ref.No 0789/STS/ENG/CVENG/OCG/1X/18 Wisma Aldiron

23 Sat

24 Sun

25 Mon 08.25 17.25 Meeting internal di OCG Wisma Aldiron

26 Tue 08.15 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron

27 Wed 08.17 17.25 Mencari perbandingan mesin di depo dan menyandingkan dengan data dari PT.KAI Wisma Aldiron

28 Thu 08.12 17.25 Membuat tabel perbandingan perhitungan load forklift untuk kebutuhan alat angkat di depo LRT Wisma Aldiron

29 Fri 08.12 17.25 Mempelajari tabel perbandingan forklift load untuk kebutuhan alat angkat di depo LRT Wisma Aldiron

30 Sat Wisma Aldiron

31 Sun

Total 0.0

Signature / 署名: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


デポや工房機械工学 Your Name Mr. O.Katano
Your Name Ir.Helmy Budisusanto
Jabodebek LRT Project

Activity Record -
Month : April 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

2 Tue 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron

3 Wed 08.10 17.25 Mempelajari MOM Ref .MM No :0007/MM-DEP/LRT-JKT/1/19 . Floor load in the heavy & light maintenance Wisma Aldiron

4 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0007/MM-DEP/LRT-JKT/1/19 . Progress Design of Access to depot & depot Wisma Aldiron

5 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Rail Guide Lifting Jack Wisma Aldiron

6 Sat 09.10 Piket 14.25 Wisma Aldiron

7 Sun

8 Mon 08.10 17.00 Meeting internal di OCG Wisma Aldiron

9 Tue 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Bogie Turn Table Wisma Aldiron

10 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron

11 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

12 Fri 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron

13 Sat Wisma Aldiron

14 Sun

15 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

16 Tue 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. 3 Alternatives test track Wisma Aldiron

17 Wed 08.10 17.25 Mempelajari Location and length of Test Track in Depot Ref MM No. : 0030/MM/-ATM/LRT-JKT/I/19 Wisma Aldiron

Mempelajari New Track Alignment including new position of Washing in Depot Ref MM No. : 0030/MM/-
18 Thu 08.11 17.25 ATM/LRT-JKT/I/19 Wisma Aldiron

19 Fri 08.17 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron

20 Sat Wisma Aldiron

21 Sun

22 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

23 Tue 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

24 Wed 08.10 17.25 Sakit,kaki luka sobek kena besi Wisma Aldiron

25 Thu 08.25 17.25 Sakit,kaki luka sobek kena besi Wisma Aldiron

26 Fri 08.15 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron

27 Sat Wisma Aldiron

28 Sun

29 Mon 08.12 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

30 Tue 08.12 17.25 Mempelajari Heavy Maintenance Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

Total 0.0

Signature / 署名: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


デポや工房機械工学 Your Name Mr. O.Katano
Your Name Ir.Helmy Budisusanto
Jabodebek LRT Project

Activity Record -
Month : Mei 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Wed 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron

2 Thu 08.10 17.25 Mempelajari MOM Ref .MM No :0007/MM-DEP/LRT-JKT/1/19 . Floor load in the heavy & light maintenance Wisma Aldiron

3 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0007/MM-DEP/LRT-JKT/1/19 . Progress Design of Access to depot & depot Wisma Aldiron

4 Sat

5 Sun

6 Mon 09.10 17.25 Meeting internal di OCG Wisma Aldiron

7 Tue 09.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Rail Guide Lifting Jack Wisma Aldiron

8 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Bogie Turn Table Wisma Aldiron

9 Thu 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron

10 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron

11 Sat 09.10 14.25 PIKET Wisma Aldiron

12 Sun

13 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

14 Tue 08.10 17.25 Membuat weekly report depo and workshop machinery Wisma Aldiron

15 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

16 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. 3 Alternatives test track Wisma Aldiron

17 Fri 08.10 17.25 Mempelajari Location and length of Test Track in Depot Ref MM No. : 0030/MM/-ATM/LRT-JKT/I/19 Wisma Aldiron

18 Sat

19 Sun

20 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

Mempelajari New Track Alignment including new position of Washing in Depot Ref MM No. : 0030/MM/-
21 Tue 08.10 17.25 ATM/LRT-JKT/I/19 Wisma Aldiron

22 Wed 08.10 17.25 Mempelajari area Heavy Maintenance dan light maintenance Ref MM depot.rabu 4 Juli 18.tempat PT Adhi Karya Wisma Aldiron

23 Thu 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

24 Fri 08.10 17.25 Mempelajari area Heavy Maintenance dan light maintenance Ref MM depot.rabu 4 Juli 18.tempat PT Adhi Karya Wisma Aldiron

25 Sat

26 Sun

27 Mon 08.12 17.25 Meeting internal di OCG Wisma Aldiron

Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
28 Tue 08.12 17.25 18.tempat PT Adhi Karya Wisma Aldiron

29 Wed 08.12 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

30 Thu 08.12 17.25 Mempelajari Heavy Maintenance Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

31 Fri 08.12 17.25 Cuti Wisma Aldiron

Total 0.0

Signature / 署名: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


デポや工房機械工学 Your Name Mr. O.Katano
Your Name Ir.Helmy Budisusanto
Jabodebek LRT Project

Activity Record -
Month : Juni 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Sat

2 Sun

3 Mon CUTI BERSAMA

4 Tue CUTI BERSAMA

5 Wed LIBUR

6 Thu LIBUR

7 Fri CUTI BERSAMA

8 Sat

9 Sun

10 Mon 08.10 17.25 CUTI

11 Tue 08.10 17.25 CUTI

12 Wed 08.10 17.25 CUTI

13 Thu 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

14 Fri 08.10 17.25 Mempelajari area Heavy Maintenance dan light maintenance Ref MM depot.rabu 4 Juli 18.tempat PT Adhi Karya Wisma Aldiron

15 Sat

16 Sun

17 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

18 Tue 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Bogie Turn Table Wisma Aldiron

19 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron

20 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

21 Fri 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

22 Sat

23 Sun

24 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
25 Tue 08.10 17.25 18.tempat PT Adhi Karya Wisma Aldiron

26 Wed 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

27 Thu 08.12 17.25 Mempelajari Heavy Maintenance Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

28 Fri 08.12 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

29 Sat Wisma Aldiron

30 Sun

Total 0.0

Signature / 署名: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


デポや工房機械工学 Your Name Mr. O.Katano
Your Name Ir.Helmy Budisusanto
Jabodebek LRT Project

Activity Record -
Month : Juli 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
2 Tue 08.10 17.25 18.tempat PT Adhi Karya Wisma Aldiron

3 Wed 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

4 Thu 08.10 17.25 Mempelajari Heavy Maintenance Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

5 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

6 Sat

7 Sun

8 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

9 Tue 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Bogie Turn Table Wisma Aldiron

10 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron

11 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

12 Fri 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

13 Sat 08.10 17.25 PIKET Wisma Aldiron

14 Sun

15 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

16 Tue 08.10 17.25 Mempelajari area Heavy Maintenance dan light maintenance Ref MM depot.rabu 4 Juli 18.tempat PT Adhi Karya Wisma Aldiron

17 Wed 08.10 17.25 Meeting internal di OCG Wisma Aldiron

18 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Bogie Turn Table Wisma Aldiron

19 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron

20 Sat

21 Sun

22 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

23 Tue 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

24 Wed 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
25 Thu 08.10 17.25 18.tempat PT Adhi Karya Wisma Aldiron

26 Fri 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

27 Sat

28 Sun

29 Mon 08.12 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

30 Tue 08.12 17.25 Mempelajari MOM MM No.KG.104/VII.1.DIV.LRT-2019.Pembahasan Depo LRT Jabodebek Wisma Aldiron

31 Wed 08.12 17.25 Mempelajari MOM No.KG.104/I/7/DIV.LRT-2018.Rencana Pembngunan Perkantoran KAI Divisi LRT di Dipo Bekasi Timur Wisma Aldiron

Total 0.0

Signature / 署名: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


デポや工房機械工学 Your Name Mr. O.Katano
Your Name Ir.Helmy Budisusanto
Jabodebek LRT Project

Activity Record -
Month : Agustus 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Thu 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
2 Fri 08.10 17.25 18.tempat PT Adhi Karya Wisma Aldiron

3 Sat 08.10 17.25 Mempelajari Basic Design Ref MM No:0002 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron

4 Sun

5 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

6 Tue 08.10 17.25 Mempelajari Basic Design Ref MM No:0003 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron

7 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron

8 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

9 Fri 08.10 17.25 Mempelajari Layout Depot Ref MM No. : KG.104/V/7/DIV.LRT-2018 Wisma Aldiron

10 Sat Wisma Aldiron

11 Sun

12 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

13 Tue 08.10 17.25 Mempelajari DED of Depo Ref MM No:0004 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron

14 Wed 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

15 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0007/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron

16 Fri 08.10 17.25 Mempelajari DED depo Ref MM No.: KG/104/VII/1/DIV.LRT-2019 Wisma Aldiron

17 Sat Wisma Aldiron

18 Sun

19 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

20 Tue 08.10 17.25 Mempelajari DED of Depo Ref MM No:0005 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron

21 Wed 08.10 17.25 Mempelajari Test Track di depo LRT Jabodebek Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

22 Thu 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

23 Fri 08.10 17.25 Mempelajari Pembangunan Perkantoran KAI di lokasi Depo Bekasi Timur Ref MM no. :KG.104/I/7/DIV.LRT-2018 Wisma Aldiron

24 Sat

25 Sun

26 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

27 Tue 08.10 17.25 Mempelajari Washing Machine in Depot LRTjabodebek Ref MM No :0008/MM-DEP/LRT-JKT/II/19 Wisma Aldiron

28 Wed 08.10 17.25 Mempelajari Heavy and light Maintenance Machinery ref MM No. :0030/MM-ATM/LRT-JKT/I/19 Wisma Aldiron

29 Thu 08.12 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

30 Fri 08.12 17.25 Mempelajari MOM MM No.KG.104/VII.1.DIV.LRT-2019.Pembahasan Depo LRT Jabodebek Wisma Aldiron

31 Sat

Total 0.0

Signature / 署名: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


デポや工房機械工学 Your Name Mr. O.Katano
Your Name Ir.Helmy Budisusanto
Jabodebek LRT Project

Activity Record -
Month : September 2019
Assignment No. B 39 Assignment : Depot and Workshop Machinery Engineer
Mobilized Date : Demobilization Schedule :
Work Hours
Day Week Description of Work Working Location
From To Hours

1 Sun

2 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

3 Tue 08.10 17.25 Mempelajari Basic Design Ref MM No:0002 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron

4 Wed 08.10 17.25 Mempelajari Bekasi Timur Depot Ref MM : KG.104/XII/4/DIV.LRT-2018 Wisma Aldiron

5 Thu 08.10 17.25 Mempelajari Difference in Maintenance Principle Ref MM No:0002 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron

6 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron

7 Sat

8 Sun

9 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

Mempelajari Kebutuhan Minimum Operasi Depot yaitu Under floor wheel lathe.Ref MM depot.rabu 4 Juli
10 Tue 08.10 17.25 18.tempat PT Adhi Karya Wisma Aldiron

11 Wed 08.10 17.25 Mempelajari Layout Depot Ref MM No. : KG.104/V/7/DIV.LRT-2018 Wisma Aldiron

12 Thu 08.10 17.25 Mempelajari MOM Ref.MM No :0007/MM-DEP/LRT-JKT/XII/18 . Depo Design Wisma Aldiron

13 Fri 08.10 17.25 Mempelajari MOM Ref.MM No :0006/MM-DEP/LRT-JKT/XII/18. Placement of machinery Wisma Aldiron

14 Sat

15 Sun

16 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

17 Tue 08.10 17.25 Mempelajari DED depo Ref MM No.: KG/104/VII/1/DIV.LRT-2019 Wisma Aldiron

18 Wed 08.10 17.25 Mempelajari Test Run Ref MM No:0002 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron

19 Thu 08.10 17.25 Mempelajari cleaning of Rolling Stock Ref MM No:0002 /MM-DEP/LRT-JKT/IX/18 Wisma Aldiron

20 Fri 08.10 17.25 Mempelajari Washing Machine in Depot Ref MM No: 0008/MM-DEP/LRT-JKT/II/19 Wisma Aldiron

21 Sat 09.10 PIKET 17.25 Mempelajari Backup Genset di Area Depot Ref MM No: 0008/MM-DEP/LRT-JKT/II/19 Wisma Aldiron

22 Sun

23 Mon 08.10 17.25 Meeting internal di OCG Wisma Aldiron

24 Tue 08.10 17.25 Mempelajari Pembangunan Perkantoran KAI di lokasi Depo Bekasi Timur Ref MM no. :KG.104/I/7/DIV.LRT-2018 Wisma Aldiron

25 Wed 08.10 17.25 Mempelajari Access to Washing Machine Area Ref MM No: 0008/MM-DEP/LRT-JKT/II/19 Wisma Aldiron

26 Thu 08.10 17.25 Mempelajari DED Depo Ref MM N0. : KG/104/VII/1/DIV.LRT-2019 Wisma Aldiron

27 Fri 08.10 17.25 Mempelajari Area Heavy maintenance Ref.MM No : Ref MM.No : KG.104/V/7/DIV. LRT- 2018 Wisma Aldiron

28 Sat Wisma Aldiron

29 Sun

30 Mon 08.12 17.25 Mempelajari MOM MM No.KG.104/VII.1.DIV.LRT-2019.Pembahasan Depo LRT Jabodebek Wisma Aldiron

Total 0.0

Signature / 署名: Approved By / 承認者:

Position Depot and workshop machinery engineering Position


デポや工房機械工学 Your Name Mr. O.Katano
Your Name Ir.Helmy Budisusanto
6287883928383

Draf wr 103
Ref MM No. : 0030/MM/-ATM/LRT-JKT/I/19
Location and length of Test Track in Depot
1.
KAI has presented the revision location and length of test track based on the concept such as
1) Minimum 500m length
2) Access-ablity of WashingMachine (WM)
3) Train into Depot can enter without passing WM, and
4) Access-ability from 2 routes to Stabling Building.
AK,DGR and OCG Jopriss accepted the concept the new location and length of test track in Depot by maximum 650m.AK sha

Draf wr 104
1. New Track Alignment including new position of Washing in Depot
KAI decided to decrease the maximum length of washing machine by 35 m due to space constraint such as not enough distance by st
Based on proposal by KAI,AK will review the position and angle of Test track so that the effective length of Test track can be kept as l
System team of AK will manage the railway system issues based on the new alignment.
OCG jopriss and AK follow the suggestion to change the alignment based on the KAI’s concept.
Based on KAI suggestion,AK will discuss with Ak Depot consultant.The result will be accepted by DGR.
Ref MM No. : 0030/MM/-ATM/LRT-JKT/I/19

Draf wr 108
Test Track
1. To perform test under GoA3 still need confirmation from signalling team (AK and OCG)
Heavy Maintenance
2. OCG,KAI and Ak have agreed the workshop layout in heavy maintenance area
3. OCG,KAI and AK have agreed flow chart to design floor load
4. KAI planned 1 set underfloor lifting system and 1 set rail guided lifting jack in Heavy maintenance area.
Ref MM : KG.104/XII/4/DIV.LRT-2018

Draf wr 105
Heavy Maintenance
1. KAI already send list facility/machinery to AK and OCG.
2. For Bekasi Timur Depot Detail Design by AK,Ak can make a detail design with approved assumtion from OCG
Ref MM : KG.104/XII/4/DIV.LRT-2018

Draf wr 106
Bekasi Timur Depot
Washing machine and turnout arrange alternative
Initial Bekasi Timur depot track design from AK consist 2 tracks from mainline to stabling .Systra has propo

KAI needs review from AK and OCG if the turnout and washing machine reposition refer to the initial conc

Ref MM : KG.104/XII/4/DIV.LRT-2018
y maximum 650m.AK shall review in detail for about the length test track within one week.

ot enough distance by starting point of gradient curve of access track.


est track can be kept as long as possible within one week.
ntenance area.

ved assumtion from OCG about the machinery weight and size.AK already sent this assumtion to OCG.OCG will give recommendation to Ak at the and of January 2019.

tabling .Systra has proposed the change of depot access with only 1 track from mainline to depot,this will cause a problem.

n refer to the initial concept of access to depot.