You are on page 1of 75

District Cooling Code

District Cooling Regulatory Framework


Date of issuance: July 2019

[“DoE/PD/C01/001”]
Preface
The District Cooling (DC) Code has been developed to govern the design and operation of
District Cooling Systems in the Emirate of Abu Dhabi.

The Code requires certain mandatory design and operational practices by DC Providers, DC
Retailers and Customers, as defined herein.

The Code is divided into the following Chapters:

1. Introduction that describes the legal basis, purpose and scope of the Code;

2. Definitions, Abbreviations & Units that describes certain words and abbreviations
used in the Code, and explains the units of measurement used in the Code;

3. District Cooling General Conditions that describe provisions of general application


and include requirements and arrangements not otherwise referred to in the Code,
including the role and constitution of the District Cooling Code Review Panel;

4. District Cooling Planning Code that provides planning procedures and related data
requirements, and establishes the Security Standards to be met in the planning of
District Cooling Systems;

5. District Cooling Systems Design Code that provides requirements for the design
of District Cooling Systems;

6. District Cooling Connection and District Cooling-Ready Buildings Code that


describes design requirements for connection with District Cooling Systems and
establishes minimum design and operational criteria for building cooling systems
connected to District Cooling Systems; and

7. District Cooling Operating Code that addresses forecasting of cooling loads,


outage planning, operational liaison and contingency planning.

In addition, this document includes the following Appendices:

 Appendix A – Key Performance Indicators (KPIs) that establishes minimum required


performance levels relative to reliability, energy efficiency, water management,
metering, environmental, health and safety compliance, and customer satisfaction;

 Appendix B – DC Provider Annual Information Submission that shows the data


required to be submitted by DC Providers relative to KPIs and for other purposes;

 Appendix C – DC Retailer Annual Information Submission that shows the data


required to be submitted by DC Retailers relative to KPIs and for other purposes;

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 1
 Appendix D -- Key Health, Safety and Environmental Documents that lists key
OSHAD Codes of Practice and EAD requirements potentially relevant to DC Systems;
and

 Appendix E -- District Cooling Connection and Metering Points that describes and
provides schematic diagrams for different types of DC connections.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 2
Contents
1. Introduction........................................................................................................... 7
1.1 Citation ........................................................................................................ 7
1.2 Commencement .......................................................................................... 7
1.3 Purpose ....................................................................................................... 7
1.4 Scope .......................................................................................................... 7
1.5 Codes, Standards and References .............................................................. 7
2. Definitions, Abbreviations & Units .................................................................... 11
2.1 Interpretation ............................................................................................. 11
2.2 Definitions ................................................................................................. 11
2.3 Abbreviations ............................................................................................ 19
2.4 Units and Unit Conversions ....................................................................... 21
3. District Cooling General Conditions ................................................................. 23
3.1 Introduction ............................................................................................... 23
3.2 Scope ........................................................................................................ 23
3.3 Key Performance Indicators ...................................................................... 23
3.4 Unforeseen Circumstance ......................................................................... 23
3.5 Code Exemptions ...................................................................................... 23
3.6 District Cooling Code Review Panel .......................................................... 24
3.7 Miscellaneous ........................................................................................... 24
3.8 Duty of Good Faith and Standard of Conduct ............................................ 24
4. District Cooling Planning Code ......................................................................... 25
4.1 Introduction ............................................................................................... 25
4.2 Objective ................................................................................................... 25
4.3 Scope ........................................................................................................ 25
4.4 Planning Procedures and Data Transfer .................................................... 25
4.5 Network Capacity Planning ....................................................................... 27
4.6 Environmental Compliance Planning ......................................................... 27
4.7 Security Standards .................................................................................... 27
5. District Cooling Systems Design Code ............................................................. 29
5.1 Introduction ............................................................................................... 29
5.2 Objectives ................................................................................................. 29
5.3 Scope ........................................................................................................ 29
5.4 General Requirements .............................................................................. 29
5.5 Human Health and Environmental Safety .................................................. 29
5.6 Water Management ................................................................................... 31
5.7 DC Plant .................................................................................................... 34
5.8 Distribution Pipelines ................................................................................. 36

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 3
5.9 DC System Commissioning and Handover ................................................ 38
6. District Cooling Connection and District Cooling-Ready Buildings Code ..... 40
6.1 Introduction ............................................................................................... 40
6.2 Objectives ................................................................................................. 40
6.3 Scope ........................................................................................................ 40
6.4 Connection ................................................................................................ 40
6.5 DC-Ready Building Systems ..................................................................... 41
6.6 Site-Related Conditions ............................................................................. 43
7. District Cooling Operating Code ....................................................................... 45
7.1 Introduction ............................................................................................... 45
7.2 Objective ................................................................................................... 45
7.3 Scope ........................................................................................................ 45
7.4 Cooling Load Forecasts including Outage Planning .................................. 45
7.5 Water Treatment and Environmental Compliance ..................................... 46
7.6 Operational Liaison ................................................................................... 47
7.7 Contingency Planning and Procedures ...................................................... 48
8. Appendix A -- Key Performance Indicators ...................................................... 50
8.1 Introduction ............................................................................................... 50
8.2 Objectives ................................................................................................. 50
8.3 Scope ........................................................................................................ 50
8.4 Compliance Requirement .......................................................................... 50
8.5 Compliance Reporting ............................................................................... 50
8.6 Reliability ................................................................................................... 53
8.7 Energy Efficiency....................................................................................... 54
8.8 Water Management ................................................................................... 57
8.9 Metering .................................................................................................... 58
8.10 Customer Complaints and Dispute Resolution .......................................... 59
9. Appendix B – DC Provider Annual Information Submission ........................... 60
9.1 General Information ................................................................................... 60
9.2 DC Provider Key Performance Indicator Data ........................................... 60
9.3 DC Provider Additional Data for Each DC System ..................................... 63
9.4 DC Provider Additional Data for Each DC Plant......................................... 63
9.5 Maintenance Logs (attachments) .............................................................. 64
9.6 Statements of Compliance (attachments) .................................................. 64
10. Appendix C – DC Retailer Annual Information Submission ............................ 65
10.1 General Information ................................................................................... 65
10.2 DC Retailer Key Performance Indicator Data ............................................ 65
10.3 DC Retailer Additional Data ....................................................................... 66
10.4 Maintenance Logs (attachments) .............................................................. 66
10.5 Statements of Compliance (attachments) .................................................. 67

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 4
11. Appendix D – Key Health, Safety and Environmental Documents .................. 68
12. Appendix E – District Cooling Connections and Metering Points................... 70

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 5
Tables
Table 1: Units and Unit Conversions ............................................................................................. 22
Table 2: Key Sections of Code Relevant to Security Standard Categories .................................. 28
Table 3: Quarterly Water Quality Reports ..................................................................................... 47
Table 4: Overview of Key Performance Indicators ........................................................................ 51
Table 5: KPI 1 -- System Reliability ............................................................................................... 54
Table 6: KPI 2 -- Electricity Consumption in New Plants Using Potable Water ............................ 55
Table 7: KPI 3 -- Electricity Consumption in New Plants Using Recycled Water ......................... 56
Table 8: KPI 4 -- Electricity Consumption in New Plants Using Seawater .................................... 56
Table 9: KPI 5 -- Electricity Consumption in Temporary Plants .................................................... 56
Table 10: KPI 6 -- Water Consumption for Condenser Cooling Using Potable Water for Cooling
Tower Make-Up....................................................................................................................... 57
Table 11: KPI 7 -- Water Consumption for Chilled Water Make-Up .............................................. 57
Table 12: KPI 8 -- Cooling Tower Circulating Water Quality ......................................................... 58
Table 13: KPI 9 -- Metering Equipment Maximum Service Intervals............................................. 58
Table 14: KPI 10 -- Maximum Percentage of Meter Components Failing to Achieve Required
Accuracy Level During Period Inspection and Testing ........................................................... 59
Table 15: KPI 11 – Customer Complaint and Dispute Resolution ................................................ 59
Table 16: Overview of Potential Relationships Between DC Provider, DC Retailer and Customers
................................................................................................................................................. 71
Table 17: Definitions of Point of Delivery and Point of Return ...................................................... 72

Figures
Figure 1: Points of Delivery and Return When DC Provider is DC Retailer .................................. 73
Figure 2: Points of Delivery and Return When DC Provider and DC Retailer Are Separate Entities
................................................................................................................................................. 74

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 6
1. Introduction
1.1 Citation

This Code is the District Cooling Code ______, implemented pursuant to Law ___.

1.2 Commencement

This Code came into force on _______, and is issued by the Regulator pursuant to Article
___ of Law No ___.

1.3 Purpose

This Code is intended to ensure that District Cooling Systems are designed and operated in
furtherance of the following objectives:
1. Reliability and service quality for consumers;
2. Efficient use of energy;
3. Sound water management;
4. Health, safety and environmental protection and compliance; and
5. Long-term cost-effectiveness.

1.4 Scope

This Code applies to DC Providers, DC Retailers and Customers as defined herein.

1.5 Codes, Standards and References

Codes, standards and references used in the development of this District Cooling Code are
listed in this Section.

1.5.1 Abu Dhabi Government

1.5.1.1 Department of Energy, previously, the Regulation & Supervision Bureau


 Forward Plan 2015-2019, Jan. 2015
 Law No (11) of 2018 concerning the establishment of the Department of Energy
 Law No (2) of 1998 Concerning the Regulation of the Water and Electricity Sector in
the Emirate of Abu Dhabi (as amended)
 Law No (18) of 2007 Amending Certain Provisions of Law No (17) of 2005
Concerning the Establishment of Abu Dhabi Sewerage Services Company
 Trade Effluent Control Regulations 2010, June 2010
 Recycled Water and Biosolids Regulations 2010, June 2010
 The Water Transmission Code, Revision 4, Abu Dhabi Transmission and Despatch
Company, Jan. 2012
 The Water Distribution Code, Version 3, July 2010

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 7
 The Electricity Supply Regulations 2007
 Guaranteed and Overall Service Standards
 The Water Supply Regulations 2009
 Guide to Water Supply Regulations 2009
 The Water Quality Regulations (Fourth Edition), January 2014
 The Streetworks and Access Regulations 2008

1.5.1.2 Urban Planning Council (UPC) now part of Department of Urban Planning and
Municipalities (DPM)
 Plan Capital 2030, Urban Vision
 Plan Abu Dhabi Vision 2030, Urban Structure Framework Plan
 Plan Al Ain 2030
 Plan Al Ain 2030, Urban Structure Framework Plan
 Al Ain Architectural Guidelines
 Plan Al Gharbia 2030
 Abu Dhabi Utility Corridors Design Manual - Version 1
 Abu Dhabi Public Realm Design Manual
 Abu Dhabi Utility Plot Design Manual, Draft Nov. 2015
 Abu Dhabi Infrastructure Framework Plan and Utility Corridors Location & Design
Manual, Task 1: District Cooling System – Prefeasibility Study Final Report, Dec. 2010
 Abu Dhabi Capital Development Code, Draft Jan. 2016

1.5.1.3 Abu Dhabi Water and Electricity Authority (ADWEA)


 Memorandum Ref. No. ADWEA/PROJ/ 2548
 Memorandum Ref. No. ADWEA/PROJ/ 2948
 Letter Ref. ADWEA/PROJ/ 306, dated Jan. 27, 2008, addressed to Tourism
Development & Investment Company, approving potable water for irrigation until TSE
is available

1.5.1.4 Abu Dhabi Sewerage Services Company (ADSSC)


 Irrigation & Marine Sampling Spreadsheet Data
 Excel file titled ”Salinity Parameters for 5 Main Plants”
 Excel file titled “1 2014” provided by ADSSC, including:
o Table 5: Quantity of Treated Wastewater by method of final disposing 2014
o Table 3: State of Wastewater Treatment plants by Designated Hydraulic
Capacity, 2014

1.5.1.5 Environment Agency


 Federal Law No. (24) of 1999 for the Protection and Development of the Environment
 Federal Law No. (23) Of the year 1999 concerning Exploitation, Protection and
Development of the Living Aquatic Resources In the State Of The United Arab
Emirates
 Law No. (21) of 2005 for Waste Management in the Emirate of Abu Dhabi
 Best Management Practices Technical Guidance Document for Discharges from
Construction Activities, EAD-EQ-PCE-TG-15, April 2014

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 8
 Permitting of Development and Infrastructure Projects in Abu Dhabi, EAD-EQ-PCE-
SOP-02, Oct. 2011
 Technical Guidance Document for Environmental Impact Assessment (EIA), EAD-EQ-
PCE-TG-02, April 2010
 Abu Dhabi Water Resources Master Plan, Draft, Jan. 2009
 Marine Water Quality Report
 Maximizing Recycled Water Use in the Emirate of Abu Dhabi, Annual Policy Brief,
2013
 EAD Proposed Ambient Marine Water and Sediment Quality Limits, Revision
number: 00, Sept. 2015

1.5.1.6 Abu Dhabi Emirate Environment, Health and Safety Management System
Regulatory Framework
 Elements, Version 2.0, Feb. 2012
 Manual, Version 2.0, Feb. 2012
 Guidance Document, Self-Regulation and the AD EHS Guiding Principles, Version
2.0, Feb. 2012
 Mechanism, EHS RI – Mechanism 2.0 – Concerned Sector EHSMS Requirements,
Version 2.0, Feb. 2012
 Mechanism, EHS RI – Mechanism 4.0 – EHSMS Submission, Review and Approval,
Version 2.0, Feb. 2012
 Standards and Guideline Values, EHS RI – Occupational Standards and Guideline
Values, Version 2.0, Feb. 2012

1.5.1.7 Abu Dhabi Quality & Conformity Council


 Abu Dhabi Certification Scheme for Air/Water-cooled Chillers, Assessment and
Surveillance Plan, Nov. 2014
 Abu Dhabi Certification Scheme for Heating, Ventilation & Air Conditioning (HVAC)
Personnel, Assessment and Surveillance Plan for Trade Assistant [HVAC
Mechanics]/Construction Worker [Electrical], Nov. 2014

1.5.1.8 Estidama
 The Pearl Rating System for Estidama [for buildings], Emirate of Abu Dhabi, Version
1.0, April 2010
 The Pearl Rating System for Estidama [for communities], Emirate of Abu Dhabi,
Version 1.0, April 2010

1.5.1.9 Abu Dhabi Department of Municipal Affairs


 Standard Specifications, Internal Roads and Infrastructure Directorate, Version 2.0,
Nov. 2014
 2013 Abu Dhabi International Building Code, March 2014.
1.5.2 External Standards
 ASHRAE Handbook, Fundamentals
 ASHRAE Standard 15, Safety Standard for Refrigeration Systems

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 9
 AHRI Liquid-to-Liquid Heat Exchanger Certification Program
 CTI Standard 201
 CTI Standard ATC-105
 Section 7.2 of ANSI/ASHRAE Standard 188-2015, Legionellosis: Risk Management
for Building Water Systems
 ANSI/ASME B31.1 Power Piping code

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 10
2. Definitions, Abbreviations & Units
2.1 Interpretation

Words defined in this Code begin with capital letters when used in the Code.

Words and expressions other than those defined in this Code which are defined in Law No.
(2) and Law No. (11), shall have the meanings ascribed to them in Law No (2) and Law No.
11.

Words using the singular or plural number also include the plural or the singular number
respectively.

Unless otherwise specified, days shall mean calendar days.

2.2 Definitions

Air Conditioning – means the process of treating air to simultaneously control its
temperature, humidity and cleanliness, and distribution of this air to meet the requirements of
the conditioned space.

Air-conditioning, Heating, and Refrigeration Institute – means a certain trade association


representing manufacturers of HVAC, refrigeration and water heating equipment.

American National Standards Institute – means a certain organisation that creates and
promulgates a wide variety of technical standards.

American Society of Heating, Refrigeration and Air-conditioning Engineers – means an


internationally recognised society providing research, standards writing, publishing and
continuing education focused on building systems, energy efficiency, indoor air quality,
refrigeration and sustainability.

American Society of Mechanical Engineers – means a certain non-profit organisation that


provides continuing education, training and professional development, codes and standards,
research, conferences and publications for mechanical engineers.

Annual Information Submission – means a report required to be submitted to the Regulator


by DC Providers or DC Retailers containing specified information.

Blowdown – means the effluent water which is released from a water-cooled Cooling Tower
system to maintain the concentration of Total Dissolved Solids at an acceptable level.

Building – means buildings and associated structures and facilities constructed or to be


constructed by, or on behalf of, Customers.

Building Side – means the Building System side at the Point of Delivery.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 11
Building System – means a Chilled Water system and associated equipment within a
Building.

Building Use Type – means a classification of how building space is used, which shall include
at least the following categories: Office, Hotel, Residential, Retail, Medical, School and Other.

Chilled Water – means cool water used in a closed hydronic system for Air Conditioning or
process cooling applications.

Chilled Water Make-Up – means water used for filling the DC Network with Chilled Water, or
replacing water lost from the DC Network.

Chilled Water Return – means Chilled Water which has a flow direction toward a DC Plant
(in a DC Network) or toward ETS Equipment (in a Building System).

Chilled Water Supply – means Chilled Water which has a flow direction toward a Building (in
a DC Network) or from ETS Equipment (in a Building System).

Coincident Peak Load – means the sum of Cooling Loads for all Customers at the time of
the DC System Peak Cooling Load.

Colony Forming Units – means a unit used to estimate the number of viable bacteria or
fungal cells in a sample of water.

Cooling Energy – means the removal of heat energy.

Cooling Load – means the rate of removal of heat energy.

Cooling Load Diversity Factor – means the Coincident Peak Load divided by the Non-
coincident Peak Load.

Cooling Planning Data – means data as defined in Section 4.4.2 of this DC Code.

Cooling Technology Institute – means a certain industry association which promotes


environmentally responsible cooling technologies through education, development of codes,
standards, and guidelines, development, use, and oversight of independent performance
verification and certification programs, and research.

Cooling Tower – means a heat removal device using water to reject heat to the atmosphere
and cool the condenser side of a chiller, using evaporation (latent heat of vaporisation) to
reject heat from condenser water.

Cooling Tower Make-Up – means a water source used to replace water loss in Cooling
Towers due to evaporation, Drift Loss and Blowdown.

Commercial Operation – means operation of a facility following completion of commissioning


and initiation of operations.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 12
Condenser Cooling Plan – means a plan provided by the DC Provider in which potential
condenser cooling alternatives are analysed and a recommendation is made regarding the
preferred alternative.

Contingency Plan – means a means plan meeting the requirements in Section 7.7 of this
Code.

Customer – means a person or Entity that includes, but is not limited to, an owner of a Building
or an apartment, home unit or other form of segregated accommodation within a Building, or
an owners’ association in relation to a Building, or an industrial facility, who contracts with a
DC Retailer or DC Provider for DC Retailer Services.

DC Code – means the entire District Cooling Code.

DC Network – means the distribution piping system (including all piping, pumps, valves and
fittings) and related equipment to be operated and maintained by the DC Provider for purposes
of transporting Chilled Water from one or more DC Plant(s) or Temporary Plant(s) to
Building(s) or to Distribution Pipelines that comprise a portion of DC Retailer Facilities.

DC Plant – means the central cooling plant and all associated equipment, including chillers,
pumps, piping, TES facilities, Cooling Towers, emergency power supply equipment, control
systems, electrical equipment and other installations and ancillary equipment, used or useful
in the production of Cooling Energy and the distribution of Chilled Water, operated and
maintained for purpose of supporting the provision of DC Provider Services.

DC Provider – means an Entity which generates Cooling Energy and distributes such Cooling
Energy to DC Retailers or to Customers using DC Provider Facilities pursuant to a District
Cooling Provider licence.

DC Provider ETS Equipment – means a facility used to transfer Cooling Energy from DC
Provider Facilities to DC Retailer Facilities or to a Building System, including:
a. In the case of a Direct Connection, pipes, valves, sensors, instrumentation, controls
and DC Provider Metering Equipment; and
b. In the case of an Indirect Connection, Heat Exchanger(s), pipes, valves, sensors,
instrumentation, controls and DC Provider Metering Equipment.

DC Provider Facilities – means equipment and facilities including the DC Plant, DC Network
and DC Provider ETS Equipment, and any other type of equipment installed, designed,
constructed, operated and maintained by the DC Provider for the purpose of providing Cooling
Services to DC Retailers or to Buildings up to the applicable Points of Delivery and Points of
Return.

DC Provider Metering Equipment – means any apparatus owned, operated and maintained
by the DC Provider used in or in connection with DC Provider Facilities for the purpose of
determining the Cooling Energy and Cooling Load of a DC Retailer, Building or group of
Buildings.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 13
DC Provider Services – means any activity by a DC Provider related to the generation of
Cooling Energy and the distribution of such Cooling Energy to DC Retailers or to Customers.

DC-Ready Building – means a Building that meets the requirements of the District Cooling
Connections and DC-Ready Buildings Code.

DC Retailer – means an Entity which acquires Cooling Energy from a DC Provider or from
another DC Retailer for the purpose of resale of such acquired Cooling Energy to Customers;
a DC Provider which serves a Customer directly may also act as a DC Retailer.

DC Retailer Facilities – means equipment and facilities owned, designed and installed by
the DC Retailer as required for the supply of DC Retailer Services to Customers.

DC Retailer Metering Equipment – means any apparatus owned, operated and maintained
by the DC Retailer used in or in connection with DC Retailer Facilities for the purpose of
determining the Cooling Energy and Cooling Load of a Building or a group of Buildings.

DC Retailer Services – means any activity by a DC Provider or DC Retailer related to:


a. The provision of Cooling Energy by the DC Provider to Customers; or
b. The purchase of Cooling Energy by means of Chilled Water from a DC Provider and
resale of the Cooling Energy to Customers.

DC Service – means provision and sale of Cooling Energy by means of Chilled Water from
a DC Provider to a DC Retailer or Customer, or from a DC Retailer to a Customer.

DC Services Agreement – means an agreement for provision and sale of Cooling Energy
by means of Chilled Water from a DC Provider to a DC Retailer, from a DC Provider to a
Customer, or from a DC Retailer to a Customer.

DC Side – means the DC System side at the Point of Delivery in an ETS.

DC System – means the equipment comprising a system of centralised production and


distribution of Cooling Energy in the form of Chilled Water from a DC Plant to multiple
Buildings through a DC Network.

Delta T – means the difference in temperature between Chilled Water Supply and Chilled
Water Return.

Direct Connection – means supply of Cooling Energy from a DC Provider to a DC Retailer,


or from a DC Retailer to a Customer, without transfer of Cooling Energy through one or more
heat exchangers.

Distribution Pipeline – means a pipeline used for transporting Chilled Water, which may be
part of DC Provider Facilities or DC Retailer Facilities.

District Cooling – means the centralised production and distribution of Cooling Energy in
the form of Chilled Water from a DC Plant to multiple Buildings through a DC Network.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 14
Drift Loss – means the loss of water from a Cooling Tower into the atmosphere resulting
from water droplets that are carried out of the Cooling Tower with the exhaust air.

Emergency – means an event or circumstance (including the leakage of a material quantity


of water) occurring in or around any Building System, DC Retailer Facilities or DC Provider
Facilities, irrespective of the cause, which results in, or reasonably could be expected to
result in: (a) death of or injury to the health or safety of any person; (b) grave loss of, or
material damage or disruption to, any property or the environment; or (c) an event or a
circumstance that requires the immediate partial or total shutdown of the relevant Building
System, DC Retailer Facilities or DC Provider Facilities in order to comply with, or to avoid
breaching, any order of an agency of the Government, legal requirements or Good Industry
Practice.

Energy Transfer Station – means equipment used to facilitate the interconnection and
transfer of Cooling Energy between DC Provider Facilities and DC Retailer Facilities, or
between DC Retailer Facilities and a Building System.

Entity – means an individual, company, association, society, partnership, corporation,


municipality, institution, government organisation, agency or group.

ETS Equipment – means, as appropriate, either DC Provider ETS Equipment or DC


Retailer ETS Equipment.

Existing – means, in reference to facilities (such as DC Plants, DC Networks or Buildings),


facilities which entered into Commercial Operation prior to the effective date of the DC Law.

Force Majeure Event – means an extraordinary event or circumstance beyond the control
of the parties to a contract, such as a war, strike, riot, crime, or an event described by the
legal term act of God (hurricane, flood, earthquake, volcanic eruption, etc.) that prevents one
or both parties from fulfilling their obligations under the contract.

Government – means the Government of the Emirate of Abu Dhabi.

Good Industry Practice – means in relation to any undertaking and any circumstances, the
exercise of that degree of skill, diligence, prudence and foresight which would reasonably
and ordinarily be expected from a skilled and experienced operator engaged in the same
type of undertaking.

Gross Floor Area – means the sum of all horizontal areas of each floor of a building,
measured from the exterior wall faces of the exterior walls or from the centreline of walls
separating two buildings.

Heat Exchanger – means heat transfer equipment installed as part of the ETS in an Indirect
Connection.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 15
Indirect Connection – means supply of Cooling Energy from a DC Provider to a DC
Retailer or DC Customer, or from a DC Retailer to a Customer, using one or more Heat
Exchangers.

Interruption of Service – means an interruption in the provision of Cooling Services to a DC


Retailer or to a Customer resulting from any cause.

Key Performance Indicator – means a metric used to express performance and assess
compliance on a given activity by a DC Provider or DC Retailer.

Licensed Entity – means a DC Provider or DC Retailer licensed to provide DC Provider


Services or DC Retailer Services, respectively.

Life-Cycle Cost – means a measure of the total capital and operating costs of a design
alternative, in which all costs over the life of system are calculated on a Net Present Value
basis.

Master Developer – means an Entity seeking to create a real estate development


composed of multiple buildings.

Meter – means a set of equipment for measuring Cooling Energy and Cooling Load and
which may refer to a DC Provider Meter or DC Retailer Meter.

N + 1 – means a measure of capacity redundancy meaning that sufficient capacity of a given


type of equipment is available to meet the load with the largest unit of capacity out of
operation.

National Fire Protection Association – means a certain non-profit organisation devoted to


eliminating death, injury, property and economic loss due to fire, electrical and related
hazards.

Net Present Value – means an economic calculation in which a stream of costs are
discounted to reflect the time value of capital.

New Building – means a Building which enters into Commercial Operation after the
effective date of the DC Law.

New – means, in reference to facilities (such as DC Plants, DC Networks or Buildings),


facilities which entered into Commercial Operation after the effective date of the DC Law.

Normal Usage Hours – means the period from 7 AM to 7 PM every day excluding Fridays
and public holidays.

Once-Through Seawater – means an approach to condenser cooling in which seawater is


passed directly through chiller condensers.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 16
Operation Diagram – means a diagram prepared for each ETS which provides a
diagrammatic but accurate record of pipes, valves, pumps, heat exchangers, meters and
other equipment, as well as an indication of the ownership of each item of equipment.

Peak Cooling Load – means the maximum instantaneous Cooling Load during a certain
time period (day, month, Year).

Periodic Inspection and Testing – means an inspection and test performed to determine
the accuracy of equipment which have been put into service in accordance with the District
Cooling Metering Code.

Planned Interruption of Services – means an interruption in the provision of DC Provider


Services and/or DC Retailer Services resulting from the removal from service of equipment
within the DC Provider Facilities or DC Retailer Facilities to perform maintenance or repair
work.

Plant Capacity – means Cooling Load production capacity that is fully installed and
operational within a DC Plant.

Point of Delivery (to DC Retailer) – means, for an Indirect Connection, the supply pipe
flange on the DC Retailer Side of the heat exchanger(s) forming part of the DC Provider’s
Facilities; and for a Direct Connection, the point at which the supply pipe flange forming part
of the DC Provider’s Facilities connects with the DC Retailer Facilities. See Appendix E.

Point of Delivery (to Customer) – means, for an Indirect Connection, the supply pipe
flange on the Building Side of the heat exchanger(s) connected to the Building System; and
for a Direct Connection, the point at which the supply pipe flange forming part of the DC
Retailer Facilities connects with the Building System. See Appendix E.

Point of Return (from DC Retailer) – means, for an Indirect Connection, the return pipe
flange on the DC Retailer Side of the heat exchanger(s) forming part of the DC Provider’s
Facilities; and for a Direct Connection, the point at which the return pipe flange forming part
of the DC Provider’s Facilities connects with the DC Retailer Facilities. See Appendix E.

Point of Return (from Customer) – means, for an Indirect Connection, the return pipe
flange on the Building Side of the heat exchanger(s) connected to the Building System; and
for a Direct Connection, the point at which the return pipe flange forming part of the DC
Retailer Facilities connects with the Building System. See Appendix E.

Polishing Plant – means a plant that includes any process that removes particulate material
or dissolved material from a water stream.

Potable Water – means water defined in the Water Quality Regulations (Fourth Edition),
issued by the Abu Dhabi Regulation and Supervision Regulator, January 2014.

Reconditioning and Recalibration – means a repair or corrective activity to ensure that the
accuracy of Metering Equipment is within the permissible tolerance for service through

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 17
another Service Interval. Reconditioning may include recalibration, cleaning, replacing
batteries and/or replacement of defective or worn parts.

Recycled Water – means treated liquid effluent produced by a wastewater treatment system
that is suitable for reuse; equivalent to the term “treated sewage effluent”.

Recycled Water Quality Expectations – means a set of criteria for the minimum quality of
RW, which is established through joint action of relevant agencies.

Refurbished Building – means a Building that has or will undergo a major renovation to
Existing hydronic Air Conditioning systems inclusive of adding new chillers or replacing
Existing chillers, or a Building that has or will undergo a conversion from a non-hydronic Air
Conditioning system to a hydronic Air Conditioning system.

Regulator – means the agency of the Government of Abu Dhabi which is responsible for
implementation of this Code.

Relevant Authority – means the agency of the Government possessing legal authority for a
specified decision.

Responsible Manager – means an individual named in the Site Responsibility Schedule


who has been appointed by each Entity involved in providing or receiving DC Services, who
is responsible for: operation and maintenance of equipment and facilities owned by that
Entity; adherence to all Safety Rules; and liaison with other Responsible Managers.

Safety Rules – means rules and procedures established by the entities involved in providing
or receiving DC Services which are intended to protect human health and safety.

Seasonal COP – means the ratio of the total Cooling Energy (kW c) delivered to DC Retailers
and Customers in a Year from a DC System to the total electricity (kW) consumed by the DC
System.

Site Responsibility Schedule – means a document which incorporates the Operation


Diagram, identifies responsibility for operation and maintenance for each item of equipment
in the ETS, incorporates applicable Safety Rules and provides contact information for each
Responsible Manager.

Temperature Differential Event – means the occurrence of an event in which the


temperature of the Chilled Water at the Point of Return is outside of the minimum acceptable
tolerances agreed in the agreement between a DC Provider and a DC Retailer or between a
DC Retailer and a Customer.

Temporary Plant – means a DC Plant providing Chilled Water on a temporary basis until
the permanent DC Plant is ready. A Temporary Plant is intended to operate for a maximum
of five (5) Years subject to the Regulator’s approval.

Thermal Energy Storage – means a technology allowing the storage of Cooling Energy in a
thermal medium such as Chilled Water or ice.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 18
Total Dissolved Solids – means the combined content of all inorganic and organic
substances dissolved in a given volume of water, measured according to The Water Quality
Regulations (Fourth Edition), issued by the Abu Dhabi Regulation and Supervision
Regulator, January 2014, and expressed in units of mg per unit volume of water (a unit
which is equivalent to parts per million).

Trench metre – means one metre of DC Network, composed of both CHW Supply and
CHW Return pipelines.

Variable Frequency Drive – means a motor drive system to control motor speed and torque
by varying motor input frequency and voltage. Also sometime referred to as Variable Speed
Drive.

Year – means a calendar year according to the Gregorian calendar.

2.3 Abbreviations
AADC – Al Ain Distribution Company

ADDC – Abu Dhabi Distribution Company

ADSSC – Abu Dhabi Sewage Services Company

AHRI -- Air-conditioning, Heating, and Refrigeration Institute

ASHRAE – American Society of Heating, Refrigeration and Air-conditioning Engineers

ANSI -- American National Standards Institute

ASME – American Society of Mechanical Engineers

ºC – degrees Celsius

CFU – Colony Forming Units

CHW – Chilled Water

COP – Coefficient of Performance

CTI – Cooling Technology Institute

DC -- District Cooling

DoE – Department of Energy

DPM – Department of Urban Planning and Municipalities

EAD – Environment Agency – Abu Dhabi

ECWT – Entering Condenser Water Temperature

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 19
ETS – Energy Transfer Station

ºF – degrees Fahrenheit

GIS – Geographic Information Systems

GRP – Glass Reinforced Plastic

HDPE – High Density Polyethylene

HEX – Heat Exchanger

HVAC – Heating Ventilation and Air Conditioning

KPI – Key Performance Indicator

NFPA – National Fire Protection Association

NOC – No Objection Certificate

OSHAD – Abu Dhabi Occupational Safety and Health Center

PLC – Programmable Logic Controller

PW – Potable Water

QCC – Abu Dhabi Quality and Conformity Council

RSB – Abu Dhabi Regulation and Supervision Bureau, now the DoE

RW – Recycled Water

TDS – Total Dissolved Solids

TES – Thermal Energy Storage

UAE – United Arab Emirates

UPC – Urban Planning Council

VFD – Variable Frequency Drive

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 20
2.4 Units and Unit Conversions

Table 1 shows the numerical units used in this document. Alternative Industry Terminology is
shown to aid understanding by equating the units in effect to other units which are frequently
used. In addition, this table shows how to convert between the units in effect and Alternative
Industry Terminology.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 21
Table 1: Units and Unit Conversions

Alternative Industry
Unit Unit Conversion
Terminology
To convert Multiple
Unit Abbreviation Unit Abbreviation to
from by

MegaWatt-hours Ton-hours
MWhc TRh MWhc TRh 284.36
cooling Refrigeration
Cooling energy
kiloWatt-hours Ton-hours
kWhc TRh kWhc TRh 0.28436
cooling Refrigeration

Tons
MegaWatts cooling MW c TR MW c TR 284.36
Cooling capacity Refrigeration
or demand Tons
kiloWatts cooling kW c TR kW c TR 0.28436
Refrigeration
Electric energy MegaWatt-hours MWh
Electric capacity
MegaWatts MW
or demand
bar bar
Pressure
kiloPascal kPa
millilitre ml
Volume litre l Imperial Gallons IG l IG 0.212
cubic metre m3
Imperial Gallons
litres per second l/s IG/min l/s IG/min 13.198
per minute
Flow
cubic metre per
m3/hr
hour
millimetre mm
centimetre cm
Length
metre m
kilometre km
degree
Temperature degree celsius ºC ºF 1 ºF =(ºC x 1.8) + 32
fahrenheit
milligram mg
Mass gram g
kilogram kg
square metre m2
Area
square kilometre km 2
Speed metre per second m/sec
millimetres per
Corrosion rate mm/yr mils per year mpy mm/yr mpy 0.03937
year
Concentration * milligrams per liter mg/l

* Note: 1 mg/l is the same as 1 part per million (ppm)

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 22
3. District Cooling General Conditions
3.1 Introduction

These District Cooling General Conditions contain provisions which are of general application
to all provisions of the District Cooling (DC) Code. Their objective is to ensure, to the extent
possible, that the various sections of the DC Code work together.

3.2 Scope

These General Conditions apply to DC Providers, DC Retailers and Customers. Unless


otherwise specified, the General Conditions are applicable to all New DC Systems, excluding
Temporary Plants.

3.3 Key Performance Indicators

DC Providers and DC Retailers shall comply with the applicable Key Performance Indicators
(KPIs) in Appendix A. DC Providers shall supply a DC Provider Annual Information
Submission compliant with Appendix B. DC Retailers shall supply a DC Retailer Annual
Information Submission compliant with Appendix C. Customers shall annually provide to the
DC Retailer (or DC Provider acting as DC Retailer) updated data on Gross Floor Area by
Building Use Type receiving DC Service.

3.4 Unforeseen Circumstance

If circumstances arise which the provisions of the DC Code have not foreseen, the DC
Provider, DC Retailer or Customer shall, to the extent reasonably practicable in the
circumstances, consult promptly and in good faith with other affected entities in an effort to
reach agreement as to what should be done. If agreement between the affected entities as to
what should be done cannot be reached in the time available, the DC Provider shall determine
what is to be done. Wherever the DC Provider makes a determination, it shall do so having
regard, wherever possible, to the views expressed by the other affected entities and, in any
event, to what is reasonable in all the circumstances. The DC Retailer or Customer shall
comply with all instructions given to it by the DC Provider following such a determination
provided that the instructions are consistent with the then current technical parameters of the
particular DC Retailer or Customer under the DC Code. The DC Provider shall promptly refer
all such unforeseen circumstances and any such determination to the District Cooling Code
Review Panel for consideration.

3.5 Code Exemptions

A Licensed Entity may make an application to the Regulator for an Exemption from
provisions of this Code. Such application should be made in writing and the response to any
such application shall also be in writing.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 23
The Regulator shall be responsible for maintaining an up-to-date register of all Exemption
applications together with their approval status. District Cooling Code Review Panel
members shall be informed of the outcome of such applications.

3.6 District Cooling Code Review Panel

The Regulator shall establish and maintain a single Panel, which shall be a standing body to
carry out the functions referred to below. The Panel shall:
1. Keep the DC Code and its working under review;
2. Review all suggestions for amendments to the DC Code;
3. Publish recommendations as to amendments to the DC Code that DC Providers, DC
Retailers, Customers or the Panel feels are necessary or desirable and the reasons
for the recommendations;
4. Issue guidance in relation to the DC Code and its implementation, performance and
interpretation when asked to do so by any DC Providers, DC Retailers, or Customers;
and
5. Consider what changes are necessary to the DC Code arising out of any unforeseen
circumstances.

The Panel shall consist of a membership determined by the Regulator.

The Panel shall establish and comply at all times with its own rules and procedures relating to
the conduct of its business, which shall be approved by the Regulator.

3.7 Miscellaneous

Data and notices to be submitted to the Regulator under the DC Code (other than delivery of
data which is the subject of a specific requirement of the DC Code) shall be delivered in
writing (hard copy).

3.8 Duty of Good Faith and Standard of Conduct

Each party to the DC Code shall at all times in its dealings with the other parties to this DC
Code:
1. Act in good faith; and
2. Act in accordance with Good Industry Practice.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 24
4. District Cooling Planning Code
4.1 Introduction

The District Cooling Planning Code specifies the criteria and procedures to be applied by a
DC Provider in planning and development of the DC System and to be taken into account by
DC Retailers and Customers in the planning and development of their own systems. It
identifies the information to be supplied by DC Retailers and Customers to a DC Provider, and
certain information to be made available by a DC Provider to DC Retailers and Customers.

4.2 Objective

The objectives of this Code are:


1. To promote interaction between DC Providers, DC Retailers and Customers;
2. To formalise the exchange of information on Cooling Load so that DC Providers can
appropriately plan the development or expansion of DC Systems;
3. To provide sufficient information for a DC Retailer or Customer to plan and develop
his own system and assess connection opportunities; and
4. To provide safe, reliable, and efficient DC Systems by adopting planning standards.

4.3 Scope

This Code applies to DC Providers, DC Retailers and Customers as described below.


Unless otherwise specified, this Code is applicable to all New DC Systems, excluding
Temporary Plants.

4.4 Planning Procedures and Data Transfer

4.4.1 General

Master Developers shall engage with the appropriate municipal authority and DPM regarding
planned real estate projects.

DC Providers shall engage with the appropriate municipal authority and DPM regarding
planning for DC Systems.

The means by which DC Retailers, Master Developers and Customers are able to
investigate connection to and use a DC System comprises two distinct parts, namely:

1. A planning statement prepared by the DC Provider; and

2. Offers to enter into a DC Services Agreement, which may relate to—


a. Connection of a Building System to DC Retailer Facilities, or
b. Connection of DC Retailer Facilities to DC Provider Facilities, or

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 25
c. Connection of a Building System to DC Provider Facilities with the DC Provider
acting as a DC Retailer.

4.4.2 Provision of Cooling Planning Data for Connection

This Section of the Code specifies the information required from DC Retailers and
Customers
by the DC Provider in order to ensure adequate technical provision is made for new Cooling
Loads or increases in Cooling Load. The information required is termed Cooling Planning
Data and shall include forecasts over at least the next ten (10) Years for:

1. Buildings to be served, including--


a. Building types, usage and location,
b. Gross Floor Areas (GFAs) and Air Conditioned areas for each Building Use
Type, and
c. Target completion dates; and

2. Cooling load forecasts, including—


a. Peak Cooling Load by month,
b. Cooling Energy by month, and
c. Peak day load profile by hour.

Units of measure shall be as follows:


1. Floor area shall be measured in square metres (m2).
2. Cooling Load shall be measured in MegaWatts cooling (MW c).
3. Cooling Energy shall be measured in MegaWatt-hours cooling (MWhc).

If, subsequent to entering into a DC Services Agreement, the DC Retailer or Customer


becomes aware of material changes to the project which would change the Cooling Planning
Data previously submitted, the DC Retailer or Customer shall submit the revised Cooling
Planning Data to the DC Provider. If the submittal of such revised Cooling Planning Data is
not addressed in the Cooling Services Agreement, the revised Cooling Planning Data shall
be submitted within the following number of days after the DC Retailer or Customer
becomes aware of the potential for changes in the project:
 One (1) month for changes which would affect Cooling Load within the following 12
months; and
 Three (3) months for changes which would affect Cooling Load after 12 months.

If the above submission timelines conflict with the Cooling Services Agreement, the
provisions of the Cooling Services Agreement shall prevail.

4.4.3 Planning Statement

On January 1 of each Year, DC Providers shall annual prepare a statement detailing present
and future DC System plant and network plans, arrangements and capacities that may affect
supply of Cooling Load and Cooling Energy.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 26
4.4.4 Information to be Provided to DC Retailers and Customers

Where the DC Provider proposes to make changes to the DC System which may have an
impact on DC Retailer Facilities or Building Systems, the DC Provider shall notify the
potentially affected DC Retailers and Customers. Such notice shall be provided at least 2
months prior to the proposed change in the DC System.

4.5 Network Capacity Planning

Network hydraulic analysis of the water distribution system shall be undertaken by the DC
Provider to ensure that an adequate and secure cooling supply is available to all consumers
connected to the system. The network hydraulic model shall address the long-term
development of the DC System, and shall be developed, calibrated and updated in order to:
 Size, select and locate infrastructure and equipment, including the integration of TES
and multiple DC Plant locations;
 Evaluate pipe routing scenarios and the impact of loops;
 Consider the impact of future customer connections and load changes;
 Evaluate the impact of heat gain and temperature rise in supply and return piping;
 Identify hydraulically remote locations for pump speed control; and
 Evaluate the impact of temporary removal from service of pipe sections for
maintenance or repair.

The hydraulic model should be maintained and continuously updated after initial system
design to assist in system analysis and future decisions that affect the DC Network.

4.6 Environmental Compliance Planning

DC Providers shall engage with EAD early in the DC System planning process to ensure
environmental compliance and avoid delays in issuance of No Objection Certificates (NOCs)
by EAD for the DC System.

EAD requirements may include, but are not limited to, the documents listed in Appendix D.

4.7 Security Standards

DC Providers shall take into consideration the following three categories of Security
Standards in the planning, development, and operation of DC Systems:
1. Ensuring adequate Capacity Planning;
2. Ensuring Security of Supply; and
3. Ensuring protection of Health, Safety and Environment.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 27
Table 2 summarises the key sections of the DC Code relevant to each Security Standard
category.

Table 2: Key Sections of Code Relevant to Security Standard Categories

DC Planning DC Systems Design DC Operating


Code Code Code

Capacity Planning 4.5 7.4.1 and 7.7


5.6.3, 5.6.4, 5.7.1,
Security of Supply 5.7.2, 5.7.8, 5.8.3, 7.4.2
5.8.4, 5.8.6, and 5.8.7
Health, Safety &
5.5 and 5.6.5 7.5
Environment

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 28
5. District Cooling Systems Design Code
5.1 Introduction

The District Cooling Systems Design Code specifies minimum requirements for the design of
DC Systems.

5.2 Objectives
The objectives of this Code are to promote:
1. Reliability and service quality for consumers;
2. Efficient use of energy;
3. Sound water management;
4. Health, safety and environmental protection and compliance; and
5. Long-term cost-effectiveness.

5.3 Scope

This Code applies to DC Providers, DC Retailers, Customers and all relevant stake holders
including Engineering Consultants and Contractors. Unless otherwise specified, this Code is
applicable to all New DC Systems, excluding Temporary Plants.

5.4 General Requirements

The design, fabrication, installation and operation of a DC System shall be fit for purpose
operating in the Emirate of Abu Dhabi. The DC Provider is accountable to ensure the DC
System, once operational, is capable of:
1. Delivering the design Cooling Load; and
2. Operating within the KPIs determined by the Regulator.

If the design of the DC System is found to not meet any of the requirements of this Code then
the DC Provider shall be required to carry out retrospective work at its own expense to ensure
the DC System is compliant.

DC Providers shall design the DC System in full compliance with requirements of the ADDC
or AADC, as appropriate, ADSSC, EAD, Department of Municipal Affairs and all other
applicable requirements.

5.5 Human Health and Environmental Safety

5.5.1 Regulatory Compliance

DC Systems shall be designed to comply with all laws, regulations and codes promulgated in
the Emirate of Abu Dhabi or the UAE relating to human health and environmental safety,
including federal limits or standards for the air, land and water, unless a specific exemption

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 29
by been granted by the regulating agency. Requirements relative to regulatory compliance
include but are not limited to:
1. In accordance with federal Law No. 24 of 1999, DC Providers shall obtain
Construction NOCs and Operating Permits from EAD in accordance with EAD
standard operating procedures, which may include preparation of an EIA report,
Construction Environmental Management Plan, and Operation Environmental
Management Plan; and
2. DC Systems shall be designed to meet the requirements of all applicable OSHAD
Codes of Practice, including but not limited to the Codes of Practice listed in
Appendix D.

5.5.2 Environment, Health and Safety Management

DC Providers shall prepare and implement an Environment, Health and Safety Management
System in compliance with OSHAD.

5.5.3 Refrigerants and Refrigerant Systems

DC Systems shall be designed to ensure safe and environmentally acceptable operation.


Minimum requirements relative to refrigerant system safety are as follows:
1. Refrigerant systems, including but not limited to refrigerant piping, refrigerant
storage, safety relief valves, alarm systems, emergency ventilation and refrigerant
leak detection, shall be designed and sized in accordance with the latest edition of
ISO 5149; Refrigerating systems and heat pumps – Safety and environmental
requirements;
2. Refrigerant systems must meet all applicable EAD and municipality requirements;
and
3. Refrigerant types used in chillers shall comply with all relevant decisions, rules or
procedures mandated by local regulations and international protocols.

5.5.4 Backflow Prevention

For DC Plants where Potable Water (PW) is used as a Cooling Tower Make-Up water back-
up in conjunction with use of Recycled Water (RW) or seawater, the Cooling Tower Make-Up
water, system design shall include cross connection control and backflow prevention in
accordance with the following:
1. The backflow prevention device used shall be either an air gap or a reduced pressure
principle backflow assembly suitable for high hazard and potential backpressure
applications;
2. Backflow prevention devices shall be periodically inspected by a cross connection
control specialist to ensure that they are functioning properly;
3. All applicable requirements of the Water Supply Regulations and the Uniform
Plumbing Code shall be met; and
4. All non-PW system components shall be prominently labelled as such in both Arabic
and English.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 30
5.6 Water Management

5.6.1 Condenser Cooling Planning

DC Providers shall use the most cost-effective approach to condenser cooling consistent
with applicable laws and regulations. Such approaches may include but are not limited to:
1. Cooling Towers using PW;
2. Cooling Towers using RW which has been “polished” through reverse osmosis and
ultrafiltration or other treatment methods;
3. Cooling towers using unpolished RW in conjunction with a fully automated water
treatment system that actively and continuously monitors water quality parameters
and corrects treatment levels;
4. Cooling Towers using seawater; or
5. Direct cooling of condensers using Once-Through Seawater.

DC Providers shall undertake and submit to the Relevant Authority and the Regulator a
Condenser Cooling Plan which shall include Life-Cycle Cost analysis of condenser cooling
alternatives at the site or sites for the DC Plant(s).

The Condenser Cooling Plan should be submitted prior to execution of any DC Service
Agreements for the planned system.

The Condenser Cooling Plan should be submitted before or during the process of applying
for a license for the planned system.

Prior to preparation of the Condenser Cooling Plan, the DC Provider shall request from
ADDC/AADC a statement of availability of supply of RW for the DC Plant. This request shall
include 20-year forecast quantities of Cooling Tower Make-Up requirements under a range
of assumptions regarding RW Total Dissolved Solids (TDS) levels up to a TDS level limit
which precludes compliance with applicable wastewater discharge regulations.

Within 30 days of the request from the DC Provider for a supply of RW, relevant RW
distribution company shall inform the Relevant Authority, the Regulator and the affected DC
Provider of the anticipated 20-year supply of RW for the DC Plant, including projected RW
quantities by Year and by month and RW Quality Expectations including average and
maximum TDS.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 31
The Condenser Cooling Plan shall consider, among other things, the following:
1. When RW will be available at the DC Plant site(s) in sufficient quantities and of
adequate quality to provide for condenser cooling for the DC Plant(s);
2. RW Quality Expectations;
3. Capital and operating costs of using RW either directly or with a Polishing Plant;
4. Capital and operating costs of using seawater for condenser cooling, either in
seawater Cooling Towers or with direct cooling of condensers;
5. Assessment of the environmental and regulatory requirements for using seawater,
and the associated timelines for meeting regulatory requirements;
6. Regulatory requirements and associated costs for disposal of wastewater for each
condenser cooling alternative;
7. Comparison of Life-Cycle Costs of all condenser cooling alternatives, with
comparison to condensing cooling using PW as a base case; and
8. Proposed plan for condenser cooling, including phasing as appropriate.

The Relevant Authority, in conjunction with other relevant agencies (which may include DoE,
ADSSC, ADDC, AADC, and the municipality), will review and comment on the Condenser
Cooling Plan. Following comments by other relevant agencies, the Relevant Authority will
either:
1. Approve the Condenser Cooling Plan; or
2. Provide direction to the DC Provider regarding additional information or analysis
required for an approvable Condenser Cooling Plan.

An approvable Condenser Cooling Plan shall ensure that:


1. The DC System has sufficient water supply for condenser cooling under all projected
Cooling Loads; and
2. The DC System can meet all applicable wastewater discharge regulations.

DC Providers must receive approval from the Relevant Authority of the Condenser Cooling
Plan for a DC System.

A DC Provider may appeal to the Regulator for review of a decision of the Relevant
Authority.

5.6.2 Chilled Water Make-Up

For all DC Plants, Potable Water shall be used for Chilled Water Make-Up.

5.6.3 Back-Up Water Supplies and Storage

DC Systems must be able to continue operations during short-term disruptions to supplies of


water for condenser cooling. Minimum requirements relative to back up water systems are
as follows:
1. In DC Plants using RW as the normal source for condenser cooling, PW may be
used, and shall be provided, for Cooling Tower Make-Up as an emergency source of
water in the event that RW is not available in sufficient quantities or at acceptable
quality for more than twenty-four (24) hours; and

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 32
2. Cooling Tower Make-Up water storage shall be provided with capacity sized for a
minimum of twenty-four (24) hours storage based on the projected peak Cooling
Tower Make-Up water consumption for the DC Plant.

5.6.4 Materials for Seawater Applications

For all applications using seawater, materials and equipment exposed to seawater shall be
capable of withstanding the aggressive characteristics of seawater. Minimum requirements
relative to such materials and equipment are as follows:
1. Seawater intake and discharge piping shall be non-ferrous materials such as glass-
reinforced plastic (GRP) or high-density polyethylene (HDPE); and
2. Chiller condenser materials and seawater Cooling Tower materials shall meet the
following requirements--
a. Chillers shall be constructed of special tube materials (such as titanium or
copper-nickel alloys), specially-clad tube sheets, and internally coated water
boxes for corrosion resistance to seawater; and
b. Cooling Towers and nearby equipment subject to exposure due to Cooling
Tower Drift shall be constructed of corrosion-resistant materials or materials
that are protected with coatings suitable for seawater corrosion resistance.

5.6.5 Water Treatment Systems

All water treatment control, monitoring and alarm functions shall be through the DC Plant
monitoring and control system.

The CHW circuit is a low temperature, closed system and therefore protection against
corrosion shall be given primary consideration in developing an appropriate water treatment
system. Secondary consideration shall be given to deposit control and microbiological
activity.

An automatic dosing system shall be used for the dosing of corrosion inhibitor. The
automatic system shall consist of a water meter fitted in the CHW Make-Up line, chemical
dosing pump and storage tank with low-level switch. DC Plant control system shall monitor
the quantity of CHW Make-Up and control the corrosion inhibitor dosing pump based on the
CHW Make-up rate.

The CHW circuit water treatment program shall be designed to control corrosion to less than
0.0254 mm/yr (1 mpy) maximum.

The condenser circuit water treatment program, in conjunction with equipment material
selection, shall be designed to control or limit corrosion to less than 0.0762 mm/yr (3 mpy)
maximum.

Dosing pumps and tanks for required chemicals shall be provided with low level alarm.

If the condenser cooling approach is use of unpolished RW in Cooling Towers, then the
water treatment system shall be a fully automated system with active monitoring and

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 33
capable of adjusting water treatment in real time in response to changes in Cooling Tower
Make-Up water quality.

5.7 DC Plant
5.7.1 Reliability

DC Providers shall design the DC Plant to ensure high levels of reliability and minimal
Interruption of Service. Equipment redundancy is a key element that shall be considered in
the design to ensure reliability. Minimum standards relative to equipment redundancy are as
follows:
1. DC Plants shall be designed with electrical redundancy in accordance with
requirements of the Distribution Planning and Connection Code (DPCC) section of
the Electrical Distribution Code1;
2. DC Systems shall be designed with redundant (n+1) CHW distribution pumps, such
that the Coincident Peak Load can be met with the any single pump out of service;
3. DC Systems shall be designed with chiller redundancy in line with standard industrial
practice such that the Coincident Peak Load can be met with any single chiller out of
service. This may be achieved by any of the following options or combination of
these options, all subject to DoE review and approval:
 n+1 chillers
 Spare capacity for chillers
 Thermal energy storage (TES) tanks
 Multiple circuit chillers
 Any other feasible method with supportive documentation proving the
redundancy

5.7.2 Equipment Certification

Key equipment shall be certified. Minimum requirements relative to equipment certification


are as follows:
1. Chillers shall be certified in accordance with the Abu Dhabi Certification Scheme for
Air/Water-cooled Chillers administered by QCC and carry the Abu Dhabi Trustmark
for Environmental Performance;
2. Cooling Towers shall be certified in accordance with CTI Standard 201 or,
alternatively, the Cooling Towers shall be field performance tested in accordance
with the latest editions of CTI Standard ATC-105 or ASME Standard PTC-23; and
3. Plate and frame HEX, if utilised within the DC Plant, shall be certified in accordance
with the AHRI Liquid-to-Liquid Heat Exchanger Certification Program, provided that
the capacity of the HEX is encompassed by the latest edition this certification
program at the time of procurement.

5.7.3 Chiller Variable Frequency Drives

1 Electrical Distribution Code, Version 3.0, November 30th 2005, Approved by the DoE.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 34
Application of VFDs on some of the chillers in the DC Plant shall be installed to improve
efficiency at lower than design ECWT if determined to be cost-effective based on a Life-
Cycle Cost analysis.

5.7.4 Chilled Water (CHW) Pumps

Variable flow pumping shall be used for secondary distribution CHW pumps in primary-
secondary pumping schemes.

Variable flow pumping shall be used for primary CHW pumps in variable primary pumping
schemes.

CHW pumps shall be controlled to maintain the minimum required differential pressure at the
most hydraulically remote Customer in the DC Network.

5.7.5 Plant Pipe Sizing

DC Plant internal pipe sizing shall be performed in accordance with the latest edition of
ASHRAE Handbook, Fundamentals, to minimise noise, erosion levels and pumping costs.

5.7.6 Cooling Towers

Cooling Tower fans shall be installed with VFDs to reduce speed at part load conditions to
minimise annual energy consumption.

Cooling Towers using unpolished RW or seawater shall be equipped with cellular type drift
eliminators.

5.7.7 Thermal Energy Storage

TES tank walls shall be provided with insulation on all sides, ends, bottom and top of tank.
Insulation shall be of adequate thickness to prevent condensation on tank walls and limit
heat gain to less than 1% of tank capacity across a twenty-four (24) hour period at 46ºC
ambient temperature. Tank exterior shall include a complete vapour barrier and protection of
the insulation.

For CHW TES tanks, the diffuser shall be designed to resist damage from unanticipated
water hammer events that could be initiated elsewhere in the hydraulic system apart from
the TES tank.

5.7.8 Fire Protection

DC Plants shall be designed with firestops and fire protection systems in accordance with
NFPA Standards and all relevant Abu Dhabi requirements.

5.7.9 Controls, Automation and Metering

The DC Plant monitoring and control system shall be an industrial grade system with the
following capabilities:

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 35
1. Complete process monitoring, control, and troubleshooting capabilities;
2. Monitoring and control of all process equipment (mechanical and electrical) including
water treatment systems;
3. Measuring, displaying and storing hourly data on Cooling Energy consumption by
each individual DC Retailer and Customer served by the DC System; and
4. Maintaining logs of hourly data for key process variables, alarm status, and power
and water consumption for a rolling three (3) Year period, at minimum.

Electric meters shall be installed which are capable of measuring, displaying and storing
and/or transmitting data on:
1. Hourly total DC Plant electricity consumption; and
2. Peak instantaneous DC Plant electricity demand occurring on a daily, monthly and
annual basis.

Meters shall be installed which shall be capable of measuring, displaying and storing and/or
transmitting data on:
1. Hourly total DC Plant Cooling Energy production; and
2. Hourly peak instantaneous DC Plant Cooling Load.

DC Plant Meters shall comply with Meter accuracy requirements specified in the DC
Metering Code.

Flow meters shall be installed which shall be capable of measuring, displaying and storing
and/or transmitting data on hourly flow of:
1. CHW Supply flow to the DC Network;
2. CHW Make-Up;
3. Cooling Tower Make-Up water;
4. Cooling Tower Blowdown;
5. RW consumption;
6. PW consumption;
7. Process flows in Polishing Plant, as appropriate; and
8. Seawater flows for Cooling Tower Make-Up water or direct cooling of chiller
condensers, as appropriate.

Flow meters shall comply with flow meter accuracy requirements specified in the DC
Metering Code.

5.8 Distribution Pipelines


5.8.1 Scope

The minimum requirements in this section apply to all New Distribution Pipelines and
extensions of Existing Distribution Pipelines, and apply to both DC Provider Facilities (DC
Networks) and Distribution Pipelines comprising part of DC Retailer Facilities.

5.8.2 Distribution System Design Life

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 36
Distribution Pipelines shall be designed for a life expectancy of a minimum of forty (40)
Years.

5.8.3 Piping Material

Selection of piping material shall consider all requirements of this Code, with special
attention given to reliability requirements as well as Life-Cycle Costs. For Distribution
Pipelines installed within public carriageways, pre-insulated steel piping material shall be the
preferred piping material selection.

5.8.4 Piping System Design

Pipe sizing shall be based on Life-Cycle Cost analysis that considers Distribution Pipeline
capital cost and cost of pumping energy. Piping pressure drop shall not exceed 0.3 kPa/m.

Stress analysis calculations to confirm that thermal stresses produced as a result of


temperature difference from start-up to operation shall comply with ANSI/ASME B31.1
Power Piping code for steel Distribution Pipelines. Stress analysis calculations shall be
performed, at a minimum, for all Distribution Pipelines installed within public carriageways,
and for other pipelines at the DC System designer’s discretion to ensure safe operation of
the DC System.

Hydraulic analysis shall be performed to ensure that required minimum differential pressure
is available under all operational conditions for connections to DC-Ready Buildings.

Surge (water hammer) analysis shall be performed if pipe fluid flow velocities are over 2.5
m/sec or if the DC Network is an open system (e.g. with CHW TES tank that is open to
atmosphere), or at the DC System designer’s discretion to ensure safe operation of the DC
System.
Distribution Pipeline design shall incorporate, at strategic locations, sectioning valves
(isolation valves) to facilitate repair while minimising Interruption of Services.

Automatic control or isolation valves shall not be fast-closing valves, or fail closed, unless
specific provisions are put in place to mitigate water hammer under these conditions.

Pre-insulated steel piping installed within public carriageways shall include an integral
sensor wire leak detection system to allow insulation jacket breaches to be identified and
repaired before steel carrier pipe is compromised.

DC Network designers shall consider specifying insulation joint systems that are air testable,
to ensure that risk of ground water ingress is minimised.

Direct-buried, pre-insulated, weld-end ball valves shall be considered for use in place of
traditional flanged valves within valve chambers to reduce Life-Cycle Costs and eliminate
potential CHW leakage points at flanges.

5.8.5 Insulation

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 37
DC Networks shall be designed with an annual heat gain less than 4% of annual Cooling
Energy for the DC System at full projected build-out of the DC System. The optimal level of
insulation shall be determined through Life-Cycle Cost analysis that considers capital cost
against cost of loss of Cooling Energy over the lifespan of the DC Network.

Heat gain calculations shall be performed to determine minimum Distribution Pipeline


insulation requirements and to ensure the required CHW Supply temperature is maintained
under all Cooling Load conditions.

Piping insulation for buried Distribution Pipelines shall be factory-applied; field application of
piping insulation to buried Distribution Pipelines shall not be allowed, except at piping joints
and in cases of pre-insulated piping repair.

5.8.6 Installation of Pipelines in Utility Corridors

Distribution Pipeline installation shall comply with utility corridor design requirements of the
latest edition of the Abu Dhabi Utility Corridor Design Manual issued by UPC (DPM) as
agreed with the QCC, unless an exemption has been granted by UPC (DPM).

Minimum depth of burial for underground Distribution Pipelines shall be in accordance with
local regulations and in accordance with the minimum pipe manufacturer’s recommendations
to maintain pipeline integrity under required traffic load conditions.

In order to ensure DC System reliability and allow for potential repairs, no other utilities shall
be placed above or below Distribution Pipelines in the same trench.

Provisions to allow for venting and draining of sections shall be included in DC Networks.

Detectable warning tape shall be installed over top of both CHW Supply and CHW Return
Distribution Pipelines.

5.8.7 Distribution Pipelines Inspection and Testing

Distribution Pipelines shall be thoroughly cleaned via flushing or mechanical cleaning and
inspected before they are put into service.

All underground Distribution Pipelines shall be tested to ensure fitness for service. Minimum
requirements relative to Distribution Pipeline testing shall include hydrostatic pressure
testing of Distribution Pipelines prior to commissioning and in accordance with requirements
of the latest edition of ANSI/ASME B31.1 Power Piping code.

5.9 DC System Commissioning and Handover

5.9.1 Integrated Commissioning of DC System

Prior to initiating Commercial Operation of a DC System, DC Providers must implement an


integrated commissioning of the entire DC System, including DC Plant(s), DC Network and
ETSs.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 38
5.9.2 System Documentation and Commissioning Results

As a condition of contracts for construction of a DC System, DC Providers must require


submission of the following materials from the contractor(s) constructing any part of the DC
System that comprise DC Provider Facilities:

1. Comprehensive listing of all DC Plant equipment;


2. Process flow diagram of DC Plant mechanical systems;
3. Single line diagram of DC Plant electrical systems;
4. Piping & Instrumentation Diagram (P&ID);
5. Full as-built drawings of the DC Plant;
6. Full as-built drawings of the DC Network;
7. Mapping of the DC Network in GIS format;
8. Full as-built drawings of all DC Provider Energy Transfer Stations;
9. Specifications for all mechanical, electrical, civil and structural installations; and
10. All O&M manuals for all equipment and systems.

Commissioning results must be recorded and available for inspection.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 39
6. District Cooling Connection and District
Cooling-Ready Buildings Code
6.1 Introduction

The District Cooling Connection and District Cooling-Ready Buildings Code specifies the
minimum design criteria for connections to DC Systems and minimum technical, design and
operational criteria which must be complied with by any Customer using DC Services.

6.2 Objectives

The objectives of this Code are to ensure sound design and operation of DC Service
connections and optimal performance by Building Systems in receiving DC Service.

6.3 Scope

This Code applies to DC Providers, DC Retailers and Customers as described below. The
requirements of this Code apply to all New and Refurbished Buildings receiving DC Service,
unless otherwise noted.

6.4 Connection

6.4.1 Requirements for Completion

Prior to initiation of DC Service, the following should be submitted by the DC Retailer or


Customer being connected:
1. Information to enable the DC Provider to prepare Site Responsibility Schedules on
the basis of the provisions set out in Section 6.6.4.;
2. The name and contact details for routine and emergency communications between
the DC Provider and the DC Retailer or Customer; and
3. The name of the manager who has been authorised to sign Site Responsibility
Schedules on behalf of the DC Retailer or Customer.

6.4.2 Building Connection Type

Where the DC Provider and DC Retailer are separate entities, an indirect connection
between the DC Provider and DC Retailer shall be used.

For DC Systems where the DC Provider and DC Retailer are the same Entity, or for sub-
networks within a larger DC System (separated from the main DC System by a HEX), a
Direct Connection may be used for service to New Buildings if Building Systems in such
Buildings have an appropriate pressure rating.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 40
Appendix E describes and schematically illustrates connections and Points of Supply and
Points of Return under a range of possible relationships between DC Providers, DC
Retailers and Customers.

6.4.3 Heat Exchanger Certification

For Indirect Connections, plate and frame HEX shall be certified in accordance with the
AHRI Liquid-to-Liquid Heat Exchanger Certification Program, provided that the capacity of
the HEX is encompassed by the latest edition of this certification program at the time of
procurement.

6.4.4 DC Side Flow Control For Indirect Connections

Two-way modulating flow control valves or PICVs (Pressure Independent Control Valves)
are mandatory for DC Side ETS Equipment.

In order to ensure comfort conditions for all Buildings connected to the DC System, DC Side
flow control valves shall have the ability to restrict the flow down to the maximum contracted
CHW flow.

6.4.5 Flow Control for Direct Connections

Large direct bypasses used for flushing, or other similar start-up purpose, must be removed
once the ETS Equipment is in operation.

Direct bypass lines shall be avoided, but if a bypass is required it shall include redundant
isolation valves to mitigate the possibility of unintended bypass flow.

6.4.6 Operations During a Temperature Differential Event

If a Temperature Differential Event occurs, the DC Provider shall have the right to convene a
meeting with the Customer and the DC Retailer (if the DC Retailer is a separate entity) to
assess the causes of the Temperature Differential Event and potential options for avoiding
recurrence of such events. This meeting shall take place no more than 30 days after
notification of the Customer and, as appropriate, DC Retailer, by the DC Provider of the
Temperature Differential Event. Following this meeting the Customer shall have sixty (60)
days to submit to the DC Provider a plan for modification of Building Systems equipment and
operations to bring Delta T performance into compliance with contractual requirements, and
the DC Provider shall have sixty (60) days to submit to the Customer a plan for evaluation of
the DC Provider Facilities associated with the Customer’s ETS to confirm fitness for duty
conditions.

6.5 DC-Ready Building Systems

6.5.1 General

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 41
The ETS Equipment room shall be located on the first basement or ground level of a
Building.

The ETS Equipment room and areas containing Meters shall be designed and equipped for
protection against unauthorised access.

Building Systems shall be hydronic, and all CHW piping and equipment shall be designed for
supply and return temperatures as specified by the DC Provider or DC Retailer.

6.5.2 Building Side Flow Control

All flow control valves in new Building Systems shall be two-way modulating flow control
valves; three-way flow control valves shall not be used.

In a Refurbished Building, three-way (diverting) flow control valves must be replaced with
new two-way modulating flow control valves.

Two-way modulating flow control valves shall be closed when the Air Conditioning unit is not
required for cooling (interlock).

Building System CHW pumps shall be variable speed and shall be controlled to maintain the
minimum required differential pressure at the most hydraulically remote Air Conditioning unit.

6.5.3 Direct Connected Buildings

In addition to requirements in Sections 6.5.1 and 6.5.2, for a Direct Connected Building the
following minimum requirements shall be fulfilled:
1. Space shall be available for the Meter, flow control valve and booster pump (if
applicable) as per DC Provider or DC Retailer requirements;
2. Building System CHW piping and equipment must be compatible with the DC
Network CHW chemical treatment program;
3. Building System CHW piping and equipment must be able to withstand the maximum
working pressure in the DC Network; and
4. Building System CHW piping shall be insulated and provided with a water-vapour-
barrier to avoid water condensation at DC Network temperatures.

6.5.4 Indirect Connected Buildings

In addition to requirements in Sections 6.5.1 and 6.5.2, for an Indirect Connected Building
the following minimum requirements shall be fulfilled:
1. ETS Equipment room shall have sufficient floor space, ceiling height and
ingress/egress for all required ETS Equipment. Minimum ceiling height shall be 4
meters, or in accordance with DC Provider or DC Retailer requirements;
2. Building System CHW quality must be compatible with installed Heat Exchanger(s)
and shall include a CHW treatment system to monitor and control necessary
chemicals such as rust inhibitors and biocides required for operation; and

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 42
3. Customer shall be responsible for filling the Building System CHW along with
providing break tanks of suitable capacities (if applicable) and with pressurisation
units.

6.5.5 Commissioning

The DC Connection and the Building Systems must be commissioned to confirm


performance fulfilling the design, including acceptable Delta T performance.

Commissioning results must be recorded and available for inspection.

A systems manual, documenting the information required to allow future operations staff to
understand and optimally operate the commissioned services, must be developed and
provided to the building owner or facilities operator following commissioning. The systems
manual should include, at a minimum:
1. Comprehensive listing of all Building System and ETS equipment;
2. Process flow diagram of Building System and ETS equipment;
3. Piping & Instrumentation Diagram (P&ID);
4. Description of the control sequence;
5. Full as-built drawings of the ETS; and
6. Specifications for control valves, HEX and Meter components.

6.6 Site-Related Conditions

6.6.1 Access to Meters

Customer shall provide access by Licensed Entities (DC Retailers and DC Providers) to
Meters operated and maintained by the Licensed Entity.

6.6.2 Operation Diagram

An Operation Diagram shall be prepared for each ETS using graphical symbols as agreed
between the parties. The Operation Diagram shall include all equipment and facilities in the
ETS, providing a diagrammatic but accurate record of pipes, valves, pumps, heat
exchangers, meters and other equipment, as well as an indication of the ownership of each
item of equipment.

6.6.3 Operation and Maintenance Responsibility

Each Entity (DC Provider, DC Retailer and Customer) shall be responsible for operation and
maintenance of equipment and facilities that Entity owns, unless a contractual agreement
has been implemented for an alternative arrangement of responsibilities.

6.6.4 Site Responsibility Schedule

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 43
In order to inform operational staff of all parties of agreed responsibilities and applicable
Safety Rules, a Site Responsibility Schedule for the operational phase shall be produced by
the DC Provider with input from the DC Retailer or Customer.

Site Responsibility Schedules shall incorporate the Operation Diagram and shall include the
following additional information:
1. Name, mailing address and telephone number of the Responsible Manager for each
party;
2. Applicable Safety Rules; and
3. Responsibility for operation and maintenance for each item of equipment.

Every page of each Site Responsibility Schedule shall bear the date of issue and the issue
number.

The Site Responsibility Schedule shall be signed by the Responsible Manager for each
party.

When a DC Retailer or Customer on a Site Responsibility Schedule becomes aware that an


alteration is necessary, it must inform the DC Provider prior to any change taking effect.

Where the DC Provider has been informed of a change by a DC Retailer or Customer, or


itself proposes a change, it will prepare a revised Site Responsibility Schedule prior to the
change
taking effect.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 44
7. District Cooling Operating Code
7.1 Introduction

The District Cooling Operating Code is concerned with forecasting short and medium-term
Cooling Load for routine operation and outage planning, water treatment and environmental
compliance, operational liaison, and contingency planning and procedures.

7.2 Objective

The objectives of this Code are:


1. Reliability of DC Service;
2. Good communication between DC Providers, DC Retailers and Customers;
3. Health, safety and environmental protection and compliance; and
4. Sound planning for emergencies.

7.3 Scope

This Code applies to DC Providers, DC Retailers and Customers as described below.


Unless otherwise specified, this Code is applicable to all New DC Systems.

7.4 Cooling Load Forecasts including Outage Planning

7.4.1 Cooling Load Forecasts

This Section specifies:


1. Procedures to be followed in forecasting Cooling Load over periods between one day
and one Year in advance to accommodate operational requirements; and
2. Procedures to be followed when programming outages for any component of a DC
System for maintenance or repair.

In preparing Cooling Load forecasts, DC Providers shall take account of the following
factors:
1. Forecast Cooling Load information received from DC Retailers and Customers;
2. Historic trends and Cooling Load patterns over seasonal and weekly periods
(including the effects of holidays); and
3. Projected growth in Cooling Load from existing Customers.

Load forecasts should indicate, in tabular form, for each month in the forecast period the
following projections for DC System Cooling Load:
 Minimum weekday;
 Minimum weekend/holiday;
 Maximum weekday;
 Maximum weekend/holiday;
 Average weekday; and

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 45
 Average weekend/holiday.

Should DC Retailers or Customers connected to the DC System become aware of factors


which would result in material changes to their Cooling Load, they shall provide this
information to the DC Provider within 30 days.

7.4.2 Outage Planning

The DC Provider shall give DC Retailers and Customers at least 30 days notice of planned
outages of any portion of the DC System which would affect service to that DC Retailer or
Customer.

The DC Provider shall give DC Retailers and Customers notice, as soon as practicable, of
unplanned or forced outages of any portion of the DC System which would affect service to
that DC Retailer or Customer.

7.5 Water Treatment and Environmental Compliance

DC Providers shall create and file with the Regulator a plan to maintain Cooling Tower systems
and equipment to comply with Section 7.2 of ANSI/ASHRAE Standard 188-2015,
Legionellosis: Risk Management for Building Water Systems.”

The DC Provider shall engage an independent party for inspection and verification of proper
execution of the DC Provider’s water treatment equipment and program on a minimum
quarterly basis.

Quarterly water quality reports shall be prepared and conveyed to the Regulator and other
relevant authorities to ensure compliance with environmental and health requirements.
Minimum water parameters to be recorded, in addition to other parameters required by
jurisdictional authorities, are indicated in Table 3.

Wastewater discharge quantities and water quality must meet all applicable laws, regulations
and permit conditions, including but not limited to:
 Trade Effluent Control Regulations 2010, June 2010;
 Recycled Water and Biosolids Regulations 2018, January 2018;
 Federal Law No. (24) of 1999 for the Protection and Development of the Environment;
and
 EAD Proposed Ambient Marine Water and Sediment Quality Limits, Revision number:
00, Sept. 2015

DC Providers shall permit any person authorised by the Regulator or other jurisdictional
agency access to any facilities comprising the DC System to inspect at any time for the
purpose of verifying compliance with health, safety and environmental regulations.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 46
Table 3: Quarterly Water Quality Reports

Cooling Circulating
Chilled Wastewater
Unit Tower Condenser
Water Discharge
Make-up Water
pH pH √ √ √ √
Conductivity µS/cm √ √ √ √
Total coliform MPN/100 ml √ √ √
Total hardness mg/l √ √
Chloride mg/l √ √ √
Total alkalinity mg/l √
Iron mg/l √ √ √
Total Suspended Solids mg/l √ √
Total Dissolved Solids mg/l √ √ √
Free Residual Chlorine mg/l √
Corrosion inhibitor level mg/l √ √
Legionella Colony
Heterotrophic Aerobic Bacteria Forming Units √
(CFU)
Biological Oxygen Demand (1) mg/l √
Chemical Oxygen Demand (1) mg/l √
Temperature degrees C √
Other as required by discharge
permitting authority √

(1) Required only if Recycled Water is used.

7.6 Operational Liaison

This Section sets out the requirements for the exchange of information relating to routine
operation and/or unplanned events which might occur, or which have occurred, and which
could affect continuity of DC Service.

In case of an event in the facilities operated by a given Entity (DC Provider, DC Retailer or
Customer) which could affect other entities, the given Entity will notify the parties whose
systems may be affected. The notification must contain sufficient detail to enable the
recipient to assess the implications and risks. It should also contain the following specific
information:
1. Name and contact details for the individual making the notification;
2. The nature of the operation/event;
3. The extent of any anticipated effects of the operation/event; and
4. The timing of the operation/event.

The notification shall be given as far in advance as practicable and in writing if there is
sufficient time to do so. If notification is given orally, it shall be recorded by the recipient and
confirmed by the sender in writing at the earliest opportunity.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 47
The following are examples of effects where notification will be required:
1. Where plant is being operated under conditions which presents a hazard to
personnel;
2. Where an alarm or other indication of abnormal operating conditions has been
activated;
3. Breakdowns, faults or temporary changes in performance of plant;
4. Breakdowns of or faults to control or communication equipment or instrumentation;
5. Damage to pipelines; or
6. A Chilled Water leak.

7.7 Contingency Planning and Procedures

This Section covers:


1. The implementation of procedures following an Emergency; and
2. The establishment of communications between the relevant Entities to facilitate
urgent managerial action at all times.

The DC Provider is responsible for coordinating action in the event of a failure which results
in, or may result in, serious, widespread loss or disruption of DC Services.

Where parts of the system are isolated while emergency work is carried out, the DC Provider
shall ensure that parts of the system isolated under these circumstances are minimised and
that maximum integration is achieved with the minimum possible delay.

DC Retailers and Customers shall abide by instructions issued by the DC Provider in the
event of a failure which results in, or may result in, serious, widespread loss or disruption of
DC Services.

If a DC Retailer or Customer is unable to comply with instructions issued by the DC Provider,


the DC Retailer or Customer shall advise the DC Provider accordingly so that the DC
Provider can consider whether to issue revised instructions or provide conditions which
enable the DC Retailer or Customer to comply.

The DC Provider shall advise the affected DC Retailers and Customers when normal
operation has been resumed.

The DC Provider shall initiate and co-ordinate system studies and investigations to enable
emergency plans to be prepared and updated as development of the system takes place.
This plan shall be made available to all DC Retailers and Customers.

A Contingency Plan covering all plausible events in general terms will be developed and
maintained by the DC Provider, in consultation with DC Retailers and Customers connected
to the DC System. The procedure to be used in any particular event, however, will be
determined by the DC Provider at the time.

The Contingency Plan shall include:

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 48
1. Summary Sheet – General information on the contingency plan;
2. Decision Flow Chart – This should identify the process by which actions are selected
for use depending on the failure scenario;
3. A complete set of Record Drawings for all pipe work and fixed installations;
4. Action Plan – Step by step summary of actions to be taken to resolve issues and
reinstate supply;
5. Procedures – Specific details of activities identified in the action plan;
6. Contact Details – details for all personnel who should be contacted whilst
implementing the Contingency Plan; and
7. The date the plan was originally produced, the date it was revised and the version
number.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 49
8. Appendix A -- Key Performance Indicators
8.1 Introduction

This Appendix establishes minimum required levels of operating performance by DC


Providers and DC Retailers.

8.2 Objectives

The Key Performance Indicators (KPIs) are established to ensure minimum levels of
performance relative to:
1. Reliability and service quality for consumers;
2. Efficient use of energy;
3. Sound water management; and
4. Health, safety and environmental protection and compliance.

8.3 Scope

The KPIs are applicable to DC Providers and DC Retailers as summarised in Table 4.

8.4 Compliance Requirement

DC Providers and DC Retailers are required to meet minimum KPI performance levels as
provided herein.

8.5 Compliance Reporting

8.5.1 DC Provider Annual Information Submissions

Each DC Provider must monitor its own performance levels for key activities against all KPIs
and must provide reporting to the Regulator in a DC Provider Annual Information Submission
in the form provided in Appendix B.

Each Annual Information Submission must contain:


1. Key Performance Indicator performance levels;
2. The nature and extent of any failures to meet minimum KPI performance levels
during the reporting period;
3. Explanation of the causes of each failure, if any;
4. Planned corrective actions to prevent recurrence of each failure; and
5. Other information that has been reasonably requested by the Regulator in advance
of Annual Information Submission.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 50
Table 4: Overview of Key Performance Indicators

Entity Key Parameter System Type KPI #s

Reliability
DCP & DCR DC Service Reliability New DC Systems 1

Energy Efficiency
New DC Plants Using Potable Water 2.1 - 2.3
New DC Plants Using Recycled Water 3.1 - 3.3
DCP Electricity Consumption
New DC Plants Using Seawater 4.1 - 4.6
Temporary Plants 5.1 - 5.2
Water Management
Water Consumption for Condenser
New DC Plants 6
Cooling
Water Consumption for Chilled Water
DCP New DC Plants 7
Loop Make-up
Water Quality of Circulating Water in
New DC Plants 8
Cooling Tower
Energy Metering

DCP & DCR Periodic Inspection and Testing Intervals New Meters 9.1 - 9.4

Maximum % of Meters Failing Accuracy


DCP & DCR New Meters 10
Test During Periodic Testing
Customer Complaints and Dispute Resolution
DCP & DCR Customer Complaints Registry All 11.1
DCP & DCR Staffing of Help Desk All 11.2
DCP & DCR Timely Response to Complaints All 11.3
DCP & DCR Resolution of Customer Complaints All 11.4

Notes
DCP means DC Provider.
DCR means DC Retailer.

8.5.2 DC Retailer Annual Information Submissions

Each DC Retailer must monitor its own performance levels for key activities against KPIs 1,
9.1-9.4, 10, and 11.1-11.4, and must provide reporting to the Regulator and to the relevant
DC Provider(s) in a DC Retailer Annual Information Submission in the form provided in
Appendix C.

Each Annual Information Submission must contain:


1. Key Performance Indicator performance levels;

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 51
2. The nature and extent of any failures to meet minimum KPI performance levels
during the reporting period;
3. Explanation of the causes of each failure, if any;
4. Planned corrective actions to prevent recurrence of each failure; and
5. Other information that has been reasonably requested by the Regulator in advance
of Annual Information Submission.

8.5.3 Customer Submission of Data

By December 31 of each Year, Customers served by DC Systems must submit to the DC


Retailer and DC Provider data GFA by Building Type for each Building using DC Service.

8.5.4 Reporting to Estidama and Customers

Within 60 days of submitting the Annual Information Submission, DC Providers shall provide
to Estidama:
1. Data on the Seasonal COP of the DC System; and
2. The following information on each Customer receiving DC Service--
 GFA by Building Type,
 Peak DC Load, and
 Annual Cooling Energy.

8.5.5 Reporting to Customers

Within 60 days of submitting the Annual Information Submission, DC Providers shall provide
to each DC Retailer and Customer data on the Seasonal COP of the DC System.

8.5.6 Non-Compliance

If a DC Provider or DC Retailer is found to be non-compliant with any of the KPIs:


1. The non-compliant Licensed Entity must submit a letter, signed by a responsible
officer of that Entity, with the following information--
a. Identification of the reporting period during which non-compliance occurred,
b. The reported values for the KPI parameter(s) which did not meet the
requirement(s),
c. Discussion of the causes of each failure, and
d. Corrective actions to be implemented and the schedule for such corrective
actions;
2. The non-compliant Entity must submit quarterly update reports until performance is
brought into compliance; and
3. Information about the non-compliance shall be made publically available until such
time that performance is brought into compliance.

Compliance with the KPIs does not absolve the DC Provider or DC Retailer from compliance
with all laws, standards, regulations, and codes applicable to their systems and business
activities.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 52
8.6 Reliability

DC Providers must operate their DC Provider Facilities, and DC Retailers must operate their
DC Retailer Facilities, to minimise Interruption of Service.

A minimum of one week of notification shall be given to Customers, in writing, providing the
date of any Planned Interruption of Service and the expected duration of the Interruption of
Service.

Planned Interruption of Services shall be scheduled during low-load seasons and outside of
Normal Usage Hours whenever possible.

Table 5 provides the minimum required performance level with respect to DC Provider
Service reliability and DC Retailer Service reliability, with the KPI calculated for DC Providers
and DC Retailers as follows:

For DC Providers, the KPI for the Reporting Period2 is calculated as follows:

KPI = SHP
THP - FMP

In which --

 SHP = Number of hours during which DC Provider Services


were available to meet the Cooling Load requirements of all
DC Retailers
 THP = Total number of hours during the Reporting Period.
 FMP = Number of hours during the Reporting Period during
which service to any DC Retailer by DC Provider was
interrupted due to a Force Majeure Event, or due to actions of
a Customer, DC Retailer or other Entity.

For DC Retailers, the KPI for the Reporting Period is calculated as follows:

KPI = SHR
THR - FMR

In which --

2 Reporting Period is the calendar Year for Annual Information Returns or the calendar quarter for follow-up
reporting in case of non-compliance as discussed in Section 8.5.6.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 53
 SHR = Number of hours during which DC Retailer Services
were available to meet the Cooling Load requirements of all
Customers
 THR = Total number of hours during the Reporting Period.
 FMR = Number of hours during the Reporting Period during
which service to any Customer by DC Retailer was interrupted
due to a Force Majeure Event or due to actions of a Customer,
DC Provider or other Entity.

Table 5: KPI 1 -- System Reliability

KPI Level
KPI # (% of
hours)
1 99.5%

8.7 Energy Efficiency

The following KPIs address requirements for minimum annual average energy efficiency. The
KPI is enforced based on maximum kWh/kWhc. However, this requirement can also be stated
as a minimum Seasonal COP, which is the inverse of kWh/kWhc.

KPIs 2.1 – 2.3 (Table 6) shall be in effect for New Plants using Potable Water for Cooling
Tower Make-Up.

KPIs 3.1 – 3.3 (Table 7) shall be in effect for New Plants using Recycled Water for condensing
cooling.

KPIs 4.1 – 4.6 (Table 8) shall be in effect for New Plants using seawater for condensing
cooling.

KPIs 5.1 – 5.2 (Table 9) shall be in effect for Temporary Plants.

Compliance with KPIs 2, 3, 4 and 5 shall be calculated as follows:

KPI = Plant Electricity Consumption in kWh


Cooling Energy (kWhc) produced at the DC Plant(s)

In which Plant Electricity Consumption refers to total annual DC Plant consumption


including chillers, Cooling Towers, process pumps, distribution pumps, HVAC power
and all other auxiliary equipment.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 54
Table 6: KPI 2 -- Electricity Consumption in New Plants Using Potable Water

KPI Level
Maximum Minimum
KPI # TES
kWh/kWhc COP
2.1 CHW 0.25 3.99
2.2 None 0.26 3.85
2.3 Ice 0.34 2.96

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 55
Table 7: KPI 3 -- Electricity Consumption in New Plants Using Recycled Water

KPI Level
Maximum Minimum
KPI # TES
kWh/kWhc COP
3.1 CHW 0.26 3.90
3.2 None 0.27 3.77
3.3 Ice 0.34 2.91

Table 8: KPI 4 -- Electricity Consumption in New Plants Using Seawater

KPI Level
Condenser Cooling Maximum Minimum
KPI # TES
Type kWh/kWhc COP
4.1 Cooling Towers CHW 0.26 3.81
4.2 Cooling Towers None 0.27 3.67
4.3 Cooling Towers Ice 0.35 2.82
4.4 Direct (once-through) CHW 0.27 3.74
4.5 Direct (once-through) None 0.28 3.60
4.6 Direct (once-through) Ice 0.36 2.82

Table 9: KPI 5 -- Electricity Consumption in Temporary Plants

KPI Level
Condenser Cooling Maximum Minimum
KPI # TES
Type kWh/kWhc COP
5.1 Water cooled None 0.36 2.75
5.2 Air cooled None 0.45 2.20

KPIs 2.1 – 2.3, 3.1 – 3.3, and 4.1 – 4.6 shall be in effect after a period of one (1) Year (or
more, at the Regulator’s discretion) after initiation of Commercial Operation.

Energy efficiency KPI requirements for DC Providers utilising unconventional DC Plant


designs (e.g. natural gas chillers) or that otherwise do not fit into the categories listed shall
be established by the Regulator based on the design characteristics of the DC Plant(s).

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 56
8.8 Water Management

KPI 6 (Table 10) provides the required performance level for consumptive use of water for
DC Plants using Potable Water for Cooling Tower Make-Up.3

Compliance with KPI 6 shall be calculated as follows:

KPI = Water Consumption in litres


Cooling Energy (kWhc) produced at the Plant(s)

In which:

 Water Consumption refers to total DC Plant water consumption including


Cooling Tower Make-Up water and auxiliary water uses including domestic
water.

 Cooling Tower Make-Up water is comprised as follows:

Cooling Tower Make-Up water = Blowdown + Drift Loss + evaporation

Table 10: KPI 6 -- Water Consumption for Condenser Cooling Using Potable
Water for Cooling Tower Make-Up

KPI Level -- Max


KPI # Water Source
litres per kWhc
6 Potable Water 2.33

KPI 7 (Table 11) sets the minimum performance level for all New Plants with respect to
Chilled Water Make-Up consumption.

Table 11: KPI 7 -- Water Consumption for Chilled Water Make-Up

KPI Level (Max


KPI #
annual %)
7 2.0%

Compliance with KPI 7 is calculated as follows:

KPI = CHW Make-Up Consumption in litres during the reporting period


Average DC Network CHW total volume in litres during the reporting period

3Note: KPIs for use of RW are not provided because current levels of TDS from most sources in RW in Abu
Dhabi municipality combined with current regulatory discharge limits preclude legal use of RW for DC Systems in
Abu Dhabi.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 57
In which CHW Make-Up Consumption excludes CHW losses due to Planned
Interruption of Services (such as connection of new Buildings) or Force Majeure
Events

KPI 8 (Table 12) sets the required minimum performance level for the quality of water
circulating in Cooling Towers. This requirement is in addition to other requirements that may
be set by permitting authorities.

Table 12: KPI 8 -- Cooling Tower Circulating Water Quality

KPI Level (Legionella


DC Plant Colony Forming Units
KPI #
Type per ml of circulating
water)
8 All 100

8.9 Metering

KPIs 9.1 – 9.4 (Table 13) establish performance levels for the maximum intervals for
Metering Equipment Periodic Inspection and Testing compliant with the provisions of the
District Cooling Metering Code.

Compliance with KPIs 9.1 – 9.4 is calculated as the interval a component of Metering
Equipment (free from known defects) is permitted to be in service between Periodic
Inspection and Testing.

Table 13: KPI 9 -- Metering Equipment Maximum Service Intervals

KPI # Equipment KPI Level (Max years)

9.1 Large flow meters (Q max1 > 3 m 3/h) 5


1 3
9.2 Small flow meters (Q max ≤ 3 m /h) 10
9.3 Temperature sensors 10
9.4 Energy calculator 10

1
Qmax is the maximum permitted CHW flow, according to the manufacturer,
where the flow meter is able to work continuously without exceeding the maximum
pressure drop.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 58
KPI 10 (Table 14) establishes performance levels for the maximum percentage of Meter
components failing to achieve the accuracy requirements of the District Cooling Metering
Code during Periodic Inspection and Testing.

Table 14: KPI 10 -- Maximum Percentage of Meter Components Failing to


Achieve Required Accuracy Level During Period Inspection and Testing

KPI Level (Max % of


Components Failing to Meet
KPI # Equipment
Accuracy Level During
Periodic Testing)

10 All Meter Components 10%

8.10 Customer Complaints and Dispute Resolution

DC Providers and DC Retailers shall certify compliance with KPIs 11.1 – 11.4 in the DC
Provider Annual Information Returns or the DC Retailer Annual Information Submission, as
appropriate, per Appendix B or Appendix C, as appropriate.

KPIs 11.1 -- 11.4 (Table 15) set the required minimum performance levels for customer
complaints and dispute resolution.

Compliance with the KPIs in this Section are calculated by the affirmative reporting of
compliances in the applicable Annual Information Submission.

Table 15: KPI 11 – Customer Complaint and Dispute Resolution

KPI # Annual Information Return Certification KPI Level (minimum)

11.1 Hours per year the Customer Help Desk is manned 8,760 hours/year
11.2 Maintenance of Customer complaint log 100%
11.3 Reporting on follow-up on customer complaints 100%
11.4 Resolution of customer complaints 100%

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 59
9. Appendix B – DC Provider Annual
Information Submission
The following Information shall be submitted to the Regulator by the Licensed Entities by
April 30 of each Year covering performance for the prior calendar Year. Data shall be
provided in each area indicated in grey. Supporting data shall be attached.

9.1 General Information

Input Value
Company Name
Information Return Date
Respondent Name
Respondent Position
Respondent Email
Respondent Phone Number
Information on and Copy of Corporate Insurance

9.2 DC Provider Key Performance Indicator Data

Color Codes for KPI Performance Data Form


Values to be inserted
Weighted average calculations (weighting based on % of annual CHW production)
Other calculations as indicated
Performance requirement met? (Yes or No)

System Reliability
Minimum KPI Level
Performance Level
KPI # DC Plant Type Permitted (% of
Achieved
hours)
1 All 99.5%
Performance Requirement Met?

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 60
Electricity Consumption
Maximum
DC Plant Type as Performance
Condenser Cooling KPI Level
KPI # Water Source TES % of Annual CHW Level Achieved
Type Permitted
Production by Plant Type
(kWh/kWhc)
2.1 Potable Water Cooling Towers CHW 0.25
2.2 Potable Water Cooling Towers None 0.26
2.3 Potable Water Cooling Towers Ice 0.34
3.1 Recycled Water Cooling Towers CHW 0.26
3.2 Recycled Water Cooling Towers None 0.27
3.3 Recycled Water Cooling Towers Ice 0.34
4.1 Seawater Cooling Towers CHW 0.26
4.2 Seawater Cooling Towers None 0.27
4.3 Seawater Cooling Towers Ice 0.35
4.4 Seawater Direct (once-through) CHW 0.27
4.5 Seawater Direct (once-through) None 0.28
4.6 Seawater Direct (once-through) Ice 0.36
5.1 Potable Water Water cooled None 0.36
5.2 N/A Air cooled None 0.45
Weighted Average kWh/kWhc
Performance Requirement Met?
Weighted Average Seasonal COP (inverse of kWh/kWhc)

Water Consumption for Condenser Cooling

Maximum KPI
Condenser Cooling Performance
KPI # Water Source Level Permitted
Type Level Achieved
(litres/kWhc)

6 Potable Water Cooling Towers 2.33


Performance Requirement Met?

Water Consumption for Chilled Water Distribution Make-up

KPI Level (Max Performance


KPI #
annual %) Level Achieved

7 2.0%
Performance Requirement Met?

Cooling Tower Circulating Water Quality


KPI Level
(Legionella Performance Level Achieved
DC Plant
KPI # Colony Forming
Type
Units per ml of 1st 2nd 3rd 4th Annual
circulating water) Quarter Quarter Quarter Quarter Maximum
8 All 100
Performance Requirement Met?

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 61
Maximum KPI
Performance Level
KPI # Equipment Level Permitted
Achieved
(years)
9.1 Flow meter maximum service interval (Q max1 > 3 m 3/hr) 5
9.2 Flow meter maximum service interval (Q max1 ≤ 3 m 3/hr) 10
9.3 Temperature sensor maximum service interval 10
9.4 Energy calculator (Btu meter) maximum service interval 10
Performance Requirements Met?

KPI Level (Max % of


Components Failing to Performance
KPI # Equipment
Meet Accuracy Level Level Achieved
During Periodic Testing)
10 All Meter Components 10%
Performance Requirements Met?

KPI # Annual Information Return Certification KPI Level (minimum)


11.1 Hours per year the Customer Help Desk is manned 8,760 hours/year
11.2 Maintenance of Customer complaint log 100%
11.3 Reporting on follow-up on customer complaints 100%
11.4 Resolution of customer complaints 100%
Performance Requirements Met?

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 62
9.3 DC Provider Additional Data for Each DC System

Input Unit By DC System


Licensed Capacity MWc
Installed Chiller Capacity MWc
Planned Capacity Increase (within next 5 Years) MWc
Potential Additional Capacity Increase MWc
Thermal Energy Storage Volume m3
Thermal Energy Storage Energy Storage Capacity MWhc
Thermal Energy Storage Peak Capacity MWc
Time of Annual Peak Cooling Demand HH/DD/MM/YYYY
Coincident Peak Load MWc
Cooling Energy Production MWhc
Delivered Cooling Energy to Customers MWhc
Total Electricity Consumption kWh
Total Consumption of RW m3
Total Consumption of Potable Water m3
DC Network Length Trench metres
Building Area Serviced (Gross Floor Area) m2 per Building Type
Number of Flow Meters Tested Annual Total
% of Tested Flow Meters Meeting Accuracy Standard %
Number of Flow Meters Replaced Annual Total
Number of Flow Metered Reconditioned Annual Total
Number of Temperature Sensors Tested Annual Total
% of Tested Temp. Sensors Meeting Accuracy Standard %
Number of Temperature Sensors Replaced Annual Total
Number of Energy Calculators Tested Annual Total
% of Tested Calculators Meeting Accuracy Standard %
Number of Energy Calculators Replaced Annual Total

9.4 DC Provider Additional Data for Each DC Plant

Input Unit By DC Plant


Plant Address N/A
Commissioning Date DD/MM/YYYY
Temporary Plant? Yes/No
Licensed Capacity MWc
Installed Chiller Capacity MWc
Planned Capacity Increase (within next 5 Years) MWc
Potential Additional Capacity Increase MWc
Thermal Energy Storage Volume m3
Thermal Energy Storage Energy Storage Capacity MWhc
Thermal Energy Storage Peak Capacity MWc
Coincident Peak Load Demand MWc
Cooling Energy Production MWhc
Electricity Consumption kWh
RW Consumption m3
Potable Water Consumption m3
Refrigerant replaced due to leakage or release during
maintenance – by refrigerant type kg

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 63
9.5 Maintenance Logs (attachments)

1. Preventive maintenance activities completed during the Reporting Period.

2. Preventive maintenance activities planned but not completed during the Reporting
Period.

3. Preventive maintenance activities planned for the following Reporting Period.

9.6 Statements of Compliance (attachments)

1. Statement of Compliance with occupational health and safety laws and regulations.

2. Statement of Compliance with environmental laws and regulations.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 64
10. Appendix C – DC Retailer Annual
Information Submission
The following Information shall be submitted to the Regulator and to the relevant DC
Providers by the Licensed Entities by March 31 of each Year covering performance for the
prior calendar Year. Data shall be provided in each area indicated in grey. Supporting data
shall be attached.

10.1 General Information

Input Value
Company Name
Information Return Date
Respondent Name
Respondent Position
Respondent Email
Respondent Phone Number
Information on and Copy of Corporate Insurance

10.2 DC Retailer Key Performance Indicator Data

Color Codes for KPI Performance Data Form


Values to be inserted
Weighted average calculations (weighting based on % of annual CHW production)
Other calculations as indicated
Performance requirement met? (Yes or No)

System Reliability

Minimum KPI Level Performance


KPI #
Permitted (% of hours) Level Achieved
1 99.5%
Performance Requirement Met?

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 65
Maximum KPI
Performance Level
KPI # Equipment Level Permitted
Achieved
(years)
9.1 Flow meter maximum service interval (Q max1 > 3 m 3/hr) 5
9.2 Flow meter maximum service interval (Q max1 ≤ 3 m 3/hr) 10
9.3 Temperature sensor maximum service interval 10
9.4 Energy calculator (Btu meter) maximum service interval 10
Performance Requirements Met?

KPI Level (Max % of


Components Failing to Performance
KPI # Equipment
Meet Accuracy Level Level Achieved
During Periodic Testing)
10 All Meter Components 10%
Performance Requirements Met?

KPI # Annual Information Return Certification KPI Level (minimum)


11.1 Hours per year the Customer Help Desk is manned 8,760 hours/year
11.2 Maintenance of Customer complaint log 100%
11.3 Reporting on follow-up on customer complaints 100%
11.4 Resolution of customer complaints 100%
Performance Requirements Met?

10.3 DC Retailer Additional Data

Input Unit By DC System


Total Building Area Served (Gross Floor Area) m3
Number of Flow Meters Tested Annual Total
% of Tested Flow Meters Meeting Accuracy Standard %
Number of Flow Meters Replaced Annual Total
Number of Flow Metered Reconditioned Annual Total
Number of Temperature Sensors Tested Annual Total
% of Tested Temp. Sensors Meeting Accuracy Standard %
Number of Temperature Sensors Replaced Annual Total
Number of Energy Calculators Tested Annual Total
% of Tested Calculators Meeting Accuracy Standard %
Number of Energy Calculators Replaced Annual Total

10.4 Maintenance Logs (attachments)

1. Preventive maintenance activities completed during the Reporting Period.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 66
2. Preventive maintenance activities planned but not completed during the Reporting
Period.

3. Preventive maintenance activities planned for the following Reporting Period.

10.5 Statements of Compliance (attachments)

1. Statement of Compliance with occupational health and safety laws and regulations.

2. Statement of Compliance with environmental laws and regulations.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 67
11. Appendix D – Key Health, Safety and
Environmental Documents
The following OSHAD Codes of Practices are considered the key OSHAD Codes of Practice
relevant to DC Systems. This list is not comprehensive, and other Codes of Practice may
apply.

 CoP 1.0 Hazardous Materials-V2.0- February 2012


 CoP 3.0 Occupational Noise-V2.0- February 2012
 CoP 3.1 Vibration-V2.0- February 2012
 CoP 12.0 Prevention and Control of Legionnaires Disease-V2.0- February 2012
 CoP 15.0 Electrical Safety-V2.0- February 2012
 CoP 17.0 Safety Signage and Signals-V2.0- February 2012
 CoP 24.0 Tag-out - Lock-out (Isolation)-V2.0- February 2012
 CoP 26.0 Scaffolding-V2.0- February 2012
 CoP 39.0 Overhead and Underground Services-V2.0- February 2012
 CoP 44.0 Traffic Management and Logistics-V2.0- February 2012
 CoP 45.0 Underwater Activities-V2.0- February 2012
 CoP 46.0 Underground Construction (Tunnels Shafts Cofferdams Piling etc)-V2.0-
February 2012
 CoP 47.0 Machine Guarding-V2.0- February 2012
 CoP 49.0 Compressed Gases and Air-V2.0- February 2012
 CoP 53.0 EHS Management During Construction Work-V2.0- February 2012
 CoP 53.1 EHS Construction Management Plan-V2.0- February 2012
 CoP 55.0 Environmental Management-V2.0- February 2012
 CoP - 27.0 Confined Spaces- V2.01- April 2015
EAD requirements may include, but are not limited to, the following:
 Preliminary Environmental Review, EAD-EQ-PCE-TG-01
 Environmental Impact Assessment, EAD-EQ-PCE-TG-02
 Strategic Environmental Assessment, EAD-EQ-PCE-TG-03
 Terms of Reference, EAD-EQ-PCE-TG-04
 Construction Environmental Management Plan, EAD-EQ-PCE-TG-05

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 68
 Operation Environmental Management Plan, EAD-EQ-PCE-TG-06
 Decommissioning Environmental Management Plan, EAD-EQ-PCE-TG-07
 Leak Detection and Repair Plan, EAD-EQ-PCE-TG-19

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 69
12. Appendix E – District Cooling Connections
and Metering Points
The Energy Transfer Station (ETS) serves as the point of transfer of Cooling Energy from one
Entity to another. The transfer may occur between:
 The DC Provider and DC Retailer;
 The DC Provider and Customer (if the DC Provider also is the DC Retailer); or
 The DC Retailer and Customer.
There are two main types of ETS connections through which Cooling Energy is transferred:
 Indirect Connection, in which Cooling Energy is transferred from one system to another
through a heat exchanger (HEX); or
 Direct Connection, in which Cooling Energy is transferred in CHW conveyed from one
system to another without use of a HEX.
The ETS incorporates the physical boundary for ownership and responsibility for equipment.
Generally, at the ETS the Meter is composed of a flow meter, paired temperature sensors and
an integrator for calculating cooling energy consumption and demand for billing.

Table 16 summarises potential relationships between DC Providers, DC Retailers and


Customers. This table provides abbreviations and color-coding for the subsequent Figures.

Table 17 provides definition of the Point of Delivery and Point of Return under a range of
circumstances.

Figure 1 illustrates the delineation of responsibility for facilities and the Points of Delivery and
Points of Return when the DC Provider is same entity as the DC Retailer. Figure 2 illustrates
the delineation of responsibility for facilities and the Points of Delivery and Points of Return
when the DC Provider and the DC Retailer are different Entities. Existing Meter installations
may differ from the arrangement depicted in the Figures.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 70
Table 16: Overview of Potential Relationships Between DC Provider, DC
Retailer and Customers

Connections Between
Who is the Provider & Retailer &
Scenario
Retailer? Retailer Customer
1.a. Provider Same Entity Indirect
1.b. Provider Same Entity Direct
2.a. Separate Retailer Indirect Indirect
2.b. Separate Retailer Direct Indirect
2.c. Separate Retailer Indirect Direct
2.d. Separate Retailer Direct Direct

Abbreviations and color codes


S Chilled water supply
R Chilled water return
HX Heat exchanger
BS Building system *
M Flow Meter
Ṭ Temperature sensor
Flange
RPOD Point of Delivery (to Retailer)
RPOR Point of Return (to Retailer)
CPOD Point of Delivery (to Customer)
CPOR Point of Return (to Customer)
DC Provider Facilities
DC Retailer Facilities
DC Customer Facilities

* This could be an entire building or individual units within a building.

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 71
Table 17: Definitions of Point of Delivery and Point of Return

Points of Delivery and Return for Service to DC Retailer Points of Delivery and Return for Service to Customer
Point of Delivery to Retailer Point of Return to Retailer Point of Delivery to Customer Point of Return to Customer
Scenario
(RPOD) is defined as: (RPOR) is defined as: (CPOD) is defined as: (CPOR) is defined as:

Supply pipe flange on the Building Return pipe flange on the Building
1.a. (Not applicable) (Not applicable)
DC Provider is Side of the Heat Exchanger Side of the Heat Exchanger
the same as
the DC Point at which supply pipe flange Point at which return pipe flange
Retailer forming part of the DC Provider’s forming part of the DC Provider’s
1.b. (Not applicable) (Not applicable)
Facilities connects with the Building Facilities connects with the Building
System System
Supply pipe flange on the DC Return pipe flange on the DC
Retailer Side of the Heat Retailer Side of the Heat
2.a.
Exchanger(s) forming part of the DC Exchanger(s) forming part of the DC
Provider's Facilities Provider's Facilities Supply pipe flange on the Building Return pipe flange on the Building
Side of the heat exchanger(s) Side of the heat exchanger(s)
Point at which supply pipe flange Point at which return pipe flange connected to the Building System connected to the Building System
forming part of the DC Provider's forming part of the DC Provider's
DC Provider 2.b.
Facilities connects with the DC Facilities connects with the DC
and DC Retailer Facilities Retailer Facilities
Retailer are
separate Supply pipe flange on the DC Return pipe flange on the DC
entities Retailer Side of the Heat Retailer Side of the Heat
2.c.
Exchanger(s) forming part of the DC Exchanger(s) forming part of the DC The point at which the supply pipe The point at which the return pipe
Provider's Facilities Provider's Facilities flange forming part of the DC flange forming part of the DC
Point at which supply pipe flange Point at which return pipe flange Retailer Facilities connects with the Retailer Facilities connects with the
forming part of the DC Provider's forming part of the DC Provider's Building System Building System
2.d.
Facilities connects with the DC Facilities connects with the DC
Retailer Facilities Retailer Facilities

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 72
Figure 1: Points of Delivery and Return When DC Provider is DC Retailer

S CP0D S


HX BS

1.a.

R M CPOR R

S CPOD

BS
1.b.

R CPOR
M

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 73
Figure 2: Points of Delivery and Return When DC Provider and DC Retailer Are
Separate Entities

List of revisions
Revision Date Prepared By Checked by Issued to Approved by
0.0 22 July 2019 DC Project team JS Publication DoE
Page | 74